CN107013029A - Wall covering construction auxiliary device - Google Patents

Wall covering construction auxiliary device Download PDF

Info

Publication number
CN107013029A
CN107013029A CN201710203264.0A CN201710203264A CN107013029A CN 107013029 A CN107013029 A CN 107013029A CN 201710203264 A CN201710203264 A CN 201710203264A CN 107013029 A CN107013029 A CN 107013029A
Authority
CN
China
Prior art keywords
supporting plate
auxiliary device
wall covering
connecting rod
purlin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710203264.0A
Other languages
Chinese (zh)
Other versions
CN107013029B (en
Inventor
牛彬彬
安旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201710203264.0A priority Critical patent/CN107013029B/en
Publication of CN107013029A publication Critical patent/CN107013029A/en
Application granted granted Critical
Publication of CN107013029B publication Critical patent/CN107013029B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/003Devices for storing material on the scaffold
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings

Abstract

The invention provides a kind of wall covering construction auxiliary device.The servicing unit includes supporting plate and bindiny mechanism;Supporting plate is used to cross at least two purlins;Bindiny mechanism is connected with supporting plate and is slideably connected along purlin length direction with least two purlins.The wall covering construction auxiliary device that the present invention is provided, rendering personnel can ride on the supporting plate, both paint coating can be slided along the length direction of supporting plate, supporting plate can also be made to drive length direction of the rendering personnel along purlin to slide by bindiny mechanism, expand the scope of rendering personnel's shift motion, and ride on and safety is painted on purlin eliminate the not convenient and unsafe operation such as bend over, while improving the efficiency for painting operation, be conducive to live construction.Therefore, the servicing unit greatly increases the stroke and security of paint coating travel in high sky.In addition, the servicing unit can also carry out painting other coating, and outdoor rendering can be carried out.

Description

Wall covering construction auxiliary device
Technical field
Technical field is painted the present invention relates to coating, in particular to a kind of wall covering construction auxiliary device.
Background technology
Steel-structure factory building is widely used in industry and civil buildings at present, wherein, the main of steel-structure factory building is weighed Component is made up of steel, including steel column, girder steel, steel structure base, steel roof truss and steel worm-gearing.Because steel construction is generally 450 Can lose bearing capacity in~650 DEG C of temperature, deform upon, and then cause steel column and girder steel to bend, because excessive deformation without It can be continuing with, the fire endurance for being typically not added with the steel construction of protection is 15 minutes or so.Therefore, overcome anti-in actual applications Deficiency in terms of fire, it is necessary to carry out fire prevention processing, its purpose is exactly that the fire endurance of steel construction is brought up into design specification regulation Limit range.Therefore, the construction of roof structure fireproof coating is very important fire prevention measure.
At present, because the roofing of steel-structure factory building is in high-altitude, roofing region is wide, and roof girder intersects with primary and secondary purlin, prevents Fiery coating operating worker implements often direct along purlin walking paint coating during construction, due to travel in high sky and construction inconvenience of bending over The many unsafe factors of site operation are caused, many dangerous accidents easily occur after long-term construction.
The content of the invention
In consideration of it, the present invention proposes a kind of wall covering construction auxiliary device, it is intended to solve to apply during existing rendering The unsafe problem of work.
On one side, the present invention proposes a kind of wall covering construction auxiliary device.The servicing unit include supporting plate and Bindiny mechanism;The supporting plate is used to cross at least two purlins;The bindiny mechanism be connected with the supporting plate and Slideably it is connected along the purlin length direction with least two purlins.
Further, above-mentioned wall covering construction auxiliary device, the bindiny mechanism includes:Connector;Wherein, the company The number of fitting is twice of at least two and no more than described purlin;The supporting plate is opened up along the supporting plate length direction Have it is multipair be set up in parallel first through hole, also, the logarithm of the first through hole is not less than the number of the connector;The purlin It may be contained between connector described in outermost, also, at most two connections be provided between any two purlins Part;The connector is arranged in first through hole described in a pair and to be slidably connected to the purlin relative with the connector Sideways.
Further, above-mentioned wall covering construction auxiliary device, the connecting rod includes:Head rod, the second connection Bar and the 3rd connecting rod;Wherein, the 3rd connecting rod is placed in the top of the supporting plate.The head rod and described Two connecting rods are set up in parallel and are connected by the 3rd connecting rod;The head rod and second connecting rod are worn It is connected in first through hole described in a pair and slideably the purlin side relative with the connector.
Further, above-mentioned wall covering construction auxiliary device, the servicing unit also includes:Two handrails;Wherein, it is described Two handrails are connected with the end of the supporting plate, for bundling safety belt.
Further, above-mentioned wall covering construction auxiliary device, the handrail includes:First support bar, second support bar With handrail connecting rod;Wherein, the handrail connecting rod is placed in the top of the supporting plate;The first support bar and described second Support bar is set up in parallel, also, first end is connected by the handrail connecting rod;The first support bar and described second Strut is connected with the end of the supporting plate.
Further, the of above-mentioned wall covering construction auxiliary device, the first support bar and the second support bar Two ends are provided with threaded rod;The two ends of the supporting plate are provided with a pair of second through holes, also, the supporting plate is in described Second through hole is provided with the nut being adapted with the threaded rod;The threaded rod is arranged in second through hole and the spiral shell Parent phase is spirally connected.
Further, above-mentioned wall covering construction auxiliary device, the supporting plate is set between the two ends of the supporting plate Third through-hole is equipped with, for passing through rope suspensions material bucket;The material bucket treats paint coating for splendid attire.
Further, above-mentioned wall covering construction auxiliary device, the third through-hole is placed in the centre bit of the supporting plate Put.
Further, above-mentioned wall covering construction auxiliary device, the supporting plate is provided with holder;The clamping device For rope described in clamping connection.
Further, above-mentioned wall covering construction auxiliary device, the holder is fixture.
The wall covering construction auxiliary device that the present invention is provided, due to be provided with supporting plate can along purlin length direction Slide, rendering personnel can ride on the supporting plate, both can slide paint coating along the length direction of supporting plate, and can also lead to Crossing bindiny mechanism makes supporting plate drive length direction of the rendering personnel along purlin to slide, and expands the model of rendering personnel's shift motion Enclose, and ride on to paint safety on purlin and eliminate and bend over etc. not convenient and unsafe to operate and be seated compared to stand Operation can improve the efficiency for painting operation, be conducive to the construction at scene.Therefore, the servicing unit greatly increases rendering and applied Expect the stroke and security of travel in high sky.In addition, the servicing unit can also carry out painting other coating, and room can be carried out Exterior plaster.
Brief description of the drawings
By reading the detailed description of hereafter preferred embodiment, various other advantages and benefit is common for this area Technical staff will be clear understanding.Accompanying drawing is only used for showing the purpose of preferred embodiment, and is not considered as to the present invention Limitation.And in whole accompanying drawing, identical part is denoted by the same reference numerals.In the accompanying drawings:
Fig. 1 is the structural representation of wall covering construction auxiliary device provided in an embodiment of the present invention;
Fig. 2 is the main structure diagram of wall covering construction auxiliary device provided in an embodiment of the present invention;
Fig. 3 is the left view structural representation of wall covering construction auxiliary device provided in an embodiment of the present invention.
Embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although showing the disclosure in accompanying drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here Limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure Complete conveys to those skilled in the art.It should be noted that in the case where not conflicting, embodiment in the present invention and Feature in embodiment can be mutually combined.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
Referring to Fig. 1, Fig. 1 is the structural representation of wall covering construction auxiliary device provided in an embodiment of the present invention.As schemed Shown, the servicing unit includes:Supporting plate 1 and bindiny mechanism 2.Wherein,
Supporting plate 1 is used to cross at least two purlins.Certainly, supporting plate 1 can also be horizontally set with and treat paint coating room Other structures outside interior or room, the present embodiment does not do any restriction to it.When it is implemented, the length direction of supporting plate 1 can be with Length direction with purlin is perpendicular.To increase the intensity of supporting plate 1 and mitigating its quality, it is preferable that supporting plate 1 can be poly- Acrylic plastic sheet material (PP sheet materials).
Bindiny mechanism 2 is connected with supporting plate 1 and is slideably connected along purlin length direction with least two purlins. When it is implemented, attachment structure 2 can be connected with supporting plate 1, also, attachment structure 2 and at least two purlins are long along purlin Degree direction is slideably connected, meanwhile, the purlin that supporting plate 1 is connected to supporting plate 1 with every is slideably connected.For Ensure the stability that the device is slided, it is preferable that attachment structure 2 and two purlins of outermost being connected on the downside of supporting plate 1 can Slidably it is connected, certainly, attachment structure 2 can also be connected with the purlin for the centre for being connected to the downside of supporting plate 1, this implementation Example does not do any restriction to it.
Compared with prior art, the servicing unit provided in the present embodiment, can be along purlin due to being provided with supporting plate Length direction is slided, and rendering personnel can ride on the supporting plate, both can slide paint coating along the length direction of supporting plate, Supporting plate can also be made to drive length direction of the rendering personnel along purlin to slide by bindiny mechanism, rendering personnel movement is expanded The scope of stroke, and ride on and safety is painted on purlin eliminate not convenient and unsafe operation and the phase that is seated such as bend over Than in stand operation can improve paint operation efficiency, be conducive to scene construction.Therefore, the servicing unit is greatly improved The stroke and security of paint coating travel in high sky.In addition, the servicing unit can also carry out painting other coating, Er Qieke To carry out outdoor rendering.
Top in a kind of embodiment in the above-described embodiments, the purlin that the lower section of supporting plate 1 is connected with supporting plate 1 can Fluted to set, the length direction that supporting plate 1 can be by bindiny mechanism 2 with purlin along purlin is slideably connected.Its In, bindiny mechanism 2 can be key, can be integrally formed with supporting plate 1, not do any restriction in the present embodiment to it.
Another embodiment in the above-described embodiments, with continued reference to Fig. 1, bindiny mechanism 2 includes:Connector 21.Its In, the number of connector 21 is at least two and no more than twice of purlin.Supporting plate 1 is offered along the length direction of supporting plate 1 It is multipair to be set up in parallel first through hole 11, also, number of the logarithm not less than connector 21 of first through hole 11.When it is implemented, Bindiny mechanism 2 can include at least two and no more than cross at twice of the lower section purlin of supporting plate 1.Preferably, supporting plate 1 can Equably to offer the multipair first through hole 11 being set up in parallel along its length, each pair first through hole 11 is along its width side To, also, the distance between each pair first through hole 11 is identical.It is further preferred that the width both sides at the two ends of supporting plate 1 are equal Two are offered evenly ranked first through hole 11.
Purlin may be contained between outermost connector 21, also, at most be provided with two companies between any two purlins Fitting 21.Connector 21 is arranged in a pair of first through hole 11 and is slidably connected to the purlin side relative with connector 21. When it is implemented, connector 21 is arranged in one pair of which first through hole 11, the purlin for being respectively arranged at the lower section of supporting plate 1 is placed in most Between the connector 21 of two, outside, one or two connector 2 either company of being not provided with can be set between any two purlins Fitting 21.Preferably, respectively it is arranged in the purlin of the lower section of supporting plate 1 and is provided with one on the outside of outermost two purlins Connector 21, two connectors 21 are arranged in a pair of first through hole and are slideably connected with the lateral surface of outermost two purlins Connect.
As can be seen that in the present embodiment, bindiny mechanism 2 is arranged in first through hole 11 and is slideably connected with purlin, enters And length direction of the supporting plate along purlin is slided, the apparatus structure simply assembling is simple, it is easy to dismantles and transports, together When, the device can prevent supporting plate 1 from moving or being rotated around purlin along purlin width, can further increase branch The stability of fagging 1.
In the above-described embodiments, with continued reference to Fig. 1, connecting rod 21 includes:The (not shown) of head rod 211, The (not shown) of two connecting rod 212 and the 3rd connecting rod 213.Wherein, the 3rd connecting rod 213 is placed in the top (phase of supporting plate 1 For the position shown in Fig. 1), the connecting rod 212 of head rod 211 and second is set up in parallel and by the 3rd connecting rod 213 are connected.The connecting rod 212 of head rod 211 and second is arranged in a pair of first through hole and is slideably connected to purlin The bar side relative with connector 21.
When it is implemented, connecting rod 21 includes being placed in the top of supporting plate 1 (for the position shown in Fig. 1) 3rd connecting rod 213 and the connecting rod 212 of head rod 211 and second for being arranged in a pair of first through hole, also, the first connection The connecting rod 212 of bar 211 and second is placed (for the position shown in Fig. 1) and is placed in the end of the top of supporting plate 1 vertically (upper end as shown in Figure 1) is connected by the 3rd connecting rod 213.It should be noted that the 3rd connecting rod 213 can be straight-bar, It can also be the rod member such as bow of other structures, not do any restriction to it in the present embodiment.Wherein, head rod 211st, the second connecting rod 212 and the 3rd connecting rod 213 can be connect by being weldingly connected, naturally it is also possible to pass through other connection sides Formula is for example integrally formed, and does not do any restriction in the present embodiment to it.
As can be seen that in the present embodiment, the connecting rod 21 is simple in construction, it is easy to manufacture, assembling is simple, convenient transportation.Together When, the device connects the intensity for increasing the connecting rod 21 by the 3rd connecting rod 213, can further increase head rod 211 and second connecting rod 212 and purlin clamping power.
Referring to Fig. 2, Fig. 2 is the main structure diagram of wall covering construction auxiliary device provided in an embodiment of the present invention. In the above-described embodiments, as illustrated, the device also includes:Two handrails 3.Wherein, two handrails 3 and the end of supporting plate 1 (left and right ends as shown in Figure 2) are connected, for bundling safety belt.When it is implemented, two handrails 3 can respectively with support The two ends (left and right ends as shown in Figure 2) of plate 1 are connected, and two handrails 3 can be connect with supporting plate 1 by being weldingly connected, when Can also be so connected such as bolt by other connected modes, and any restriction is not done to it in the present embodiment.Wherein, paint When personnel can be ridden in supporting plate 1, hand with hand steered handrail and then can be painted, certainly, it is contemplated that during shift position, can be with Hand steered handrail 3 further promotes supporting plate 3 to be moved along the length direction of purlin.In addition, the safety belt that rendering personnel generally wear It can be bundled on handrail 3 and then ensure security.Preferably, the two ends of safety belt can be bundled to handrail 3 and purlin respectively. As can be seen that in the present embodiment, the setting of handrail 3 further improves the safety coefficient of the device.
Referring to Fig. 3, Fig. 3 is the left view structural representation of wall covering construction auxiliary device provided in an embodiment of the present invention. Further, handrail 3 includes:First support bar 31, second support bar 32 and handrail connecting rod 33.Wherein, handrail connecting rod 33 It is placed in the top of supporting plate 1 (for the position shown in Fig. 3);First support bar 31 and second support bar 32 are set side by side Put, also, first end (upper end as shown in Figure 3) is connected by handrail connecting rod 33;First support bar 31 and second is supported Bar 32 is connected with the end (left and right ends as shown in Figure 3) of supporting plate 1.
When it is implemented, handrail connecting rod 33 is placed in the top (for the position shown in Fig. 3) of supporting plate 1, the One support bar 31 and second support bar 32 are placed (for the position shown in Fig. 3) vertically, also, the He of first support bar 31 Second support bar 32 is placed in the first end (upper end as shown in Figure 3) of the top of supporting plate 1 (for the position shown in Fig. 3) It is connected by handrail connecting rod 33.It should be noted that handrail connecting rod 33 can be straight-bar, or other structures Any restriction is not done to it in rod member such as bow, the present embodiment.For the intensity of further increase handrail 3, first support bar Many connecting rods are also provided between 31 and the two ends (upper and lower ends as shown in Figure 3) of second support bar 32.Wherein, One support bar 31, second support bar 32, handrail connecting rod 33 and connecting rod can be connect by being weldingly connected, naturally it is also possible to be passed through Other connected modes are for example integrally formed, and do not do any restriction in the present embodiment to it.
As can be seen that in the present embodiment, handrail 3 is simple in construction, it is easy to manufacture, assembling is simple, convenient transportation.Meanwhile, should Device connects the intensity for increasing the handrail 3 by handrail connecting rod 33, can further increase the life-span of handrail.
With continued reference to Fig. 3, further, the second end of first support bar 31 and second support bar 32 (as shown in Figure 3 Lower end) it is provided with threaded rod 34;The two ends (left and right ends as shown in Figure 3) of supporting plate 1 are provided with a pair of second through holes 12, also, supporting plate 1 is provided with the nut 14 being adapted with threaded rod 34 at the second through hole 12;Threaded rod 34 is arranged in Two through holes 12 and the bolt of nut 14.
When it is implemented, being placed in the first support bar 31 and the of the lower section of supporting plate 1 (for the position shown in Fig. 3) The second end (lower end as shown in Figure 3) of two support bars 32 can be provided with the externally threaded threaded rod 34 of grinding, when It can also so be processed by other processing modes in screw thread such as turning, the present embodiment and not do any restriction to it.Supporting plate 1 Two ends (left and right ends as shown in Figure 3) offer a pair of the second through holes 12 being adapted with threaded rod 34, wherein second is logical Hole 12 can be manhole, or not do any restriction in hexagon through hole, the present embodiment to it.Supporting plate 1 and The nut 14 being adapted with threaded rod 34, internal thread and the bolt of threaded rod 34 of nut 14 are provided with the second through hole 12. Nut 14 can be arranged in the second through hole 12, can also be arranged above or below supporting plate 1 (relative to shown in Fig. 3 For position), any restriction is not done to it in the present embodiment.
As can be seen that in the present embodiment, the height of handrail 3 can be adjusted, height that can be according to the personnel of rendering or operation The height of handrail connecting rod 33 is conveniently adjusted, therefore, the device further increases the convenience of rendering personnel.
With continued reference to Fig. 1, in the various embodiments described above, supporting plate 1 is in the two ends (left and right two as shown in Figure 1 of supporting plate 1 End) between be provided with third through-hole 13, for by rope 4 suspension material bucket 5, material bucket 5 to treat paint coating for splendid attire.Tool When body is implemented, supporting plate 1 can offer third through-hole 13 in position therebetween, and containing the material bucket 5 with paint coating can be with Bundled by rope 4 to third through-hole so that material bucket 5 can hang the lower section to supporting plate 1 (relative to shown in Fig. 1 For position), certainly, during rendering, material bucket 5 is also possible to prevent in supporting plate 1.Preferably, to be further ensured that supporting plate 1 Stability, third through-hole 13 is placed in the center of supporting plate 1.Wherein, rope 4 can be nylon rope, naturally it is also possible to be The rope of other materials, the present embodiment is not made any to it.The servicing unit can also include rope 4 and material bucket 5, certainly It can be provided for rendering personnel or with producer's carrying is painted, not do any restriction in the present embodiment to it.
As can be seen that opening up for third through-hole 13 be able to can not only be contained with suspension material bucket 5, material bucket 5 in the device Paint coating is treated, when suspension is also prevented from rendering personnel shift position to third through-hole or when being positioned in supporting plate 1, support The unbalance run-off the straight in two ends of plate 1.
With continued reference to Fig. 1, further, supporting plate 1 is provided with holder 15, clamping device 15 is used for clamping connection rope 4. When it is implemented, supporting plate 1 can be provided with holder 15 around third through-hole 13, holder 15 is used for clamping connection rope 4 And then fixed material bucket 5 is hung to the lower section of supporting plate 1 (for the position shown in Fig. 1).Preferably, holder can be with For fixture, such as vice, naturally it is also possible to be not do any restriction to it in other fixtures, the present embodiment.
As can be seen that in the present embodiment, the setting of holder 15 can fix material bucket 5 and rope 4, can prevent material Bucket 5 is fixed unstable or even dropped.
Wall covering construction auxiliary device provided in an embodiment of the present invention is described in more detail below.
As shown in Figures 1 to 3, the servicing unit includes:Supporting plate 1, bindiny mechanism 2, two handrails 3, rope 4 and material bucket 5.Wherein, supporting plate 1 is the PP sheet materials that specification is 2500mm*400mm*400mm, and supporting plate 1 is horizontally set with two purlins, and And, the two ends (left and right ends as shown in Figure 1) of supporting plate 1 equably offer double a diameter of 22mm first through hole 11. Bindiny mechanism 2 includes the U-shaped card that two a diameter of 16mm round steel is bent, also, the straight bar part length of two U-shaped cards is 200mm.The arc tips (upper end as shown in Figure 1) of two U-shaped cards are placed in the top of supporting plate 1 (relative to the position shown in Fig. 1 For), the straight-bar end (lower end as shown in Figure 1) of two U-shaped cards is placed in the lower section of supporting plate 1 (relative to the position shown in Fig. 1 For).The both sides that two U-shaped cards are placed in two purlins are arranged in a pair of suitable first through hole and the outside with purlin can respectively Two purlins are connected between two U-shaped cards by i.e. two U-shaped cards that are slidably connected.The two ends of supporting plate 1 are (as shown in Figure 2 Left and right ends) offer two the second through holes 12, the top of the second through hole 12 is provided with a diameter of 20 nut 14.Shield Hand 3 is a diameter of 20 U-shaped handrail that bends of round steel, also, the straight-bar end (lower end as shown in Figure 3) of U-shaped handrail is arranged There is the externally threaded threaded rod 34 being adapted with nut 14, the straight-bar end length of the top of threaded rod 34 is 1200mm, threaded rod 34 Length then be 100mm.U-shaped handrail is arranged in the second through hole 12, wherein threaded rod 34 and the bolt of nut 14.Supporting plate 1 Center offers a diameter of 20 manhole-third through-hole 13, and rope 4 bears quality for a diameter of 10mm and is more than 250kg nylon rope, rope 4 is arranged in third through-hole 13 by being arranged at the top of supporting plate 1 (relative to the position shown in Fig. 2 For) fixture phase clamping connection, the lower end of rope 4 is bundled with containing the material for treating paint coating bucket 5.
In summary, the servicing unit provided in the present embodiment, can be along the length side of purlin due to being provided with supporting plate To slip, rendering personnel can ride on the supporting plate, both can slide paint coating along the length direction of supporting plate, can also Make supporting plate drive length direction of the rendering personnel along purlin to slide by bindiny mechanism, expand rendering personnel's shift motion Scope, and ride on to paint safety on purlin and eliminate and bend over etc. not convenient and unsafe to operate and be seated compared to station The efficiency for painting operation can be improved by operation, be conducive to the construction at scene.Therefore, the servicing unit greatly increases rendering The stroke and security of coating travel in high sky.In addition, the servicing unit can also carry out painting other coating, and it can carry out Outdoor rendering.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these changes and modification.

Claims (10)

1. a kind of wall covering construction auxiliary device, it is characterised in that including:Supporting plate (1) and bindiny mechanism (2);Wherein,
The supporting plate (1) is used to cross at least two purlins;
The bindiny mechanism (2) is connected with the supporting plate (1) and with least two purlins along the purlin length side To being slideably connected.
2. wall covering construction auxiliary device according to claim 1, it is characterised in that the bindiny mechanism (2) includes: Connector (21);Wherein,
The number of the connector (21) is twice of at least two and no more than described purlin;
The supporting plate (1) along the supporting plate (1) length direction offer it is multipair be set up in parallel first through hole (11), also, The logarithm of the first through hole (11) is not less than the number of the connector (21);
The purlin may be contained between connector described in outermost (21), also, at most be set between any two purlins It is equipped with two connectors (21);
The connector (21) is arranged in first through hole described in a pair (11) and is slidably connected to the purlin and the company The relative side of fitting (21).
3. wall covering construction auxiliary device according to claim 2, it is characterised in that the connecting rod (21) includes: Head rod (211), the second connecting rod (212) and the 3rd connecting rod (213);Wherein,
3rd connecting rod (213) is placed in the top of the supporting plate (1);
The head rod (211) and second connecting rod (212) are set up in parallel and by the 3rd connecting rod (213) It is connected;
The head rod (211) and second connecting rod (212) are arranged in first through hole described in a pair and slideably It is connected to the purlin side relative with the connector (21).
4. wall covering construction auxiliary device according to claim 1, it is characterised in that the servicing unit also includes:Two Individual handrail (3);Wherein,
Described two handrails (3) are connected with the end of the supporting plate (1), for bundling safety belt.
5. wall covering construction auxiliary device according to claim 4, it is characterised in that the handrail (3) includes:First Support bar (31), second support bar (32) and handrail connecting rod (33);Wherein,
The handrail connecting rod (33) is placed in the top of the supporting plate (1);
The first support bar (31) and the second support bar (32) are set up in parallel, also, first end is connected by the handrail Extension bar (33) is connected;
The first support bar (31) and the second support bar (32) are connected with the end of the supporting plate (1).
6. wall covering construction auxiliary device according to claim 5, it is characterised in that
Second end of the first support bar (31) and the second support bar (32) is provided with threaded rod (34);
The two ends of the supporting plate (1) are provided with a pair of second through holes (12), also, the supporting plate (1) is in described second Through hole (12) place is provided with the nut (14) being adapted with the threaded rod (34);
The threaded rod (34) is arranged in second through hole (12) and the nut (14) bolt.
7. the wall covering construction auxiliary device according to any one of claim 1 to 6, it is characterised in that
The supporting plate (1) is provided with third through-hole (13) between the two ends of the supporting plate (1), for passing through rope (4) Suspension material bucket (5);
The material bucket (5) treats paint coating for splendid attire.
8. wall covering construction auxiliary device according to claim 7, it is characterised in that
The third through-hole (13) is placed in the center of the supporting plate (1).
9. wall covering construction auxiliary device according to claim 7, it is characterised in that
The supporting plate (1) is provided with holder (15);
The clamping device (15) is used for rope (4) described in clamping connection.
10. wall covering construction auxiliary device according to claim 9, it is characterised in that the holder (15) is folder Tool.
CN201710203264.0A 2017-03-30 2017-03-30 Wall covering construction auxiliary device Active CN107013029B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710203264.0A CN107013029B (en) 2017-03-30 2017-03-30 Wall covering construction auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710203264.0A CN107013029B (en) 2017-03-30 2017-03-30 Wall covering construction auxiliary device

Publications (2)

Publication Number Publication Date
CN107013029A true CN107013029A (en) 2017-08-04
CN107013029B CN107013029B (en) 2019-02-22

Family

ID=59445595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710203264.0A Active CN107013029B (en) 2017-03-30 2017-03-30 Wall covering construction auxiliary device

Country Status (1)

Country Link
CN (1) CN107013029B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5624006A (en) * 1995-09-05 1997-04-29 Richardson, Jr.; Gary P. Support apparatus for use on an inclined roof
CN202892703U (en) * 2012-08-22 2013-04-24 四汇建设集团有限公司 Sliding safety pole for installing tension bar on fabricated building roof
CN104153586A (en) * 2014-08-08 2014-11-19 宁波建工股份有限公司 Construction method for installing purline through suspension cable cranes
CN105464355A (en) * 2015-12-23 2016-04-06 中国建筑第六工程局有限公司 Operating platform used for installation of curved building external window

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5624006A (en) * 1995-09-05 1997-04-29 Richardson, Jr.; Gary P. Support apparatus for use on an inclined roof
CN202892703U (en) * 2012-08-22 2013-04-24 四汇建设集团有限公司 Sliding safety pole for installing tension bar on fabricated building roof
CN104153586A (en) * 2014-08-08 2014-11-19 宁波建工股份有限公司 Construction method for installing purline through suspension cable cranes
CN105464355A (en) * 2015-12-23 2016-04-06 中国建筑第六工程局有限公司 Operating platform used for installation of curved building external window

Also Published As

Publication number Publication date
CN107013029B (en) 2019-02-22

Similar Documents

Publication Publication Date Title
CN205654069U (en) Saddle formula is climbed platform and is attached wall device
CN202595979U (en) Connecting structure for upright post and building main body
CN109244950A (en) A kind of steel cable bridge method
CN205296906U (en) Filling station's lightweight steel construction awning support
CN107013029A (en) Wall covering construction auxiliary device
CN204781895U (en) Adjustable hanging flower basket leans on guide bracket and hanging flower basket of wall distance
CN204387992U (en) A kind of light weight steel structure spool lays and lamp installation hanger
CN106049843A (en) Hanging type anti-shaking construction platform and mounting method thereof
CN108978978A (en) Closed-section steel deck cast-in-situ floor elevator apparatus, ceiling structure and construction method
CH684448A5 (en) Mounting rail for installation in buildings.
CN205840303U (en) A kind of button bar adaptor
CN204676756U (en) The fastener of top board furred ceiling
CN205329845U (en) Steel member
CN204873403U (en) A supplementary steel pipe that is used for hoisting simultaneously room roof beam purlin
CN207363260U (en) A kind of plain form buddhist seam fixture
CN212836659U (en) Scaffold structure for construction
CN213509128U (en) Assembled steel structure protector
CN219983744U (en) Safety belt suspension clamp capable of being adjusted freely
CN214674017U (en) Fixing device for exposed wiring pipe passing through bottom of steel beam
CN205746000U (en) A kind of C-type steel component of high fastening
CN206950481U (en) A kind of detachable safety belt hanging point device
CN208853179U (en) A kind of anticorrosive paint application device for anti-corrosion C-type steel end
JP3125149U (en) Roof fall prevention device
CN206205476U (en) The adjustable connector of temporary railing
CN206707244U (en) A kind of climbing frame load device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant