CN107015553A - A kind of Hydropower Unit remote control platform status definition and logic computing method - Google Patents

A kind of Hydropower Unit remote control platform status definition and logic computing method Download PDF

Info

Publication number
CN107015553A
CN107015553A CN201710097003.5A CN201710097003A CN107015553A CN 107015553 A CN107015553 A CN 107015553A CN 201710097003 A CN201710097003 A CN 201710097003A CN 107015553 A CN107015553 A CN 107015553A
Authority
CN
China
Prior art keywords
state
unit
load
control
exit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710097003.5A
Other languages
Chinese (zh)
Other versions
CN107015553B (en
Inventor
曹险峰
于文革
伍志
韩兵
李泽宏
张超
郑丁午
左天才
庞敏
郭晨旭
王鑫
夏安宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING HEHAI NANZI HYDROPOWER AUTOMATION CO Ltd
Guizhou Province Source Electric Power Ltd Co
Original Assignee
NANJING HEHAI NANZI HYDROPOWER AUTOMATION CO Ltd
Guizhou Province Source Electric Power Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING HEHAI NANZI HYDROPOWER AUTOMATION CO Ltd, Guizhou Province Source Electric Power Ltd Co filed Critical NANJING HEHAI NANZI HYDROPOWER AUTOMATION CO Ltd
Priority to CN201710097003.5A priority Critical patent/CN107015553B/en
Publication of CN107015553A publication Critical patent/CN107015553A/en
Application granted granted Critical
Publication of CN107015553B publication Critical patent/CN107015553B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0259Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
    • G05B23/0275Fault isolation and identification, e.g. classify fault; estimate cause or root of failure

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a kind of definition of Hydropower Unit remote control platform status and logic computing method;After present invention addition condition adjudgement priority, decision logic judges successively according to priority of status precedence, when one of state is met, and directly succeeding state is set and is unsatisfactory for, and ensures that eight kinds of states are in mutual exclusion;Addition set state judges that the primary control program primary control program is used for according to set state priority, and set state is judged successively, when meeting certain state, directly follow-up state is set to exit state, it is ensured that unit only has a kind of state to occur;Also change the calculating logic of partial status simultaneously, it is such to be designed to avoid the occurrence of various states while the situation and a kind of state met also ungratified situation, actual operating mode of more fitting, improve the stability and accuracy of platform operation.

