CN107014696A - Beams of concrete Indirect Loaded experimental rig - Google Patents

Beams of concrete Indirect Loaded experimental rig Download PDF

Info

Publication number
CN107014696A
CN107014696A CN201710361708.3A CN201710361708A CN107014696A CN 107014696 A CN107014696 A CN 107014696A CN 201710361708 A CN201710361708 A CN 201710361708A CN 107014696 A CN107014696 A CN 107014696A
Authority
CN
China
Prior art keywords
steel
ear
distribution device
girder
test beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710361708.3A
Other languages
Chinese (zh)
Inventor
曹霞
陈逸聪
金奇志
张金丹
张士保
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guilin University of Technology
Original Assignee
Guilin University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guilin University of Technology filed Critical Guilin University of Technology
Priority to CN201710361708.3A priority Critical patent/CN107014696A/en
Publication of CN107014696A publication Critical patent/CN107014696A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • G01N3/10Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces generated by pneumatic or hydraulic pressure
    • G01N3/12Pressure testing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/0014Type of force applied
    • G01N2203/0016Tensile or compressive
    • G01N2203/0019Compressive
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/003Generation of the force
    • G01N2203/0042Pneumatic or hydraulic means
    • G01N2203/0048Hydraulic means

Abstract

The invention discloses a kind of beams of concrete Indirect Loaded experimental rig.Including distribution beam, secondary distribution device, test beam, hydraulic jack, pressure sensor, base, I-shaped crossbeam, pillar.The two ends of I-shaped crossbeam set pillar respectively, and hydraulic jack is connected with I-shaped crossbeam bottom wing listrium;Pressure sensor is located between hydraulic jack and distribution beam;Test beam is set on test beam and chooses ear on the base, and secondary distribution device is placed on the choosing on ear of test beam, and distribution beam is placed on secondary distribution device.Load is produced by hydraulic jack, pressure sensor reads payload data, and secondary distribution device is passed to by distribution beam, then averagely apply pressure to the both sides of test beam and chosen on ear, complete Indirect Loaded experiment.Distribution beam of the present invention can be dismantled with secondary distribution device upper and lower part, assembled and replacing, and materials are easy, economical and practical, be adapted to Indirect Loaded and tested.

Description

Beams of concrete Indirect Loaded experimental rig
Technical field
The present invention relates to field of civil engineering, especially a kind of beams of concrete Indirect Loaded experimental rig.
Background technology
In practical structures engineering, the load that the reinforced beam in many structural systems is born not is directly to apply The top of beam is added in, and is consequently exerted in the range of the depth of section of the bottom of beam or beam.For example, prefabricated board and load thereon Transmitted by the flange of precast beam belly;Secondary beam in cast-in-site slab-beam floors system and load thereon, mainly by joint face not Cracking part(The nip in i.e. secondary beam support section)It is transferred to girder;In prefabricated concrete structure connecting node construction, put Put at formula primary and secondary beam connecting node, be to be shelved on that girder is chosen on ear or the steel corbel of girder is first-class by prefabricated secondary beam.
Routine test is, directly in the top-loaded of beam, to study the stress performance of beam.But, with the development of architectural engineering With the demand of social progress, prefabricated concrete structure again goes into the visual field of people due to the superiority of itself, in future Development in, associated Indirect Loaded experiment will become more to popularize.At this time, it may be necessary to which a set of simple structure, economy has The indirect charging device of effect.
The content of the invention
It is an object of the invention to provide a kind of beams of concrete Indirect Loaded experimental rig.
What the present invention was realized in:Beams of concrete Indirect Loaded experimental rig includes:I-shaped crossbeam, pillar, hydraulic pressure Jack, pressure sensor, distribution beam, secondary distribution device, with test beam test specimen, the base for choosing ear.
The two ends of I-shaped crossbeam are respectively equipped with pillar, hydraulic jack top/bottom part and I-shaped crossbeam lower end edge of a wing plate surface Center is fixedly connected;Pressure sensor be arranged on hydraulic jack top center and distribution beam end face center position it Between;Test beam is arranged in the rectangular base that the concrete being connected with ground is made, and according to experiment institute research contents, adjusts base The distance between.
Test beam is Indirect Loaded of the simulation secondary beam to girder, is set on girder and chooses ear.The making of this test beam is combined Shelf type primary and secondary beam connecting node full-page proof in 15G310-1.
Selected secondary distribution device, secondary distribution device is made up of top I-steel and bottom I-steel, according to test beam The selected bottom I-steel of height:In order to not make secondary distribution device touch girder surface, bottom I-steel is highly plus the height for choosing ear Degree need to be more than deck-molding, meanwhile, the distance between bottom I-steel should be slightly bigger than width of main beam.In order to ensure bottom I-steel web Not because of bend by pressure, while considering financial cost, ribbed panel is welded in I-steel web middle;According between the I-steel of bottom Distance and bottom I-steel flange width select top I-steel, make top I-steel length be equal to bottom I-steel between Distance plus two blocks of bottom I-steel flange width.Two pieces of bottom works of the orthogonal connection in two ends of top I-steel length direction Word steel, is bolted the bottom wing listrium of top I-steel and the top flange plate of bottom I-steel, constitutes a biography for falling U-shaped Force system, can ensure that the stability and security of whole loading system, while being easy to group again, tearing recycling open.This load transfer device Referred to as secondary distribution device.The selection of the I-steel also needs to check by steel construction intensity and resistance to overturning.
Secondary distribution device is placed on test beam.Bottom I-steel is chosen on ear positioned at test beam both sides respectively.Adjustment The position of good secondary distribution device, makes secondary distribution device not contacted with girder surface, while bottom I-steel is again relative to master Beam is symmetrical.Ensureing that the load transfer of distribution beam institute is carried can evenly distribute to choosing on ear.
Calculated according to the bearing capacity of test beam and make distribution beam, distribution beam is placed on secondary distribution device, loaded Point is respectively aligned at test beam girder and the distribution beam centre of form, it is ensured that 2 centres of form are located at load(ing) point to the plumb line on ground.
In experiment, load is produced by hydraulic jack, pressure sensor reads payload data, two are passed to by distribution beam Sub-distribution device, then averagely apply pressure to by secondary distribution device the both sides of test beam and choose on ear, so as to complete the examination of Indirect Loaded Test.
It is flexibly, slim and graceful compact present invention uses secondary distribution beam loading device, occupy little space, it is simple and feasible, removable Interchangeable, adjustable loading position, also can be recycled, and repeatedly also can easily be repaired by changing part after consumption.The device material Material obtains simple, and cheap, convenient and practical, manufacture difficulty is low.
Brief description of the drawings
Fig. 1 is device schematic three dimensional views of the invention.
Fig. 2 is the positive elevational schematic view of the device of the present invention.
Fig. 3 for the present invention in secondary distribution device schematic three dimensional views.
Marked in figure:1- distribution beams;The first tops of 2- I-steel;The second tops of 3- I-steel, the first bottoms of 4- I-steel; The second bottoms of 5- I-steel, 6- girders;7- first chooses ear;8- second chooses ear;9- hydraulic jacks;10- pressure sensors;11- First base;12- second bases;The I-shaped crossbeams of 13-;The pillars of 14- first;15 second pillars.
Embodiment
Embodiment:
With reference to accompanying drawing, the present invention is further described.
The present embodiment is tested using single span simply supported beam as object using indirect charging device, and load is by hydraulic jack Produce, pass sequentially through distribution beam and secondary distribution device the load of application is reached into test beam and choose on ear.It is specific as follows:
Beams of concrete Indirect Loaded experimental rig includes:Distribution beam 1, secondary distribution device, test beam, hydraulic jack 9, pressure Sensor 10, first base 11, second base 12, I-shaped crossbeam 13, pillar 14,15.Wherein, two secondary distribution devices point Not be made up of the first top I-steel 2 and the first bottom I-steel 4, the second top I-steel 3 and the second bottom I-steel 5;Examination Test beam ear 7 and second is chosen by girder 6, first and choose ear 8 and constitute.
The two ends of I-shaped crossbeam 13 are respectively equipped with the first pillar 14 and the second pillar 15.The bottom of hydraulic jack 9 and work The lower end flange plate centre of surface position of font crossbeam 13 is fixedly connected.Pressure sensor 10 is arranged in the top of hydraulic jack 9 Between heart position and the end face center position of distribution beam 1.Test beam is arranged at the rectangle first that the concrete being connected with ground is made On base 11 and second base 12, according to experiment institute research contents, the distance between first base 11 and second base 12 are adjusted.
The test beam of experimental rig is simulation secondary beam to the Indirect Loaded of girder, sets first to choose ear 7 and the on girder 6 Two choose ear 8.Shelf type primary and secondary beam connecting node full-page proof in the making combination 15G310-1 of this test beam.
Selected secondary distribution device, the first bottom I-steel 4 and the second bottom I-steel 5 are selected according to experiment deck-molding:For Secondary distribution device is not set to touch the surface of test beam girder 6, the height of the first bottom I-steel 4 is plus the first height for choosing ear 7 Degree and the height of the second bottom I-steel 5 and the height of the second bottom I-steel 5 are added and the second height for choosing ear 8 is all higher than girder 6 is high, meanwhile, the distance between I-steel of the distance between I-steel of the first bottom I-steel 4 and the second bottom I-steel 5 Should be equal, and slightly larger than the width of girder 6.In order to ensure the first bottom I-steel 4 and the web of the second bottom I-steel 5 not because being pressurized Bending, while financial cost is considered, in the first bottom I-steel 4 and the web middle of the second bottom I-steel 5 welding ribbed panel; According to the spacing of the I-steel of the first bottom I-steel 4 and the width on the I-steel edge of a wing of the first bottom I-steel 4, and under second The distance between I-steel of portion's I-steel 5 and the flange width of the second bottom I-steel 5 select the He of the first top I-steel 2 respectively Second top I-steel 3, makes the length of the first top I-steel 2 and the second top I-steel 3 be respectively equal to the first bottom I-shaped The spacing of the I-steel of steel 4 adds the width on the edge of a wing, and the distance between the I-steel of the second bottom I-steel 5 is wide plus the edge of a wing Degree.Two ends difference the first bottom I-steel 4 of orthogonal connection of first top I-steel 2 and the length direction of the second top I-steel 3 With the second bottom I-steel 5, be bolted the first top I-steel 2 bottom wing listrium and the first bottom I-steel 4 it is upper Flange plate, and the second top I-steel 3 bottom wing listrium and the top flange plate of the second bottom I-steel 5, constitute one group and fall U-shaped Actuating system, can ensure that the stability and security of whole loading system, while being easy to group again, tearing recycling open.This power transmission is filled Put referred to as secondary distribution device.The selection of the I-steel also needs to check by steel construction resistance to overturning.
Secondary distribution device is placed on test beam.First bottom I-steel 4 and the second bottom I-steel 5 are located at the respectively One, which chooses ear 7 and second, chooses on ear 8.Adjust the position of secondary distribution device, make secondary distribution device not with the table of test beam girder 6 Face is contacted, while the bottom I-steel of the first bottom I-steel 4 is relative respectively with the bottom I-steel of the second bottom I-steel 5 It is symmetrical in test beam girder 6.This ensure that the load that distribution beam 1 is transmitted can evenly distribute and choose ear 7 and second to first and choose On ear 8.
Calculated according to the bearing capacity of test beam and make distribution beam 1, distribution beam 1 is placed on secondary distribution device, protected Card load(ing) point is respectively aligned at test beam girder 6 and the top surface centre of form of distribution beam 1, it is ensured that 2 centres of form are in load(ing) point in the lead on ground On vertical line.
In experiment, load is produced by hydraulic jack 9, pressure sensor 10 reads payload data, transmitted by distribution beam 1 To secondary distribution device, then averagely apply pressure to by secondary distribution device the both sides first of test beam and choose ear 7 and second and choose on ear 8, So as to complete the experiment of Indirect Loaded.
In this embodiment, the steel used is Q235B steel, and distribution beam 1 is chosen according to actual calculate, high 180mm, Wide 120mm;Secondary distribution device also passes through actual calculating, employs No. 16 I-steel, i.e., high 160mm, the wide 88mm in the edge of a wing, abdomen Thickness of slab 6mm.To ensure the intensity of I-steel, in the first bottom I-steel 4 and the welding of the web of the second bottom I-steel 5 and abdominal depth phase With the rib of size.
The original device of non-ribbed panel is used for load test of the load for 670kN or so in actual tests, works well, Do not loaded further for the consideration to experiment safety, the present invention considers that floor is strengthened, and can bear on the original basis Higher load.
In above-mentioned Indirect Loaded experimental rig, distribution beam 1 is detachable with secondary distribution device upper and lower part, it is assembled with more Change, and materials are easy, it is economical and practical, it is adapted to Indirect Loaded experiment.
These are only the embodiment of practical application of the present invention, be not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.

