CN106988332A - A kind of ultra-deep waters aquatic pile foundation construction method - Google Patents
A kind of ultra-deep waters aquatic pile foundation construction method Download PDFInfo
- Publication number
- CN106988332A CN106988332A CN201710125064.8A CN201710125064A CN106988332A CN 106988332 A CN106988332 A CN 106988332A CN 201710125064 A CN201710125064 A CN 201710125064A CN 106988332 A CN106988332 A CN 106988332A
- Authority
- CN
- China
- Prior art keywords
- steel
- square steel
- cast
- length
- longeron
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
- Foundations (AREA)
Abstract
The invention discloses a kind of ultra-deep waters aquatic pile foundation construction method, including Pile, square steel, H profile steel, template is constituted, on the water during rack construction, first carry out the construction of cast-in-situ bored pile, in all drill-pouring stake tops, one square steel is set, square steel is located in the middle of cast-in-situ bored pile reinforcing bar gap, square steel is in horizontal positioned, square steel length is the diameter length of cast-in-situ bored pile, H profile steel is placed in square steel, H profile steel passes through square steel, every H profile steel length is 1.5 times of support cushion cap length, the H profile steel one section of crossbeam of formation passed through at the top of every cast-in-situ bored pile, several cast-in-situ bored pile shape crossbeams in a row, the longeron perpendicular to crossbeam is set up on crossbeam, the quantity of longeron is customized by specific requirement, longeron length is 1.5 times of support cushion cap length, support cushion cap template is laid on longeron, facilitate setting up and constructing for cushion cap template, offered convenience simultaneously to follow-up reinforcing bar colligation and concrete placings.
Description
Technical field
The invention belongs to carry out a kind of method that concrete rack construction is used in ultra-deep waters, particularly in ultra-deep waters
A kind of method constructed using the pile foundation of completion to support cushion cap set in pile foundation.
Background technology
At present, ultra-deep waters carry out concrete support construction, the method used be set up large area under water, work waterborne
Industry platform support lifts up into row operation using argosy, and extensive work amount is brought to construction, while setting up the expense of platform generation
With very high, construction costs is added.
The content of the invention
The purpose of the present invention is held aiming at the disadvantages mentioned above that prior art is present there is provided a kind of ultra-deep waters aquatic pile foundation
Platform construction method, simple and effective can carry out cushion cap model sheetinstallat waterborne, concrete placings etc..
The object of the present invention is achieved like this:A kind of ultra-deep waters aquatic pile foundation construction method, including drilling are filled
Note stake stake, square steel, H profile steel, template composition.On the water during rack construction, the construction of cast-in-situ bored pile is first carried out, in perfusion
Pile driving construction to design drawing require when, all drill-pouring stake tops set a square steel, square steel be located at cast-in-situ bored pile reinforcing bar seam
In the middle of gap, square steel is in horizontal positioned, and square steel length is the diameter length of cast-in-situ bored pile.H profile steel, H profile steel are placed in square steel
Through square steel, every H profile steel length is 1.5 times of support cushion cap length.The H profile steel passed through at the top of every cast-in-situ bored pile is formed
One section of crossbeam, several cast-in-situ bored pile shape crossbeams in a row, sets up the longeron perpendicular to crossbeam, the quantity of longeron on crossbeam
Customized by specific requirement, longeron length is 1.5 times of support cushion cap length.Support cushion cap template is laid on longeron, simultaneously
Take reinforcement measure.After the completion of cushion cap template construct is reinforced, you can carry out the colligation of cushion cap reinforcing bar and concrete placings.Treat that concrete support is completed
Afterwards, template is removed, cleared up.Longeron, the H profile steel crossbeam being placed in square steel are extracted out simultaneously.The H profile steel of extraction can be
It is continuing with next time in boat support frame bearing platform construction.
Beneficial effect of the present invention;Compared with prior art, a kind of ultra-deep waters aquatic pile foundation cushion cap that the present invention is provided is applied
Work method, need not set up on platform base, using the cast-in-situ bored pile constructed, is being added on cast-in-situ bored pile in addition
Square steel and H profile steel, facilitate setting up and constructing for cushion cap template, while being offered convenience to follow-up reinforcing bar colligation and concrete placings.
Brief description of the drawings
Accompanying drawing is used for providing a further understanding of the present invention, and constitutes a part for specification, the reality with the present invention
Applying example is used to explain the present invention together, is not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is a kind of ultra-deep waters aquatic pile foundation construction method schematic diagram proposed by the invention;
In figure:1st, cast-in-situ bored pile;2nd, square steel;3rd, H profile steel;4th, template.
Embodiment
The preferred embodiments of the present invention are illustrated below in conjunction with accompanying drawing, it will be appreciated that preferred reality described herein
Apply example to be merely to illustrate and explain the present invention, be not intended to limit the present invention.
Embodiment 1
As shown in figure 1, the present invention provides a kind of ultra-deep waters aquatic pile foundation construction method, drill-pouring is carried out in water body
The construction of stake 1, the depth of water is more than 5 meters, 0.8 meter of the diameter of the drilling of cast-in-situ bored pile 1,16 meters of drilling depth, the GPS-20 types of use
Drilling machine.In the construction of cast-in-situ bored pile 1 to during design drawing requirement, one square steel 2, square steel 2 are set on all cast-in-situ bored piles 1 top
It is located in the middle of the reinforcing bar gap of cast-in-situ bored pile 1, square steel 2 is in horizontal positioned, the length of square steel 2 is the diameter length of cast-in-situ bored pile 1.
H profile steel 3 is placed in square steel 2, H profile steel 3 passes through square steel 2, and the every length of H profile steel 3 is 1.5 times of support cushion cap length.Every
The one section of crossbeam of formation of H profile steel 3 that the top of cast-in-situ bored pile 1 is passed through, several shape of cast-in-situ bored pile 1 crossbeams in a row, in crossbeam
On set up longeron perpendicular to crossbeam, the quantity of longeron is customized by specific requirement, and longeron length is the 1.5 of support cushion cap length
Times.Support cushion cap template 4 is laid on longeron, while taking reinforcement measure.Cushion cap template 4 is made after the completion of reinforcing, you can
Carry out the colligation of cushion cap reinforcing bar and concrete placings.Treat after the completion of concrete support, template 4 is removed, cleared up.While by longeron, being placed on
The crossbeam of H profile steel 3 in square steel 2 is extracted out.The H profile steel 3 of extraction can be continuing with boat support frame bearing platform construction next time.
Beneficial effect of the present invention;Compared with prior art, a kind of ultra-deep waters aquatic pile foundation cushion cap that the present invention is provided is applied
Work method, need not set up on platform base, using the cast-in-situ bored pile constructed, is being added on cast-in-situ bored pile in addition
Square steel and H profile steel, facilitate setting up and constructing for cushion cap template, while being offered convenience to follow-up reinforcing bar colligation and concrete placings.
Finally it should be noted that:The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention,
Although the present invention is described in detail with reference to the foregoing embodiments, for those skilled in the art, it still may be used
To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic.
Within the spirit and principles of the invention, any modification, equivalent substitution and improvements made etc., should be included in the present invention's
Within protection domain.
Claims (1)
1. a kind of ultra-deep waters aquatic pile foundation construction method, it is characterized in that, including Pile, square steel, H profile steel,
Template, on the water during rack construction, first carries out the construction of cast-in-situ bored pile, a side is set in all drill-pouring stake tops
Steel, square steel is located in the middle of cast-in-situ bored pile reinforcing bar gap, and square steel is in horizontal positioned, and square steel length is long for the diameter of cast-in-situ bored pile
Degree, places H profile steel in square steel, and H profile steel passes through square steel, and every H profile steel length is 1.5 times of support cushion cap length, every brill
The H profile steel one section of crossbeam of formation passed through at the top of hole pouring pile, several cast-in-situ bored pile shape crossbeams in a row are set up on crossbeam
Perpendicular to the longeron of crossbeam, the quantity of longeron is customized by specific requirement, and longeron length is 1.5 times of support cushion cap length, will be propped up
Frame cushion cap template is laid on longeron, while reinforcement measure is taken, after the completion of cushion cap template construct is reinforced, you can carry out pile cap steel
Muscle colligation and concrete placings, treat after the completion of concrete support, template are removed, cleared up, while by longeron, the H types being placed in square steel
Gooseneck is extracted out, and the H profile steel of extraction can be continuing with boat support frame bearing platform construction next time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710125064.8A CN106988332A (en) | 2017-03-03 | 2017-03-03 | A kind of ultra-deep waters aquatic pile foundation construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710125064.8A CN106988332A (en) | 2017-03-03 | 2017-03-03 | A kind of ultra-deep waters aquatic pile foundation construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106988332A true CN106988332A (en) | 2017-07-28 |
Family
ID=59413141
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710125064.8A Pending CN106988332A (en) | 2017-03-03 | 2017-03-03 | A kind of ultra-deep waters aquatic pile foundation construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106988332A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108612121A (en) * | 2018-04-18 | 2018-10-02 | 中国十七冶集团有限公司 | A kind of formwork structure and its construction method of the pile framing of large area shallow waters |
CN109537617A (en) * | 2018-12-03 | 2019-03-29 | 中铁十二局集团有限公司 | A kind of construction method pouring hanging cushion cap using suspension type bed die bracket |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4800716B2 (en) * | 2005-09-12 | 2011-10-26 | 株式会社間組 | Artificial ground |
CN102251530A (en) * | 2011-04-27 | 2011-11-23 | 中铁二十局集团第二工程有限公司 | Construction process of double-wall steel cofferdam for construction of pier bearing platform in main river water of Yellow River |
CN104314011A (en) * | 2014-11-17 | 2015-01-28 | 华北水利水电大学 | Concrete construction method of underwater bearing platform |
CN104532813B (en) * | 2014-12-16 | 2017-01-04 | 江西省城建建设集团有限公司 | A kind of aquatic building operation platform and erection method, using method |
-
2017
- 2017-03-03 CN CN201710125064.8A patent/CN106988332A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4800716B2 (en) * | 2005-09-12 | 2011-10-26 | 株式会社間組 | Artificial ground |
CN102251530A (en) * | 2011-04-27 | 2011-11-23 | 中铁二十局集团第二工程有限公司 | Construction process of double-wall steel cofferdam for construction of pier bearing platform in main river water of Yellow River |
CN104314011A (en) * | 2014-11-17 | 2015-01-28 | 华北水利水电大学 | Concrete construction method of underwater bearing platform |
CN104532813B (en) * | 2014-12-16 | 2017-01-04 | 江西省城建建设集团有限公司 | A kind of aquatic building operation platform and erection method, using method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108612121A (en) * | 2018-04-18 | 2018-10-02 | 中国十七冶集团有限公司 | A kind of formwork structure and its construction method of the pile framing of large area shallow waters |
CN109537617A (en) * | 2018-12-03 | 2019-03-29 | 中铁十二局集团有限公司 | A kind of construction method pouring hanging cushion cap using suspension type bed die bracket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105239594B (en) | Pile for prestressed pipe column | |
CN106869321A (en) | The prefabricated regeneration concrete bean column node and its construction method of a kind of reinforcement | |
CN106988332A (en) | A kind of ultra-deep waters aquatic pile foundation construction method | |
CN106854941A (en) | A kind of construction method of heavy in section Stand Inclined Beams and batter post | |
CN106836240A (en) | Basement annular brace construction method for supporting | |
CN104295112B (en) | A kind of reinforced concrete post connects steel core concrete column syndeton and construction method | |
CN107299764A (en) | A kind of concrete apparatus and construction method for being conveniently constructed the positioning of post cage bar | |
CN204510221U (en) | Rotary marine piling saddle | |
CN204174955U (en) | Reinforced concrete post connects steel core concrete column syndeton | |
CN208251077U (en) | A kind of positioning constructing device of networking measurement control stake | |
CN206204768U (en) | A kind of stainless steel reinforced concrete bridge pier for being cladded with CFRP cloth | |
CN205421352U (en) | Adopt reverse construction method post -cast strip reinforced structure of dowel steel | |
CN205999730U (en) | A kind of non-fragment orbit base pours uses template | |
CN205604283U (en) | Building bar planting concrete column | |
CN206015511U (en) | One implant post steel pipe column | |
CN205975995U (en) | Cast -in -place concrete floor indent steel tube frame | |
CN204780892U (en) | Tubular pile crack reinforcement structure of high strength | |
CN105297758B (en) | Prestress square pile and the integrated column of steel lattice column | |
CN206859263U (en) | A kind of large formwork construction device of subway station side wall | |
CN205474861U (en) | Vertical bed -jig of pier stud reinforcement | |
CN207092382U (en) | A kind of steel plate concrete composite reinforcement reinforced beam anti-fatigue performance structure | |
CN106049205A (en) | Formwork for ballast-less track base casting | |
CN102162224B (en) | Top reaching one-time casting process of concrete check gate seam pier | |
CN206418514U (en) | A kind of strip footing for not destroying hard surface | |
CN205369217U (en) | Double -deck channel -section steel support of detachable ground fixed modulus of wall steel reinforcement cage segmentation butt joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170728 |
|
RJ01 | Rejection of invention patent application after publication |