Description

A kind of Hydropower Unit remote control platform status definition and logic computing method
Technical field
Be related to Hydropower Unit remote control platform field, particularly a kind of definition of Hydropower Unit remote control platform status and Logic computing method.
Background technology
Water power remote control platform finds that set state decision logic is present certain in Guizhou Province Yuan Ji control deployment implementation processes Problem, sometimes various states meet simultaneously, sometimes one state is also unsatisfactory for, therefore some wrong statistics and state occurs Judged result.
Market in urgent need is according to the decision logic and practical operation situation of former eight kinds of states, and modification condition adjudgement condition is with patrolling Volume, with actual operating mode of more fitting, while avoid the occurrence of various states at the same the situation and a kind of state met not yet The situation of satisfaction;Not the problem of prior art does not also solve such.
The content of the invention
To solve the deficiencies in the prior art, it is an object of the invention to provide a kind of Hydropower Unit remote control platform status Definition and logic computing method, can avoid the occurrence of various states while the situation and a kind of state also ungratified feelings that meet Condition, actual operating mode of more fitting improves the stability and accuracy of platform operation.
In order to realize above-mentioned target, the present invention is adopted the following technical scheme that:
A kind of Hydropower Unit remote control platform status defines method, Hydropower Unit remote control platform status, including:Thing Therefore shut down, inspecting state, communication disruption, scene operation at full capacity, dispatches limited load, equipment limited load, reserve shut-down;Accident Stopped status is defined as:Unit is in generating state, and unit failure stopping signal was sent after 5 minutes and unit is in and shuts down shape State, as accidental shutdown state;Inspecting state is defined as:Machine set outlet circuit interrupter grounding knife is closing position, machine set outlet open circuit Device bilateral disconnecting link a point position, it is artificial put maintenance mark three condition at least one meet, along with control power station, Non- accidental shutdown state, as inspecting state;Communication disruption is orientated as:Power station and collection control communication disruption signal, as communication disruption State;Scene operation is defined as:Control is not accidental shutdown, inspecting state, communication interruption condition in power station, as existing Field operation;It is defined as at full capacity:Control is exerted oneself the two conditions in the maximum technology that collection control, unit reach under current head Meet simultaneously, be at full capacity;Scheduling limited load is defined as:Control does not reach when collection control, unit are in generating state, AGC inputs The two conditions are exerted oneself while it is scheduling limited load to meet to the maximum technology under current head;Equipment limited load is defined For:Control is not put into collection control, unit in generating state, AGC, because of unit Bearing Temperature or the too high original of main transformer temperature Cause, causes to reach that the maximum technology under current head is exerted oneself, as equipment limited load;Reserve shut-down is defined as:It is non-other Seven kinds of states are reserve shut-down.
A kind of foregoing Hydropower Unit remote control platform status defines method, and the condition adjudgement of unit is provided with priority, Condition adjudgement judges successively according to priority precedence, and when one of state is met, directly succeeding state is set to It is unsatisfactory for;Priority order is followed successively by:Accidental shutdown, inspecting state, communication disruption, scene operation, at full capacity, scheduling limit are negative Lotus, equipment limited load, reserve shut-down.
A kind of foregoing Hydropower Unit remote control platform logic computational methods, master control program logical calculated process is: Judge whether to be in accidental shutdown state, if entering accidental shutdown calculating logic in accidental shutdown state, if not sentencing It is disconnected whether to be in inspecting state, if entering inspecting state calculating logic in inspecting state, if not judging whether to be in Communication interruption condition, if entering communication disruption calculating logic in communication interruption condition, if not judging whether in control Whether system power is in power station, if control enters operation calculating logic in scene in power station, if control is not that judgement is in power station No entrance full load condition, if entering calculating logic at full capacity in full load condition, is adjusted if not judging whether to enter Spend limited load state, if entering scheduling limited load calculating logic in scheduling limited load state, if not judge whether into Enter equipment limited load state, if entering equipment limited load calculating logic in equipment limited load state, if not entering standby With shutdown calculating logic.
A kind of foregoing Hydropower Unit remote control platform logic computational methods, accidental shutdown calculating logic includes:If machine Group is not at generating state or compressor emergency shutdown signal is not sent or signal sends unit after postponing 5 minutes and is not on shutting down shape State, and original state is not at accidental shutdown state, then exits;If original state is unit failure stopped status, at unit In after generating state, then removing unit accidental shutdown status indication and recording current time, stop statistics unit accidental shutdown state Time and storehouse is updated the data, update unit failure stopped status unit number of units, sent and exit unit failure stopped status notice Information, then exit;If unit is in generating state and compressor emergency shutdown signal is sent and signal sends unit after postponing 5 minutes and is in and stops Machine state, and script state is in accidental shutdown state, then continues to count unit accidental shutdown state for time and update the data Storehouse, then exit;If unit is in generating state and compressor emergency shutdown signal is sent and signal sends unit after postponing 5 minutes and is in shutdown State, and original state is not at accidental shutdown state, then sets unit failure stopped status to mark and record current time, open The statistics that begins unit accidental shutdown state for time, updates unit failure stopped status unit number of units, updates unit failure stopped status Unit number of times, sends into unit failure stopped status announcement information, then exit.
A kind of foregoing Hydropower Unit remote control platform logic computational methods, inspecting state calculating logic includes:If machine Group control in power station or is not at non-accidental shutdown state or machine set outlet circuit interrupter grounding disconnecting link and not gone out closing position, unit Mouth breaker bilateral isolation switch artificially puts maintenance mark not in a point position, not, and original state is not at unit maintenance state, Then exit;If original state is in unit maintenance state, when control switches to collection control, then unit inspecting state mark is removed And current time is recorded, stop the statistics unit inspecting state time and update the data storehouse, update unit maintenance state unit platform Number, sends and exits unit maintenance state notification message, then exit;If machine set outlet circuit interrupter grounding knife goes out in conjunction position, unit Mouth breaker bilateral disconnecting link is put at least one in maintenance mark three condition in a point position, artificially and met, and control is in electricity Stand, in non-accidental shutdown state, and original state is not at unit maintenance state, then sets unit maintenance status indication and remember Current time is recorded, starts to count the unit inspecting state time, updates unit maintenance state unit number of units, update unit maintenance state Unit number of times, sends into unit maintenance state notification information, then exit;If machine set outlet circuit interrupter grounding knife close position, Machine set outlet breaker bilateral disconnecting link is put at least one in maintenance mark three condition in a point position, artificially and met, and control Power is in power station, in non-accidental shutdown state, and original state is in unit maintenance state, then when continuing to count unit inspecting state Between and update the data storehouse, then exit.
A kind of foregoing Hydropower Unit remote control platform logic computational methods, communication disruption calculating logic includes:First by Signal procedure judges whether communication is interrupted, if centralized control center communicates with power station does not interrupt and be not on communication interruption condition, Then exit;Do not interrupted if centralized control center communicates with power station, and original state is in communication interruption condition, then removes communication disruption Status indication simultaneously records current time, stops the statistics unit communication interruption condition time and updates the data storehouse, updates communication disruption State unit number of units, sends and exits group communication interrupt status announcement information, then exit;If during centralized control center communicates with power station It is disconnected, and communication interruption condition was in originally, continue to count the communication interruption condition time, update the data storehouse, then exit;If in collection control The heart and power station communication disruption, and be not at communication interruption condition originally, then set group communication interrupt status to mark and record and work as The preceding time, start to count the communication interruption condition time, update group communication interrupt status unit number of units, update communication interruption condition Unit number of times, sends into communication interruption condition announcement information, then exit.