Claims (1)

1. a kind of beams of concrete Indirect Loaded experimental rig, it is characterised in that beams of concrete Indirect Loaded experimental rig includes:Point With beam(1), secondary distribution device, test beam, hydraulic jack(9), pressure sensor(10), first base(11), the second bottom Seat(12), I-shaped crossbeam(13), the first pillar(14), the second pillar(15);Wherein, two secondary distribution devices are respectively by One top I-steel(2), the second top I-steel(3), the first bottom I-steel(4)With the second bottom I-steel(5)Composition;Examination Beam is tested by girder(6), first choose ear(7)Ear is chosen with second(8)Composition;
I-shaped crossbeam(13)Two ends be respectively equipped with the first pillar(14)With the second pillar(15);Hydraulic jack(9)Bottom With I-shaped crossbeam(13)Lower end flange plate centre of surface position is fixedly connected;Pressure sensor(10)It is arranged on hydraulic jack (9)Top center and distribution beam(1)Between end face center position;Test beam is arranged at the concrete being connected with ground and is made Rectangle first base(11)And second base(12)On, according to experiment institute research contents, adjust first base(11)With second Base(12)The distance between;
The test beam of experimental rig is Indirect Loaded of the simulation secondary beam to girder, in girder(6)It is upper to set first to choose ear(7)With Two choose ear(8);Shelf type primary and secondary beam connecting node full-page proof in the making combination 15G310-1 of this test beam;
Selected secondary distribution device, the first bottom I-steel is selected according to experiment deck-molding(4)With the second bottom I-steel(5):For The secondary distribution device is not set to touch test beam girder(6)Surface, the first bottom I-steel(4)Height choose ear plus first (7)Height and the second bottom I-steel(5)Height choose ear plus second(8)Height be all higher than girder(6)Height, meanwhile, First bottom I-steel(4)The distance between I-steel and the second bottom I-steel(5)The distance between I-steel answer phase Deng, and slightly larger than girder(6)Width;In order to ensure the first bottom I-steel(4)With the second bottom I-steel(5)Web not because by Song is bent, in the first bottom I-steel(4)With the second bottom I-steel(5)Weld ribbed panel in web middle;According under first Portion's I-steel(4)I-steel spacing and the first bottom I-steel(4)The width on the I-steel edge of a wing, and the second bottom I-shaped Steel(5)The distance between I-steel and the second bottom I-steel(5)Flange width selectes the first top I-steel respectively(2)With Second top I-steel(3), make the first top I-steel(2)With the second top I-steel(3)Length be respectively equal under first Portion's I-steel(4)The spacing of I-steel adds the width on the edge of a wing, and the second bottom I-steel(5)The spacing of I-steel adds the wing The width of edge;First top I-steel(2)With the second top I-steel(3)Under the orthogonal connection first of two ends difference of length direction Portion's I-steel(4)With the second bottom I-steel(5), it is bolted the first top I-steel(2)Bottom wing listrium and first Bottom I-steel(4)Top flange plate, and the second top I-steel(3)Bottom wing listrium and the second bottom I-steel(5)It is upper Flange plate, constitutes one group of actuating system for falling U-shaped;
Secondary distribution device is placed on test beam;First bottom I-steel(4)With the second bottom I-steel(5)It is located at the respectively One chooses ear(7)Ear is chosen with second(8)On;Adjust the position of secondary distribution device, make secondary distribution device not with test beam master Beam(6)Surface is contacted, while the first bottom I-steel(4)Bottom I-steel and the second bottom I-steel(5)Bottom work Word steel is respectively relative to test beam girder(6)Symmetrically;This ensure that distribution beam(1)The load transmitted can be evenly distributed to One chooses ear(7)Ear is chosen with second(8)On;
Calculated according to the bearing capacity of test beam and make distribution beam(1), by distribution beam(1)It is placed on secondary distribution device, protects Card load(ing) point is respectively aligned to test beam girder(6)And distribution beam(1)At the top surface centre of form, it is ensured that 2 centres of form are in load(ing) point in ground Plumb line on.
CN201710361708.3A 2017-05-22 2017-05-22 Beams of concrete Indirect Loaded experimental rig Pending CN107014696A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710361708.3A CN107014696A (en) 2017-05-22 2017-05-22 Beams of concrete Indirect Loaded experimental rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710361708.3A CN107014696A (en) 2017-05-22 2017-05-22 Beams of concrete Indirect Loaded experimental rig

