CN106978840A - A kind of face groundwater pollution control for drainage system pipe network system - Google Patents
A kind of face groundwater pollution control for drainage system pipe network system Download PDFInfo
- Publication number
- CN106978840A CN106978840A CN201710325055.3A CN201710325055A CN106978840A CN 106978840 A CN106978840 A CN 106978840A CN 201710325055 A CN201710325055 A CN 201710325055A CN 106978840 A CN106978840 A CN 106978840A
- Authority
- CN
- China
- Prior art keywords
- sewage
- water
- sewer
- storm
- rainwater
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F1/00—Methods, systems, or installations for draining-off sewage or storm water
- E03F1/001—Methods, systems, or installations for draining-off sewage or storm water into a body of water
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/10—Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/14—Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/30—Flood prevention; Flood or storm water management, e.g. using flood barriers
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Sewage (AREA)
Abstract
The invention discloses a kind of face groundwater pollution control for drainage system pipe network system, it passes through the multiple unit areas including sewage conduct and storm sewer of function and usage Attribute transposition in urban area;Storm sewer in each unit area is connected with sewage conduct;Set the first rain processing system that the combined sewage of the sewage in sewage conduct and early-stage rainwater formation is branched into trunk sewer or Storm-water sewer realizes the processing of combined sewage in unit area on sewage conduct in each unit area, its water conservancy diversion is entered trunk sewer or Storm-water sewer;Set the second rain processing system to realize the processing to combined sewage in Storm-water sewer on Storm-water sewer, its water conservancy diversion is entered trunk sewer or directly discharge natural water.The present invention is simple in construction, build convenient, and the efficient process that just rain storage pond is the achievable sewage in the regional that is divided in city with administrative functionality and early-stage rainwater need to be only built in the limited region of town road.
Description
Technical field
The present invention relates to a kind of face groundwater pollution control, belong to distributing source face pollution control technology field, specifically relate to
And a kind of face groundwater pollution control for drainage system pipe network system.
Background technology
Municipal drainage system is broadly divided into combined drainage system and combined drainage system.The interflow occurred earliest
Drainage system processed, is that sanitary sewage, industrial wastewater and rainwater are blended in same pipe duct, without any processing with regard to directly
Water body closely is discharged into, makes receiving water body by severe contamination, lot of domestic and international mature city is nearly all in this way.Often adopt now
It is interceptive combined system drainage system.
Interceptive combined system drainage system and traditional combined drainage system are essentially identical in structure, and distinctive points are
Interceptive combined system drainage system is provided with catch basin between municipal administration interflow main and sewage treatment plant.Interceptive combined system is arranged
When water system works, the rainwater that the sanitary sewage and inlet for stom water of resident's discharge are collected is all dry into municipal administration interflow by collaborating pipeline
The rainwater that inlet for stom water along pipe, town road is collected also all enters municipal administration interflow main, and Vatch basin is set in main end.It is fine
It when, all sewage are all delivered to sewage treatment plant, and natural water is discharged into after processing.During rainfall, sewage and rainfall initial stage
Rainwater can also be transported to sewage treatment plant, natural water is discharged into after processing.But with the increase of rainfall, rainwater footpath
Stream also increases, and after the flow of combined sewage exceedes the conveyance power of water for the main that dams, just has part combined sewage overflow and straight
Tap into natural water.
For this combined drainage system, its problem is mainly:1. during rainfall, it can be produced on residential area and town road
Pollution of area source, although existing combined drainage system is dammed in end provided with Vatch basin, the interception ratio of design
Not enough so that Vatch basin could not be intercepted to area source pollutants, and area source pollutants are directly entered natural water, to natural water
Pollute.2. to be controlled to pollution of area source, it is necessary to increase the size of Vatch basin, the size for the main that dams is increased,
Increase the capacity of sewage treatment plant.3. Vatch basin dams for the control of extensive style, it is impossible to accurately early-stage rainwater is cut
Stream.
Combined drainage system is divided into complete combined system and incomplete combined system two again according to the difference for excluding rainwater mode
Plant drainage system.Complete combined drainage system is completely to separate rainwater and sanitary sewage, trade effluent, by different pipelines
Conveyed.The sanitary sewage of resident's discharge enters trunk sewer by sewage conduct, is then sent to sewage treatment plant's processing
After discharge, inlet for stom water collect rainwater Storm-water sewer is entered by storm sewer, be directly discharged to natural water.Town road edge
The rainwater that the inlet for stom water of line is collected also all enters Storm-water sewer, is directly discharged to natural water.In this combined drainage system
In, it there are problems that a lot:1. the part sanitary sewage in residential area is mistakenly entered and done washing on storm sewer, such as balcony
The sanitary sewage of machine discharge can be directly discharged to natural water.2. the part of contaminated water on town road mistakenly enters rain pipe
The sewage that road, such as road are produced when cleaning can be directly discharged to natural water.3. during rainfall, meeting on residential area and town road
Pollution of area source is produced, area source pollutants can be directly entered natural water.
Incomplete combined system is handled primarily directed to the collection of rainwater, on the rainwater and town road that residential block is collected
The rainwater being collected into is separated.The rainwater that the sanitary sewage and inlet for stom water of resident's discharge are collected all is discharged by collaborating pipeline,
Vatch basin is set to be dammed before municipal drainage pipeline is entered.The rainwater that inlet for stom water along town road is collected enters rain
Water conduit tube, is directly discharged to natural water.During fine day, the sewage of residential area discharge is trapped to trunk sewer, is then sent to
Sewage treatment plant, be discharged into after processing on natural water, but town road have part of contaminated water into Storm-water sewer and it is direct
It is discharged into natural water.During rainfall, the sewage and the rainwater at rainfall initial stage of residential area discharge can be also trapped to trunk sewer, so
After be delivered to sewage treatment plant, natural water is discharged into after processing, but with the increase of rainfall, rainfall runoff also increases,
After the flow of combined sewage exceedes the conveyance power of water for the pipeline that dams, just have part combined sewage overflow and be directly entered rainwater
Main, while the early-stage rainwater of a large amount of pollutants is carried on town road can also be directly entered Storm-water sewer, is then discharged to
Natural water.The problem of this drainage system, is mainly:1. whole system can not effectively be intercepted to area source pollutants, be blocked
Cut efficiency low.2. the sewage for entering storm sewer can not be controlled.3. during rainfall, sanitary sewage is easily carried along into by rainwater
Natural water.4. the control of Vatch basin is extensive, on the one hand may not handle more early-stage rainwaters feeding sewage treatment plant,
So that area source pollutants have been discharged into natural water, on the other hand substantial amounts of later stage rainwater may be sent into sewage treatment plant, increased
Add the load of sewage treatment plant, reduce the treatment effeciency of sewage treatment plant.
All things considered, current run-off system has problems with:First, it is impossible to which pollution of area source is controlled;The
Two, control extensive, it is impossible to which sewage and early-stage rainwater are accurately controlled;3rd, pipeline hybrid junction, sewage has been directly discharged to certainly
Right water body;4th, for the area that land used is nervous, end treatment can not effectively be implemented.
There is patent document to propose new pipe net arrangement method to solve the above problems with this, Patent No.
The Chinese invention patent of entitled " a kind of region burst rain processing system based on combined system pipe network " of " CN105625545A ",
A kind of new pipe network division methods are the patent describe, whole pipe network is divided into latticed multiple by the patent by area
Individually online rainwater treatment facility is set in area, each section, by the online rainwater treatment facility in section to the section
Interior rainwater carries out integrated treatment, but this is a kind of end treatment thinking, although improve rainwater treatment in the section
Efficiency and degree, control that can be effective to the pollution of area source in the section.But still there is overland flow collection and be difficult to essence
It is poor for the first rain collection existence time apart from online rainwater treatment facility distalmost end and most proximal end really the problem of control, first rain
Collection with pollution of area source can not be controlled accurately, it is impossible to accomplish accurate improvement.Further, since the problem of urban planning, will
Urban pipe network is divided into latticed section and there are many interference, realizes that difficulty is very big, can be arranged to the urban pipe network of this pattern
Mode causes very big puzzlement.The subregion of other prior art administer there is a problem in that, industry, residential quarters, school
It may be divided into the same area etc. different purposes facilities, cause the sewage composition in the region complicated, realize that accurate administer is divided
Big from difficulty, cost is high.
The content of the invention
In view of the above-mentioned drawbacks of the prior art, present invention aim to solve the deficiency of above-mentioned background technology,
A kind of face groundwater pollution control for drainage system pipe network system is provided, urban units region in the prior art is which solved
Can not effectively intercept process, the technical problem that sewage and rainwater can not be accurately controlled with the pollution of town road area surface.
In order to solve the above technical problems, present invention employs such a face pollution for drainage system pipe network system
Control method, it includes, trunk sewer, and natural water is discharged after the sewage in urban area is delivered into sewage treatment plant's processing;
Storm-water sewer, natural water is discharged by the rainwater in urban area;Also include multiple unit areas, each unit area is city
With the soil region including structures of function and usage Attribute transposition in region, the structures be residential area, industrial and mining enterprises,
One kind in office, school, hospital or market;Sewage conduct and storm sewer are provided with each unit area;Each unit
Sewage conduct in region is connected with storm sewer;By setting rainwater treatment system on the sewage conduct in each unit area
Unite and the combined sewage of the early-stage rainwater formation of the sewage in the sewage conduct and the storm sewer is introduced directly into the dirt
Water conduit tube discharges storm sewer after being purified through rain processing system;By setting rainwater treatment system on the Storm-water sewer
Unite and the combined sewage of the sewage in the Storm-water sewer and early-stage rainwater formation is introduced directly into the trunk sewer or through rain
Natural water is discharged after water treatment system purification.
In a kind of preferred embodiment of the present invention, the water inlet end of the sewage conduct and the first rain processing system connects
Logical, a discharge ends of the first rain processing system are connected with trunk sewer, another draining of the first rain processing system
End is connected with Storm-water sewer;The second rain processing system is provided with the Storm-water sewer;When fine day and smaller rainfall,
Sewage and the combined sewage of early-stage rainwater formation are not diluted by rainwater, and the combined sewage in the storm sewer is discharged into sewage conduct
The mixing in trunk sewer or Storm-water sewer, the Storm-water sewer is emitted into after first rain processing system shunting afterwards
Sewage directly discharges natural water after second rain processing system processing or is introduced directly into the trunk sewer;When
When rainfall is larger, the combined sewage of sewage and the formation of middle and later periods rainwater is diluted by rainwater, and the mixing in the storm sewer is dirty
Water is discharged into after sewage conduct to be emitted into Storm-water sewer, the Storm-water sewer after first rain processing system shunting
Combined sewage rainwater after second rain processing system processing directly discharges natural water.
In a kind of preferred embodiment of the present invention, first rain processing system is shunting well or described first
Rain processing system is Rainwater Storage Tank and bottom-open type weir gate or first rain processing system is at online rainwater
Manage pond;Second rain processing system be shunting well or first rain processing system be Rainwater Storage Tank and under
Open type weir gate or second rain processing system are online rainwater treatment pond or second rain processing system is LID
Cleaning system.
In a kind of preferred embodiment of the present invention, the LID cleaning systems include being sequentially connected in series the particle point of connection
From device, filter and rainwater treatment module.
In a kind of preferred embodiment of the present invention, the just rain storage pond includes buffer pool, storage pond and flood discharge corridor
Road.
In a kind of preferred embodiment of the present invention, the end of the sewage conduct is connected with the first shunting well, described
First shunting well includes the water inlet end that is connected with the end of sewage conduct and connected respectively with trunk sewer and Storm-water sewer
Sewage water side and water purification water side, are provided with first shunting well water purification importing water purification water side and by sewage and initial stage
Rainwater imports the part flow arrangement of sewage water side;The Storm-water sewer is provided with the second shunting well, described second point along water (flow) direction
Stream well includes the water inlet end being connected respectively with Storm-water sewer and sewage conduct and sewage water side and is connected simultaneously with Storm-water sewer
Water purification water side positioned at water inlet end downstream, be provided with second shunting well water purification is imported into water purification water side and by sewage and
Early-stage rainwater imports the part flow arrangement of sewage water side.
In a kind of preferred embodiment of the present invention, the online rainwater treatment pond includes buffer pool, first rain storage pond
With online processing storage pond;The port of export of described buffer pool is provided with urgent flood discharge gallery;On described urgent flood discharge gallery
Control valve is installed, the port of export of urgent flood discharge gallery is connected with Storm-water sewer;Described first rain storage pond entrance point is with delaying
Pond connection is rushed, the port of export is connected with online processing storage pond entrance point;The port of export and rainwater of described online processing storage pond
Main is connected.
In a kind of preferred embodiment of the present invention, the water inlet end of second rain processing system is located at the first rainwater
The discharge ends of processing system and the downstream of Storm-water sewer connectivity part.
The beneficial effects of the invention are as follows:The present invention is simple in construction, build convenient, only need to be in the limited region of town road
It is that the sewage and the height of early-stage rainwater in the regional that is divided in city with administrative functionality can be achieved to build just rain storage pond
Effect processing.Technical scheme need not be being reconstructed in unit area on the basis of former drainage pipeline, by using first rain
Storage pond connects sewage conduct in unit area and storm sewer, and have effectively achieved has to area source pollutants in unit area
Effect is intercepted, and improves the intercepting efficiency of area source pollutants;By using first rain storage pond by the trunk sewer on town road with
Storm-water sewer is connected, and be have effectively achieved area source pollutants in town road and is effectively intercepted, improves the interception of area source pollutants
Efficiency;Above-mentioned overall structure realize in urban area in each administrative region sewage and early-stage rainwater accurate control, together
When avoid the sewage that pipeline hybrid junction causes and be directly discharged to natural water;The present invention passes through dry in storm sewer and/or rainwater
LID cleaning systems are set on pipe, the treatment effeciency of early-stage rainwater is further increased;The present invention is also by the way that the first first rain is regulated and stored
Pond and the second first rain storage pond are arranged in town road region, efficiently avoid the reconstruction to unit area interior conduit, from
And efficiently solve the problem of urban land is nervous.
Brief description of the drawings
Fig. 1 is the knot of the drainage system pipe network system that a kind of control sanitary sewage and early-stage rainwater pollute in the prior art
Structure schematic diagram;
Fig. 2 is a kind of structural representation of face groundwater pollution control for drainage system pipe network system in the prior art
Figure;
Fig. 3 is a kind of combined system of the only control sanitary sewage of control sanitary sewage and early-stage rainwater pollution in the prior art
The structural representation of sewerage pipeline network;
Fig. 4 is that a kind of structure of embodiment one of face groundwater pollution control for drainage system pipe network system of the invention is shown
It is intended to;
Fig. 5 is that a kind of structure of embodiment two of face groundwater pollution control for drainage system pipe network system of the invention is shown
It is intended to;
Fig. 6 is that a kind of structure of embodiment three of face groundwater pollution control for drainage system pipe network system of the invention is shown
It is intended to;
Fig. 7 is that a kind of example IV structure of face groundwater pollution control for drainage system pipe network system of the invention is shown
It is intended to;
Fig. 8 is that a kind of online rainwater treatment of face groundwater pollution control for drainage system pipe network system of the invention is set
The structural representation applied;
In accompanying drawing:1- inlets for stom water, 2- particle separators, 3- filters, 4- rainwater treatment modules, 5- sewage treatment plants, 6-
Natural water, 7- Vatch basins, 8- municipal administrations interflow pipeline, 9- bottom-open type weir gates, the shunting wells of 10- first, the shunting wells of 11- second, 12-
Storage pond, 13- buffer pools, the first rain storage ponds of 14-, 15- handles storage pond online, the urgent flood discharge passages of 16-, 17- control valves,
18- collaborates pipeline, the sewage vent lines of 19- first, the storm drain lines of 20- first, the sewage vent lines of 21- second, 22- the
Two storm drain lines, A- unit areas, B- town roads region, the first rain storage ponds of C- first, the first rain storage ponds of D- second, A-
1- sewage conducts, A-2- storm sewers, B-1- trunk sewers, B-2- Storm-water sewers, B-3- municipal administration storm sewers,.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples
The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only to explain the present invention, not
For limiting the present invention.
A kind of control sanitary sewage and the structure of the combined flow system pipe network system of early-stage rainwater pollution as shown in Figure 4 shows
It is intended to understand, the present invention includes multiple unit area A, and trunk sewer B-1 and Storm-water sewer B-2, the unit area A are city
With the soil region including structures of function and usage Attribute transposition in region, the structures are residential area, industrial and mining enterprises
Or one kind in office or school or hospital or market, each it is provided with and is connected with structures drainpipe in the unit area A
Sewage conduct A-1 and storm sewer A-2, the storm sewer A-2 connects with sewage conduct A-1, the sewage conduct A-1 with
First first rain storage pond C water inlet end connection, the described first first rain storage pond C the first discharge ends and the trunk sewer B-1
Connection, the described first first rain storage pond C the second discharge ends are connected with the Storm-water sewer B-2;Connect on the Storm-water sewer B-2
Meet the inlet for stom water pipeline B-3 on town road.
As shown in figure 4, one of which embodiment (technical scheme one) of the present invention:It is sequentially communicated on the Storm-water sewer B-2
There is the second first rain storage pond D and bottom-open type weir gate 9, the described second first rain storage pond D water inlet end is connected with Storm-water sewer B-2,
Described second first rain storage pond D discharge ends are connected with the trunk sewer B-1, and the bottom-open type weir gate 9 is located at described second
At the downstream of first rain storage pond D water inlet end.
In above-mentioned technical proposal, the described first first rain storage pond C includes buffer pool, storage pond and flood discharge gallery;Described
Two first rain storage pond D include buffer pool, storage pond.
As shown in figure 5, another embodiment (technical scheme two) of the invention:Connected on the Storm-water sewer B-2 by branch pipe
LID cleaning systems are connected with, the branch pipe is provided with bottom-open type weir gate 9, and the bottom-open type weir gate 9 is located at before LID cleaning systems
End.
In above-mentioned technical proposal, the LID cleaning systems include being sequentially connected in series particle separator 2, the and of filter 3 of connection
Rainwater treatment module 4.
Operation principle of the present invention:In residential area, the rainwater that the sanitary sewage and inlet for stom water of resident's discharge are collected all passes through
Sewage conduct A-1, storm sewer A-2 interflow pipeline discharge, set the first first rain to regulate and store before municipal drainage pipeline is entered
Pond C is accurately controlled and collected the sewage and early-stage rainwater that sewage treatment plant can not be handled in time.On Storm-water sewer B-2
Subsection setup second just regulated and stored or handled to the sewage and rainwater that enter storm sewer by rain storage pond D or LID cleaning system.
During fine day, the sewage of residential area discharge and the sewage into municipal storm sewer can all pass through the first first rain storage pond
C buffer pool enters trunk sewer, is then sent to sewage treatment plant, and natural water is discharged into after processing.During rainfall, according to
A combined sewage part for the disposal ability of sewage treatment plant, sewage and early-stage rainwater formation can pass through the first first rain storage pond C
Buffer pool enter trunk sewer B-1, and be delivered to sewage treatment plant processing, a part can enter second just rain storage pond D (set
Put bottom-open type weir gate 9 to be dammed, the rain at the beginning of dams to the second first rain storage pond D, and first rain, which dams, to be finished, and bottom-open type weir gate 9 is complete
Later stage rainwater, is discharged band natural water by full open) or LID cleaning systems, into the second first rain storage pond D combined sewage meeting
Sewage treatment plant is pumped to when there is disposal ability in sewage treatment plant, natural water is discharged into after processing.And enter LID purifications
The combined sewage of system, then can penetrate into underground after preprocessed and advanced treating or be discharged into natural water or reuse.LID is net
Change system can be made up of particle separator, filter and rainwater module, and particle separator is used to intercepting floating object in rainwater, big
Particulate matter, oil and the pollutant such as grease;Filter is used for depth-type filtration, removes tiny particulate matter in rainwater, nitrogen, phosphorus and again
The pollutants such as metal;Rainwater module, which is used for collecting, handles clean rainwater, is subsequently used for permeating or discharges or reuse.With rainfall
Continue, when rainfall intensity is small, the mixing water of part middle and later periods rainwater and sewage formation can pass through the first first rain storage pond C
Buffer pool enters trunk sewer B-1, and is delivered to sewage treatment plant, and its total amount is determined by the disposal ability of sewage treatment plant, remains
Remaining mixing water then enters Storm-water sewer B-2 by the first first rain storage pond C flood discharge gallery, is directly discharged to natural water;
When rainfall intensity is big, sewage is diluted by middle and later periods rainwater, and mixing water does not enter trunk sewer, and enters after Storm-water sewer directly
Natural water is discharged into, now the combined sewage in the first first rain storage pond is pumped to trunk sewer.
The present invention need not carry out any transformation to the drainage pipeline networks in city in original unit area, it is only necessary to build certain
The first rain storage pond of quantity can efficiently solve the pollution of area source that sewage and early-stage rainwater face in urban area and be directly entered
The technical problem of natural water, while solving, urban land is nervous, be difficult implementation, the technical problem of constructional difficulties, greatly
Shorten construction man-hour and construction cost;The present invention also sets a certain amount of LID cleaning systems or first rain to adjust by Storm-water sewer
Reservoir realizes the high-efficient purification of early-stage rainwater, is effectively improved effective interception to area source pollutants, while realizing pair
The real-time control of storm sewer sewage;The present invention can also handle the efficiency of sewage according to sewage treatment plant, be regulated and stored by first rain
Pond carries out effectively shunting to early-stage rainwater and dammed, so as to improve the service efficiency of the system.
As shown in fig. 6, another embodiment (technical scheme three) of the invention, control sanitary sewage as shown in Figure 4 and just
The combined flow system pipe network system of phase rainwater pollution, including multiple unit area A and town road region B, unit area A are city
With the soil region including structures of function and usage Attribute transposition in city region, structures are residential area, industrial and mining enterprises, machine
One kind in pass, school, hospital or market.Sewage conduct A-1 and storm sewer A-2, town road are provided with the A of unit area
Trunk sewer B-1, Storm-water sewer B-2 and municipal storm sewer B-3 are provided with the B of region;Storm sewer A-2 and sewage conduct A-
1 connection;Trunk sewer B-1 end connection storage pond 11 and sewage treatment plant 5, municipal storm sewer B-3 and Storm-water sewer B-2
Connection;Storm-water sewer B-2 end connection natural water 6;Sewage conduct A-1 end connects the water inlet end of the first shunting well 9,
The sewage water side and water purification water side of first shunting well 9 are connected with trunk sewer B-1 and Storm-water sewer B-2 respectively;Rain
Be connected with the second shunting well 10 on water conduit tube B-2, the water inlet end of the second shunting well 10 and water purification water side with Storm-water sewer B-2
Connection, the sewage water side of the second shunting well 10 is connected with trunk sewer B-1.Second shunting well 10 can be sets corresponding with cell
Put, can not also be correspondingly arranged.
In residential area, the rainwater that the sanitary sewage and inlet for stom water 1 of resident's discharge are collected all is discharged by collaborating pipeline,
The first shunting well 9 is set accurately to be controlled before into municipal drainage pipeline.In trunk sewer B-1 ends, storage pond 11 is set
Collect sewage and early-stage rainwater that sewage treatment plant 5 can not be handled in time.The subsection setup on the Storm-water sewer B-2 of town road
The sewage and rainwater that second 10 pairs of shunting well enters Storm-water sewer B-2 are accurately controlled.
During fine day, the sewage of residential area discharge and the municipal storm sewer B-3 of entrance sewage all can be by the second shunting wells 10
Trunk sewer B-1 is delivered to, sewage treatment plant 5 is then discharged to, natural water 6 is discharged into after processing.
During rainfall, the first shunting well 9 and the second shunting well 3 all convey sewage and the combined sewage of early-stage rainwater formation
To trunk sewer B-1, and it is discharged into sewage treatment plant 5 and handles, if the flow of combined sewage has exceeded the place of sewage treatment plant 5
Reason ability, combined sewage can then enter storage pond 11, be pumped to when there is disposal ability in sewage treatment plant 5, then by combined sewage
Sewage treatment plant 5 is handled.With continuing for rainfall, the first shunting well 9 and the second shunting well 10 will compare clean middle and later periods rain
Water is directly discharged to natural water 6 by Storm-water sewer B-2.
This system can accurately control early-stage rainwater and middle and later periods rainwater by shunting well, by dry flow sewage and early-stage rainwater
All it is delivered to sewage treatment plant 5 to handle, while relatively clean middle and later periods rainwater is not delivered to sewage treatment plant 5, improves
The treatment effeciency of sewage treatment plant 5, reduces the pollutant into natural water 6.
As shown in Figure 7 and Figure 8, another embodiment (technical scheme four) of the invention, the pipe network structure of the present embodiment will be managed
Web area is divided into multiple unit area A, unit area A urban areas includes structures with function and usage Attribute transposition
Soil region, the structures of the present embodiment are one kind in the places such as industrial and mining enterprises, office, school, hospital, market.By inciting somebody to action
These regions are independent, and accurate Control the Plan Pollution Sources, the collection and processing of the accurate first rain of control are come with this.
The pipe network of the present embodiment includes trunk sewer B-1 and Storm-water sewer B-2, and trunk sewer B-1 outlet is provided with dirt
Water treatment plant 5, Storm-water sewer B-2 outlet is connected with natural water 6, in the light of actual conditions, and sewage is entered by trunk sewer B-1
Enter and integrated treatment is carried out into sewage treatment plant 5, rainwater is entered in natural water 6 by Storm-water sewer B-2.
The multiple second online rainwater treatment facilities II are provided between trunk sewer B-1 and Storm-water sewer B-2, second is online
Rainwater treatment facility II can be corresponded with unit area A, can also be without being corresponded with unit area A.Second is online
The import of rainwater treatment facility II is connected with Storm-water sewer B-2, be provided with the outlet of the second online rainwater treatment facility II with
Second sewage vent line 21 of trunk sewer B-1 connections and the second storm drain lines 22 connected with Storm-water sewer B-2, position
Set on Storm-water sewer B-2 between the import of the second online rainwater treatment facility II and the outlet of the second storm drain lines 22
Bottom-open type weir gate 9 is equipped with, each second online rainwater treatment facility II is provided with a corresponding bottom-open type weir gate 9, under
The closing of open type weir gate 9, the first rain in the length of tubing can be dammed enter in the second online rainwater treatment facility II.Second
Online rainwater treatment facility can be collected processing to the early-stage rainwater being discharged into Storm-water sewer B-2, it is to avoid early-stage rainwater
Enter pollution natural water 6 in natural water 6.Multiple second are provided between trunk sewer B-1 and Storm-water sewer B-2 online
Rainwater treatment facility II, can carry out division adjustment according to region area.
The sewage conduct A-1 connected with structures drainpipe, storm sewer A-2 (storm sewers are provided with the A of unit area
A-2 collects rainwater and pollution of area source water body in the region by the catch-basin being arranged in the A of unit area) and interflow pipeline
18, sewage conduct A-1, storm sewer A-2 outlet and the inlet communication of interflow pipeline 18.Pipe network structure in the A of unit area
For combined system structure, sewage and rainwater in the A of unit area are mixed.The outlet of interflow pipeline 18 is provided with the first online rain
Water processing establishment I, the first online rainwater treatment facility I may be disposed in town road region or in the A of unit area.First
The outlet of line rainwater treatment facility I is provided with the first sewage vent line 19 and and Storm-water sewer connected with trunk sewer B-1
First storm drain lines 20 of B-2 connections.First online rainwater treatment facility I can be in time to being discharged into the pipeline 18 of interflow
Combined sewage handled, one be can avoid sewage be directly discharged in natural water 6 pollute natural water 6, two be energy
Enough avoid large amount of sewage from entering sewage treatment plant 5 and cause the load increase of sewage treatment plant 5.
The first online rainwater treatment facility I of the present embodiment is identical with the second online structure of rainwater treatment facility II, including
Functional rain water treatment facilities, as shown in figure 8, functional rain water treatment facilities is buffer pool, first rain storage pond or online place
Manage one kind in storage pond or several combinations.Wherein, in order to avoid the first online rainwater treatment facilities exhaust is dry to rainwater
Water pollution natural water 6 in pipe B-2, the import of at least one the second online rainwater treatment facility II of the present embodiment is located at
Downstream of the outlet of first storm drain lines 20 of the first online rainwater treatment facility I on Storm-water sewer B-2.It is such to set
Putting structure, if to allow for the water body discharged from the first online rainwater treatment facility I unholiness, also can be online by second
Rainwater treatment facility II is timely handled, it is to avoid pollution natural water 6.
As shown in Fig. 1~2, the first online rainwater treatment facility II of online rainwater treatment facility I and second of the present embodiment
Structure includes functional rain water treatment facilities, and functional rain water treatment facilities includes buffer pool 13, first rain storage pond 14 and online
Storage pond 15 is handled, wherein the import of the buffer pool 13 of the first online rainwater treatment facility I and unit area A storm sewer A-
2 outlet, the buffer pool 13 of the second online rainwater treatment facility is connected with Storm-water sewer B-2.
The port of export of buffer pool 13 is provided with urgent flood discharge passage 16, urgent flood discharge passage 16 and is provided with control valve
17, urgent flood discharge passage 16 is used for when rainfall is very big, when completely outstripped the disposal ability of online rainwater treatment facility, directly
By unnecessary discharge into water into natural water 6.The overflow of buffer pool 13 is connected with first rain storage pond 14, overflowing in buffer pool 13
Flowing into the polluted-water carried out in just rain storage pond 14 in processing of regulating and storing, buffer pool 13 directly can pass through effluent outfall
Road, which is entered, carries out integrated treatment in trunk sewer B-1.The clean water body of first rain storage pond 14 can pass through urgent flood discharge passage
16 enter the sewage in natural water 6, first rain storage pond 14 can be pumped into online processing storage pond 15 by water pump
Clean water body in the online processing of row, online processing storage pond 15 can be directly discharged in natural water 6 after treatment, remained
Remaining sewage can be entered in trunk sewer B-1 by the first sewage vent line 19.
Urgent flood discharge passage 16 is used to the water body that online rainwater treatment facility has little time processing being directly discharged to Natural Water
In body 6, it is to avoid online rainwater treatment facility overload operation.The present embodiment is by setting online rainwater treatment facility to concentrate to first
Rain and face source sewage is collected control process, it is to avoid the load of increase sewage treatment plant 5, and it also avoid directly discharge can make
Into the pollution of natural water 6.
In use, during fine day, the sewage of unit area A discharges enters trunk sewer B-1 by sewage conduct A-1, then
It is delivered to after sewage treatment plant 5 is handled and discharges, the sewage into storm sewer A-2 also can enters trunk sewer by buffer pool 13
B-1, is then sent to sewage treatment plant 5, and natural water 6 is discharged into after processing.During rainfall, the sewage of unit area A discharges
Still trunk sewer B-1 can be entered by sewage conduct A-1, is then sent to after sewage treatment plant 5 is handled and discharges.According to sewage
The disposal ability for the treatment of plant 5, the combined sewage part into storm sewer A-2 sewage and early-stage rainwater formation can be by slow
Rush pond 13 and enter trunk sewer B-1, and be delivered to sewage treatment plant 5 and handle, a part can enter first rain storage pond 14, into first
The combined sewage of rain storage pond 14 can be pumped to sewage treatment plant 5 when there is disposal ability in sewage treatment plant 5, be discharged after processing
To natural water 6.With continuing for rainfall, when rainfall intensity is small, the mixing water of part middle and later periods rainwater and sewage formation can
Trunk sewer B-1 is entered by buffer pool 13, and is delivered to sewage treatment plant 5, its total amount by sewage treatment plant 5 disposal ability
It is determined that, remaining combined sewage then by entering Storm-water sewer B-2 after line rainwater treatment pond 4 is handled, is directly discharged to nature
Water body 6;When rainfall intensity is big, sewage is diluted by middle and later periods rainwater, and mixing water does not enter trunk sewer B-1, and enters online
Rainwater treatment pond 4 is discharged into natural water 6 after handling, and now the combined sewage just in rain storage pond 14 is pumped to trunk sewer B-
1;When rainfall intensity is bigger, flow exceedes the disposal ability in online rainwater treatment pond 4, is keeping online rainwater treatment pond 4 most
On the premise of big disposal ability, start urgent flood discharge passage and flood is directly discharged into Storm-water sewer B-2.
When actual use, in some regions more narrow place, online processing storage pond 15 can be removed with frugally
Domain area, reduces the volume and floor space of whole functional rain water treatment facilities.
For the use of the second online rainwater treatment facility II, when being collected into early-stage rainwater in Storm-water sewer B-2, you can
Start the second online rainwater treatment facility II and processing control is carried out to it, first rain can be emitted into trunk sewer B-1 (at sewage
When reason factory 5 has the ability to handle), can voluntarily it handle (when sewage treatment plant 5 has no ability to processing), it is directly logical by urgent flood discharge
Road is discharged into Storm-water sewer B-2 (rainfall is too big, beyond disposal ability).Second online rainwater treatment facility II is mainly used in pair
The pollution of area source produced on town road is controlled, and the sewage that can also be discharged into unit area A in Storm-water sewer B-2 enters
The further regulation and control processing of row.
Finally it may be noted that the separate system being used in the present invention in combined flow system pipe network system substantially refers to cellular zone
Sewage conduct A-1 and storm sewer A-2 shunting, unrelated with main pipe in the A of domain.
It should be appreciated that the foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not
Be confined to this, any those skilled in the art disclosed herein technical scope in, the change that can be readily occurred in
Or replace, it should all be included within the scope of the present invention.
Claims (8)
1. a kind of face groundwater pollution control for drainage system pipe network system, it is characterised in that:Including,
Trunk sewer (B-1), natural water is discharged after the sewage in urban area is delivered into sewage treatment plant's processing;
Storm-water sewer (B-2), natural water is discharged by the rainwater in urban area;It is characterized in that:
Also include multiple unit areas (A), each unit area (A) is including with function and usage Attribute transposition in urban area
The soil region of structures, the structures are one kind in residential area, industrial and mining enterprises, office, school, hospital or market;
Sewage conduct (A-1) and storm sewer (A-2) are provided with each unit area (A);
Sewage conduct (A-1) in each unit area (A) is connected with storm sewer (A-2);
By setting rain processing system on the sewage conduct (A-1) in each unit area (A) by the sewage conduct (A-
1) combined sewage of the early-stage rainwater formation of sewage and the storm sewer (A-2) in is introduced directly into the trunk sewer (B-
1) storm sewer (A-2) is discharged after or being purified through rain processing system;
By setting rain processing system by the sewage in the Storm-water sewer (B-2) on the Storm-water sewer (B-2) and just
The combined sewage of phase rainwater formation is introduced directly into the trunk sewer (B-1) or discharges nature after being purified through rain processing system
Water body.
2. a kind of face groundwater pollution control for drainage system pipe network system according to claim 1, its feature exists
In:The sewage conduct (A-1) connects with the water inlet end of the first rain processing system, a draining of the first rain processing system
End is connected with trunk sewer (B-1), and another discharge ends of the first rain processing system are connected with Storm-water sewer (B-2);Institute
State and be provided with the second rain processing system on Storm-water sewer (B-2);
When fine day and smaller rainfall, the combined sewage of sewage and early-stage rainwater formation is not diluted by rainwater, the rainwater
Combined sewage in pipeline (A-2) is discharged into after sewage conduct (A-1) to be emitted into after first rain processing system shunting
Combined sewage in trunk sewer (B-1) or Storm-water sewer (B-2), the Storm-water sewer (B-2) is by second rainwater
Natural water is directly discharged after the processing of reason system or the trunk sewer (B-1) is introduced directly into;
When rainfall is larger, the combined sewage of sewage and the formation of middle and later periods rainwater is diluted by rainwater, the storm sewer (A-2)
Interior combined sewage is discharged into after sewage conduct (A-1) is emitted into Storm-water sewer after first rain processing system shunting
(B-2), the rainwater after second rain processing system processing of the combined sewage in the Storm-water sewer (B-2) is directly discharged
Natural water.
3. a kind of face groundwater pollution control for drainage system pipe network system according to claim 2, its feature exists
In:First rain processing system be shunting well or first rain processing system be Rainwater Storage Tank and under open
Formula weir gate or first rain processing system are online rainwater treatment pond;Second rain processing system be shunting well or
First rain processing system described in person is Rainwater Storage Tank and bottom-open type weir gate or second rain processing system is
Online rainwater treatment pond or second rain processing system are LID cleaning systems.
4. a kind of face groundwater pollution control for drainage system pipe network system according to claim 3, its feature exists
In:The LID cleaning systems include being sequentially connected in series the particle separator (2), filter (3) and rainwater treatment module (4) of connection.
5. a kind of face groundwater pollution control for drainage system pipe network system according to claim 1, its feature exists
In:The water inlet end of second rain processing system is located at the discharge ends and Storm-water sewer (B-2) of the first rain processing system even
The downstream at logical place.
6. control sanitary sewage according to claim 3 and the combined flow system pipe network system of early-stage rainwater pollution, it is special
Levy and be:The just rain storage pond includes buffer pool, storage pond and flood discharge gallery.
7. control sanitary sewage according to claim 3 and the combined flow system pipe network system of early-stage rainwater pollution, it is special
Levy and be:The end of the sewage conduct (A-1) is connected with the first shunting well (3), and first shunting well (3) includes and sewage
The water inlet end of the end connection of pipeline (A-1) and the sewage connected respectively with trunk sewer (B-1) and Storm-water sewer (B-2)
Water side and water purification water side, are provided with first shunting well (3) water purification importing water purification water side and by sewage and initial stage
Rainwater imports the part flow arrangement of sewage water side;The Storm-water sewer (B-2) is provided with the second shunting well (4), institute along water (flow) direction
State water inlet end and sewage water outlet that the second shunting well (4) includes being connected with Storm-water sewer (B-2) and sewage conduct (A-1) respectively
Is set in end and the water purification water side that water inlet end downstream is connected and be located at Storm-water sewer (B-2), second shunting well (4)
There is the part flow arrangement that water purification is imported into water purification water side and sewage and early-stage rainwater are imported to sewage water side.
8. control sanitary sewage according to claim 3 and the combined flow system pipe network system of early-stage rainwater pollution, it is special
Levy and be:The online rainwater treatment pond includes buffer pool (2), first rain storage pond (3) and online processing storage pond (4);It is described
The port of export of buffer pool (3) be provided with urgent flood discharge gallery (5);Control valve is installed on described urgent flood discharge gallery (5)
Door (6), the port of export of urgent flood discharge gallery (5) is connected with Storm-water sewer (10);Described first rain storage pond (3) entrance point is with delaying
Pond (2) connection is rushed, the port of export is connected with online processing storage pond (4) entrance point;The outlet of described online processing storage pond (4)
End is connected with Storm-water sewer (10).
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710325055.3A CN106978840A (en) | 2017-05-10 | 2017-05-10 | A kind of face groundwater pollution control for drainage system pipe network system |
CN201710830130.1A CN107747345B (en) | 2017-05-10 | 2017-09-06 | Surface pollution control system and method for combined drainage pipe network system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710325055.3A CN106978840A (en) | 2017-05-10 | 2017-05-10 | A kind of face groundwater pollution control for drainage system pipe network system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106978840A true CN106978840A (en) | 2017-07-25 |
Family
ID=59341706
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710325055.3A Pending CN106978840A (en) | 2017-05-10 | 2017-05-10 | A kind of face groundwater pollution control for drainage system pipe network system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106978840A (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107605011A (en) * | 2017-09-30 | 2018-01-19 | 武汉圣禹排水系统有限公司 | A kind of pipeline is regulated and stored system and its control method |
CN107806155A (en) * | 2017-09-30 | 2018-03-16 | 武汉圣禹排水系统有限公司 | A kind of combined drainage system and control method of sewage and rainwater |
CN107806156A (en) * | 2017-09-30 | 2018-03-16 | 武汉圣禹排水系统有限公司 | A kind of combined drainage system and control method of sewage and rainwater |
CN107806159A (en) * | 2017-09-30 | 2018-03-16 | 武汉圣禹排水系统有限公司 | A kind of combined drainage system and control method of sewage and rainwater |
CN107806157A (en) * | 2017-09-30 | 2018-03-16 | 武汉圣禹排水系统有限公司 | It is a kind of to be used for drainage system pipe network control system and its control method without trunk sewer |
CN109555206A (en) * | 2018-10-31 | 2019-04-02 | 上海市政工程设计研究总院(集团)有限公司 | A kind of safety drain system in open type underground stereo channel |
CN110029712A (en) * | 2019-04-23 | 2019-07-19 | 深圳职业技术学院 | Take into account the precision rain dirt mixing regulator control system and method that early-stage rainwater stream abandoning and flood peak are regulated and stored |
CN111364580A (en) * | 2018-12-25 | 2020-07-03 | 武汉圣禹排水系统有限公司 | Method for modifying sewage disposal and distribution system based on existing pipe network |
CN111364579A (en) * | 2018-12-25 | 2020-07-03 | 武汉圣禹排水系统有限公司 | Method for modifying sewage disposal and distribution system based on existing pipe network |
CN111364578A (en) * | 2018-12-25 | 2020-07-03 | 武汉圣禹排水系统有限公司 | Method for modifying sewage disposal and distribution system based on existing pipe network |
CN111441446A (en) * | 2020-03-27 | 2020-07-24 | 武汉圣禹排水系统有限公司 | Drainage method, electronic equipment and controller used for drainage method |
CN113006230A (en) * | 2020-12-31 | 2021-06-22 | 浙江上鑫生态建设有限公司 | Diversion equipment and diversion method for rainwater and sewage in residential area |
CN113338411A (en) * | 2021-05-25 | 2021-09-03 | 武汉圣禹排水系统有限公司 | Non-point source pollution treatment method, electronic equipment and controller used for method |
CN114592575A (en) * | 2022-04-18 | 2022-06-07 | 中国港湾工程有限责任公司 | Wharf drainage system |
-
2017
- 2017-05-10 CN CN201710325055.3A patent/CN106978840A/en active Pending
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107605011A (en) * | 2017-09-30 | 2018-01-19 | 武汉圣禹排水系统有限公司 | A kind of pipeline is regulated and stored system and its control method |
CN107806155A (en) * | 2017-09-30 | 2018-03-16 | 武汉圣禹排水系统有限公司 | A kind of combined drainage system and control method of sewage and rainwater |
CN107806156A (en) * | 2017-09-30 | 2018-03-16 | 武汉圣禹排水系统有限公司 | A kind of combined drainage system and control method of sewage and rainwater |
CN107806159A (en) * | 2017-09-30 | 2018-03-16 | 武汉圣禹排水系统有限公司 | A kind of combined drainage system and control method of sewage and rainwater |
CN107806157A (en) * | 2017-09-30 | 2018-03-16 | 武汉圣禹排水系统有限公司 | It is a kind of to be used for drainage system pipe network control system and its control method without trunk sewer |
CN107806157B (en) * | 2017-09-30 | 2023-10-27 | 武汉圣禹智慧生态环保股份有限公司 | Control system and control method for combined drainage pipe network of sewage-free main pipe |
CN109555206A (en) * | 2018-10-31 | 2019-04-02 | 上海市政工程设计研究总院(集团)有限公司 | A kind of safety drain system in open type underground stereo channel |
CN111364579A (en) * | 2018-12-25 | 2020-07-03 | 武汉圣禹排水系统有限公司 | Method for modifying sewage disposal and distribution system based on existing pipe network |
CN111364580A (en) * | 2018-12-25 | 2020-07-03 | 武汉圣禹排水系统有限公司 | Method for modifying sewage disposal and distribution system based on existing pipe network |
CN111364578A (en) * | 2018-12-25 | 2020-07-03 | 武汉圣禹排水系统有限公司 | Method for modifying sewage disposal and distribution system based on existing pipe network |
CN110029712A (en) * | 2019-04-23 | 2019-07-19 | 深圳职业技术学院 | Take into account the precision rain dirt mixing regulator control system and method that early-stage rainwater stream abandoning and flood peak are regulated and stored |
CN110029712B (en) * | 2019-04-23 | 2024-01-30 | 深圳职业技术学院 | Rain and sewage mixed regulation and control method considering initial rainwater drainage and flood peak regulation |
CN111441446A (en) * | 2020-03-27 | 2020-07-24 | 武汉圣禹排水系统有限公司 | Drainage method, electronic equipment and controller used for drainage method |
CN111441446B (en) * | 2020-03-27 | 2022-06-17 | 武汉圣禹排水系统有限公司 | Drainage method, electronic equipment used for drainage method and controller |
CN113006230A (en) * | 2020-12-31 | 2021-06-22 | 浙江上鑫生态建设有限公司 | Diversion equipment and diversion method for rainwater and sewage in residential area |
CN113006230B (en) * | 2020-12-31 | 2022-07-12 | 浙江上鑫生态建设有限公司 | Diversion equipment and diversion method for rainwater and sewage in residential area |
CN113338411A (en) * | 2021-05-25 | 2021-09-03 | 武汉圣禹排水系统有限公司 | Non-point source pollution treatment method, electronic equipment and controller used for method |
CN114592575A (en) * | 2022-04-18 | 2022-06-07 | 中国港湾工程有限责任公司 | Wharf drainage system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106978840A (en) | A kind of face groundwater pollution control for drainage system pipe network system | |
CN107747345B (en) | Surface pollution control system and method for combined drainage pipe network system | |
CN202730934U (en) | System for intercepting, shunting, regulating, storing and treating initial rainwater | |
CN106988401A (en) | A kind of face groundwater pollution control for combined flow system pipe network system | |
CN103046632A (en) | Municipal administration rainwater regulation system | |
CN107761896B (en) | Surface pollution control system and method for diversion drainage pipe network system | |
CN207436170U (en) | A kind of complete separate flow system for controlling sewage and initial rainwater pollution | |
CN207761004U (en) | A kind of shunting well with downflow weir and the drainage system including the shunting well | |
CN107806164A (en) | A kind of road rain water shunting processing system and its control method | |
CN110195463A (en) | A kind of the sponge urban rainwater processing system and method for Control the Plan Pollution Sources | |
CN102767226A (en) | Separate active road edge type pipe drainage system for managing and utilizing urban rainwater | |
CN203200884U (en) | Municipal administration rainwater regulation system | |
CN202689174U (en) | Intercepting and storing system by utilizing interceptor sewer to transfer initial rainwater in centralized mode | |
CN207436183U (en) | A kind of carry cuts dirty pipe, a drainage system for regulate and store facility and online treatment facility | |
CN108383323B (en) | A kind of efficient collection and purification system and method for city initial rainwater | |
CN208280275U (en) | A kind of road rain water shunting processing system | |
CN207760988U (en) | A kind of combined drainage system of sewage and rainwater | |
CN107605003B (en) | Incomplete diversion system for controlling pollution of sewage and initial rainwater and control method thereof | |
CN208280260U (en) | A kind of combined drainage system of sewage and rainwater | |
CN207760985U (en) | A kind of band surges the drainage system of bottom-open type weir gate and pump row | |
CN207633471U (en) | A kind of region fragment based on mixed flow tubulation net cuts dirt and regulates and stores drainage system | |
CN207418507U (en) | A kind of old town black-odor riverway governing system | |
CN212561843U (en) | City view rainwater reservoir system | |
CN107587579A (en) | A kind of a drainage system and water discharge control method with section dirt pipe and rainwater treatment facility | |
CN107806154A (en) | A kind of drainage system and water discharge control method with online treatment facility |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170725 |
|
WD01 | Invention patent application deemed withdrawn after publication |