A kind of foregoing Hydropower Unit remote control platform logic computational methods, scene operation calculating logic includes:If control System power is not broken state in power station or unit in inspecting state or in accidental shutdown state or in the communications, then directly exits live fortune Row logic judgment;If originally in live running status, when control switches to collection control, then removing Site for Unit run mode mark Remember and record current time, stop the statistics Site for Unit run mode time and update the data storehouse, update Site for Unit operation shape State unit number of units, sends and exits Site for Unit running status announcement information, then exit;If being patrolled originally in live running status Still judge to belong to live running status after collecting program scanning for the second time, then continue to count the scene running status time and update number According to storehouse, then exit;If control power station, unit not in inspecting state, not in accidental shutdown state, not in the communications break shape State, and original state is not live running status, then sets Site for Unit running status to mark and record current time, starts system The Site for Unit running status time is counted, live running status unit number of units is updated, live running status unit number of times is updated, sends Into live running status notification message, then exit;If control is in power station, unit not in inspecting state, not in accidental shutdown State, state of not breaking in the communications, and during original state during live run mode, then continue to count live running status time and more New database, then exit.
A kind of foregoing Hydropower Unit remote control platform logic computational methods, at full capacity calculating logic include:If unit It is not on generating state or control and is not less than maximum power in collection control or current unit load, and original state is not at completely Load condition, then exit;If unit is not on generating state or control is not less than maximum in collection control or current unit load Power, and full load condition was in originally, remove full load condition and mark and record current time, stop statistics full load condition Time simultaneously updates the data storehouse, updates full load condition unit number of units, sends and exit full load condition announcement information, then exit;If Unit is in generating state and control is in collection control and current unit load is more than or equal to maximum power, and original state is in full Load condition, continues to count the full load condition time and updates the data storehouse, then exit;If unit is in generating state and control It is more than or equal to maximum power in collection control and currently unit load, and was not on full load condition originally, full load condition is set Mark and record current time, start to count the full load condition time, update full load condition unit number of units, update shape at full capacity State unit number of times, sends into unit full load condition announcement information, then exit.
A kind of foregoing Hydropower Unit remote control platform logic computational methods, scheduling limited load calculating logic includes:If Unit is not at that generating state or control are not put into collection control or unit AGC or current unit load is more than or equal to most Exert oneself greatly, and original state is not on dispatching limited load generating state, then exits;If unit is not at generating state or control Power is not put into collection control or unit AGC or current unit load is more than or equal to EIAJ, and original state is in and adjusted Limited load generating state is spent, scheduling limited load generating is removed and marks and record current time, stop statistics machine unit scheduling limited load The generating state time simultaneously updates the data storehouse, update scheduling limited load generating state unit number of units, send exit scheduling limited load lead to Know information, then exit;If unit is in generating state and control is in collection control and unit AGC inputs and currently unit load is less than EIAJ, and original state is in scheduling limited load generating state, continues to count the machine unit scheduling limited load generating state time And storehouse is updated the data, then exit;If unit is in generating state and control is in collection control and unit AGC inputs and currently unit is born Lotus is less than EIAJ, but original state is not at dispatching limited load generating state, then sets scheduling limited load to generate electricity mark simultaneously Current time is recorded, starts to count the group scheduling limited load generating state time, scheduling limited load generating state unit number of units is updated, Scheduling limited load generating state unit number of times is updated, is sent into scheduling limited load announcement information, then exit.
A kind of foregoing Hydropower Unit remote control platform logic computational methods, equipment limited load calculating logic includes:If Unit is not at that generating state or control are not exited in collection control or unit AGC or current unit load goes out more than or equal to maximum Power, and be not at equipment limited load state originally, then exit;If unit is not at generating state or control not in collection control or machine Group AGC is not exited or current unit load is more than or equal to EIAJ, and original state is in equipment limited load state, and removing is set Standby limited load status indication simultaneously records current time, stops statistics unit equipment limited load state for time, and updates the data storehouse, more New equipment limited load state unit number of units, sends and exits equipment limited load state notification information, then exit;Generated electricity if unit is in State and control are in collection control and unit AGC is exited and current unit load is less than EIAJ, and original state is in equipment Limited load state, continues to count unit equipment limited load state for time and updates the data storehouse, then exit;If unit is in generating shape State and control are in collection control and unit AGC is exited and current unit load is less than EIAJ, and original state is not at equipment Limited load state, starts to count equipment limited load state for time, more new equipment limited load state unit number of units, more new equipment limit is negative Lotus state unit number of times, sends into equipment limited load state notification information, then exit.
A kind of foregoing Hydropower Unit remote control platform logic computational methods, reserve shut-down calculating logic includes:If machine Any one of group in other seven kinds of states, then exit;If unit meets any one of other seven kinds of states, but original shape State is in reserve shut-down state, then removes reserve shut-down status indication and record current time, stop statistics reserve shut-down state Time simultaneously updates the data storehouse, updates reserve shut-down state unit number of units, sends and exit reserve shut-down state notification information, then move back Go out;If unit meets reserve shut-down state, and original state is in reserve shut-down state, continues to count reserve shut-down state for time And storehouse is updated the data, then exit;If unit meets reserve shut-down state, and original state is not on reserve shut-down state, then Reserve shut-down status indication is set and current time is recorded, starts to count reserve shut-down state for time, updates reserve shut-down state Unit number of units, updates reserve shut-down state unit number of times, sends into unit reserve stopped status announcement information, then exit.
The present invention is advantageous in that:The present invention provides a kind of Hydropower Unit remote control platform status definition and logic Computational methods;After present invention addition condition adjudgement priority, decision logic judges successively according to priority of status precedence, when When one of state is met, directly succeeding state is set and is unsatisfactory for, ensure that eight kinds of states are in mutual exclusion;Add set state Judge that the primary control program primary control program is used for according to set state priority, set state is judged successively, when meeting certain state When, directly follow-up state is set to exit state, it is ensured that unit only has a kind of state to occur;Also change part shape simultaneously The calculating logic of state, it is such to be designed to avoid the occurrence of various states while the situation and a kind of state that meet also are unsatisfactory for Situation, actual operating mode of more fitting, improve platform operation stability and accuracy.
Brief description of the drawings
Fig. 1 is the logic chart of primary control program of the present invention;
Fig. 2 is the logic chart of accidental shutdown of the present invention;
Fig. 3 is the logic chart of inspecting state of the present invention;
