CN110097807A - Hv cable termination experiment porch - Google Patents
Hv cable termination experiment porch Download PDFInfo
- Publication number
- CN110097807A CN110097807A CN201910293885.1A CN201910293885A CN110097807A CN 110097807 A CN110097807 A CN 110097807A CN 201910293885 A CN201910293885 A CN 201910293885A CN 110097807 A CN110097807 A CN 110097807A
- Authority
- CN
- China
- Prior art keywords
- platform
- cable
- frame
- fixing
- clamp
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B19/00—Teaching not covered by other main groups of this subclass
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Instructional Devices (AREA)
Abstract
本发明公开了一种高压电缆终端实验平台,包括具有若干层操作平台的主体框架、位于底层操作平台下方的线夹固定框架、固定于主体框架顶部的吊装支架,每层操作平台均铺设平台板,其中,底层操作平台上平台板的中心设有电缆通过孔,底层以上操作平台在两相对侧的平台板之间对应电缆通过孔位置设有间隔空间,底层操作平台的侧面设有扶梯,底层以上操作平台的其中一侧面对应间隔空间位置设有爬梯,所述线夹固定框架对应电缆通过孔位置安装有电缆线夹,所述吊装支架对应电缆通过孔位置悬挂有吊钩。本发明可以在多层操作平台上进行操作实验和教学,方便快速,高效,安全的进行操作及各种实验教学,可有效解决不能多人教学及学习的困扰。
The invention discloses a high-voltage cable terminal experiment platform, which comprises a main frame with several layers of operating platforms, a wire clamp fixing frame located below the bottom operating platform, and a hoisting bracket fixed on the top of the main frame, and each layer of operating platforms is laid with platform boards , wherein, the center of the platform plate on the bottom operating platform is provided with a cable passage hole, and the operation platform above the bottom floor is provided with an interval space corresponding to the position of the cable passage hole between the platform plates on two opposite sides, and an escalator is provided on the side of the bottom operating platform, and the bottom floor One of the sides of the above operation platform is provided with a ladder corresponding to the interval space, the cable clamp fixing frame is equipped with a cable clamp corresponding to the cable passing hole, and the lifting bracket is hung with a hook corresponding to the cable passing hole. The invention can carry out operation experiments and teaching on the multi-layer operation platform, convenient, fast, efficient and safe operation and various experimental teachings, and can effectively solve the problem that many people cannot teach and learn.
Description
技术领域technical field
本发明涉及电力系统实验平台。The invention relates to a power system experiment platform.
背景技术Background technique
随着电网规模日益增加,各种有关电缆的制作、操作以及教学实验也随之增多,如何快速、高效、安全的完成教学实验成为当前的迫切需求。同时结合实际情况,电缆终端头基本在户外及高处,不方便教学及实验工作的开展。With the increasing scale of the power grid, the production, operation and teaching experiments of various related cables are also increasing. How to quickly, efficiently and safely complete the teaching experiments has become an urgent need. At the same time, combined with the actual situation, the cable terminals are basically located outdoors and at high places, which is inconvenient for teaching and experimental work.
发明内容Contents of the invention
本发明所要解决的技术问题就是提供一种高压电缆终端实验平台,方便快速、高效、安全的完成电缆的有关实验教学。The technical problem to be solved by the present invention is to provide a high-voltage cable terminal experiment platform, which is convenient, fast, efficient and safe to complete the related experiment teaching of cables.
为解决上述技术问题,本发明采用如下技术方案:高压电缆终端实验平台,包括具有若干层操作平台的主体框架、位于底层操作平台下方的线夹固定框架、固定于主体框架顶部的吊装支架,每层操作平台均铺设平台板,其中,底层操作平台上平台板的中心设有电缆通过孔,底层以上操作平台在两相对侧的平台板之间对应电缆通过孔位置设有间隔空间,底层操作平台的侧面设有扶梯,底层以上操作平台的其中一侧面对应间隔空间位置设有爬梯,所述线夹固定框架对应电缆通过孔位置安装有电缆线夹,所述吊装支架对应电缆通过孔位置悬挂有吊钩。In order to solve the above-mentioned technical problems, the present invention adopts the following technical solutions: the high-voltage cable terminal experiment platform includes a main frame with several layers of operating platforms, a wire clip fixing frame below the bottom operating platform, and a lifting bracket fixed on the top of the main frame. The operation platforms on the first floor are all laid with platform boards, wherein, the center of the platform board on the bottom operation platform is provided with a cable passage hole, and the operation platform above the bottom floor is provided with an interval space corresponding to the position of the cable passage hole between the two opposite side platform boards, and the bottom operation platform An escalator is provided on the side of the operating platform above the bottom floor, and a ladder is provided on one of the sides of the operating platform above the bottom floor corresponding to the space. The clamp fixing frame is equipped with cable clamps corresponding to the cable passage holes. hook.
可选的,所述主体框架包括设于矩形四角的框架立柱以及每层操作平台四边设置的框架横担,所述框架横担的端部上下侧通过角连接座与框架立柱连接,平台板两端连接操作平台其中两平行侧边的框架横担。Optionally, the main frame includes frame columns arranged at the four corners of the rectangle and frame cross arms arranged on the four sides of each operation platform, the upper and lower sides of the ends of the frame cross arms are connected to the frame columns through corner connecting seats, and the two sides of the platform board are connected to the frame columns. A frame cross arm that connects two parallel sides of the operating platform at one end.
可选的,所述框架立柱和框架横担采用铝合金方管,所述角连接座为角铝,所述平台板采用铝板,且主体框架采用热镀锌螺栓连接成整体。Optionally, the frame column and frame cross arm are made of aluminum alloy square tubes, the corner connecting seat is made of angle aluminum, the platform board is made of aluminum plate, and the main frame is connected as a whole with hot-dip galvanized bolts.
可选的,主体框架左右两侧面每侧面的两根框架立柱在底层操作平台下方连接有框架横担,所述线夹固定框架包括与底层操作平台侧面及下方框架横担固定的线夹固定立柱,所述线夹固定立柱连接有至少两根线夹固定横梁且至少两根线夹固定横梁具有高度差,所述电缆线夹固定于线夹固定横梁。Optionally, the two frame uprights on each side of the left and right sides of the main frame are connected with a frame cross arm under the bottom operating platform, and the wire clip fixing frame includes a wire clip fixing upright fixed to the side of the bottom operating platform and the lower frame cross arm , the clamp fixing column is connected with at least two clamp fixing beams and the at least two clamp fixing beams have a height difference, and the cable clamp is fixed to the clamp fixing beams.
可选的,所述框架立柱在底层操作平台下方连接有两个电缆固定层架,两个电缆固定层架具有相互垂直的线夹固定横梁,相互垂直的线夹固定横梁具有高度差且连接有电缆线夹。Optionally, the frame column is connected with two cable fixing shelves below the bottom operating platform, and the two cable fixing shelves have mutually perpendicular wire clip fixing beams, and the mutually perpendicular wire clamp fixing beams have a height difference and are connected with Cable clamp.
可选的,两个电缆固定层架上相互垂直的两线夹固定横梁与框架立柱采用层架套管连接且远离框架立柱的悬空端下方由伸缩支撑杆支撑。Optionally, two cable clamps perpendicular to each other on the two cable fixing shelves are used to connect the fixed crossbeam with the frame column with a shelf sleeve, and the bottom of the suspended end away from the frame column is supported by a telescopic support rod.
可选的,所述线夹固定横梁为铝型材,所述铝型材设有T型槽,所述电缆线夹采用T型螺栓固定于T型槽。Optionally, the clamp fixing beam is an aluminum profile, the aluminum profile is provided with a T-shaped slot, and the cable clamp is fixed to the T-shaped slot with a T-shaped bolt.
可选的,所述吊装支架包括两根呈十字交叉设置的吊装横梁,所述吊钩安装于两根吊装横梁十字交叉位置。Optionally, the hoisting bracket includes two hoisting beams arranged in a cross, and the hook is installed at the cross position of the two hoisting beams.
可选的,所述吊装横梁采用槽铝制造,所述框架立柱的顶端焊接有固定板,所述吊装横梁的两端焊接有安装板,所述安装板与连接板采用固定螺栓连接。Optionally, the hoisting beam is made of channel aluminum, the top of the frame column is welded with a fixing plate, and the two ends of the hoisting beam are welded with a mounting plate, and the mounting plate and the connecting plate are connected by fixing bolts.
