CN106989927A - A kind of engine based on suspension type ground test stand installs automatization process - Google Patents

A kind of engine based on suspension type ground test stand installs automatization process Download PDF

Info

Publication number
CN106989927A
CN106989927A CN201611192393.6A CN201611192393A CN106989927A CN 106989927 A CN106989927 A CN 106989927A CN 201611192393 A CN201611192393 A CN 201611192393A CN 106989927 A CN106989927 A CN 106989927A
Authority
CN
China
Prior art keywords
engine
test
installation technology
integrative installation
technology frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611192393.6A
Other languages
Chinese (zh)
Other versions
CN106989927B (en
Inventor
刘志友
陈鹏飞
龚小琦
何培垒
石小江
刘涛
文晓武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AECC Sichuan Gas Turbine Research Institute
Original Assignee
China Gas Turbine Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gas Turbine Research Institute filed Critical China Gas Turbine Research Institute
Priority to CN201611192393.6A priority Critical patent/CN106989927B/en
Publication of CN106989927A publication Critical patent/CN106989927A/en
Application granted granted Critical
Publication of CN106989927B publication Critical patent/CN106989927B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M15/00Testing of engines
    • G01M15/02Details or accessories of testing apparatus

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Engines (AREA)

Abstract

The present invention relates to a kind of engine automation mounting process method based on suspension type ground test stand, it is characterised in that specifically including following steps includes:Integrative installation technology frame is connected on the major-minor fulcrum of engine by driving a vehicle;The prepackage work of engine is completed on integrative installation technology frame;Affiliated integrative installation technology frame is accurately positioned the precalculated position immediately below test bay stand by automatic transferring platform;Complete integrative installation technology frame to dock with test bay stand, and locked by forced locking device;Connect each system fast interface.The process that the present invention is designed by engine test appear on the stage preparation be transferred to wait to try between complete, take test cell test bay time it is short;Automatic degree is high, and installation accuracy can effectively ensure that personnel labor intensity is low.

Description

A kind of engine based on suspension type ground test stand installs automatization process
Technical field
The invention belongs to a kind of test technology designing technique of aero-engine complete machine ground experiment, and in particular to Yi Zhongji In the engine automation mounting process method of suspension type ground test stand.
Background technology
During Aero Engine Testing, engine appear on the stage installation and adjustment occupy the plenty of time, leverage examination The service efficiency of ride.Existing suspension type ground test stand engine flow of installation is broadly divided into:First between waiting to try Engine is hung out from the packing case that lorry is shipped, then will treat that spreadsheet engine and its bottom plate are manually pushed to test run by fork truck On hoistable platform below platform stand, then it is filled to by supporting suspender with traveling crane in moving frame, whole hoisting process is mainly By artificially positioning and being oriented to, and by artificial connection, the demarcation major-minor fulcrum of engine, detecting electric pipeline company is finally carried out again Connect, general 3~5 days of process of entirely appearing on the stage, and the mainly operation on test bay.This operating type major defect:1. it is different Because structure is different when engine rotation is appeared on the stage, different stand process equipments need to be changed, lack unified general installation form;② Current mounting process is mainly completed on the test bay of test cell, and single engine is appeared on the stage the sky that the set-up time can shorten again Between it is limited, under test bay resource stressful situation, constrain test bay utilization rate;3. manual labor accounts for major part, installs essence Degree can only artificially be adjusted on test-bed, and installation parameter lacks rational detection means.
The content of the invention
The technical problem to be solved in the present invention:
A kind of engine automation mounting process method based on suspension type ground test stand of design.Prepared with improving experiment Efficiency, reduce labor intensity, optimize test bay process layout.
Technical scheme:
A kind of engine automation mounting process method based on suspension type ground test stand, specifically includes following steps bag Include:
Step 1, by driving a vehicle integrative installation technology frame is connected on the major-minor fulcrum of engine, and by integrative installation technology frame and Engine integral hoisting is to plane on operating platform, plane automatic adjustable level on the operating platform;
Step 2, on integrative installation technology frame complete engine prepackage work, the integrative installation technology frame be engine it is pre- Fixed mount is filled, is fixed comprising owner's fulcrum installing mechanism, engine auxiliary fulcrum installing mechanism, detecting electric integration module is started Mechanism, engine accessory power rating and process pipeline fixed mechanism, traveling crane attaching mouthful, operating platform interface and test bay platform Frame connection and lock interface etc., the prepackage work include:
Automatic detection device is installed on integrative installation technology frame, and enrolls zero point;
Automatic detection is set to survey target on each installment state test point of engine;
Main position of the fulcrum on the engine installment state shown according to automatic detection device, adjustment integrative installation technology frame, Make engine in integrative installation technology frame longitudinal center;
The auxiliary position of the fulcrum on integrative installation technology frame is adjusted, makes engine axis level;
Complete the installation of the flowtube at engine intake end;
Complete the installation of engine accessory power rating and process pipeline;
Each measuring point of engine is completed to be connected with the detecting electric integration module being fixed on integrative installation technology frame, and by auxiliary Calibration system is helped, the calibration of test line break-make is completed;
Step 3, automatic transferring platform will complete the integrative installation technology frame of engine prepackage, along the transport road of planning On footpath, automatic transportation to test cell hoistable platform, and by laser locating apparatus, affiliated integrative installation technology frame is accurately positioned Precalculated position immediately below test bay stand;
Step 4, rise hoistable platform are until plane passes through fine setting close to test bay stand lower plane on integrative installation technology frame The adjustable height of transferring platform, integrative installation technology bridge joint mouthful is slowly pushed into the automatic guide groove of stand, completes integration peace Shelve and docked with test bay stand, and locked by forced locking device;
The electric integration module of step 5, connecting test is to test bay operating system;Engine technology pipeline is connected to test bay On the fast interface of process system;Test bay operating system is run, school is carried out to engine all devices instrument, test line etc. Look into;Installation accuracy after being appeared on the stage by automatic detection device reinspection engine and flowtube.
Beneficial effects of the present invention:
Advantage:
A) engine test is appeared on the stage, and preparation is main to be completed between waiting to try, and the time for taking test cell test bay is short.
B) automatic degree is high, and installation accuracy can effectively ensure that personnel labor intensity is low.
Effect:
This is used for the automation process flow scheme design of suspension type ground aviation engine test installation rationally, automaticity Height, experiment prepares efficiency and greatly promoted.Worked well in the preliminary use of test bay, test preparation efficiency effectively lifted.
Brief description of the drawings
Fig. 1 is automation process flow chart.
Embodiment
A kind of engine based on suspension type ground test stand installs automation process flow, pre-installed comprising engine, The work(such as self-driven transhipment, lifting platform, integrated detecting electric, auxiliary driving, laser positioning, automatic detection and auto lock Can, the committed step of engine flow of installation automation includes:
1) engine is transported to test bay factory building by lorry from assembly shop and waited between trying.
2) integrative installation technology frame is connected on the major-minor fulcrum of engine by driving a vehicle, and by integrative installation technology frame and started Machine integral hoisting is in plane on the platform transferring platform of automatic adjustable level.
3) the main installment work of engine is completed on integrative installation technology frame, the integrative installation technology frame is that engine is pre- Fixed mount is filled, is fixed comprising owner's fulcrum installing mechanism, engine auxiliary fulcrum installing mechanism, detecting electric integration module is started Mechanism, engine accessory power rating and process pipeline fixed mechanism, traveling crane attaching mouthful, operating platform interface and test bay platform Frame connection and lock interface etc., the main contents of installment work include:
Automatic detection device is installed on integrative installation technology frame, and enrolls zero point;In each installment state test point of engine Upper setting automatic detection surveys target;On the engine installment state shown according to automatic detection device, adjustment integrative installation technology frame Main position of the fulcrum, makes engine in integrative installation technology frame longitudinal center;The auxiliary position of the fulcrum on integrative installation technology frame is adjusted, is made Engine axis level.
Complete the installation of the flowtube at engine intake end.
Complete the installation of engine accessory power rating and process pipeline.
Each measuring point of engine is completed to be connected with the detecting electric integration module being fixed on integrative installation technology frame, and by auxiliary Calibration system is helped, the calibration of test line break-make is completed.
After pre-installing area between trying and completing engine installment work, engine is in and treats examination state.
4) when needing to carry out engine test, automatic transferring platform will complete the integrative installation technology frame of engine prepackage, Along the transportation route of planning, on automatic transportation to test cell hoistable platform, and by laser locating apparatus, examination is accurately positioned Precalculated position immediately below ride stand.
5) rise hoistable platform is until plane passes through close to test bay stand lower plane certain position on integrative installation technology frame The adjustable height of transferring platform is finely tuned, integrative installation technology bridge joint mouthful is slowly pushed into the automatic guide groove of stand, one is completed Change mounting bracket to dock with test bay stand, and locked by forced locking device.
6) the electric integration module of connecting test is to test bay operating system;Engine technology pipeline is connected to test bay technique On the fast interface of system;Test bay operating system is run, carrying out school to engine all devices instrument, test line etc. looks into; Installation accuracy after being appeared on the stage by automatic detection device reinspection engine and flowtube.After the completion of above-mentioned work, engine is in Trystate.
7) after engine test is finished, integrative installation technology frame is integrally transported to by above-mentioned inverse process between waiting to try, dismounting, After the completion of packaging, test run factory building is transported.

Claims (1)

1. a kind of engine automation mounting process method based on suspension type ground test stand, it is characterised in that specifically include Following steps include:
Step 1, by driving a vehicle integrative installation technology frame is connected on the major-minor fulcrum of engine, and by integrative installation technology frame and started Machine integral hoisting is to plane on operating platform, plane automatic adjustable level on the operating platform;
Step 2, the prepackage work for completing on integrative installation technology frame engine, the integrative installation technology frame is that engine prepackage is solid Determine frame, machine is fixed comprising owner's fulcrum installing mechanism, engine auxiliary fulcrum installing mechanism, detecting electric integration module is started Structure, engine accessory power rating and process pipeline fixed mechanism, traveling crane attaching mouthful, operating platform interface and test bay stand Connection and lock interface etc., the prepackage work include:
Automatic detection device is installed on integrative installation technology frame, and enrolls zero point;
Automatic detection is set to survey target on each installment state test point of engine;
Main position of the fulcrum on the engine installment state shown according to automatic detection device, adjustment integrative installation technology frame, makes hair Motivation is in integrative installation technology frame longitudinal center;
The auxiliary position of the fulcrum on integrative installation technology frame is adjusted, makes engine axis level;
Complete the installation of the flowtube at engine intake end;
Complete the installation of engine accessory power rating and process pipeline;
Each measuring point of engine is completed to be connected with the detecting electric integration module being fixed on integrative installation technology frame, and by aiding in school Barebone, completes the calibration of test line break-make;
Step 3, automatic transferring platform will complete the integrative installation technology frame of engine prepackage, along the transportation route of planning, from On dynamic transport to test cell hoistable platform, and by laser locating apparatus, affiliated integrative installation technology frame is accurately positioned test run Precalculated position immediately below platform stand;
Step 4, rise hoistable platform are until plane is transported close to test bay stand lower plane by finely tuning on integrative installation technology frame The adjustable height of platform, integrative installation technology bridge joint mouthful is slowly pushed into the automatic guide groove of stand, integrative installation technology frame is completed Dock, and locked by forced locking device with test bay stand;
The electric integration module of step 5, connecting test is to test bay operating system;Engine technology pipeline is connected to test bay technique On the fast interface of system;Test bay operating system is run, carrying out school to engine all devices instrument, test line etc. looks into; Installation accuracy after being appeared on the stage by automatic detection device reinspection engine and flowtube.
CN201611192393.6A 2016-12-21 2016-12-21 A kind of engine installation automatization process based on suspension type ground test stand Active CN106989927B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611192393.6A CN106989927B (en) 2016-12-21 2016-12-21 A kind of engine installation automatization process based on suspension type ground test stand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611192393.6A CN106989927B (en) 2016-12-21 2016-12-21 A kind of engine installation automatization process based on suspension type ground test stand

Publications (2)

Publication Number Publication Date
CN106989927A true CN106989927A (en) 2017-07-28
CN106989927B CN106989927B (en) 2019-03-01

Family

ID=59414135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611192393.6A Active CN106989927B (en) 2016-12-21 2016-12-21 A kind of engine installation automatization process based on suspension type ground test stand

Country Status (1)

Country Link
CN (1) CN106989927B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109520739A (en) * 2018-12-20 2019-03-26 中国航发四川燃气涡轮研究院 A kind of engine switching accurate posture adjustment mounting platform of casing
CN113074945A (en) * 2021-03-16 2021-07-06 上海中船三井造船柴油机有限公司 Installation adjusting method and measurement adjusting device for complete machine pre-assembly of marine diesel engine
CN115436065A (en) * 2022-11-08 2022-12-06 中国航发四川燃气涡轮研究院 Multifunctional rack for aircraft engine test bed

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6164418A (en) * 1998-03-31 2000-12-26 Chen; Ching Hung Elevating work platform structure
CN2839997Y (en) * 2005-10-24 2006-11-22 成都发动机(集团)有限公司 Suspension type engine test run rack
CN201740646U (en) * 2010-06-12 2011-02-09 武汉东测科技有限责任公司 Preloaded platform system for engine test
CN102059549A (en) * 2010-11-12 2011-05-18 浙江大学 Airplane engine attitude regulation installation system based on four numerical control positioners and use method thereof
CN202494449U (en) * 2012-03-16 2012-10-17 上海大众汽车有限公司 Standard centring device and engine test trolley
CN203606134U (en) * 2013-10-30 2014-05-21 中国南方航空工业(集团)有限公司 Aircraft engine test bed frame
CN204758298U (en) * 2015-07-19 2015-11-11 中国人民解放军空军第一航空学院 Engine test bed
CN105241668A (en) * 2015-11-28 2016-01-13 南通华夏飞机工程技术股份有限公司 Piston type aero-engine test stand
CN205275157U (en) * 2015-12-21 2016-06-01 中国燃气涡轮研究院 Aeroengine short distance carrier

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6164418A (en) * 1998-03-31 2000-12-26 Chen; Ching Hung Elevating work platform structure
CN2839997Y (en) * 2005-10-24 2006-11-22 成都发动机(集团)有限公司 Suspension type engine test run rack
CN201740646U (en) * 2010-06-12 2011-02-09 武汉东测科技有限责任公司 Preloaded platform system for engine test
CN102059549A (en) * 2010-11-12 2011-05-18 浙江大学 Airplane engine attitude regulation installation system based on four numerical control positioners and use method thereof
CN202494449U (en) * 2012-03-16 2012-10-17 上海大众汽车有限公司 Standard centring device and engine test trolley
CN203606134U (en) * 2013-10-30 2014-05-21 中国南方航空工业(集团)有限公司 Aircraft engine test bed frame
CN204758298U (en) * 2015-07-19 2015-11-11 中国人民解放军空军第一航空学院 Engine test bed
CN105241668A (en) * 2015-11-28 2016-01-13 南通华夏飞机工程技术股份有限公司 Piston type aero-engine test stand
CN205275157U (en) * 2015-12-21 2016-06-01 中国燃气涡轮研究院 Aeroengine short distance carrier

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
北京长城计量测试技术研究所 主编: "《航空计量技术》", 31 December 2013 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109520739A (en) * 2018-12-20 2019-03-26 中国航发四川燃气涡轮研究院 A kind of engine switching accurate posture adjustment mounting platform of casing
CN113074945A (en) * 2021-03-16 2021-07-06 上海中船三井造船柴油机有限公司 Installation adjusting method and measurement adjusting device for complete machine pre-assembly of marine diesel engine
CN113074945B (en) * 2021-03-16 2024-04-05 上海中船三井造船柴油机有限公司 Installation and adjustment method and measurement and adjustment device for complete machine pre-assembly of marine diesel engine
CN115436065A (en) * 2022-11-08 2022-12-06 中国航发四川燃气涡轮研究院 Multifunctional rack for aircraft engine test bed

Also Published As

Publication number Publication date
CN106989927B (en) 2019-03-01

Similar Documents

Publication Publication Date Title
CN106989927A (en) A kind of engine based on suspension type ground test stand installs automatization process
CN102356041B (en) Workshop for preparing aircraft engines for shipping
CN106185645B (en) A kind of GNSS dual-flows station construction crane machine
CN109229418B (en) Installation method of wing hanging geophysical prospecting equipment nacelle
CN105172650B (en) Large Launch Vehicle automatic Loading rehandling facilities and reprinting method
CN105858480A (en) Building construction tower crane and fixed-point hoisting and lofting auxiliary system thereof
CN206615094U (en) Electric automobile wireless charging is automatically positioned calibrating installation
CN209280930U (en) A kind of patrol unmanned machine positioning system of converter station
CN102928233A (en) Quick change device of engine test bed
CN110203419A (en) A kind of airplane throttle rod force measuring device
CN103162934A (en) Novel hydrodynamic test high-speed trailer
CA2916522C (en) Method for attachment of a pre-assembled powerplant and pylon assembly to an aircraft
CN106000255A (en) Sectioned inverted mounting method of stirring device of decomposing tank
CN105773004B (en) Flexible equipment for manufacturing steel structure bridge and disassembling and assembling method thereof
CN104943874A (en) Intelligent operation management device for tank type fuelling vehicle for airplane
CN106383032A (en) Power assembly fixing clamp for speeding up interior noise contribution removal test
CN202693330U (en) Special fixture for vehicle clutch and accelerator pedal performance test bench rack
CN102207403A (en) Instrument for testing four corners of weighing apparatus
CN104729384B (en) A kind of gearbox leg detection means
CN201575859U (en) Weighing apparatus four-corner tester
CN105865605A (en) Remote control weight bridge test device and weight bridge test method thereof
CN205353336U (en) Special high voltage potential transformer disconnect -type check -up platform
CN205349315U (en) Small -size skid -mounted fracturing unit
CN103303187A (en) Rapid and precise vehicle-mounted weighing system
CN205440859U (en) A six rotor craft frames for disaster relief supplies are put in

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 610500 Xindu Xuefu Road, Xindu District, Chengdu, Sichuan

Patentee after: AECC SICHUAN GAS TURBINE Research Institute

Address before: 621703 P.O. Box 305, Mianyang City, Sichuan Province

Patentee before: CHINA GAS TURBINE EST