Fig. 4 is the logic chart of communication disruption of the present invention;
Fig. 5 is the logic chart of scene operation of the invention;
Fig. 6 is the logic chart of the present invention at full capacity;
Fig. 7 is the logic chart of present invention scheduling limited load;
Fig. 8 is the logic chart of present device limited load;
Fig. 9 is the logic chart of reserve shut-down of the present invention.
Embodiment
Make specific introduce to the present invention below in conjunction with the drawings and specific embodiments.
A kind of Hydropower Unit remote control platform status defines method, Hydropower Unit remote control platform status, including:Thing Therefore shut down, inspecting state, communication disruption, scene operation at full capacity, dispatches limited load, equipment limited load, reserve shut-down;Accident Stopped status is defined as:Unit is in generating state, and unit failure stopping signal was sent after 5 minutes and unit is in and shuts down shape State, as accidental shutdown state;Inspecting state is defined as:Machine set outlet circuit interrupter grounding knife is closing position, machine set outlet open circuit Device bilateral disconnecting link a point position, it is artificial put maintenance mark three condition at least one meet, along with control power station, Non- accidental shutdown state, as inspecting state;Communication disruption is orientated as:Power station and collection control communication disruption signal, as communication disruption State;Scene operation is defined as:Control is not accidental shutdown, inspecting state, communication interruption condition in power station, as existing Field operation;It is defined as at full capacity:Control is exerted oneself the two conditions in the maximum technology that collection control, unit reach under current head Meet simultaneously, be at full capacity;Scheduling limited load is defined as:Control does not reach when collection control, unit are in generating state, AGC inputs The two conditions are exerted oneself while it is scheduling limited load to meet to the maximum technology under current head;Equipment limited load is defined For:Control is not put into collection control, unit in generating state, AGC, because of unit Bearing Temperature or the too high original of main transformer temperature Cause, causes to reach that the maximum technology under current head is exerted oneself, as equipment limited load;Reserve shut-down is defined as:It is non-other Seven kinds of states are reserve shut-down.
The condition adjudgement of unit is provided with priority, and condition adjudgement judges successively according to priority precedence, when wherein one When individual state is met, directly succeeding state is set to be unsatisfactory for;Priority order is followed successively by:Accidental shutdown, inspecting state leads to Letter is interrupted, scene operation, at full capacity, dispatches limited load, equipment limited load, reserve shut-down.
Master control program logical calculated process is:Judge whether to be in accidental shutdown state, if in accidental shutdown state Enter accidental shutdown calculating logic, if not judging whether to be in inspecting state, if entering maintenance in inspecting state Status calculation logic, if not judging whether to be in communication interruption condition, if in communication interruption condition entering in communication Disconnected calculating logic, if not whether judging whether in control in power station, if control enters scene operation in power station Calculating logic, if control is not to judge whether to enter full load condition in power station, if entering in full load condition full negative Lotus calculating logic, if not judging whether to enter scheduling limited load state, if entering scheduling in scheduling limited load state Limited load calculating logic, if not judging whether to enter equipment limited load state, if being to enter in equipment limited load state Equipment limited load calculating logic, if not entering reserve shut-down calculating logic.
Accidental shutdown calculating logic includes:If unit is not at generating state or compressor emergency shutdown signal is not sent or signal hair Go out unit after postponing 5 minutes and be not on stopped status, and original state is not at accidental shutdown state, then exits;If originally State is unit failure stopped status, after unit is in generating state, then removes unit accidental shutdown status indication and record and work as The preceding time, stop statistics unit accidental shutdown state for time and update the data storehouse, update unit failure stopped status unit platform Number, sends and exits unit failure stopped status announcement information, then exit;If unit is in generating state and compressor emergency shutdown signal is sent And signal sends unit after postponing 5 minutes and is in stopped status, and script state is in accidental shutdown state, then continues statistical machine Organize accidental shutdown state for time and update the data storehouse, then exit;If unit be in generating state and compressor emergency shutdown signal send and Signal sends unit after delay 5 minutes and is in stopped status, and original state is not at accidental shutdown state, then sets unit thing Therefore stopped status marks and records current time, start to count unit accidental shutdown state for time, update unit failure and shut down shape State unit number of units, updates unit failure stopped status unit number of times, sends into unit failure stopped status announcement information, then move back Go out.
Inspecting state calculating logic includes:If unit allocation power is not in power station or is not at non-accidental shutdown state or unit Outlet breaker grounding switch not close position, machine set outlet breaker bilateral isolation switch not in a point position, artificially do not put maintenance Mark, and original state is not at unit maintenance state, then exits;If original state is in unit maintenance state, work as control When switching to collection control, then remove unit inspecting state and mark and record current time, stop the statistics unit inspecting state time simultaneously And storehouse is updated the data, unit maintenance state unit number of units is updated, sends and exits unit maintenance state notification message, then exit;If Machine set outlet circuit interrupter grounding knife overhauls mark three in conjunction position, machine set outlet breaker bilateral disconnecting link in a point position, artificial put At least one in individual condition is met, and control is in power station, in non-accidental shutdown state, and original state is not at unit inspection State is repaiied, then unit maintenance status indication is set and current time is recorded, starts to count the unit inspecting state time, updates machine Group inspecting state unit number of units, updates unit maintenance state unit number of times, sends into unit maintenance state notification information, then move back Go out;If machine set outlet circuit interrupter grounding knife overhauls mark in conjunction position, machine set outlet breaker bilateral disconnecting link in a point position, artificial put At least one in three conditions of will is met, and control is in power station, in non-accidental shutdown state, and original state is in unit Inspecting state, then continue to count the unit inspecting state time and update the data storehouse, then exit.
Communication disruption calculating logic includes:First judge whether communication is interrupted by signal procedure, if centralized control center leads to power station Letter does not interrupt and is not on communication interruption condition, then exits;Do not interrupted if centralized control center communicates with power station, and original shape State is in communication interruption condition, then removes communication interruption condition and mark and record current time, stops statistics unit communication disruption State for time simultaneously updates the data storehouse, updates communication interruption condition unit number of units, sends and exits group communication interrupt status notice letter Breath, then exit;If centralized control center and power station communication disruption, and communication interruption condition was in originally, continue to count communication disruption shape The state time, storehouse is updated the data, then exit;If centralized control center and power station communication disruption, and be not at communication interruption condition originally, then Set group communication interrupt status to mark and record current time, start to count the communication interruption condition time, update group communication Interrupt status unit number of units, updates communication interruption condition unit number of times, sends into communication interruption condition announcement information, then move back Go out.
Scene operation calculating logic includes:If control is not or not power station or unit in inspecting state or in accidental shutdown state Or state of breaking in the communications, then directly exit live operation logic and judge;If originally in live running status, when control is cut When shifting to collection control, then remove Site for Unit run mode and mark and record current time, stop the statistics Site for Unit run mode time And storehouse is updated the data, Site for Unit running status unit number of units is updated, sends and exit Site for Unit running status announcement information, Exit again;If still judging to belong to live running status after live running status, logical program scanning for the second time originally, then Continue to count the live running status time and update the data storehouse, then exit;If control power station, unit not inspecting state, Not in accidental shutdown state, state of not breaking in the communications, and original state is not live running status, then sets Site for Unit to transport Row status indication simultaneously records current time, starts to count the Site for Unit running status time, updates live running status unit platform Number, updates live running status unit number of times, sends into live running status notification message, then exit;If control is in electricity Stand, unit not in inspecting state, not in accidental shutdown state, state of not breaking in the communications, and live run mode during original state When, then continue to count the live running status time and update the data storehouse, then exit.
