CN107006916A - A kind of production technology of interlayer underwear mold cup - Google Patents

A kind of production technology of interlayer underwear mold cup Download PDF

Info

Publication number
CN107006916A
CN107006916A CN201710359863.1A CN201710359863A CN107006916A CN 107006916 A CN107006916 A CN 107006916A CN 201710359863 A CN201710359863 A CN 201710359863A CN 107006916 A CN107006916 A CN 107006916A
Authority
CN
China
Prior art keywords
mold cup
sponge
mold
air bag
press
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710359863.1A
Other languages
Chinese (zh)
Inventor
吴叶群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Nanhai Yijia Underwear Co Ltd
Original Assignee
Foshan Nanhai Yijia Underwear Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Nanhai Yijia Underwear Co Ltd filed Critical Foshan Nanhai Yijia Underwear Co Ltd
Priority to CN201710359863.1A priority Critical patent/CN107006916A/en
Publication of CN107006916A publication Critical patent/CN107006916A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A41WEARING APPAREL
    • A41CCORSETS; BRASSIERES
    • A41C5/00Machines, appliances, or methods for manufacturing corsets or brassieres
    • A41C5/005Machines, appliances, or methods for manufacturing corsets or brassieres by moulding

Abstract

The invention discloses a kind of production technology of interlayer underwear mold cup, it is related to mold cup production technical field.The production technology of the interlayer underwear mold cup, comprises the following steps:Sponge press mold is first carried out, air bag model press mold is subsequently filled, then removes air bag model, air bag is added, finally carries out the sealing of mold cup.The production technology of the interlayer underwear mold cup; the production technology of interlayer underwear mold cup; by to having the mold cup mould molding press of projection, the setting without raised mold cup mould molding press and air bag model; interior mold cup is set to be put into air bag in underwear mold cup during production; and during underwear mold cup is sealed; air bag inflation will not be caused because of high temperature and ruptured; so effectively maintain the production qualification rate of air bag mold cup; the productive expenditure is reduced simultaneously, make that the air mold cup produced uses is more comfortable.

Description

A kind of production technology of interlayer underwear mold cup
Technical field
The present invention relates to mold cup production technical field, specially a kind of production technology of interlayer underwear mold cup.
Background technology
Mold cup is cup (i.e. compression cup) of one piece of cotton by the mould shape of high temperature, then removes car into one by these cups Brassiere, a brassiere is by heart, rear tab, face cloth, cup, as root car into, the cup of the inside be press from both sides cotton cup car into be exactly to press from both sides cup Brassiere is mold cup car into be exactly mold cup brassiere.
Mold cup plays very important effect in brassiere, and mold cup is by two panels sponge by the mould shape of hot high temperature Into accompanying a sack between two panels sponge, the underwear brassiere that filling protuberance is made improves breast by the moulding of mold cup Shape, with the effect for moulding mellow and full chest type.
Once there are the central filler thing that the producer uses the sack full of mineral oil as interlayer mold cup, but this kind filling oil Bag relative cost is high, weight is big, and interlayer mold cup intermediate course is an air bag by the existing producer, and air bag cost is relative It is relatively low, and weight substantially reduces, and greatly promotes the underwear comfort level made, if but directly making and going of the technique of oil bag Air bag is made, can cause to cause air to expand and make bag breakage during high-temperature shaping, so have a strong impact on mould The qualification rate of cup, reduces the Production Gain of people.
The content of the invention
(1) technical problem solved
In view of the shortcomings of the prior art, the invention provides a kind of production technology of interlayer underwear mold cup, mold cup is solved Air bag is placed in interlayer the problem of being easily broken during processing.
(2) technical scheme
To realize object above, the present invention is achieved by the following technical programs:A kind of production of interlayer underwear mold cup Technique, comprises the following steps:
S1:First sponge is placed on the mold cup mould molding press of projection, then starts the mold cup mould pressure for having projection Mould machine, makes mold cup mould carry out compacting sponge downwards, and the temperature of molding press is located at 180 DEG C -216 DEG C, and the press time is 100s- 200s, waits after completion press mold, starts the mold cup mould molding press for having projection, mold cup mould is left sponge, form one piece and carry The mold cup sponge of two recessed positions;
S2:Another piece of new sponge is placed on without on raised mold cup mould film laminator, then started without projection Mold cup mould film laminator, mold cup mould is carried out compacting sponge downwards, the temperature of molding press is located at 180 DEG C -216 DEG C, compacting Time is 100s-200s, waits after completion press mold, starts without raised mold cup mould molding press, mold cup mould is left sponge, Form one piece of general mold cup sponge;
S3:Then the mold cup sponge with two recessed positions is put into another without raised mold cup mould molding press On, put on the mold cup sponge for having recessed position two pieces made of sponge such as the model of air bag size;
S4:Then the both sides position on the outside of the mold cup sponge with two recessed positions, scope such as air bag model is wide, applies Upper talcum powder, does not then have the new sea of processing on the mold cup sponge with two recessed positions and the surface cover of air bag model Silk floss, forms processing semi-finished product;
S5:On the mold cup mould molding press that the processing semi-finished product generated in S4 are placed on to projection, the temperature of film laminator For 180 DEG C -216 DEG C, press mold molding time is 150s-230s;
S6:The semi-finished product that press mold is completed in S5 are taken out, the position for having talcum powder to smear does not bond, formd at two Through hole, takes out filling model from hole, then all removes totally talcum powder, is then put into air bag from two through holes;
S7:The mold cup of air bag will be put into, is placed on the table, then two through holes in mold cup are carried out Glue;
S8:The mold cup that gluing is completed is placed on the film laminator without raised position mould, and mold cup is pressed, pressure The temperature of film machine is 150 DEG C -170 DEG C, and pressing time is 10s-20s, obtains the underwear mold cup that interlayer is air bag.
It is preferred that above-mentioned S7 in gluing flow comprise the following steps:
A1:First glue is applied on gluing plastic sheet, is then uniformly applied to gluing plastic sheet in through-hole surfaces;
A2:The personnel that proceed with one's work are pressed the position of spreading glue by finger, while the sponge of through hole is managed It is flat;
A3:The position of gluing is then checked for, glue is carried out to the place not being applied to, carried out by tiny sticking plaster Glue, is then pressed, and completes gluing work.
It is preferred that, the 968A of the glue model used in above-mentioned S7.
It is preferred that, it is described have projection mold cup mould molding press and without projection mold cup mould molding press on be provided with Temperature sensor.
It is preferred that, go to remove the talcum powder on mold cup surface by hair-dryer in above-mentioned S6.
(3) beneficial effect
The invention provides a kind of production technology of interlayer underwear mold cup.Possesses following beneficial effect:
(1), the production technology of the interlayer underwear mold cup, by there is the mold cup mould molding press of projection, without projection The setting of mold cup mould molding press and air bag model, makes interior mold cup to be put into air bag during production interior In clothing mold cup, and during underwear mold cup is sealed, air bag inflation will not be caused because of high temperature and is ruptured, it is so effective Maintain the production qualification rate of air bag mold cup, while reducing the productive expenditure, make what the air mold cup produced was used It is more comfortable.
(2), the production technology of the interlayer underwear mold cup, by the setting to air bag model, talcum powder and glue, makes sky Airbag is more conveniently placed in the interlayer of mold cup, and glue can fix sponge, makes what air bag was fixed in mold cup More stablize, so as to facilitate following process, while reducing the slip gradient of air bag, improve the qualification rate of product.
Embodiment
Technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only A part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
Embodiment one
S1:First sponge is placed on the mold cup mould molding press of projection, then starts the mold cup mould pressure for having projection Mould machine, makes mold cup mould carry out compacting sponge downwards, and the temperature of molding press is located at 180 DEG C, and the press time is 100s, waits completion to press After film, start the mold cup mould molding press for having projection, mold cup mould is left sponge, form one piece with two recessed positions Mold cup sponge;
S2:Another piece of new sponge is placed on without on raised mold cup mould film laminator, then started without projection Mold cup mould film laminator, mold cup mould is carried out compacting sponge downwards, the temperature of molding press is located at 180 DEG C, the press time is 100s, waits after completion press mold, starts without raised mold cup mould molding press, mold cup mould is left sponge, form one piece one As mold cup sponge;
S3:Then the mold cup sponge with two recessed positions is put into another without raised mold cup mould molding press On, put on the mold cup sponge for having recessed position two pieces made of sponge such as the model of air bag size;
S4:Then the both sides position on the outside of the mold cup sponge with two recessed positions, scope such as air bag model is wide, applies Upper talcum powder, does not then have the new sea of processing on the mold cup sponge with two recessed positions and the surface cover of air bag model Silk floss, forms processing semi-finished product;
S5:On the mold cup mould molding press that the processing semi-finished product generated in S4 are placed on to projection, the temperature of film laminator For 180 DEG C, press mold molding time is 150s;
S6:The semi-finished product that press mold is completed in S5 are taken out, the position for having talcum powder to smear does not bond, formd at two Through hole, takes out filling model from hole, then all removes totally talcum powder, is then put into air bag from two through holes;
S7:The mold cup of air bag will be put into, is placed on the table, then two through holes in mold cup are carried out Glue;
S8:The mold cup that gluing is completed is placed on the film laminator without raised position mould, and mold cup is pressed, pressure The temperature of film machine is 150 DEG C, and pressing time is 10s, obtains the underwear mold cup that interlayer is air bag.
Embodiment two
S1:First sponge is placed on the mold cup mould molding press of projection, then starts the mold cup mould pressure for having projection Mould machine, makes mold cup mould carry out compacting sponge downwards, and the temperature of molding press is located at 198 DEG C, and the press time is 150s, waits completion to press After film, start the mold cup mould molding press for having projection, mold cup mould is left sponge, form one piece with two recessed positions Mold cup sponge;
S2:Another piece of new sponge is placed on without on raised mold cup mould film laminator, then started without projection Mold cup mould film laminator, mold cup mould is carried out compacting sponge downwards, the temperature of molding press is located at 198 DEG C, the press time is 150s, waits after completion press mold, starts without raised mold cup mould molding press, mold cup mould is left sponge, form one piece one As mold cup sponge;
S3:Then the mold cup sponge with two recessed positions is put into another without raised mold cup mould molding press On, put on the mold cup sponge for having recessed position two pieces made of sponge such as the model of air bag size;
S4:Then the both sides position on the outside of the mold cup sponge with two recessed positions, scope such as air bag model is wide, applies Upper talcum powder, does not then have the new sea of processing on the mold cup sponge with two recessed positions and the surface cover of air bag model Silk floss, forms processing semi-finished product;
S5:On the mold cup mould molding press that the processing semi-finished product generated in S4 are placed on to projection, the temperature of film laminator For 198 DEG C, press mold molding time is 190s;
S6:The semi-finished product that press mold is completed in S5 are taken out, the position for having talcum powder to smear does not bond, formd at two Through hole, takes out filling model from hole, then all removes totally talcum powder, is then put into air bag from two through holes;
S7:The mold cup of air bag will be put into, is placed on the table, then two through holes in mold cup are carried out Glue;
S8:The mold cup that gluing is completed is placed on the film laminator without raised position mould, and mold cup is pressed, pressure The temperature of film machine is 160 DEG C, and pressing time is 15s, obtains the underwear mold cup that interlayer is air bag.
Embodiment three
S1:First sponge is placed on the mold cup mould molding press of projection, then starts the mold cup mould pressure for having projection Mould machine, makes mold cup mould carry out compacting sponge downwards, and the temperature of molding press is located at 216 DEG C, and the press time is 200s, waits completion to press After film, start the mold cup mould molding press for having projection, mold cup mould is left sponge, form one piece with two recessed positions Mold cup sponge;
S2:Another piece of new sponge is placed on without on raised mold cup mould film laminator, then started without projection Mold cup mould film laminator, mold cup mould is carried out compacting sponge downwards, the temperature of molding press is located at 216 DEG C, the press time is 200s, waits after completion press mold, starts without raised mold cup mould molding press, mold cup mould is left sponge, form one piece one As mold cup sponge;
S3:Then the mold cup sponge with two recessed positions is put into another without raised mold cup mould molding press On, put on the mold cup sponge for having recessed position two pieces made of sponge such as the model of air bag size;
S4:Then the both sides position on the outside of the mold cup sponge with two recessed positions, scope such as air bag model is wide, applies Upper talcum powder, does not then have the new sea of processing on the mold cup sponge with two recessed positions and the surface cover of air bag model Silk floss, forms processing semi-finished product;
S5:On the mold cup mould molding press that the processing semi-finished product generated in S4 are placed on to projection, the temperature of film laminator For 216 DEG C, press mold molding time is 230s;
S6:The semi-finished product that press mold is completed in S5 are taken out, the position for having talcum powder to smear does not bond, formd at two Through hole, takes out filling model from hole, then all removes totally talcum powder, is then put into air bag from two through holes;
S7:The mold cup of air bag will be put into, is placed on the table, then two through holes in mold cup are carried out Glue;
S8:The mold cup that gluing is completed is placed on the film laminator without raised position mould, and mold cup is pressed, pressure The temperature of film machine is 170 DEG C, and pressing time is 20s, obtains the underwear mold cup that interlayer is air bag.
It is to form two to sponge to play the role of the mold cup mould molding press of projection and the mold cup mould molding press without projection Rim of a cup of different sizes is planted, so that air bag is more easily put into, and follow-up empty sealing work is more convenient, subtracts The probability of low air bag rupture, talcum powder has the effect for placing bonding, is easy to people to take out air bag model and be put into sky Airbag.
In summary, the production technology of the interlayer underwear mold cup, the production technology of interlayer underwear mold cup, by there is projection Mold cup mould molding press, the setting without raised mold cup mould molding press and air bag model, make interior mold cup in production During air bag can not only be put into underwear mold cup, and underwear mold cup seal during, will not be because of high temperature Cause air bag inflation and rupture, so effectively maintain the production qualification rate of air bag mold cup, while reducing production branch Go out, make that the air mold cup produced uses is more comfortable.
Meanwhile, by the setting to air bag model, talcum powder and glue, air bag is more conveniently placed on mold cup Interlayer in, and glue can fix sponge, make air bag is fixed in mold cup more to stablize, thus facilitate it is follow-up plus Work, while reducing the slip gradient of air bag, improves the qualification rate of product.
It should be noted that herein, term " comprising ", "comprising" or its any other variant are intended to non-row His property is included, so that process, method, article or equipment including a series of key elements not only include those key elements, and And also including other key elements being not expressly set out, or also include for this process, method, article or equipment institute inherently Key element.In the absence of more restrictions.By sentence " including one ... the key element limited, it is not excluded that including Also there is other identical element in process, method, article or the equipment of the key element ".
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (5)

1. a kind of production technology of interlayer underwear mold cup, it is characterised in that comprise the following steps:
S1:First sponge is placed on the mold cup mould molding press of projection, then starts the mold cup mould molding press for having projection, Mold cup mould is set to carry out compacting sponge downwards, the temperature of molding press is located at 180 DEG C -216 DEG C, and the press time is 100s-200s, etc. Complete after press mold, start the mold cup mould molding press for having projection, mold cup mould is left sponge, form one piece with two depressions The mold cup sponge of position;
S2:Another piece of new sponge is placed on without on raised mold cup mould film laminator, then started without raised mould Cup mould film laminator, makes mold cup mould carry out compacting sponge downwards, and the temperature of molding press is located at 180 DEG C -216 DEG C, press time For 100s-200s, wait after completion press mold, start without raised mold cup mould molding press, mold cup mould is left sponge, formed One piece of general mold cup sponge;
S3:Then the mold cup sponge with two recessed positions is put on another no raised mold cup mould molding press, Have put on the mold cup sponge of recessed position two pieces made of sponge such as the model of air bag size;
S4:Then the both sides position on the outside of the mold cup sponge with two recessed positions, scope such as air bag model is wide, coats cunning Stone flour, does not then have the new sponge of processing on the mold cup sponge with two recessed positions and the surface cover of air bag model, Form processing semi-finished product;
S5:On the mold cup mould molding press that the processing semi-finished product generated in S4 are placed on to projection, the temperature of film laminator is 180 DEG C -216 DEG C, press mold molding time is 150s-230s;
S6:The semi-finished product that press mold is completed in S5 are taken out, the position for having talcum powder to smear is not bonded, form and lead at two Hole, takes out filling model from hole, then all removes totally talcum powder, is then put into air bag from two through holes;
S7:The mold cup of air bag will be put into, places on the table, gluing then is carried out to two through holes in mold cup;
S8:The mold cup that gluing is completed is placed on the film laminator without raised position mould, mold cup is pressed, film laminator Temperature be 150 DEG C -170 DEG C, pressing time is 10s-20s, obtain interlayer be air bag underwear mold cup.
2. a kind of production technology of interlayer underwear mold cup according to claim 1, it is characterised in that:Gluing stream in above-mentioned S7 Journey comprises the following steps:
A1:First glue is applied on gluing plastic sheet, is then uniformly applied to gluing plastic sheet in through-hole surfaces;
A2:The personnel that proceed with one's work are pressed the position of spreading glue by finger, while the sponge of through hole is patted;
A3:The position of gluing is then checked for, glue is carried out to the place not being applied to, mended by tiny sticking plaster Glue, is then pressed, and completes gluing work.
3. a kind of production technology of interlayer underwear mold cup according to claim 1, it is characterised in that:Used in above-mentioned S7 Glue model 968A.
4. a kind of production technology of interlayer underwear mold cup according to claim 1, it is characterised in that:It is described to have raised mould Cup mould molding press and without projection mold cup mould molding press on be provided with temperature sensor.
5. a kind of production technology of interlayer underwear mold cup according to claim 1, it is characterised in that:Go to pass through in above-mentioned S6 Hair-dryer removes the talcum powder on mold cup surface.
CN201710359863.1A 2017-05-20 2017-05-20 A kind of production technology of interlayer underwear mold cup Pending CN107006916A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710359863.1A CN107006916A (en) 2017-05-20 2017-05-20 A kind of production technology of interlayer underwear mold cup

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710359863.1A CN107006916A (en) 2017-05-20 2017-05-20 A kind of production technology of interlayer underwear mold cup

Publications (1)

Publication Number Publication Date
CN107006916A true CN107006916A (en) 2017-08-04

Family

ID=59450353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710359863.1A Pending CN107006916A (en) 2017-05-20 2017-05-20 A kind of production technology of interlayer underwear mold cup

Country Status (1)

Country Link
CN (1) CN107006916A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW201223466A (en) * 2010-12-03 2012-06-16 rong-hua Lin Lingerie chest pad and manufacturing method thereof
WO2014076414A1 (en) * 2012-11-19 2014-05-22 Dbapparel Operations Bra cup
CN104824863A (en) * 2015-05-08 2015-08-12 安莉芳(中国)服装有限公司 Bra cup with built-in lining and processing method
CN105455208A (en) * 2015-12-14 2016-04-06 苏州美山子制衣有限公司 Mould cup with camry position capable of being filled and manufacturing method of mould cup
TWI563926B (en) * 2016-01-22 2017-01-01 Corset cup support bag forming method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW201223466A (en) * 2010-12-03 2012-06-16 rong-hua Lin Lingerie chest pad and manufacturing method thereof
WO2014076414A1 (en) * 2012-11-19 2014-05-22 Dbapparel Operations Bra cup
CN104824863A (en) * 2015-05-08 2015-08-12 安莉芳(中国)服装有限公司 Bra cup with built-in lining and processing method
CN105455208A (en) * 2015-12-14 2016-04-06 苏州美山子制衣有限公司 Mould cup with camry position capable of being filled and manufacturing method of mould cup
TWI563926B (en) * 2016-01-22 2017-01-01 Corset cup support bag forming method

Similar Documents

Publication Publication Date Title
CN107373881B (en) Film-covered formed secondary MD shoe material and production process thereof
CN104325589A (en) Method for one-time application of polyurethane sole wrapped by thermoplastic polyurethane film to undersole
CN103689820A (en) Silica gel bra in multi-layer combination as well as preparation method of silica gel bra
CN102125313A (en) Silica gel bra and manufacturing method thereof
CN107253322A (en) A kind of forming method of latex bra cup and its application
CN102907767B (en) Silica gel brassiere mould cup and manufacturing method of silica gel brassiere mould cup
CN104367403B (en) Adopted breast of a kind of Multifunctional silica gel and preparation method thereof
CN101100125B (en) Automobile door internal decoration plate vacuum composite method
CN108851264A (en) Compound vertical continuous mold cup of a kind of Silica hydrogel and preparation method thereof
CN206699438U (en) A kind of compound vertical continuous mold cup of Silica hydrogel
CN107006916A (en) A kind of production technology of interlayer underwear mold cup
CN108556389A (en) A kind of light weight and the ETPU sole molding process with air cushion appearance
CN107127982A (en) A kind of equal pressing plate flexible connecting method being molded for composite product
CN110667138A (en) Reinforcing rib-containing carbon fiber antenna surface co-curing forming method
CN202035490U (en) Silica gel brassiere
CN203483198U (en) Vertical cotton baby pillow
CN104336972A (en) Breathable waterproof swimsuit cup, preparation method of breathable waterproof swimsuit cup and swimsuit adopting breathable waterproof swimsuit cup
CN107854201A (en) A kind of lightweight justice breast and preparation method thereof
CN109331433B (en) Manufacturing process of machine-pasted basketball
CN206306595U (en) 3D glass decoration film process equipments
CN105455208A (en) Mould cup with camry position capable of being filled and manufacturing method of mould cup
CN102910271A (en) Inflation-free swimming ring and manufacturing method thereof
CN202828047U (en) Inflation-free swimming life-buoy
CN209048368U (en) A kind of rehabilitation justice cream
CN208558487U (en) A kind of TPU composite leather

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170804

RJ01 Rejection of invention patent application after publication