Publications (1)

Publication Number Publication Date
CN107014696A true CN107014696A (en) 2017-08-04

Family

ID=59450378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710361708.3A Pending CN107014696A (en) 2017-05-22 2017-05-22 Beams of concrete Indirect Loaded experimental rig

Country Status (1)

Country Link
CN (1) CN107014696A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107314936A (en) * 2017-08-23 2017-11-03 长沙理工大学 A kind of environment fatigue load coupled simulation device that can freely regulate and control
CN108399849A (en) * 2018-04-24 2018-08-14 天津城建大学 Self-balance loading system suitable for armored concrete beam test practical teaching
CN110470461A (en) * 2019-08-22 2019-11-19 哈尔滨哈玻拓普复合材料有限公司 Distribution beam loading system and installation method for metal frames radome test
CN112461565A (en) * 2020-11-17 2021-03-09 西安建筑科技大学 Continuous beam bridge prestress overrun loss testing device and method based on balanced load shedding
CN112730080A (en) * 2020-12-24 2021-04-30 大连理工大学 Uniform distribution loading device for steel structure test
CN113466055A (en) * 2021-07-21 2021-10-01 中铁二十四局集团有限公司 Loading device for thermal induction concrete peeling test and using method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103063510A (en) * 2012-12-29 2013-04-24 青建集团股份公司 Loading device for template supporting systems
CN104062176A (en) * 2014-06-30 2014-09-24 长安大学 Steel plate beam bridge face outer deformation full size fatigue test loading device
CN104062193A (en) * 2014-06-30 2014-09-24 长安大学 Outer-of-face deformation fatigue test loading device for web gap at position of steel bridge horizontal gusset plates
CN104280297A (en) * 2014-09-23 2015-01-14 同济大学 Counterforce beam loading device and loading method for static load test of bridge beam body
CN106596251A (en) * 2017-01-25 2017-04-26 哈尔滨工业大学 Loading device used for space fabricated type semi-rigid joint test
CN207556999U (en) * 2017-05-22 2018-06-29 桂林理工大学 A kind of beams of concrete Indirect Loaded experimental rig

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103063510A (en) * 2012-12-29 2013-04-24 青建集团股份公司 Loading device for template supporting systems
CN104062176A (en) * 2014-06-30 2014-09-24 长安大学 Steel plate beam bridge face outer deformation full size fatigue test loading device
CN104062193A (en) * 2014-06-30 2014-09-24 长安大学 Outer-of-face deformation fatigue test loading device for web gap at position of steel bridge horizontal gusset plates
CN104280297A (en) * 2014-09-23 2015-01-14 同济大学 Counterforce beam loading device and loading method for static load test of bridge beam body
CN106596251A (en) * 2017-01-25 2017-04-26 哈尔滨工业大学 Loading device used for space fabricated type semi-rigid joint test
CN207556999U (en) * 2017-05-22 2018-06-29 桂林理工大学 A kind of beams of concrete Indirect Loaded experimental rig