Calculating logic includes at full capacity:Do not born if unit is not on generating state or control in collection control or current unit Lotus is less than maximum power, and original state is not at full load condition, then exits;If unit is not on generating state or control Power is not less than maximum power in collection control or current unit load, and is in full load condition originally, removes full load condition mark And current time is recorded, stop the statistics full load condition time and update the data storehouse, update full load condition unit number of units, send Full load condition announcement information is exited, then is exited;If unit is in generating state and control is in collection control and current unit load More than or equal to maximum power, and original state is in full load condition, continues to count the full load condition time and updates the data storehouse, Exit again;If unit is in generating state and control is in collection control and current unit load is more than or equal to maximum power, and originally Full load condition is not on, sets full load condition to mark and record current time, starts to count the full load condition time, more New full load condition unit number of units, updates full load condition unit number of times, sends into unit full load condition announcement information, then Exit.
Scheduling limited load calculating logic includes:If unit is not at generating state or control not in collection control or unit AGC Do not put into or current unit load is more than or equal to EIAJ, and original state is not on dispatching limited load generating shape State, then exit;Do not put into or current unit load in collection control or unit AGC if unit is not at generating state or control More than or equal to EIAJ, and original state is in scheduling limited load generating state, removes scheduling limited load and generates electricity mark simultaneously Current time is recorded, stops the statistics machine unit scheduling limited load generating state time and updates the data storehouse, scheduling limited load hair is updated Electricity condition unit number of units, sends and exits scheduling limited load announcement information, then exit;If unit is in generating state and control exists Collection control and unit AGC inputs and currently unit load are less than EIAJ, and original state is in scheduling limited load generating state, Continue to count the machine unit scheduling limited load generating state time and update the data storehouse, then exit;If unit is in generating state and control System power is in collection control and unit AGC inputs and current unit load is less than EIAJ, but original state is not at dispatching limited load Generating state, then set scheduling limited load to generate electricity and mark and record current time, start to count group scheduling limited load generating state Time, scheduling limited load generating state unit number of units is updated, update scheduling limited load generating state unit number of times, sent to enter and adjust Limited load announcement information is spent, then is exited.
Equipment limited load calculating logic includes:If unit is not at generating state or control not in collection control or unit AGC Do not exit or current unit load is more than or equal to EIAJ, and be not at equipment limited load state originally, then exit;If unit It is not at that generating state or control are not exited in collection control or unit AGC or current unit load is more than or equal to EIAJ, And original state is in equipment limited load state, removes equipment limited load status indication and record current time, stop statistical machine Group equipment limited load state for time, and update the data storehouse, more new equipment limited load state unit number of units sends that to exit equipment limit negative Lotus state notification information, then exit;If unit is in generating state and control is controlled in collection and unit AGC is exited and current unit Load is less than EIAJ, and original state is in equipment limited load state, continues to count unit equipment limited load state for time And storehouse is updated the data, then exit;If unit is in generating state and control is in collection control and unit AGC is exited and current unit is born Lotus is less than EIAJ, and original state is not at equipment limited load state, starts to count equipment limited load state for time, updates Equipment limited load state unit number of units, more new equipment limited load state unit number of times is sent into equipment limited load state notifying Information, then exit.
Reserve shut-down calculating logic includes:If unit is in any one of other seven kinds of states, exit;If unit is expired Any one of the other seven kinds of states of foot, but original state is in reserve shut-down state, then removes reserve shut-down status indication simultaneously Current time is recorded, stops statistics reserve shut-down state for time and updates the data storehouse, reserve shut-down state unit number of units, hair is updated Go out to exit reserve shut-down state notification information, then exit;If unit meets reserve shut-down state, and original state is in standby stop Machine state, continues to count reserve shut-down state for time and updates the data storehouse, then exit;If unit meets reserve shut-down state, and Original state is not on reserve shut-down state, then sets reserve shut-down status indication and record current time, start statistics standby The stopped status time is used, reserve shut-down state unit number of units is updated, reserve shut-down state unit number of times is updated, sends and enter unit Reserve shut-down state notification information, then exit.
Eight kinds of condition adjudgement conditional sum logics are as shown in the table:
The present invention provides a kind of Hydropower Unit remote control platform status definition and logic computing method;Present invention addition shape State judges after priority that decision logic judges successively according to priority of status precedence, when one of state is met, directly Connect succeeding state to set and be unsatisfactory for, ensure that eight kinds of states are in mutual exclusion;Addition set state judges the primary control program master control journey Sequence is used for according to set state priority, and set state is judged successively, when meeting certain state, directly follow-up state is set It is set to the state of exiting, it is ensured that unit only has a kind of state to occur;The calculating logic of partial status is also changed simultaneously, it is such to set Meter can avoid the occurrence of various states while the situation and a kind of state also ungratified situation that meet, actual fortune of more fitting Row operating mode, improves the stability and accuracy of platform operation.
1) priority is added
Add after condition adjudgement priority, decision logic judges successively according to priority of status precedence, when wherein one When individual state is met, directly succeeding state is set and is unsatisfactory for, ensure that eight kinds of states are in mutual exclusion.
2) addition set state judges primary control program
The primary control program is used for according to set state priority, set state is judged successively, when meeting certain state, directly Connect and follow-up state is set to exit state, it is ensured that unit only has a kind of state to occur.
3) partial status change explanation
Accidental shutdown:When accidental shutdown judges, no matter whether control is in collection control, as long as having accident resultant signal and machine Group is in non-shutdown state, is regarded as accidental shutdown, it is to avoid originally control can not judge accidental shutdown problem at existing ground.
At full capacity:Do not repartition whether AGC has been put into, as long as control is controlled in collection and unit is reached under current head Maximum technology exert oneself and be considered as having reached oepration at full load state.
Dispatch limited load:After collection control puts into operation, dispatch command is assigned generally by AGC, therefore scheduling limited load must AGC input states must be considered.
Equipment limited load:During general device input collection control control, it should may be at full hair-like state, therefore as unit AGC Exit, due to the influence of unit self reason, and the maximum technology that is not reaching under current head of unit can be sentenced when exerting oneself It is set to equipment limited load.
The basic principles, principal features and advantages of the present invention have been shown and described above.The technical staff of the industry should Understand, the invention is not limited in any way for above-described embodiment, it is all to be obtained by the way of equivalent substitution or equivalent transformation Technical scheme, all falls within protection scope of the present invention.

