CN107016510A - One kind research and development intermediate item life cycle management system - Google Patents

One kind research and development intermediate item life cycle management system Download PDF

Info

Publication number
CN107016510A
CN107016510A CN201710243871.XA CN201710243871A CN107016510A CN 107016510 A CN107016510 A CN 107016510A CN 201710243871 A CN201710243871 A CN 201710243871A CN 107016510 A CN107016510 A CN 107016510A
Authority
CN
China
Prior art keywords
project
life cycle
unit
generation unit
thing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710243871.XA
Other languages
Chinese (zh)
Inventor
谢清钟
张兴琼
谭菲菲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU ZHICUI ELECTRONIC TECHNOLOGY Co Ltd
Original Assignee
GUANGZHOU ZHICUI ELECTRONIC TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU ZHICUI ELECTRONIC TECHNOLOGY Co Ltd filed Critical GUANGZHOU ZHICUI ELECTRONIC TECHNOLOGY Co Ltd
Priority to CN201710243871.XA priority Critical patent/CN107016510A/en
Publication of CN107016510A publication Critical patent/CN107016510A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Stored Programmes (AREA)

Abstract

The present invention discloses a kind of research and development intermediate item life cycle management system, including:Time quantum, project generation unit, life cycle generation unit, project circulation unit delivers thing generation unit, delivers thing examination & approval unit, profiling unit and prewarning unit.The traditional project management system of contrast, not only creatively proposes the management mode of life cycle, while also project processing circulates, thing examination & approval management is delivered in defect management early warning, and project life cycle early warning intactly combines, and forms a unified entirety.In the life cycle of whole project, pass through the circulation between disparity items state, the task of current project is submitted in corresponding processing human hand, after processing people is disposed, then the stream of items can be gone to another processing people, for processing people, the progress of current project is commented on, task to delivery is handled, and delivers thing document by profiling unit storage, until project processing life cycle latter stage is closed.

Description

One kind research and development intermediate item life cycle management system
Technical field
The present invention relates to a kind of project management system, more particularly to it is a kind of be used to researching and developing class based on the project life cycle Project management system.
Background technology
The project for researching and developing class includes huge number, from major class point, can be divided into software project, and item of hardware supports project Deng from the start to finish of project, being discussed according to the project management method of canonical system, each different life cycle rank should be undergone Section, from the initiation of project to each project of extinction, should all be tracked the management of formula.Life cycle structure is with tree-like for knot Structure, is showed as follows:
A--XXX projects
The B-- project stages
C-- project status
D-- project tasks
E-- project delivery things
Project can include multiple project stages, and each stage can include multiple project status, and each project status can be included Multiple project tasks and delivery thing.In the past traditional project management system is main to be processed as master with affairs circulation, can not be from item Mesh life cycle is tracked to project.
The content of the invention
In order to solve the above-mentioned technical problem, present invention aims at provide a kind of research and development intermediate item life cycle management system System.
A kind of research and development intermediate item life cycle management system of the present invention, it is characterised in that including:
Time quantum, national legal festivals and holidays, perpetual calendar and time adjustment are obtained for networking;
Project generation unit, for generating project framework;
Life cycle generation unit, according to project framework and time calendar generating item purpose life cycle;
Project circulation unit, judges whether to need to circulate to next task or stage one by one according to project framework;
Thing generation unit is delivered, the corresponding delivery thing of the task is generated when each task is completed;
Thing examination & approval unit is delivered, is judged to deliver whether thing passes through according to project standard, and will determine that result is sent to project circulation Unit circulate operation;
Profiling unit, automatic archiving storage is carried out to each delivery thing/task/state/stage of project;
Prewarning unit, date-time early warning is all carried out according to life cycle task/state/stage each to project flow.
Described life cycle generation unit is according to the life cycle of each project of CMMI3 standard productions.
Described life cycle generation unit updates this after project generation unit is modified/adjusted to project framework Purpose life cycle.
A kind of research and development intermediate item life cycle management system of the present invention, the advantage is that, contrast traditional project Management system, not only creatively proposes the management mode of life cycle, while also project processing circulates, defect management is pre- It is alert, thing examination & approval management is delivered, project life cycle early warning intactly combines, and forms a unified entirety.In whole item In purpose life cycle, by the circulation between disparity items state, the task of current project is submitted to corresponding processing people In hand, after processing people is disposed, then the stream of items can be gone to another processing people, be to working as processing people Preceding paragraph purpose progress is commented on, and the task to delivery is handled, and delivers thing document by profiling unit storage, until item Mesh processing life cycle latter stage is closed, and the height of the management of development project improved into a step.
Brief description of the drawings
Fig. 1 is a kind of structural representation for researching and developing intermediate item life cycle management system of the present invention.
Fig. 2 is a kind of schematic flow sheet for researching and developing intermediate item life cycle management system of the present invention.
Embodiment
According to Fig. 1, a kind of research and development intermediate item life cycle management system of the present invention includes:Time quantum, National legal festivals and holidays, perpetual calendar and time adjustment are obtained for networking;Project generation unit, for generating project framework; Life cycle generation unit, according to project framework and time calendar generating item purpose life cycle;Project circulation unit, according to item Mesh framework judges whether to need to circulate to next task or stage one by one;Thing generation unit is delivered, is given birth to when each task is completed Into the corresponding delivery thing of the task;Thing examination & approval unit is delivered, is judged to deliver whether thing passes through according to project standard, and will determine that knot Fruit is sent to project circulation unit circulate operation;Profiling unit, enters to each delivery thing/task/state/stage of project Row automatic archiving is stored;Prewarning unit, when all carrying out the date according to life cycle task/state/stage each to project flow Between early warning.Described life cycle generation unit is according to the life cycle of each project of CMMI3 standard productions;In project generation Unit updates the life cycle of the project after project framework is modified/adjusted.
The operation principle and flow of system of the present invention are as shown in Figure 2:
1st, automatically generate and matching entries life cycle
When research staff starts project and after project generation unit establishment project, life cycle generation unit is soft according to project Part project or item of hardware, and required according to CMMI3 project management, the corresponding Life Cycle of the project is automatically generated to project Phase, comprising each project stage, state and task, delivery thing.
If during grassroot project, being to be carried out in conventional project newly-built, inputting different version numbers, then system automatic identification The project is upgrading project, and life cycle generation unit will update corresponding life according to CMMI3 project management code requirement Cycle.
If grassroot project is brand-new project, the project management code requirement of life cycle generation unit then according to CMMI3 Produce corresponding life cycle.
2nd, according to work calendar, the project plan is calculated automatically
System default provide work calendar it is instant between unit, the automatic legal festivals and holidays for obtaining country are used as the inoperative of system Day, also can artificially it be operated, after work calendar is set, all project plans are then by system automatically according to work calendar It is automatic to calculate.The setting of the project plan can be divided into two kinds:Period, working day.
Period:After the ps in the project that sets each stage and plan Close Date are the period, if In the range of the period of setting, nonworkdays is had all through the ages according to working day, then the working day number of days in the period are then the project The planned time in stage.
Working day:When setting project stage planned time for working day, such as demand stage is 8 working days, then is System is skipped nonworkdays and calculated automatically according to from date and working day number of days, and date current generation calculates will be automatic Next stage is calculated automatically.As second stage setting at the beginning of between for November 14 to November 18, when to first Stage sets November 7 time started, and working day is 7, then system is automatically according to the nonworkdays on work calendar(November 12 Day, November 13), the automatic Close Date for calculating the first stage is November 15, then the Start Date of second stage is then automatic Calculate as November 16 to November 22.
3rd, project task/stage closed loop circulation
Project circulation unit after the completion of each subtask/stage, all judge whether to need to circulate to next task or stage after Continuous work, closed loop circulation ensures the smooth of work and will not omitted any task/stage.
4th, project document is automated
Project is flowed through in journey, according to CMMI3 project management specification, can produce the process management document of many, the friendship of system Pay thing generation unit according to different life cycles automatically generate delivery thing document, deliver thing most contents all by system from Dynamic generation, and submit delivery thing examination & approval unit to be examined, filing storage is then completed by profiling unit.
5th, the active early warning of project
For the project plan, the prewarning unit of system is developed, mainly project manager's project plan is supplied on one's own initiative Warning information, include project plan early warning, document delivery thing examination & approval early warning, defect processing early warning.
Project plan early warning:According to the overall planning time of project, the planned time in each stage, when system automatic decision is each Between point, before it will expire, pass through short message and the form of wechat message, notify project relevant administrative staff.
For those skilled in the art, technical scheme that can be as described above and design, make other each Corresponding change and deformation are planted, and all these change and deformation should all belong to the protection model of the claims in the present invention Within enclosing.

Claims (3)

1. one kind research and development intermediate item life cycle management system, it is characterised in that including:
Time quantum, national legal festivals and holidays, perpetual calendar and time adjustment are obtained for networking;
Project generation unit, for generating project framework;
Life cycle generation unit, according to project framework and time calendar generating item purpose life cycle;
Project circulation unit, judges whether to need to circulate to next task or stage one by one according to project framework;
Thing generation unit is delivered, the corresponding delivery thing of the task is generated when each task is completed;
Thing examination & approval unit is delivered, is judged to deliver whether thing passes through according to project standard, and will determine that result is sent to project circulation Unit circulate operation;
Profiling unit, automatic archiving storage is carried out to each delivery thing/task/state/stage of project;
Prewarning unit, date-time early warning is all carried out according to life cycle task/state/stage each to project flow.
2. system according to claim 1, it is characterised in that described life cycle generation unit is according to CMMI3 standards Produce the life cycle of each project.
3. system according to claim 1, it is characterised in that described life cycle generation unit is in project generation unit The life cycle of the project is updated after project framework is modified/adjusted.
CN201710243871.XA 2017-04-14 2017-04-14 One kind research and development intermediate item life cycle management system Pending CN107016510A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710243871.XA CN107016510A (en) 2017-04-14 2017-04-14 One kind research and development intermediate item life cycle management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710243871.XA CN107016510A (en) 2017-04-14 2017-04-14 One kind research and development intermediate item life cycle management system

Publications (1)

Publication Number Publication Date
CN107016510A true CN107016510A (en) 2017-08-04

Family

ID=59446320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710243871.XA Pending CN107016510A (en) 2017-04-14 2017-04-14 One kind research and development intermediate item life cycle management system

Country Status (1)

Country Link
CN (1) CN107016510A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109960488A (en) * 2019-01-28 2019-07-02 平安科技(深圳)有限公司 APP complete period monitoring method, device, computer equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1629851A (en) * 2003-12-16 2005-06-22 上海汽轮机有限公司 Steam turbine product database management method
CN101676932A (en) * 2008-09-16 2010-03-24 深圳市红旗信息技术有限公司 Electronic monitoring method and system of government-invested construction project
CN103530099A (en) * 2012-07-05 2014-01-22 上海汽车集团股份有限公司 Data development and management system
CN104463503A (en) * 2014-12-29 2015-03-25 机械科学研究总院海西(福建)分院 Intellectual information service system of a new product research and development full life circle based on cloud manufacturing
CN104573991A (en) * 2015-01-28 2015-04-29 携程计算机技术(上海)有限公司 Project process management system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1629851A (en) * 2003-12-16 2005-06-22 上海汽轮机有限公司 Steam turbine product database management method
CN101676932A (en) * 2008-09-16 2010-03-24 深圳市红旗信息技术有限公司 Electronic monitoring method and system of government-invested construction project
CN103530099A (en) * 2012-07-05 2014-01-22 上海汽车集团股份有限公司 Data development and management system
CN104463503A (en) * 2014-12-29 2015-03-25 机械科学研究总院海西(福建)分院 Intellectual information service system of a new product research and development full life circle based on cloud manufacturing
CN104573991A (en) * 2015-01-28 2015-04-29 携程计算机技术(上海)有限公司 Project process management system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
金小敏: "面向汽车产品研发的项目管理系统的研究与实现", 《中国优秀硕士学位论文全文数据库(工程科技II辑)》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109960488A (en) * 2019-01-28 2019-07-02 平安科技(深圳)有限公司 APP complete period monitoring method, device, computer equipment and storage medium

Similar Documents

Publication Publication Date Title
CN103593236B (en) Computer equipment, method and device for scheduling service process
CN108985709A (en) Workflow management method towards more satellite data centers collaboration Remote Sensing Products production
Wang et al. A graph-based ant colony optimization approach for integrated process planning and scheduling
CN107578158A (en) A kind of Order Scheduling optimization method suitable for manufacturing works
CN105956953A (en) Case information distribution system and method
CN109429515A (en) Production line constitutes altering system and production line constitutes variation
CN108734454A (en) Reimbursement processing method and system
CN104199820A (en) Cloud platform MapReduce workflow scheduling optimizing method
Kim et al. Reinforcement learning approach to scheduling of precast concrete production
CN106408162A (en) Product oil pipeline sequence conveying batch control method
CN110275799A (en) Billing and accounting system does not shut down a day method for point of contact snapshot remaining sum
JP2019117454A (en) Production planning support system
CN109242269A (en) Job instruction generation method, device, system, electronic equipment and storage medium
CN107016510A (en) One kind research and development intermediate item life cycle management system
CN114971407A (en) Automatic scheduling control method and system for maintenance plan
JPS59214964A (en) Conversational scheduling system
CN112435077A (en) Sales forecasting method
CN107679635A (en) Client's follow-up method, system and readable storage medium storing program for executing based on priority
CN116934009A (en) Factory scheduling method, device, equipment and storage medium
CN106484792A (en) A kind of data power supply management method for Persistence Layer Framework and device
CN110163518A (en) A kind of production management method
Rose et al. Improving productivity through value stream mapping (VSM): A case study at electrical & electronic company
Şafak et al. A hierarchical approach for solving simultaneous lot sizing and scheduling problem with secondary resources
CN108171440A (en) A kind of hydraulic tube piece management of the processing and production system and method
JP2011048459A (en) System and method for supporting project planning

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170804

RJ01 Rejection of invention patent application after publication