可选的,所述框架立柱的底部连接有可调节底座,所述可调节底座连接有可调节水平的水平调节螺栓。Optionally, the bottom of the frame column is connected with an adjustable base, and the adjustable base is connected with a horizontal adjustment bolt that can adjust the level.
本发明采用上述技术方案,具有如下有益效果:The present invention adopts above-mentioned technical scheme, has following beneficial effect:
1、电缆终端培训教学实验平台为2.5米×2.5米方形场地,在底层操作平台下方设置线夹固定框架,且对应电缆通过孔位置安装有电缆线夹,电缆通过电缆线夹固定,并竖直穿过电缆通过孔,也可以通过每层操作品台上间隔空间,因而可以在多层操作平台上进行操作实验和教学,方便快速,高效,安全的进行操作及各种实验教学,可有效解决不能多人教学及学习的困扰。1. The teaching experiment platform for cable terminal training is a 2.5m x 2.5m square site. A cable clamp fixing frame is set under the bottom operating platform, and cable clamps are installed at the positions corresponding to the cable passing holes. The cables are fixed by the cable clamps and vertically Through the cable through hole, it can also pass through the interval space on the operating platform of each layer, so the operation experiment and teaching can be carried out on the multi-layer operation platform, which is convenient, fast, efficient and safe for operation and various experimental teaching, which can effectively solve the problem of Not able to multi-person teaching and learning problems.
2、以高强度铝合金框架为主体,主体框架采用铝型材加工代替普通Q235A钢材,其表面光滑,没有裂纹,凹凸、毛刺、熔渣等缺陷,提高平台的防腐性,大大降低产品重量,又保证了平台的机械强度。2. With high-strength aluminum alloy frame as the main body, the main frame is processed by aluminum profile instead of ordinary Q235A steel. Its surface is smooth without cracks, bumps, burrs, slag and other defects, which improves the anti-corrosion performance of the platform and greatly reduces the product weight. The mechanical strength of the platform is guaranteed.
3、平台连接形式主要采用热镀锌螺栓连接,拆卸式更加方便快捷的安装,降低了施工的难度,加快了施工的速度。3. The connection form of the platform is mainly connected by hot-dip galvanized bolts. The detachable type is more convenient and quick to install, which reduces the difficulty of construction and speeds up the construction.
4、平台顶部安装有吊钩,可起吊重物。4. There is a hook installed on the top of the platform, which can lift heavy objects.
5、底部装有可调节水平的高强度螺栓,有效解决因地面不平整而产生的与实际不符的教学困扰。5. The bottom is equipped with adjustable high-strength bolts, which can effectively solve the teaching problems caused by uneven ground and inconsistent with the actual situation.
6、框架立柱在底层操作平台下方连接有两个电缆固定层架,两个电缆固定层架具有相互垂直的线夹固定横梁,相互垂直的线夹固定横梁具有高度差且连接有电缆线夹,因而可以进行多种多个实验教学和操作,例如制作电缆头。6. The frame column is connected with two cable fixing shelves under the bottom operating platform. The two cable fixing shelves have mutually perpendicular clamp fixing beams. The mutually perpendicular clamp fixing beams have height differences and are connected with cable clamps. Therefore, it is possible to carry out a variety of experimental teaching and operations, such as making cable heads.
7、实验平台外部可以安装防护网,避免在教学过程中的高处坠落危险。7. A protective net can be installed outside the experimental platform to avoid the danger of falling from a high place during the teaching process.
本发明的具体技术方案及其有益效果将会在下面的具体实施方式中结合附图进行详细的说明。The specific technical solutions and beneficial effects of the present invention will be described in detail in the following specific embodiments with reference to the accompanying drawings.
附图说明Description of drawings
下面结合附图和具体实施方式对本发明作进一步描述:The present invention will be further described below in conjunction with accompanying drawing and specific embodiment:
图1为本发明的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of the present invention;
图2为本发明的主视图;Fig. 2 is the front view of the present invention;
图3为本发明的侧视图;Fig. 3 is a side view of the present invention;
图4为电缆线夹固定于线夹固定横梁的示意图;Fig. 4 is a schematic diagram of the cable clamp being fixed on the clamp fixing beam;
图5为电缆线夹固定于与线夹固定立柱连接的线夹固定横梁的示意图;Fig. 5 is a schematic diagram of the cable clamp fixed on the clamp fixing crossbeam connected with the clamp fixing column;
图6为电缆线夹固定于电缆固定层架上线夹固定横梁的示意图。Fig. 6 is a schematic diagram of the cable clamp fixed on the cable clamp fixing crossbeam on the cable fixing shelf.
具体实施方式Detailed ways
如图1至图6所示,高压电缆终端实验平台,包括具有若干层操作平台的主体框架1、位于底层操作平台下方的线夹固定框架、固定于主体框架顶部的吊装支架6,每层操作平台均铺设平台板11,其中,底层操作平台上平台板的中心设有电缆通过孔111,底层以上操作平台在两相对侧的平台板之间对应电缆通过孔位置设有间隔空间,底层操作平台的侧面设有扶梯4,底层以上操作平台的其中一侧面对应间隔空间位置设有爬梯5,所述线夹固定框架对应电缆通过孔位置安装有电缆线夹3,所述吊装支架6对应电缆通过孔位置悬挂有吊钩61。As shown in Figures 1 to 6, the high-voltage cable terminal experiment platform includes a main frame 1 with several layers of operating platforms, a clamp fixing frame located below the bottom operating platform, and a lifting bracket 6 fixed on the top of the main frame. The platforms are all laid with a platform plate 11, wherein the center of the platform plate on the bottom operating platform is provided with a cable passing hole 111, and the operating platform above the bottom layer is provided with a space between the corresponding cable passing hole positions between the platform plates on the two opposite sides. An escalator 4 is provided on the side of the operation platform above the bottom floor, and a ladder 5 is provided on one of the sides of the operation platform above the bottom layer corresponding to the space. The hole position is hung with a hook 61 .
其中,所述主体框架1包括设于矩形四角的框架立柱101以及每层操作平台四边设置的框架横担102,所述框架横担的端部上下侧通过角连接座与框架立柱连接,平台板两端连接操作平台其中两平行侧边的框架横担。所述框架立柱和框架横担采用铝合金方管,所述角连接座为角铝,所述平台板采用铝板,且主体框架采用热镀锌螺栓连接成整体。Wherein, the main body frame 1 includes frame columns 101 arranged at the four corners of a rectangle and frame cross arms 102 arranged on the four sides of each operation platform, the upper and lower sides of the ends of the frame cross arms are connected with the frame columns through corner connecting seats, and the platform board The two ends are connected to the frame cross arm of two parallel sides of the operating platform. The frame column and frame cross arm are made of aluminum alloy square tubes, the corner connecting seat is made of angle aluminum, the platform board is made of aluminum plate, and the main frame is connected as a whole by hot-dip galvanized bolts.
参考图4和图5所示,主体框架左右两侧面每侧面的两根框架立柱在底层操作平台下方连接有框架横担,所述线夹固定框架包括与底层操作平台下方框架横担固定的线夹固定立柱103,所述线夹固定立柱连接有至少两根线夹固定横梁2且至少两根线夹固定横梁具有高度差,所述电缆线夹固定于线夹固定横梁。这里,线夹固定横梁的两端连接支撑座21,支撑座21与线夹固定横梁通过凹凸嵌合结构211嵌合连接,支撑座与线夹固定立柱103采用固定螺栓固定。Referring to Figure 4 and Figure 5, the two frame columns on each side of the left and right sides of the main frame are connected with a frame cross arm under the bottom operating platform, and the wire clip fixing frame includes wires fixed to the frame cross arm under the bottom operating platform. The clamp fixing column 103 is connected with at least two clamp fixing crossbeams 2 and the at least two clamp fixing beams have a height difference, and the cable clamps are fixed to the clamp fixing beams. Here, both ends of the wire clamp fixing beam are connected to the support base 21, and the support base 21 and the wire clamp fixing beam are fitted and connected by a concave-convex fitting structure 211, and the support base and the wire clamp fixing column 103 are fixed by fixing bolts.
为了方便制作更多的电缆终端头或者其他实验教学及操作,以及不用爬上层操作平台即可进行实验教学及操作。参考图6所示,所述框架立柱在底层操作平台下方连接有两个电缆固定层架,两个电缆固定层架具有相互垂直的线夹固定横梁2,相互垂直的线夹固定横梁具有高度差且连接有电缆线夹3,分别用于固定电缆。四根框架立柱各连接两个电缆固定层架,共八个电缆固定层架,在地面上即可进行各种教学实验和操作。In order to facilitate the production of more cable terminals or other experimental teaching and operation, and to carry out experimental teaching and operation without climbing up the operating platform. As shown in Fig. 6, the frame column is connected with two cable fixing shelves below the bottom operating platform, and the two cable fixing shelves have mutually perpendicular wire clip fixing beams 2, and the mutually perpendicular wire clip fixing beams have a height difference In addition, cable clamps 3 are connected, which are respectively used for fixing the cables. Each of the four frame columns is connected to two cable fixing shelves, a total of eight cable fixing shelves, and various teaching experiments and operations can be carried out on the ground.
而且,两个电缆固定层架上相互垂直的两线夹固定横梁与框架立柱采用层架套管连接且远离框架立柱的悬空端下方由伸缩支撑杆22支撑。其中,线夹固定横梁与框架立柱上设有定位孔,套管穿过定位孔,通过伸缩支撑杆22调节高度,可以使线夹固定横梁绕套管旋转并处于水平或者各种倾斜角度,以方便实验教学或者操作。Moreover, the two cable clamps perpendicular to each other on the two cable fixing shelves are connected to the frame column by a shelf sleeve and are supported by telescopic support rods 22 below the free end of the frame column. Wherein, the clamp fixed crossbeam and the frame column are provided with positioning holes, and the casing passes through the positioning hole, and the height is adjusted by the telescopic support rod 22, so that the clamp fixed crossbeam can rotate around the casing and be at a level or various inclination angles, so that It is convenient for experimental teaching or operation.
所述线夹固定横梁2为铝型材,所述铝型材设有T型槽201,所述电缆线夹3采用T型螺栓固定于T型槽,方便固定电缆线夹。The clamp fixing beam 2 is an aluminum profile, and the aluminum profile is provided with a T-shaped slot 201, and the cable clamp 3 is fixed to the T-shaped slot with T-shaped bolts, which is convenient for fixing the cable clamp.
参考图1所示,所述吊装支架6包括两根呈十字交叉设置的吊装横梁,所述吊钩61安装于两根吊装横梁十字交叉位置。所述吊装横梁采用槽铝制造,所述框架立柱的顶端焊接有固定板,所述吊装横梁的两端焊接有安装板,所述安装板与连接板采用固定螺栓连接。吊钩可起吊重物方便进行实验与教学操作。Referring to FIG. 1 , the hoisting bracket 6 includes two hoisting beams arranged in a cross, and the hook 61 is installed at the cross position of the two hoisting beams. The hoisting beam is made of channel aluminum, the top of the frame column is welded with a fixing plate, and the two ends of the hoisting beam are welded with a mounting plate, and the mounting plate and the connecting plate are connected by fixing bolts. The hook can lift heavy objects to facilitate experiments and teaching operations.
另外,所述框架立柱的底部连接有可调节底座13,所述可调节底座连接有可调节水平的水平调节螺栓。有效解决因地面不平整而产生的与实际不符的教学困扰。In addition, the bottom of the frame column is connected with an adjustable base 13, and the adjustable base is connected with a level adjusting bolt that can adjust the level. Effectively solve the teaching problems that are inconsistent with the actual situation caused by uneven ground.
为了保证教学实验过程中的安全,实验平台外部可以安装防护网,避免在教学过程中的高处坠落危险。In order to ensure the safety during the teaching experiment, a protective net can be installed outside the experimental platform to avoid the danger of falling from a high place during the teaching process.
本发明以高强度铝合金框架为主体,主体框架采用铝型材加工代替普通Q235A钢材,其表面光滑,没有裂纹,凹凸、毛刺、熔渣等缺陷,提高平台的防腐性,大大降低产品重量,又保证了平台的机械强度。平台连接形式主要采用热镀锌螺栓连接,拆卸式更加方便快捷的安装,降低了施工的难度,加快了施工的速度。The invention takes the high-strength aluminum alloy frame as the main body, and the main frame is processed by aluminum profiles instead of ordinary Q235A steel. The mechanical strength of the platform is guaranteed. The connection form of the platform is mainly connected by hot-dip galvanized bolts. The detachable type is more convenient and quick to install, which reduces the difficulty of construction and speeds up the construction.
