CN106988332A - A kind of ultra-deep waters aquatic pile foundation construction method - Google Patents

A kind of ultra-deep waters aquatic pile foundation construction method Download PDF

Info

Publication number
CN106988332A
CN106988332A CN201710125064.8A CN201710125064A CN106988332A CN 106988332 A CN106988332 A CN 106988332A CN 201710125064 A CN201710125064 A CN 201710125064A CN 106988332 A CN106988332 A CN 106988332A
Authority
CN
China
Prior art keywords
steel
square steel
cast
length
longeron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710125064.8A
Other languages
Chinese (zh)
Inventor
时小兵
林涛
刘家宽
施光涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201710125064.8A priority Critical patent/CN106988332A/en
Publication of CN106988332A publication Critical patent/CN106988332A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a kind of ultra-deep waters aquatic pile foundation construction method, including Pile, square steel, H profile steel, template is constituted, on the water during rack construction, first carry out the construction of cast-in-situ bored pile, in all drill-pouring stake tops, one square steel is set, square steel is located in the middle of cast-in-situ bored pile reinforcing bar gap, square steel is in horizontal positioned, square steel length is the diameter length of cast-in-situ bored pile, H profile steel is placed in square steel, H profile steel passes through square steel, every H profile steel length is 1.5 times of support cushion cap length, the H profile steel one section of crossbeam of formation passed through at the top of every cast-in-situ bored pile, several cast-in-situ bored pile shape crossbeams in a row, the longeron perpendicular to crossbeam is set up on crossbeam, the quantity of longeron is customized by specific requirement, longeron length is 1.5 times of support cushion cap length, support cushion cap template is laid on longeron, facilitate setting up and constructing for cushion cap template, offered convenience simultaneously to follow-up reinforcing bar colligation and concrete placings.

Description

A kind of ultra-deep waters aquatic pile foundation construction method
Technical field
The invention belongs to carry out a kind of method that concrete rack construction is used in ultra-deep waters, particularly in ultra-deep waters A kind of method constructed using the pile foundation of completion to support cushion cap set in pile foundation.
Background technology
At present, ultra-deep waters carry out concrete support construction, the method used be set up large area under water, work waterborne Industry platform support lifts up into row operation using argosy, and extensive work amount is brought to construction, while setting up the expense of platform generation With very high, construction costs is added.
The content of the invention
The purpose of the present invention is held aiming at the disadvantages mentioned above that prior art is present there is provided a kind of ultra-deep waters aquatic pile foundation Platform construction method, simple and effective can carry out cushion cap model sheetinstallat waterborne, concrete placings etc..
The object of the present invention is achieved like this:A kind of ultra-deep waters aquatic pile foundation construction method, including drilling are filled Note stake stake, square steel, H profile steel, template composition.On the water during rack construction, the construction of cast-in-situ bored pile is first carried out, in perfusion Pile driving construction to design drawing require when, all drill-pouring stake tops set a square steel, square steel be located at cast-in-situ bored pile reinforcing bar seam In the middle of gap, square steel is in horizontal positioned, and square steel length is the diameter length of cast-in-situ bored pile.H profile steel, H profile steel are placed in square steel Through square steel, every H profile steel length is 1.5 times of support cushion cap length.The H profile steel passed through at the top of every cast-in-situ bored pile is formed One section of crossbeam, several cast-in-situ bored pile shape crossbeams in a row, sets up the longeron perpendicular to crossbeam, the quantity of longeron on crossbeam Customized by specific requirement, longeron length is 1.5 times of support cushion cap length.Support cushion cap template is laid on longeron, simultaneously Take reinforcement measure.After the completion of cushion cap template construct is reinforced, you can carry out the colligation of cushion cap reinforcing bar and concrete placings.Treat that concrete support is completed Afterwards, template is removed, cleared up.Longeron, the H profile steel crossbeam being placed in square steel are extracted out simultaneously.The H profile steel of extraction can be It is continuing with next time in boat support frame bearing platform construction.
Beneficial effect of the present invention;Compared with prior art, a kind of ultra-deep waters aquatic pile foundation cushion cap that the present invention is provided is applied Work method, need not set up on platform base, using the cast-in-situ bored pile constructed, is being added on cast-in-situ bored pile in addition Square steel and H profile steel, facilitate setting up and constructing for cushion cap template, while being offered convenience to follow-up reinforcing bar colligation and concrete placings.
Brief description of the drawings
Accompanying drawing is used for providing a further understanding of the present invention, and constitutes a part for specification, the reality with the present invention Applying example is used to explain the present invention together, is not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is a kind of ultra-deep waters aquatic pile foundation construction method schematic diagram proposed by the invention;
In figure:1st, cast-in-situ bored pile;2nd, square steel;3rd, H profile steel;4th, template.
Embodiment
The preferred embodiments of the present invention are illustrated below in conjunction with accompanying drawing, it will be appreciated that preferred reality described herein Apply example to be merely to illustrate and explain the present invention, be not intended to limit the present invention.
Embodiment 1
As shown in figure 1, the present invention provides a kind of ultra-deep waters aquatic pile foundation construction method, drill-pouring is carried out in water body The construction of stake 1, the depth of water is more than 5 meters, 0.8 meter of the diameter of the drilling of cast-in-situ bored pile 1,16 meters of drilling depth, the GPS-20 types of use Drilling machine.In the construction of cast-in-situ bored pile 1 to during design drawing requirement, one square steel 2, square steel 2 are set on all cast-in-situ bored piles 1 top It is located in the middle of the reinforcing bar gap of cast-in-situ bored pile 1, square steel 2 is in horizontal positioned, the length of square steel 2 is the diameter length of cast-in-situ bored pile 1. H profile steel 3 is placed in square steel 2, H profile steel 3 passes through square steel 2, and the every length of H profile steel 3 is 1.5 times of support cushion cap length.Every The one section of crossbeam of formation of H profile steel 3 that the top of cast-in-situ bored pile 1 is passed through, several shape of cast-in-situ bored pile 1 crossbeams in a row, in crossbeam On set up longeron perpendicular to crossbeam, the quantity of longeron is customized by specific requirement, and longeron length is the 1.5 of support cushion cap length Times.Support cushion cap template 4 is laid on longeron, while taking reinforcement measure.Cushion cap template 4 is made after the completion of reinforcing, you can Carry out the colligation of cushion cap reinforcing bar and concrete placings.Treat after the completion of concrete support, template 4 is removed, cleared up.While by longeron, being placed on The crossbeam of H profile steel 3 in square steel 2 is extracted out.The H profile steel 3 of extraction can be continuing with boat support frame bearing platform construction next time.
Beneficial effect of the present invention;Compared with prior art, a kind of ultra-deep waters aquatic pile foundation cushion cap that the present invention is provided is applied Work method, need not set up on platform base, using the cast-in-situ bored pile constructed, is being added on cast-in-situ bored pile in addition Square steel and H profile steel, facilitate setting up and constructing for cushion cap template, while being offered convenience to follow-up reinforcing bar colligation and concrete placings.
Finally it should be noted that:The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, Although the present invention is described in detail with reference to the foregoing embodiments, for those skilled in the art, it still may be used To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic. Within the spirit and principles of the invention, any modification, equivalent substitution and improvements made etc., should be included in the present invention's Within protection domain.

Claims (1)

1. a kind of ultra-deep waters aquatic pile foundation construction method, it is characterized in that, including Pile, square steel, H profile steel, Template, on the water during rack construction, first carries out the construction of cast-in-situ bored pile, a side is set in all drill-pouring stake tops Steel, square steel is located in the middle of cast-in-situ bored pile reinforcing bar gap, and square steel is in horizontal positioned, and square steel length is long for the diameter of cast-in-situ bored pile Degree, places H profile steel in square steel, and H profile steel passes through square steel, and every H profile steel length is 1.5 times of support cushion cap length, every brill The H profile steel one section of crossbeam of formation passed through at the top of hole pouring pile, several cast-in-situ bored pile shape crossbeams in a row are set up on crossbeam Perpendicular to the longeron of crossbeam, the quantity of longeron is customized by specific requirement, and longeron length is 1.5 times of support cushion cap length, will be propped up Frame cushion cap template is laid on longeron, while reinforcement measure is taken, after the completion of cushion cap template construct is reinforced, you can carry out pile cap steel Muscle colligation and concrete placings, treat after the completion of concrete support, template are removed, cleared up, while by longeron, the H types being placed in square steel Gooseneck is extracted out, and the H profile steel of extraction can be continuing with boat support frame bearing platform construction next time.
CN201710125064.8A 2017-03-03 2017-03-03 A kind of ultra-deep waters aquatic pile foundation construction method Pending CN106988332A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710125064.8A CN106988332A (en) 2017-03-03 2017-03-03 A kind of ultra-deep waters aquatic pile foundation construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710125064.8A CN106988332A (en) 2017-03-03 2017-03-03 A kind of ultra-deep waters aquatic pile foundation construction method

Publications (1)

Publication Number Publication Date
CN106988332A true CN106988332A (en) 2017-07-28

Family

ID=59413141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710125064.8A Pending CN106988332A (en) 2017-03-03 2017-03-03 A kind of ultra-deep waters aquatic pile foundation construction method

Country Status (1)

Country Link
CN (1) CN106988332A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612121A (en) * 2018-04-18 2018-10-02 中国十七冶集团有限公司 A kind of formwork structure and its construction method of the pile framing of large area shallow waters
CN109537617A (en) * 2018-12-03 2019-03-29 中铁十二局集团有限公司 A kind of construction method pouring hanging cushion cap using suspension type bed die bracket

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4800716B2 (en) * 2005-09-12 2011-10-26 株式会社間組 Artificial ground
CN102251530A (en) * 2011-04-27 2011-11-23 中铁二十局集团第二工程有限公司 Construction process of double-wall steel cofferdam for construction of pier bearing platform in main river water of Yellow River
CN104314011A (en) * 2014-11-17 2015-01-28 华北水利水电大学 Concrete construction method of underwater bearing platform
CN104532813B (en) * 2014-12-16 2017-01-04 江西省城建建设集团有限公司 A kind of aquatic building operation platform and erection method, using method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4800716B2 (en) * 2005-09-12 2011-10-26 株式会社間組 Artificial ground
CN102251530A (en) * 2011-04-27 2011-11-23 中铁二十局集团第二工程有限公司 Construction process of double-wall steel cofferdam for construction of pier bearing platform in main river water of Yellow River
CN104314011A (en) * 2014-11-17 2015-01-28 华北水利水电大学 Concrete construction method of underwater bearing platform
CN104532813B (en) * 2014-12-16 2017-01-04 江西省城建建设集团有限公司 A kind of aquatic building operation platform and erection method, using method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612121A (en) * 2018-04-18 2018-10-02 中国十七冶集团有限公司 A kind of formwork structure and its construction method of the pile framing of large area shallow waters
CN109537617A (en) * 2018-12-03 2019-03-29 中铁十二局集团有限公司 A kind of construction method pouring hanging cushion cap using suspension type bed die bracket

Similar Documents

Publication Publication Date Title
CN105239594B (en) Pile for prestressed pipe column
CN106869321A (en) The prefabricated regeneration concrete bean column node and its construction method of a kind of reinforcement
CN106988332A (en) A kind of ultra-deep waters aquatic pile foundation construction method
CN106854941A (en) A kind of construction method of heavy in section Stand Inclined Beams and batter post
CN106836240A (en) Basement annular brace construction method for supporting
CN104295112B (en) A kind of reinforced concrete post connects steel core concrete column syndeton and construction method
CN107299764A (en) A kind of concrete apparatus and construction method for being conveniently constructed the positioning of post cage bar
CN204510221U (en) Rotary marine piling saddle
CN204174955U (en) Reinforced concrete post connects steel core concrete column syndeton
CN208251077U (en) A kind of positioning constructing device of networking measurement control stake
CN206204768U (en) A kind of stainless steel reinforced concrete bridge pier for being cladded with CFRP cloth
CN205421352U (en) Adopt reverse construction method post -cast strip reinforced structure of dowel steel
CN205999730U (en) A kind of non-fragment orbit base pours uses template
CN205604283U (en) Building bar planting concrete column
CN206015511U (en) One implant post steel pipe column
CN205975995U (en) Cast -in -place concrete floor indent steel tube frame
CN204780892U (en) Tubular pile crack reinforcement structure of high strength
CN105297758B (en) Prestress square pile and the integrated column of steel lattice column
CN206859263U (en) A kind of large formwork construction device of subway station side wall
CN205474861U (en) Vertical bed -jig of pier stud reinforcement
CN207092382U (en) A kind of steel plate concrete composite reinforcement reinforced beam anti-fatigue performance structure
CN106049205A (en) Formwork for ballast-less track base casting
CN102162224B (en) Top reaching one-time casting process of concrete check gate seam pier
CN206418514U (en) A kind of strip footing for not destroying hard surface
CN205369217U (en) Double -deck channel -section steel support of detachable ground fixed modulus of wall steel reinforcement cage segmentation butt joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170728

RJ01 Rejection of invention patent application after publication