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
曹霞等: "间接加载高强钢筋RPC梁受剪性能试验", 《华侨大学学报(自然科学版)》 *
杨清发等: "单边钢次梁与混凝土主梁插入式连接节点的试验研究", 《土木工程与管理学报》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107314936A (en) * 2017-08-23 2017-11-03 长沙理工大学 A kind of environment fatigue load coupled simulation device that can freely regulate and control
CN107314936B (en) * 2017-08-23 2023-09-08 长沙理工大学 Environment-fatigue load coupling simulation device capable of being regulated and controlled freely
CN108399849A (en) * 2018-04-24 2018-08-14 天津城建大学 Self-balance loading system suitable for armored concrete beam test practical teaching
CN110470461A (en) * 2019-08-22 2019-11-19 哈尔滨哈玻拓普复合材料有限公司 Distribution beam loading system and installation method for metal frames radome test
CN110470461B (en) * 2019-08-22 2021-02-26 哈尔滨哈玻拓普复合材料有限公司 Distribution beam loading system for metal truss antenna housing test and installation method
CN112461565A (en) * 2020-11-17 2021-03-09 西安建筑科技大学 Continuous beam bridge prestress overrun loss testing device and method based on balanced load shedding
CN112730080A (en) * 2020-12-24 2021-04-30 大连理工大学 Uniform distribution loading device for steel structure test
CN113466055A (en) * 2021-07-21 2021-10-01 中铁二十四局集团有限公司 Loading device for thermal induction concrete peeling test and using method thereof

Similar Documents

Publication Publication Date Title
CN107014696A (en) Beams of concrete Indirect Loaded experimental rig
Valizadeh et al. Experimental investigation on cyclic behavior of perforated steel plate shear walls
CN103061360B (en) Stress application system for large-tonnage static load tests
El-Gendy et al. Effect of shear studs and high moments on punching behavior of GFRP-RC slab–column edge connections
Spyrakos et al. Seismic behavior of a post-tensioned integral bridge including soil–structure interaction (SSI)
CN106012848B (en) A kind of pre-buried bracket construction method of cast-in-situ box girder and bridge
CN107576569A (en) A kind of loading device for testing and test method that edge constraint is realized to board member
CN207556999U (en) A kind of beams of concrete Indirect Loaded experimental rig
CN201386291Y (en) Static load test device of composite foundation
CN202331993U (en) Building block type planar structure mechanical property universal experiment bench
Chen et al. Punching shear capacity of RC slab-CFT column connections
TW580531B (en) A load test method of foundation piles and device thereof formed by an assembled main beam and aid beam system
Erhan et al. Live load distribution equations for integral bridge substructures
CN104596859A (en) Testing device for bearing capacity of precast reinforced concrete slab
CN107063871A (en) The preparation method of beams of concrete Indirect Loaded experimental rig
CN204405442U (en) A kind of reinforced concrete prefabricated board testing device for bearing capacity
CN203729208U (en) Continuous beam number zero block support
CN106223369B (en) A kind of loading case that can be used for spread foundation axle center and bias-load
CN202305194U (en) Loading device for space beam post node bearing force tests
CN107460862B (en) Combined testing device for substrate bearing capacity and frictional resistance
Hassan et al. Behavior of concentrically loaded CFT braces connections
CN201128193Y (en) Detachable box girder storing rack
CN203755165U (en) Bracket structure for steel pipe pile
CN207894722U (en) Waw-1000 type pressure testing machines test the auxiliary stand of rod piece anti-bending strength
Berman et al. Cyclic testing of light-gauge steel plate shear walls

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170804

WD01 Invention patent application deemed withdrawn after publication