以上所述,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,熟悉该本领域的技术人员应该明白本发明包括但不限于上面具体实施方式中描述的内容。任何不偏离本发明的功能和结构原理的修改都将包括在权利要求书的范围中。The above description is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Those skilled in the art should understand that the present invention includes but is not limited to the content described in the above specific embodiment. Any modifications that do not depart from the functional and structural principles of the present invention will be included in the scope of the claims.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910293885.1A CN110097807A (en) | 2019-04-12 | 2019-04-12 | Hv cable termination experiment porch |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910293885.1A CN110097807A (en) | 2019-04-12 | 2019-04-12 | Hv cable termination experiment porch |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110097807A true CN110097807A (en) | 2019-08-06 |
Family
ID=67444819
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910293885.1A Pending CN110097807A (en) | 2019-04-12 | 2019-04-12 | Hv cable termination experiment porch |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110097807A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110706544A (en) * | 2019-10-24 | 2020-01-17 | 国网山东省电力公司应急管理中心 | A bench and training system for high-altitude rescue training of power transmission lines |
| CN110767014A (en) * | 2019-10-24 | 2020-02-07 | 国网山东省电力公司应急管理中心 | A bench and training system for high-altitude rescue training of distribution lines |
Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202454103U (en) * | 2012-02-09 | 2012-09-26 | 国网技术学院 | Outward training and transmission line overhaul and hot-line work training integrated platform |
| CN104196279A (en) * | 2014-08-22 | 2014-12-10 | 中广核核电运营有限公司 | Comprehensive training scene for nuclear power station personnel security skill |
| CN106097849A (en) * | 2016-08-08 | 2016-11-09 | 国网江苏省电力公司徐州供电公司 | A kind of shunting switch Disintegration overhaul training operation stage apparatus |
| CN106409085A (en) * | 2016-10-18 | 2017-02-15 | 国网福建省电力有限公司 | Power transmission and transformation live working practical-training simulation stand |
| CN206250581U (en) * | 2016-11-11 | 2017-06-13 | 广东金晖隆开关有限公司 | One kind is used for substation cable interlayer |
| CN206422471U (en) * | 2016-11-16 | 2017-08-18 | 孔心悦 | A kind of aluminium alloy cable support |
| CN206538997U (en) * | 2016-10-26 | 2017-10-03 | 中国建筑第八工程局有限公司 | Operating platform |
| CN206805907U (en) * | 2017-02-20 | 2017-12-26 | 上海二十冶建设有限公司 | The experience apparatus of steel construction potential safety hazard |
| CN207624197U (en) * | 2017-08-18 | 2018-07-17 | 上海市南电力工程有限公司 | A kind of wireline operation training platform |
| CN207651992U (en) * | 2017-12-27 | 2018-07-24 | 广东电网有限责任公司江门供电局 | A kind of 110 kv cable outdoor terminal platforms |
| CN109577630A (en) * | 2019-01-09 | 2019-04-05 | 中国长江电力股份有限公司 | Array fast-assembling inspection platform |
| CN210324715U (en) * | 2019-04-12 | 2020-04-14 | 国网浙江省电力有限公司杭州供电公司 | High-strength cable terminal training and teaching experimental platform |
-
2019
- 2019-04-12 CN CN201910293885.1A patent/CN110097807A/en active Pending
Patent Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202454103U (en) * | 2012-02-09 | 2012-09-26 | 国网技术学院 | Outward training and transmission line overhaul and hot-line work training integrated platform |
| CN104196279A (en) * | 2014-08-22 | 2014-12-10 | 中广核核电运营有限公司 | Comprehensive training scene for nuclear power station personnel security skill |
| CN106097849A (en) * | 2016-08-08 | 2016-11-09 | 国网江苏省电力公司徐州供电公司 | A kind of shunting switch Disintegration overhaul training operation stage apparatus |
| CN106409085A (en) * | 2016-10-18 | 2017-02-15 | 国网福建省电力有限公司 | Power transmission and transformation live working practical-training simulation stand |
| CN206538997U (en) * | 2016-10-26 | 2017-10-03 | 中国建筑第八工程局有限公司 | Operating platform |
| CN206250581U (en) * | 2016-11-11 | 2017-06-13 | 广东金晖隆开关有限公司 | One kind is used for substation cable interlayer |
| CN206422471U (en) * | 2016-11-16 | 2017-08-18 | 孔心悦 | A kind of aluminium alloy cable support |
| CN206805907U (en) * | 2017-02-20 | 2017-12-26 | 上海二十冶建设有限公司 | The experience apparatus of steel construction potential safety hazard |
| CN207624197U (en) * | 2017-08-18 | 2018-07-17 | 上海市南电力工程有限公司 | A kind of wireline operation training platform |
| CN207651992U (en) * | 2017-12-27 | 2018-07-24 | 广东电网有限责任公司江门供电局 | A kind of 110 kv cable outdoor terminal platforms |
| CN109577630A (en) * | 2019-01-09 | 2019-04-05 | 中国长江电力股份有限公司 | Array fast-assembling inspection platform |
| CN210324715U (en) * | 2019-04-12 | 2020-04-14 | 国网浙江省电力有限公司杭州供电公司 | High-strength cable terminal training and teaching experimental platform |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110706544A (en) * | 2019-10-24 | 2020-01-17 | 国网山东省电力公司应急管理中心 | A bench and training system for high-altitude rescue training of power transmission lines |
| CN110767014A (en) * | 2019-10-24 | 2020-02-07 | 国网山东省电力公司应急管理中心 | A bench and training system for high-altitude rescue training of distribution lines |
| CN110706544B (en) * | 2019-10-24 | 2021-09-07 | 国网山东省电力公司应急管理中心 | A bench and training system for high-altitude rescue training of power transmission lines |
| CN110767014B (en) * | 2019-10-24 | 2022-05-10 | 国网山东省电力公司应急管理中心 | A bench and training system for high-altitude rescue training of distribution lines |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207847057U (en) | Integrated lifting scaffold attachment system for irregular building | |
| US9279260B2 (en) | Modular panel concrete form for self-lifting concrete form system | |
| CN104577876A (en) | Plug-in hanging basket for live working of helicopter | |
| CN117719646B (en) | A method for assembling and hoisting a modular foremast on a ship | |
| CN206707237U (en) | Cable-stayed type top layer construction platform for elevator installation | |
| CN214995827U (en) | Hanging basket support mechanism on structural beam | |
| CN210324715U (en) | High-strength cable terminal training and teaching experimental platform | |
| CN113550552A (en) | A hanging basket support mechanism on a structural beam and an installation method | |
| CN114412192A (en) | Interlayer complex special-shaped aluminum veneer curtain wall and construction method thereof | |
| CN112031370A (en) | Ceiling installation equipment and construction method thereof | |
| CN214423952U (en) | Structure and integrative attached lift protection platform of fitment | |
| CN110706544A (en) | A bench and training system for high-altitude rescue training of power transmission lines | |
| CN204357138U (en) | Simple steel structure hoisting frame | |
| CN210923267U (en) | Novel precast concrete stair experiment frame | |
| CN209817424U (en) | A mobile adjustable cantilevered operating platform suitable for super-long cantilevered structures | |
| CN214423953U (en) | A steel-aluminum combination attachment type lifting protection platform | |
| CN223813901U (en) | Mounting platform for steel plate shear wall | |
| CN114737735A (en) | Suspension bridge type double-cantilever operation platform | |
| CN216664932U (en) | Building machine hanger connection components | |
| CN214995816U (en) | Lifting scaffold hanging point truss | |
| CN223937594U (en) | A type of construction climbing formwork | |
| CN217518116U (en) | Lifting operation platform for construction of steel structure factory building top layer | |
| CN219259298U (en) | Hanging bracket clamp for surface treatment of steel template | |
| CN218114789U (en) | Indoor and interlayer heavy component hoisting equipment | |
| CN220813762U (en) | Safety operation platform suitable for butt joint assembly of water steel pipe piles |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190806 |