Claims (10)

1. a kind of Hydropower Unit remote control platform status defines method, it is characterised in that Hydropower Unit is in remote control platform State definition, including:Accidental shutdown, inspecting state, communication disruption, scene operation at full capacity, dispatches limited load, equipment limit Load, reserve shut-down totally eight kinds of states;Wherein accidental shutdown state is defined as:Unit is in generating state, and unit failure shuts down letter Number send after 5 minutes and unit is in stopped status, as accidental shutdown state;Inspecting state is defined as:Machine set outlet breaks Road device earthing is being closed during position, machine set outlet breaker bilateral disconnecting link put maintenance mark three condition in a point position, artificially extremely A rare satisfaction, along with control is in power station, as non-accidental shutdown state, inspecting state;Communication disruption is orientated as:Power station With collection control communication disruption signal, as communication interruption condition;Scene operation is defined as:Control is not that accident is stopped in power station Machine, inspecting state, communication interruption condition, are scene operation;It is defined as at full capacity:Control reaches in collection control, unit to be worked as Maximum technology under preceding head the two conditions of exerting oneself are met simultaneously, are at full capacity;Scheduling limited load is defined as:Control exists Collection is controlled, maximum technology of the unit in generating state, AGC inputs not up under current head is exerted oneself, and the two conditions are met simultaneously As dispatch limited load;Equipment limited load is defined as:Control is not put into collection control, unit in generating state, AGC, because of unit axle The reason for holding too high temperature or too high main transformer temperature, causes to reach that the maximum technology under current head is exerted oneself, as equipment Limited load;Reserve shut-down is defined as:Other non-seven kinds of states are reserve shut-down.
2. a kind of Hydropower Unit remote control platform status according to claim 1 defines method, it is characterised in that unit Condition adjudgement be provided with priority, condition adjudgement judges successively according to priority precedence, when one of state is met, Directly succeeding state is set to be unsatisfactory for;Priority order is followed successively by:Accidental shutdown, inspecting state, communication disruption, scene fortune OK, at full capacity, limited load, equipment limited load, reserve shut-down are dispatched.
3. a kind of Hydropower Unit remote control platform logic computational methods according to claim 2, it is characterised in that master control Processing procedure sequence logical calculated process is:Judge whether to be in accidental shutdown state, if in accidental shutdown state into accident stopping Machine calculating logic, if not judge whether to be in inspecting state, if entering inspecting state calculating logic in inspecting state, If not judge whether to be in communication interruption condition, if entering communication disruption calculating logic in communication interruption condition, if It is not whether to judge whether in control in power station, if control enters operation calculating logic in scene in power station, if control System power is not to judge whether to enter full load condition in power station, if entering calculating logic at full capacity in full load condition, if It is not to judge whether to enter scheduling limited load state, is patrolled if being calculated in scheduling limited load state into scheduling limited load Volume, if not judging whether to enter equipment limited load state, if entering equipment limited load meter in equipment limited load state Logic is calculated, if not entering reserve shut-down calculating logic.
4. a kind of Hydropower Unit remote control platform logic computational methods according to claim 3, it is characterised in that above-mentioned Accidental shutdown calculating logic includes:If unit is not at generating state or compressor emergency shutdown signal is not sent or signal sends delay 5 Unit is not on stopped status after minute, and original state is not at accidental shutdown state, then exits;If original state is machine Group accidental shutdown state, after unit is in generating state, then removes unit accidental shutdown status indication and records current time, stop Only count unit accidental shutdown state for time and update the data storehouse, update unit failure stopped status unit number of units, send and move back Go out unit failure stopped status announcement information, then exit;If unit is in generating state and compressor emergency shutdown signal is sent and signal is sent out Go out unit after postponing 5 minutes and be in stopped status, and script state is in accidental shutdown state, then continues statistics unit failure and stop Machine state for time and storehouse is updated the data, then exited;If unit is in generating state and compressor emergency shutdown signal is sent and signal is sent Unit is in stopped status after postponing 5 minutes, and original state is not at accidental shutdown state, then sets unit failure to shut down shape State marks and records current time, starts to count unit accidental shutdown state for time, updates unit failure stopped status unit platform Number, updates unit failure stopped status unit number of times, sends into unit failure stopped status announcement information, then exit.
5. a kind of Hydropower Unit remote control platform logic computational methods according to claim 3, it is characterised in that above-mentioned Inspecting state calculating logic includes:If unit allocation power in power station or is not at non-accidental shutdown state or machine set outlet open circuit Device grounding switch does not artificially put maintenance mark not in a point position, not in conjunction position, machine set outlet breaker bilateral isolation switch, and former Carry out state and be not at unit maintenance state, then exit;If original state is in unit maintenance state, when control switches to collection control When, then remove unit inspecting state and mark and record current time, stop the statistics unit inspecting state time and update the data Storehouse, updates unit maintenance state unit number of units, sends and exit unit maintenance state notification message, then exit;If machine set outlet breaks Road device earthing is being closed during position, machine set outlet breaker bilateral disconnecting link put maintenance mark three condition in a point position, artificially extremely A rare satisfaction, and control is in power station, in non-accidental shutdown state, and original state is not at unit maintenance state, then Unit maintenance status indication is set and current time is recorded, starts to count the unit inspecting state time, updates unit maintenance shape State unit number of units, updates unit maintenance state unit number of times, sends into unit maintenance state notification information, then exit;If machine Group outlet breaker earthing overhauls mark three in conjunction position, machine set outlet breaker bilateral disconnecting link in a point position, artificial put At least one in condition is met, and control is in power station, in non-accidental shutdown state, and original state is in unit maintenance shape State, then continue to count the unit inspecting state time and update the data storehouse, then exit.
6. a kind of Hydropower Unit remote control platform logic computational methods according to claim 3, it is characterised in that above-mentioned Communication disruption calculating logic includes:First judge whether communication is interrupted by signal procedure, if centralized control center is communicated with power station without in Break and be not on communication interruption condition, then exit;Do not interrupted if centralized control center communicates with power station, and original state is in and led to Believe interrupt status, then remove communication interruption condition and mark and record current time, stop the statistics unit communication interruption condition time And storehouse is updated the data, communication interruption condition unit number of units is updated, sends and exits group communication interrupt status announcement information, then move back Go out;If centralized control center and power station communication disruption, and communication interruption condition was in originally, continue to count the communication interruption condition time, Storehouse is updated the data, then is exited;If centralized control center and power station communication disruption, and be not at communication interruption condition originally, then machine is set Group communication interruption condition marks and records current time, starts to count the communication interruption condition time, updates group communication and interrupts shape State unit number of units, updates communication interruption condition unit number of times, sends into communication interruption condition announcement information, then exit.
7. a kind of Hydropower Unit remote control platform logic computational methods according to claim 3, it is characterised in that above-mentioned Scene operation calculating logic includes:If control is not or not power station or unit in inspecting state or in accidental shutdown state or in communication Interrupt status, then directly exit live operation logic and judge;If originally in live running status, when control switches to collection control When, then remove Site for Unit run mode and mark and record current time, stop the statistics Site for Unit run mode time and update Database, updates Site for Unit running status unit number of units, sends and exit Site for Unit running status announcement information, then exit; If still judging to belong to live running status after live running status, logical program scanning for the second time originally, then continue to unite The meter live running status time simultaneously updates the data storehouse, then exit;If control is in power station, unit not in inspecting state, not in thing Therefore stopped status, state of not breaking in the communications, and original state is not live running status, then sets Site for Unit running status Mark and record current time, start to count the Site for Unit running status time, update live running status unit number of units, update Live running status unit number of times, sends into live running status notification message, then exit;If control is in power station, unit Not in inspecting state, not in accidental shutdown state, state of not breaking in the communications, and during original state during live run mode, then after The continuous statistics live running status time simultaneously updates the data storehouse, then exit.
8. a kind of Hydropower Unit remote control platform logic computational methods according to claim 3, it is characterised in that above-mentioned Calculating logic includes at full capacity:It is not less than most in collection control or current unit load if unit is not on generating state or control Big power, and original state is not at full load condition, then exits;If unit is not on generating state or control not in collection Control or current unit load are less than maximum power, and are in full load condition originally, remove full load condition and mark and record and work as The preceding time, stop the statistics full load condition time and update the data storehouse, update full load condition unit number of units, send to exit and completely bear Lotus state notification information, then exit;If unit is in generating state and control is in collection control and currently unit load is more than or equal to Maximum power, and original state is in full load condition, continues to count the full load condition time and updates the data storehouse, then exits; If unit is in generating state and control is in collection control and current unit load is more than or equal to maximum power, and is not on originally Full load condition, sets full load condition to mark and record current time, starts to count the full load condition time, updates at full capacity State unit number of units, updates full load condition unit number of times, sends into unit full load condition announcement information, then exit.
9. a kind of Hydropower Unit remote control platform logic computational methods according to claim 3, it is characterised in that above-mentioned Scheduling limited load calculating logic includes:Do not put into collection control or unit AGC if unit is not at generating state or control Or current unit load is more than or equal to EIAJ, and original state is not on dispatching limited load generating state, then exits; If unit is not at, generating state or control are not put into collection control or unit AGC or current unit load is more than or equal to EIAJ, and original state is in scheduling limited load generating state, when removing scheduling limited load generating marks and records current Between, stop the statistics machine unit scheduling limited load generating state time and update the data storehouse, update scheduling limited load generating state unit Number of units, sends and exits scheduling limited load announcement information, then exit;If unit is in generating state and control is in collection control and unit AGC is put into and current unit load is less than EIAJ, and original state is in scheduling limited load generating state, continues statistical machine The group scheduling limited load generating state time simultaneously updates the data storehouse, then exit;If unit is in generating state and control is controlled in collection And unit AGC is put into and current unit load is less than EIAJ, but original state is not at dispatching limited load generating state, then Set scheduling limited load to generate electricity to mark and record current time, start to count the group scheduling limited load generating state time, update and adjust Limited load generating state unit number of units is spent, scheduling limited load generating state unit number of times is updated, sends into scheduling limited load and leads to Know information, then exit.
10. a kind of Hydropower Unit remote control platform logic computational methods according to claim 3, it is characterised in that on Stating equipment limited load calculating logic includes:Do not exited in collection control or unit AGC if unit is not at generating state or control Or current unit load is more than or equal to EIAJ, and equipment limited load state is not at originally, then exited;If unit is not at Generating state or control are not exited in collection control or unit AGC or current unit load is more than or equal to EIAJ, and originally State is in equipment limited load state, removes equipment limited load status indication and records current time, stops statistics unit equipment Limited load state for time, and storehouse is updated the data, more new equipment limited load state unit number of units sends and exits equipment limited load state Announcement information, then exit;If unit is in generating state and control is in collection control and unit AGC is exited and current unit load is small In EIAJ, and original state is in equipment limited load state, continues to count unit equipment limited load state for time and updates Database, then exit;If unit is in generating state and control is in collection control and unit AGC is exited and current unit load is less than EIAJ, and original state is not at equipment limited load state, starts to count equipment limited load state for time, more new equipment limit Load condition unit number of units, more new equipment limited load state unit number of times, send into equipment limited load state notification information, then Exit;Above-mentioned reserve shut-down calculating logic includes:If unit is in any one of other seven kinds of states, exit;If unit Any one of other seven kinds of states is met, but original state is in reserve shut-down state, then removes reserve shut-down status indication And current time is recorded, stop statistics reserve shut-down state for time and update the data storehouse, update reserve shut-down state unit number of units, Send and exit reserve shut-down state notification information, then exit;If unit meets reserve shut-down state, and original state is in standby Stopped status, continues to count reserve shut-down state for time and updates the data storehouse, then exit;If unit meets reserve shut-down state, And original state is not on reserve shut-down state, then reserve shut-down status indication is set and current time is recorded, starts statistics Reserve shut-down state for time, updates reserve shut-down state unit number of units, updates reserve shut-down state unit number of times, sends and enter machine Group reserve shut-down state notification information, then exit.
CN201710097003.5A 2017-02-22 2017-02-22 A kind of Hydropower Unit remote control platform logic computational methods Active CN107015553B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710097003.5A CN107015553B (en) 2017-02-22 2017-02-22 A kind of Hydropower Unit remote control platform logic computational methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710097003.5A CN107015553B (en) 2017-02-22 2017-02-22 A kind of Hydropower Unit remote control platform logic computational methods

Publications (2)

Publication Number Publication Date
CN107015553A true CN107015553A (en) 2017-08-04
CN107015553B CN107015553B (en) 2018-03-27

Family

ID=59439794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710097003.5A Active CN107015553B (en) 2017-02-22 2017-02-22 A kind of Hydropower Unit remote control platform logic computational methods

Country Status (1)

Country Link
CN (1) CN107015553B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106815778A (en) * 2017-01-10 2017-06-09 南京河海南自水电自动化有限公司 A kind of water power remote control exchange method based on driving cabin display pattern

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090240378A1 (en) * 2006-11-30 2009-09-24 Yao Jiangang Concentrating control method of generating sets for grid energy saving and reduction of so2 discharge
CN102915026A (en) * 2012-11-14 2013-02-06 成都阜特科技股份有限公司 Centralized control system of wind power plant
CN103670921A (en) * 2013-11-11 2014-03-26 北京能高自动化技术股份有限公司 Wind generating set intelligent condition monitoring system
US20150008740A1 (en) * 2007-09-19 2015-01-08 Briggs And Stratton Corporation Power monitoring system
CN104331631A (en) * 2014-11-21 2015-02-04 国家电网公司 Remote diagnosis and decision method for running state of hydroelectric generating set
CN104483963A (en) * 2014-11-21 2015-04-01 国家电网公司 Method for performing remote analysis and diagnosis decision-making on operation state at bearing bushing temperature of hydroelectric generating set
CN105007041A (en) * 2015-07-24 2015-10-28 南京华盾电力信息安全测评有限公司 Photovoltaic power generator set performance monitoring method based on eight states
CN204989940U (en) * 2015-07-24 2016-01-20 南京华盾电力信息安全测评有限公司 Centralized control system based on monitoring of eight states of generating set

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090240378A1 (en) * 2006-11-30 2009-09-24 Yao Jiangang Concentrating control method of generating sets for grid energy saving and reduction of so2 discharge
US20150008740A1 (en) * 2007-09-19 2015-01-08 Briggs And Stratton Corporation Power monitoring system
CN102915026A (en) * 2012-11-14 2013-02-06 成都阜特科技股份有限公司 Centralized control system of wind power plant
CN103670921A (en) * 2013-11-11 2014-03-26 北京能高自动化技术股份有限公司 Wind generating set intelligent condition monitoring system
CN104331631A (en) * 2014-11-21 2015-02-04 国家电网公司 Remote diagnosis and decision method for running state of hydroelectric generating set
CN104483963A (en) * 2014-11-21 2015-04-01 国家电网公司 Method for performing remote analysis and diagnosis decision-making on operation state at bearing bushing temperature of hydroelectric generating set
CN105007041A (en) * 2015-07-24 2015-10-28 南京华盾电力信息安全测评有限公司 Photovoltaic power generator set performance monitoring method based on eight states
CN204989940U (en) * 2015-07-24 2016-01-20 南京华盾电力信息安全测评有限公司 Centralized control system based on monitoring of eight states of generating set

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨贤: "面向智能水电站的远程监测与分析系统", 《中国博士学位论文全文数据库 工程科技II辑》 *
陈国旗: "风电场集控中心综合管理平台远程监控系统的设计与实现", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106815778A (en) * 2017-01-10 2017-06-09 南京河海南自水电自动化有限公司 A kind of water power remote control exchange method based on driving cabin display pattern

Also Published As

Publication number Publication date
CN107015553B (en) 2018-03-27

Similar Documents

Publication Publication Date Title
CN105116291B (en) A kind of fault diagnosis system and method based on operation of power networks stable state monitoring information
CN107506849A (en) A kind of intelligent optimization distribution transforming, which has a power failure, studies and judges system
CN111332341B (en) Realization method for entering route handling of centralized control station based on CTC3.0
CN109510227B (en) Method and device for determining steady-state voltage of converter station bus after direct-current blocking
CN111768076A (en) Monitoring alarm signal clustering method taking power grid event as center
CN103326467A (en) Protection action report implementation method based on information protection main station device recorded information
CN112763846A (en) Multi-data source information fusion-based intelligent power failure judgment method for distribution line
CN105158647A (en) Single station end fault diagnosis and auxiliary decisionmaking method based on power supply monitoring system
CN105527541A (en) Method for judging power distribution line fault tripping
CN103227662A (en) Safety detection method and system of electric power communication equipment based on state control
CN110221183A (en) Distribution Network Failure method for early warning and system towards non-power distribution automation overlay area
CN107015553B (en) A kind of Hydropower Unit remote control platform logic computational methods
CN112529445A (en) Scheduling power failure and recovery condition anti-misoperation method and system based on artificial intelligence
CN113472074A (en) Intelligent fault handling method and system for intelligent power grid dispatching control system
CN103208089B (en) Electric network intelligent scheduling system and method based on mode identification technology
CN104135079A (en) Failure processing method for intelligent power distribution network comprising distributed power supply
CN111049131A (en) Method and system for generating regional power grid online fault disposal plan
CN108694447B (en) Equipment maintenance method and device based on power dispatching maintenance data
CN106026047A (en) Optimized control method of high-reliability distribution automation based on multi-source coordination and cooperation
CN202679073U (en) HP-9000 type switching station fault processing system
CN114626440A (en) Monitoring signal objectification analysis method and device
CN110661231B (en) Data processing method during fault recovery based on master station SOE information processing
CN114094594A (en) Transformer substation direct current load grading control method and device and terminal equipment
CN109299876B (en) Method and system for generating and issuing risk information of power grid N-1
CN111786383A (en) Spare power automatic switching device and method for realizing mutual backup of multiple power incoming lines

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant