CN106996195A - The support and its application method lifted for steel structural overhead - Google Patents

The support and its application method lifted for steel structural overhead Download PDF

Info

Publication number
CN106996195A
CN106996195A CN201610046985.0A CN201610046985A CN106996195A CN 106996195 A CN106996195 A CN 106996195A CN 201610046985 A CN201610046985 A CN 201610046985A CN 106996195 A CN106996195 A CN 106996195A
Authority
CN
China
Prior art keywords
joist
column
crossbeam
welded
elevated structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610046985.0A
Other languages
Chinese (zh)
Inventor
常华
刘明路
王馥琴
朱术文
唐启旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mcc No13 Construction Co Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
Shanghai Mcc No13 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mcc No13 Construction Co Ltd filed Critical Shanghai Mcc No13 Construction Co Ltd
Priority to CN201610046985.0A priority Critical patent/CN106996195A/en
Publication of CN106996195A publication Critical patent/CN106996195A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/163Jacks specially adapted for working-up building elements

Abstract

The present invention is specifically a kind of holder device lifted for steel structural overhead;It is characterized in that:It includes column, crossbeam, brace, support bracket, lifter, connection wirerope, top joist and bottom joist;Column arranges that column bottom plate is arranged on column bottom vertically, and column is welded on the top of building post by column bottom plate;Crossbeam and support bracket are located at the top and middle part of column respectively, and brace is supported between crossbeam and bracket;Top joist is located at cross rail top and is fixedly connected with crossbeam top plate;Bottom joist is connected with elevated structure;Top joist and bottom joist are all symmetrically provided with through hole in crossbeam both sides, and connection wirerope is worn with being connected top joist and bottom joist in through hole.Two table lifters can be set in this holder device, and are held in the palm by bottom joist and hold elevated structure, to reach that suitable suspension centre is arranged on the purpose of elevated structure bottom, it has easy construction, it is safe and stable the characteristics of.

Description

The support and its application method lifted for steel structural overhead
Technical field
The present invention relates to lifting construction for steel structure field, specifically a kind of support lifted for steel structural overhead and its application method.
Background technology
Continued to develop with economical and society, Super High, large span connected buildings increase year by year, and conjoined structure generally uses steel structural form.CONTROLLED INTEGRAL LIFT TECHNOLOGY because have the advantages that overhead welding operation is few, installation accuracy is high and short construction period be widely adopted.Conventional lift support is generally using single lifter, when the hoist point of elevated structure need to be arranged on bottom, and this often makes the connection of connection wirerope and elevated structure become inconvenient, and the perforate in elevated structure is even needed sometimes.
The content of the invention
It is an object of the present invention to provide one kind is suitable for lifting construction when hoist point is arranged on the bottom of elevated structure in steel structural overhead hoisting support apparatus, it has easy construction, it is safe and stable the characteristics of.
In order to achieve the above object, the present invention is realized in:
A kind of support lifted for steel structural overhead, it includes column, crossbeam, brace, support bracket, lifter, connection wirerope, top joist and bottom joist;Column arranges that column bottom plate is arranged on column bottom vertically, and column is welded on the top of building post by column bottom plate;Crossbeam and support bracket are located at the top and middle part of column respectively, and brace is supported between crossbeam and bracket;Top joist is located at cross rail top and is fixedly connected with crossbeam top plate, and transverse stiffener is provided between top joist and crossbeam;Bottom joist is connected by transverse stiffener with elevated structure;Top joist and bottom joist are all symmetrically provided with through hole in crossbeam both sides, and top joist is corresponding with the through hole on the joist of bottom, and connection wirerope is worn with being connected top joist and bottom joist in through hole.
The application method of the support, including
Step 1:Holder device is welded on building iron column top by the column bottom plate of bottom, wherein, when it is concrete column to build post, then it is welded on the pre-embedded steel slab at the top of it;
Step 2:Two hydraulic rockshafts are set on the joist of top;
Step 3:Bottom joist is welded on to the bottom of elevated structure;
Step 4:Connection wirerope is installed, structure is lifted to design attitude and installed using wirerope is connected;
Step 5:Slow unloading, bottom joist is separated simultaneously with elevated structure;
Step 6:Holder device is cut off, lifting construction is completed.
Two table lifters can be set in this holder device, and are held in the palm by bottom joist and hold elevated structure, to reach that suitable suspension centre is arranged on the purpose of elevated structure bottom, it has easy construction, it is safe and stable the characteristics of.
Brief description of the drawings
Fig. 1 is the front view of the present invention.
Fig. 2 is the right view of the present invention.
Fig. 3 is the top view of the present invention.
Embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of holder device for lift up of steel structure, it includes column 1, crossbeam 2, brace 3, support bracket 4, lifter 5 and connection wirerope 6;Column 1 arranges that column bottom plate 11 is arranged on the bottom of column 1 vertically, and column 1 is welded on the top of building post by column bottom plate 11;Crossbeam 2 and support bracket 4 are located at the top and middle part of column 1 respectively, and brace 3 is supported between crossbeam 2 and support bracket 4;Also include top joist 7, bottom joist 8;Top joist 7 is located at the top of crossbeam 2 and is fixedly connected with the top plate of crossbeam 2, and transverse stiffener is provided between top joist 7 and crossbeam 2;Bottom joist 8 is connected by transverse stiffener with elevated structure;Top joist 7 and bottom joist 8 are all symmetrically provided with through hole in the both sides of crossbeam 2, and top joist 7 is corresponding with the through hole on bottom joist 8.
In above-mentioned holder device,
The column 1, crossbeam 2 and brace 3 are welding box-shaped component, and each box-type member intersection is connected using angle welding, and fillet weld seam size is 12mm;The top of column 1 sets internal ribbed stiffener, ribbed stiffener thickness of slab 20mm with the flange plate correspondence position of crossbeam 2;Column 1 is welded on column bottom plate 11, column bottom plate thickness 30mm;
The support bracket 4 is welded H type beam, and fillet weld seam size is 12mm;Two pieces of transverse stiffeners, ribbed stiffener thickness of slab 15mm are set with the junction of brace 3 in support bracket 4;
The top joist 7 and bottom joist 8 are also using welding section steel beam;Top joist 7 is welded on the top of crossbeam 2, and sets four pieces of transverse stiffeners, and ribbed stiffener thickness of slab is 15mm;Bottom joist 8 is welded in elevated structure, and ribbed stiffener is set depending on concrete condition;Joist is symmetrical arranged a diameter of 140mm through hole in the both sides of crossbeam 2 up and down, and top joist 7 sets four pieces of internal ribbed stiffeners in through hole, and bottom joist 8 sets four pieces of internal ribbed stiffeners in through hole;
The lifter 5 is arranged on top joist 7, is connected by connecting wirerope 6 and servicing unit with bottom joist 8.
Steel structural overhead lifting holder device used is to arrange in groups, and profit is computerizedd control, and hydraulic lifting device is synchronous to be lifted.Below by taking one of holder device as an example, holder device construction method is introduced:
Step 1:Holder device is welded on building column top by the column bottom plate of bottom first(Post is such as built for concrete column, then is welded on the pre-embedded steel slab at the top of it);
Step 2:Two hydraulic rockshafts are set on the joist of top;
Step 3:Bottom joist is welded on to the bottom of elevated structure;
Step 4:Connection wirerope is installed, to design attitude and installation is attached using connecting wirerope and lifting structure;
Step 5:Slow unloading, bottom joist is separated simultaneously with elevated structure;
Step 6:Holder device is cut off, lifting construction is completed.
Two table lifters can be set in this holder device, and are held in the palm by bottom joist and hold elevated structure, to reach that suitable suspension centre is arranged on the purpose of elevated structure bottom, it has easy construction, it is safe and stable the characteristics of.

Claims (2)

1. a kind of support lifted for steel structural overhead, it is characterized in that:It includes column, crossbeam, brace, support bracket, lifter, connection wirerope, top joist and bottom joist;Column arranges that column bottom plate is arranged on column bottom vertically, and column is welded on the top of building post by column bottom plate;Crossbeam and support bracket are located at the top and middle part of column respectively, and brace is supported between crossbeam and bracket;Top joist is located at cross rail top and is fixedly connected with crossbeam top plate, and transverse stiffener is provided between top joist and crossbeam;Bottom joist is connected by transverse stiffener with elevated structure;Top joist and bottom joist are all symmetrically provided with through hole in crossbeam both sides, and top joist is corresponding with the through hole on the joist of bottom, and connection wirerope is worn with being connected top joist and bottom joist in through hole.
2. the application method of support described in claim 1, it is characterized in that:Including
Step 1:Holder device is welded on building iron column top by the column bottom plate of bottom, wherein, when it is concrete column to build post, then it is welded on the pre-embedded steel slab at the top of it;
Step 2:Two hydraulic rockshafts are set on the joist of top;
Step 3:Bottom joist is welded on to the bottom of elevated structure;
Step 4:Connection wirerope is installed, structure is lifted to design attitude and installed using wirerope is connected;
Step 5:Slow unloading, bottom joist is separated simultaneously with elevated structure;
Step 6:Holder device is cut off, lifting construction is completed.
CN201610046985.0A 2016-01-25 2016-01-25 The support and its application method lifted for steel structural overhead Pending CN106996195A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610046985.0A CN106996195A (en) 2016-01-25 2016-01-25 The support and its application method lifted for steel structural overhead

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610046985.0A CN106996195A (en) 2016-01-25 2016-01-25 The support and its application method lifted for steel structural overhead

Publications (1)

Publication Number Publication Date
CN106996195A true CN106996195A (en) 2017-08-01

Family

ID=59428377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610046985.0A Pending CN106996195A (en) 2016-01-25 2016-01-25 The support and its application method lifted for steel structural overhead

Country Status (1)

Country Link
CN (1) CN106996195A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108483247A (en) * 2018-04-08 2018-09-04 中建三局安装工程有限公司 A kind of townhouse carrying pole type hoisting frame being mounted laterally based on concrete isolated beam
CN111236077A (en) * 2020-02-13 2020-06-05 中国水利水电第十一工程局有限公司 Unloading construction method for steel box girder
CN113860203A (en) * 2021-10-14 2021-12-31 中铁六局集团有限公司 Promote frock convenient to operation in narrow and small region in space

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060844A (en) * 2014-04-30 2014-09-24 浙江东南网架股份有限公司 Sliding device and lifting device for truss frame of steel structural transfer floor of the high-rise building and construction method thereof
CN104389433A (en) * 2014-10-21 2015-03-04 北京建工土木工程有限公司 Integral hoisting system and construction method for steel truss support concrete heavy roof system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060844A (en) * 2014-04-30 2014-09-24 浙江东南网架股份有限公司 Sliding device and lifting device for truss frame of steel structural transfer floor of the high-rise building and construction method thereof
CN104389433A (en) * 2014-10-21 2015-03-04 北京建工土木工程有限公司 Integral hoisting system and construction method for steel truss support concrete heavy roof system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108483247A (en) * 2018-04-08 2018-09-04 中建三局安装工程有限公司 A kind of townhouse carrying pole type hoisting frame being mounted laterally based on concrete isolated beam
CN111236077A (en) * 2020-02-13 2020-06-05 中国水利水电第十一工程局有限公司 Unloading construction method for steel box girder
CN113860203A (en) * 2021-10-14 2021-12-31 中铁六局集团有限公司 Promote frock convenient to operation in narrow and small region in space

Similar Documents

Publication Publication Date Title
JP2008088782A (en) Cantilever overhang erection method of corrugated steel plate web bridge
CN103628680A (en) Construction method for large-area steel structure hanging layer
CN204589822U (en) The two cantilever bent cap anchor ear Construction Support system of a kind of solely post
CN103114681A (en) To-be-poured structure and construction method of high-altitude large-span reinforced concrete beam
CN106996195A (en) The support and its application method lifted for steel structural overhead
CN105201198A (en) Tool-type cantilever beam and construction method thereof
CN106436573A (en) Construction method of corbel and steel truss bracket of wide-span upper crossbeam of extra-high cable bent tower
CN203878965U (en) Device for construction of elevator shaft
JP2015511567A5 (en)
CN203392766U (en) Lightweight lifting bracket arranged on roof
CN103669665B (en) The elevation difference node construction technique of steel bar truss floor support plate construction
CN105133501B (en) A kind of high pier construction method utilizing Integral hoisting bracket
CN103362069A (en) Steel and concrete combined box girder concrete wing plate formwork and construction method
CN103195241B (en) Early removal support device for constructional engineering
CN204850048U (en) Overlap joint structure of quick hoist and mount of supplementary high -rise girder steel
CN102635070B (en) Mutual-pulling type vertical turning construction method for steel towers of cable-stayed bridge
CN202717499U (en) Simple hanging bracket used for hoisting bridge crane pair trolley
CN104563525A (en) Overall horizontal assembly method for box-type steel arched girder
CN210236845U (en) Adjustable hanger for component steel reinforcement cage
CN202429894U (en) Holder for mounting and assembling of bridge crane
CN203583776U (en) Truss structure of reinforced concrete beam
CN203924484U (en) A kind of precast beam and there is the reinforced concrete structure of tenon anchor system
CN105019556A (en) Lap-joint structure assisting quick hoisting of high-rise steel beam, and application of lap-joint structure
CN203112397U (en) Simple olecranon hoisting equipment
CN204510481U (en) Shaped steel junction plate vertical in steel building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170801