CN106978812A - The support-replacing system and support replacement method of the outer existing structures of foundation ditch in foundation pit construction - Google Patents

The support-replacing system and support replacement method of the outer existing structures of foundation ditch in foundation pit construction Download PDF

Info

Publication number
CN106978812A
CN106978812A CN201710136224.9A CN201710136224A CN106978812A CN 106978812 A CN106978812 A CN 106978812A CN 201710136224 A CN201710136224 A CN 201710136224A CN 106978812 A CN106978812 A CN 106978812A
Authority
CN
China
Prior art keywords
foundation ditch
existing structures
support
foundation
force transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710136224.9A
Other languages
Chinese (zh)
Inventor
田惠文
陈华
张双龙
施晓盼
缑立鹏
张�林
王家岳
修亚光
续文昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201710136224.9A priority Critical patent/CN106978812A/en
Publication of CN106978812A publication Critical patent/CN106978812A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

The present invention relates to the support-replacing system of existing structures outside foundation ditch in a kind of foundation pit construction and support replacement method, the periphery of the foundation ditch is provided with retaining design, the inside of the foundation ditch is provided with horizontal struts system, the support-replacing system includes the Force transmission partses being supported between the retaining design and the outer existing structures of foundation ditch, and the axial force of the supports of the horizontal struts system of the foundation ditch is delivered to the setting position of existing structures outside foundation ditch by the Force transmission partses.The axial force of the supports of the horizontal struts system of foundation ditch is delivered to the setting position of existing structures outside foundation ditch using Force transmission partses; the strong position of lateral pressure is resisted in selection existing structures to bear axial force of the supports; axial force of the supports can preferably be resisted; avoid the problem of axial force of the supports directly acts on wall and causes deformation of wall or even cracking destruction; effectively protect the integrality of existing structures; also reliable Path of Force Transfer is provided for foundation pit support system, it is ensured that the stability of pattern foundation pit supporting structure.

Description

The support-replacing system and support replacement method of the outer existing structures of foundation ditch in foundation pit construction
Technical field
The present invention relates to pattern foundation pit supporting structure field in construction, a kind of outer existing structures of foundation ditch in foundation pit construction are refered in particular to Support-replacing system and support replacement method.
Background technology
In base pit engineering, foundation ditch is ensured by the retaining design and horizontal struts system of setting during foundation pit construction Stability.Retaining design therein includes the fender post in the foundation ditch periphery soil body and encloses purlin on fender post, rises Having arrived soil mass consolidation ensures the stable effect of foundation ditch, encloses purlin and is arranged at the inner side of fender post on the side wall of foundation ditch, also sets The top of fender post is placed in, horizontal struts system branch is located at enclosing on purlin, and laterally branch is located in foundation ditch by horizontal struts system Portion, serves support action.
When foundation ditch is next to existing structures, i.e., existing structures are located on the outside of foundation ditch, and are enclosed with foundation ditch Fender post in watch box system it is closer to the distance, the axial force of the supports produced by the horizontal struts system of foundation ditch is direct by retaining design Act on the vertical wall of existing structures, because the ability that vertical wall resists lateral pressure is poor, by adjacent After the extruding of foundation ditch axial force of the supports, even cracking destruction can be deformed.
The content of the invention
It is an object of the invention to the defect for overcoming prior art, there is provided existed building knot outside foundation ditch in a kind of foundation pit construction The support-replacing system and support replacement method of structure, solve in the prior art foundation ditch close to existing structures construct when because axial force of the supports act on The problem of the vertical wall of existed building causes deformation of wall even cracking destruction.
Realizing the technical scheme of above-mentioned purpose is:
The invention provides the support replacement method of existing structures outside foundation ditch in a kind of foundation pit construction, comprise the following steps:
Construction foundation pit;
Construct the retaining design and horizontal struts system of the foundation ditch;And
Force transmission partses are set between existing structures outside the retaining design and the foundation ditch, by the water of the foundation ditch The axial force of the supports of flat support system is delivered to the setting position of the outer existing structures of foundation ditch.
The axial force of the supports of the horizontal struts system of foundation ditch is delivered to existing structures outside foundation ditch using Force transmission partses Resist the strong position of lateral pressure to bear axial force of the supports in setting position, selection existing structures, can preferably resist Axial force of the supports, it is to avoid axial force of the supports directly act on wall and cause deformation of wall even cracking destruction the problem of, effectively protect The integrality of existing structures has been protected, also reliable Path of Force Transfer has been provided for foundation pit support system, it is ensured that pattern foundation pit supporting structure Stability.
The support replacement further improvements in methods of the outer existing structures of foundation ditch are in foundation pit construction of the present invention, are enclosed in described Force transmission partses are set to include between watch box system and the outer existing structures of the foundation ditch:
Enclosing in the floor of existing structures and the retaining design outside the foundation ditch sets Force transmission partses between purlin.
The support replacement further improvements in methods of the outer existing structures of foundation ditch are in foundation pit construction of the present invention, construction level Support system includes:
Inside foundation ditch and the concrete support that purlin is fixedly connected is enclosed in Construction Support in the foundation ditch with corresponding;With/ Or
Inside foundation ditch and the bracing members that purlin is fixedly connected are enclosed in Construction Support in the foundation ditch with corresponding.
The support replacement further improvements in methods of the outer existing structures of foundation ditch are in foundation pit construction of the present invention, set power transmission Component includes:
The outer soil body between existing structures and the retaining design of the foundation ditch is excavated until existing outside the foundation ditch At the bottom of the building plate of building structure, so that empty in foring operation outside the foundation ditch between existing structures and the retaining design Between;
Corresponding enclose pours to form Force transmission partses between purlin in the bottom of the building plate and the retaining design;
The soil body is backfilled into the operating space, at the bottom that the soil body is backfilled to last layer floor, and in next level Corresponding enclose pours to form Force transmission partses between purlin in plate and the retaining design, repeats backfill body and pours to form power transmission structure The step of part, is untill construction completes to be located at the Force transmission partses enclosed at the top of in the retaining design at purlin.
The support replacement further improvements in methods of the outer existing structures of foundation ditch are in foundation pit construction of the present invention, the power transmission Component is the cast-in-place horizontal support replacement plate of armored concrete.
Present invention also offers the support-replacing system of existing structures outside foundation ditch in a kind of foundation pit construction, the week of the foundation ditch Edge is provided with retaining design, and the inside of the foundation ditch is provided with horizontal struts system, and the support-replacing system includes being supported in described go along with sb. to guard him Force transmission partses between the outer existing structures of system and foundation ditch, by the Force transmission partses by the horizontal supports of the foundation ditch The axial force of the supports of system is delivered to the setting position of the outer existing structures of foundation ditch.
The outer existing structures of foundation ditch support-replacing system in foundation pit construction of the present invention further improvement is that, the power transmission Component is supported in corresponding in the floor of the outer existing structures of the foundation ditch and the retaining design enclose between purlin.
The outer existing structures of foundation ditch support-replacing system in foundation pit construction of the present invention further improvement is that, the level Support system includes being supported in inside foundation ditch and encloses the concrete support and/or be supported in foundation ditch that purlin is fixedly connected with corresponding Simultaneously the bracing members that purlin is fixedly connected are enclosed with corresponding in portion.
The outer existing structures of foundation ditch support-replacing system in foundation pit construction of the present invention further improvement is that, the power transmission Component is multiple tracks, right in the end of every first floor plate of the branch in the outer existing structures of the foundation ditch and the retaining design That answers encloses between purlin.
The outer existing structures of foundation ditch support-replacing system in foundation pit construction of the present invention further improvement is that, the power transmission Component is the cast-in-place horizontal support replacement plate of armored concrete.
Brief description of the drawings
Fig. 1 is the sectional view of the support-replacing system of the outer existing structures of foundation ditch in foundation pit construction of the present invention.
Fig. 2 to Fig. 4 is the decomposition of the support-replacing system work progress of existing structures outside foundation ditch in foundation pit construction of the present invention Structural representation.
Embodiment
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
The invention provides the support-replacing system of existing structures outside foundation ditch in a kind of foundation pit construction and support replacement method, it is applicable The situation of existing structures, i.e. the side construction foundation pit engineering in existing structures are provided immediately in foundation ditch.Foundation ditch Retaining design and horizontal struts system are used to ensure the stability of foundation ditch, and horizontal struts system therein is to the soil body on the outside of foundation ditch Axial force of the supports is formed with, when existing structures are disposed proximate to foundation ditch, the axial force of the supports can directly act on existed building On the vertical wall of structure, because the ability that vertical wall resists lateral pressure is poor, by adjacent foundation ditch axial force of the supports It can be deformed or even ftracture after extruding.To solve to be squeezed buckling close to the existing structures axle power supported that foundation ditch is set The problem of shape or even cracking destruction, support-replacing system of the invention and support replacement method provide rational stress bang path, pass through The Force transmission partses between existing structures and retaining design are arranged on, axial force of the supports is directly transferred to existing structures On setting position, axial force of the supports is born using the very capable position that lateral pressure is resisted in existing structures, so energy The integrality of enough effectively protection existing structures, while also providing reliable Path of Force Transfer for foundation pit support system, it is ensured that The stability of foundation ditch.Support-replacing system below in conjunction with the accompanying drawings to existing structures outside foundation ditch in foundation pit construction of the present invention and change Support method is illustrated.
As shown in figure 1, in a kind of foundation pit construction for providing of the present invention the outer existing structures of foundation ditch support-replacing system, foundation ditch Periphery be provided with retaining design, the inside of foundation ditch is provided with horizontal struts system 123, and the support replacement system includes being supported in retaining design Force transmission partses 21 between existing structures outside foundation ditch 11, by Force transmission partses 21 by the horizontal struts system of foundation ditch 12 123 axial force of the supports is delivered to the setting position of the outer existing structures 11 of foundation ditch.The setting position selects existing structures The stronger position of lateral pressure is resisted in 11.Axial force of the supports is transferred in existing structures 11 using Force transmission partses 21 and resisted The stronger position of lateral pressure, can provide reliable Path of Force Transfer, and can be existed building for the horizontal struts system of foundation ditch Structure provides effective protection, protects the integrality of existing structures.
The support-replacing system of the present invention is disposed proximate to suitable for foundation ditch 12 with existing structures 11, i.e., in existing structures 11 side construction foundation pit 12.Existing structures 11 include main building 111 and ground storehouse 112, wherein main building 111 and ground storehouse 112 In include multilayer floor slab.The retaining design of foundation ditch 12 includes the fender post 121 being arranged in the periphery soil body 10 of foundation ditch 12, and Be formed on the inside of fender post 121 and top encloses purlin 122.The horizontal struts system 123 of foundation ditch 12, which is supported in, to be enclosed on purlin 122 and horizontal To branch in the foundation ditch 12, after the soil body inside foundation ditch 12 is dug out, the inwall of foundation ditch 12 can by the surrounding soil body pressure, if not The danger such as foundation pit collapse can then be produced by setting the horizontal struts system 123 of foundation ditch, by the horizontal struts system 123 of foundation ditch and be enclosed Watch box system ensures the stability of foundation ditch 12.Horizontal struts system 123 is formed towards outside foundation ditch 12 during foundation ditch 12 is supported The axial force of the supports in portion, the axial force of the supports that can produce horizontal struts system 123 close to the fender post 121 of existing structures 11 is passed Existing structures 11 are passed, to avoid the axial force of the supports that existing structures 11 are produced with crimp or even causing to have built The problem of building structure cracking destruction, Force transmission partses 21 of the invention are supported in the setting position of existing structures 11 and close to Between the retaining design for having building structure 11, axial force of the supports is transferred to the setting of existing structures 11 by Force transmission partses 21 Position, provides reliable Path of Force Transfer for foundation pit support system, effectively protects the integrality of existing structures 11.
As the better embodiment of the present invention, as shown in figure 1, being constructed on fender post 121 close to the side of foundation ditch 12 Be formed with it is corresponding with floor enclose purlin 122, also constructed at the top of fender post 121 and enclose purlin 122, set Force transmission partses 21 When, Force transmission partses 21 are supported on the end of the floor 114,113 of existing structures 11 and corresponding enclosed between purlin 122.By It is connected in enclosing purlin 122 with horizontal struts system 123, the axial force of the supports of foundation ditch 12 is produced by horizontal struts system 123, and is concentrated In enclosing at purlin 122, Force transmission partses 21 are arranged on and enclosed between purlin and corresponding floor, directly quickly can transmitted axial force of the supports On to corresponding floor, greatly reduce the axial force of the supports suffered by the vertical wall on existing structures 11.Floor and frame Trestle and Vierendeel girder are fixedly connected with, therefore floor resistance lateral pressure is very capable, existing structures can be protected to be in Intact state.The Force transmission partses 21 of the present invention provide rational and reliable power transmission for the axial force of the supports of base pit engineering Path, it is ensured that the stability of foundation ditch, also protects the integrality of existing structures.Existing structures are shown in Fig. 1 11 have two layers floor, as bottom of the building plate 113 and floor 114, and the Force transmission partses 21 in the support-replacing system of the present invention are not certainly It is limited to the existing structures of two layers of floor, can be corresponded to and be respectively provided with per at first floor plate according to the actual conditions of existing structures Force transmission partses.
As another better embodiment of the present invention, horizontal struts system 123 include being supported in the inside of foundation ditch 12 and with It is corresponding to enclose the concrete support and/or be supported in the inside of foundation ditch 12 and fix company with the corresponding purlin 122 that encloses that purlin 122 is fixedly connected The bracing members connect.The purlin that encloses of correspondence connection concrete support is coagulation fortifield village purlin, and the purlin that encloses of correspondence connection bracing members encloses purlin for steel. Fender post 121 in retaining design is preferably cast-in-situ bored pile.Force transmission partses 21 in the present invention are preferably cast-in-place reinforcing bar and mixed Coagulate native horizontal support replacement plate.
As the another better embodiment of the present invention, as shown in figure 1, Force transmission partses 21 are multiple tracks, branch, which is located at, has built It is corresponding in the end of every first floor plate in building structure 11 and retaining design to enclose between purlin 122.It is right with reference to shown in Fig. 2 to Fig. 3 The work progress of Force transmission partses 21 is illustrated.As shown in Fig. 2 excavating the fender post in existing structures 11 and retaining design The soil body between 121 is at the bottom of the building plate 113 of existing structures 11, so that in existing structures 11 and fender post 121 Between form operating space 22;As shown in figure 3, pouring shape between bottom of the building plate 113 and fender post 121 in operating space 22 Into Force transmission partses 21;As shown in figure 4, backfilling the soil body 10 into operating space 22, the soil body 10 is backfilled to last layer floor 114 At bottom, pour to form Force transmission partses 21 with reference to shown in Fig. 1, and between last layer floor 114 and fender post 121, repeating should Step, i.e., repeatedly backfill body 10 completes to be located at the top of fender post 121 with the step of forming Force transmission partses 21 is poured up to constructing Untill the Force transmission partses 21 at place, thus Force transmission partses 21 are provided with every first floor plate.
The support replacement method of existing structures is illustrated outside foundation ditch in the foundation pit construction provided below the present invention.
The support replacement method of the outer existing structures of foundation ditch comprises the following steps in the foundation pit construction of the present invention:As shown in figure 1, Construction foundation pit 12;The retaining design of construction foundation pit 12 and horizontal struts system 123;And it is outer existing in retaining design and foundation ditch 12 Force transmission partses 21 are set between building structure 11, the axial force of the supports of the horizontal struts system 123 of foundation ditch 12 is delivered to outside foundation ditch The setting position of existing structures 11.The stronger position of resistance lateral pressure in setting position selection existing structures 11 Put.Axial force of the supports is transferred in existing structures 11 using Force transmission partses 21 and resists the stronger position of lateral pressure, can Reliable Path of Force Transfer is provided for the horizontal struts system of foundation ditch, and effectively protection can be provided for existing structures, is protected The integrality of existing structures.
The support replacement method of the present invention is disposed proximate to suitable for foundation ditch 12 with existing structures 11, i.e., in existing structures 11 side construction foundation pit 12.Existing structures 11 include main building 111 and ground storehouse 112, wherein main building 111 and ground storehouse 112 In include multilayer floor slab.The containment system of foundation ditch 12 includes the fender post 121 being arranged in the periphery soil body 10 of foundation ditch 12, and Be formed on the inside of fender post 121 and top encloses purlin 122.The horizontal struts system 123 of foundation ditch 12, which is supported in, to be enclosed on purlin 122 and horizontal To branch in the foundation ditch 12, after the soil body inside foundation ditch 12 is dug out, the inwall of foundation ditch 12 can by the surrounding soil body pressure, if not The danger such as foundation pit collapse can then be produced by setting the horizontal struts system 123 of foundation ditch, by the horizontal struts system 123 of foundation ditch and be enclosed Watch box system ensures the stability of foundation ditch 12.Horizontal struts system 123 is formed towards foundation ditch 12 during foundation ditch 12 is supported Outside axial force of the supports, the axial force of the supports that horizontal struts system 123 can be produced close to the fender post 121 of existing structures 11 Existing structures 11 are passed to, to avoid the axial force of the supports that existing structures 11 are produced with crimp or even causing existing The problem of building structure cracking destruction, Force transmission partses 21 of the invention are supported in the setting positions of existing structures 11 and close Between the retaining design of existing structures 11, axial force of the supports is transferred to setting for existing structures 11 by Force transmission partses 21 Positioning is put, and is provided reliable Path of Force Transfer for foundation pit support system, is effectively protected the integrality of existing structures 11.
As the better embodiment of the present invention, when constructing fender post 121, in close foundation ditch 12 on fender post 121 Side construction it is corresponding with floor enclose purlin 122, also constructed at the top of fender post 121 and enclose purlin 122, setting Force transmission partses When 21, Force transmission partses 21 are supported on the end of the floor 114,113 of existing structures 11 and corresponding enclosed between purlin 122. It is connected due to enclosing purlin 122 with horizontal struts system 123, the axial force of the supports of foundation ditch 12 is produced by horizontal struts system 123, union In in enclosing at purlin 122, Force transmission partses 21 are arranged on and enclosed between purlin and corresponding floor, directly quickly can be passed axial force of the supports It is handed on corresponding floor, greatly reduces the axial force of the supports suffered by the vertical wall on existing structures 11.Floor with Frame column and Vierendeel girder are fixedly connected with, therefore floor resistance lateral pressure is very capable, can protect at existing structures In intact state.The Force transmission partses 21 of the present invention provide rational and reliable biography for the axial force of the supports of base pit engineering Power path, it is ensured that the stability of foundation ditch, also protects the integrality of existing structures.Existed building knot is shown in Fig. 1 Structure 11 has two layers floor, as bottom of the building plate 113 and floor 114, and the Force transmission partses 21 in the support-replacing system of the present invention are simultaneously certainly The existing structures of two layers of floor are not limited to, can be corresponded to and be all provided with per at first floor plate according to the actual conditions of existing structures Put Force transmission partses.
As another better embodiment of the present invention, construction level support system 123 includes:In construction branch in foundation ditch 12 Support in the inside of foundation ditch 12 and with the concrete support that purlin is fixedly connected that encloses in corresponding retaining design;And/or
In Construction Support in foundation ditch 12 inside the foundation ditch and with the steel branch that purlin is fixedly connected of enclosing in corresponding retaining design Support.The purlin that encloses of correspondence connection concrete support is coagulation fortifield village purlin, and the purlin that encloses of correspondence connection bracing members encloses purlin for steel.Retaining design In fender post 121 be preferably cast-in-situ bored pile.Force transmission partses 21 in the present invention are preferably cast-in-place armored concrete level Support replacement plate.
As the another better embodiment of the present invention, construction Force transmission partses 21 include, and have been built as shown in Fig. 2 excavating The soil body in building structure 11 and retaining design between fender post 121 until at the bottom of the building plate 113 of existing structures 11 so that Operating space 22 is formd between existing structures 11 and fender post 121;As shown in figure 3, in bottom of the building in operating space 22 Pour to form Force transmission partses 21 between plate 113 and fender post 121;As shown in figure 4, the soil body 10 is backfilled into operating space 22, will The soil body 10 is backfilled at the bottom of last layer floor 114, with reference to shown in Fig. 1, and last layer floor 114 and fender post 121 it Between pour to form Force transmission partses 21, repeat the step, i.e. repeatedly backfill body 10 and to pour the step of forming Force transmission partses 21 straight Untill the Force transmission partses 21 that construction completes to be located at at the top of fender post 121, thus biography is provided with every first floor plate Power component 21.
The present invention is described in detail above in association with accompanying drawing embodiment, those skilled in the art can be according to upper State it is bright the present invention is made many variations example.Thus, some of embodiment details should not constitute limitation of the invention, this Invention regard the scope defined using appended claims as protection scope of the present invention.

Claims (10)

1. a kind of support replacement method of the outer existing structures of foundation ditch in foundation pit construction, it is characterised in that comprise the following steps:
Construction foundation pit;
Construct the retaining design and horizontal struts system of the foundation ditch;And
Force transmission partses are set between existing structures outside the retaining design and the foundation ditch, by the level branch of the foundation ditch The axial force of the supports of support body system is delivered to the setting position of the outer existing structures of foundation ditch.
2. the support replacement method of the outer existing structures of foundation ditch in foundation pit construction as claimed in claim 1, it is characterised in that in institute State sets Force transmission partses to include between retaining design and the outer existing structures of the foundation ditch:
Enclosing in the floor of existing structures and the retaining design outside the foundation ditch sets Force transmission partses between purlin.
3. the support replacement method of the outer existing structures of foundation ditch in foundation pit construction as claimed in claim 2, it is characterised in that construction Horizontal struts system includes:
Inside foundation ditch and the concrete support that purlin is fixedly connected is enclosed in Construction Support in the foundation ditch with corresponding;And/or
Inside foundation ditch and the bracing members that purlin is fixedly connected are enclosed in Construction Support in the foundation ditch with corresponding.
4. the support replacement method of the outer existing structures of foundation ditch in foundation pit construction as claimed in claim 2, it is characterised in that set Force transmission partses include:
The outer soil body between existing structures and the retaining design of the foundation ditch is excavated until the outer existed building of the foundation ditch At the bottom of the building plate of structure, so that in foring operating space between existing structures and the retaining design outside the foundation ditch;
Corresponding enclose pours to form Force transmission partses between purlin in the bottom of the building plate and the retaining design;
Backfill the soil body into the operating space, at the bottom that the soil body is backfilled to last layer floor, and in last layer floor and Corresponding enclose pours to form Force transmission partses between purlin in the retaining design, repeats backfill body and pours to form Force transmission partses Step is untill construction completes to be located at the Force transmission partses enclosed at the top of in the retaining design at purlin.
5. the support replacement method of the outer existing structures of foundation ditch in foundation pit construction as claimed in claim 1, it is characterised in that described Force transmission partses are the cast-in-place horizontal support replacement plate of armored concrete.
6. a kind of support-replacing system of the outer existing structures of foundation ditch in foundation pit construction, the periphery of the foundation ditch is provided with retaining design, The inside of the foundation ditch is provided with horizontal struts system, it is characterised in that the support-replacing system includes being supported in the retaining design Force transmission partses between existing structures outside foundation ditch, by the Force transmission partses by the horizontal struts system of the foundation ditch Axial force of the supports is delivered to the setting position of the outer existing structures of foundation ditch.
7. the support-replacing system of the outer existing structures of foundation ditch in foundation pit construction as claimed in claim 6, it is characterised in that described Force transmission partses are supported in corresponding in the floor of the outer existing structures of the foundation ditch and the retaining design enclose between purlin.
8. the support-replacing system of the outer existing structures of foundation ditch in foundation pit construction as claimed in claim 7, it is characterised in that described Horizontal struts system includes being supported in inside foundation ditch and encloses the concrete support and/or be supported in base that purlin is fixedly connected with corresponding Hole is internal and encloses the bracing members that purlin is fixedly connected with corresponding.
9. the support-replacing system of the outer existing structures of foundation ditch in foundation pit construction as claimed in claim 7, it is characterised in that described Force transmission partses are multiple tracks, the end of every first floor plate of the branch in the outer existing structures of the foundation ditch and the retaining design In corresponding enclose between purlin.
10. the support-replacing system of the outer existing structures of foundation ditch in foundation pit construction as claimed in claim 6, it is characterised in that institute Force transmission partses are stated for the cast-in-place horizontal support replacement plate of armored concrete.
CN201710136224.9A 2017-03-09 2017-03-09 The support-replacing system and support replacement method of the outer existing structures of foundation ditch in foundation pit construction Pending CN106978812A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710136224.9A CN106978812A (en) 2017-03-09 2017-03-09 The support-replacing system and support replacement method of the outer existing structures of foundation ditch in foundation pit construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710136224.9A CN106978812A (en) 2017-03-09 2017-03-09 The support-replacing system and support replacement method of the outer existing structures of foundation ditch in foundation pit construction

Publications (1)

Publication Number Publication Date
CN106978812A true CN106978812A (en) 2017-07-25

Family

ID=59338285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710136224.9A Pending CN106978812A (en) 2017-03-09 2017-03-09 The support-replacing system and support replacement method of the outer existing structures of foundation ditch in foundation pit construction

Country Status (1)

Country Link
CN (1) CN106978812A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605444A (en) * 2021-07-27 2021-11-05 上海建工一建集团有限公司 Newly developed plot basement structure first-pass supporting stress structure system and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720201A (en) * 2012-07-02 2012-10-10 中建三局第二建设工程有限责任公司 Support change construction building method implemented by using main structure of building
CN203429661U (en) * 2013-04-02 2014-02-12 东南大学 Basement with additional downward layers
CN203891028U (en) * 2014-05-07 2014-10-22 广州市市政工程设计研究院 Supporting structure of reinforced steel sheet piles and core tube bracings in deep foundation pit
CN204715364U (en) * 2015-05-06 2015-10-21 中国地质大学(武汉) A kind of foundation pit support device
KR101662072B1 (en) * 2015-12-01 2016-10-06 (주)서현컨스텍 Temporary retaining wall using underground wall and connector and the construction method therefor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720201A (en) * 2012-07-02 2012-10-10 中建三局第二建设工程有限责任公司 Support change construction building method implemented by using main structure of building
CN203429661U (en) * 2013-04-02 2014-02-12 东南大学 Basement with additional downward layers
CN203891028U (en) * 2014-05-07 2014-10-22 广州市市政工程设计研究院 Supporting structure of reinforced steel sheet piles and core tube bracings in deep foundation pit
CN204715364U (en) * 2015-05-06 2015-10-21 中国地质大学(武汉) A kind of foundation pit support device
KR101662072B1 (en) * 2015-12-01 2016-10-06 (주)서현컨스텍 Temporary retaining wall using underground wall and connector and the construction method therefor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605444A (en) * 2021-07-27 2021-11-05 上海建工一建集团有限公司 Newly developed plot basement structure first-pass supporting stress structure system and construction method
CN113605444B (en) * 2021-07-27 2022-12-20 上海建工一建集团有限公司 Newly developed plot basement structure first-pass supporting stress structure system and construction method

Similar Documents

Publication Publication Date Title
CN105545323B (en) The construction method of cut-and-cover tunnel lining cutting
JP7009773B2 (en) Building construction method and building structure
CN205024712U (en) Combined tower crane foundation
CN103628571B (en) Beam-column joint for reverse construction method and construction method
CN105332388A (en) Assembled concrete-filled steel tubular column cap type tower crane foundation structure and construction method
CN105421488B (en) The construction method of sole plate support replacement in the combined fender construction system of underground
CN108086307B (en) Steel pipe concrete hole digging and pouring composite miniature pile
CN107366290A (en) Foundation pit supporting method and raked pile
KR101187170B1 (en) Application of under pinning method in remodeling
CN111648400B (en) Construction method for civil air defense engineering to meet thick-layer water-bearing sand layer through reverse method
JP7386095B2 (en) Underground structure construction method
JP6422084B2 (en) Underground space construction method
JP2000352296A (en) Method o constructing passage just under underground structure
CN106978812A (en) The support-replacing system and support replacement method of the outer existing structures of foundation ditch in foundation pit construction
CN206625233U (en) The support-replacing system of the outer existing structures of foundation ditch in foundation pit construction
CN106223344B (en) A kind of ground line piled anchor frame foundation pit supporting method
CN211621964U (en) Connecting node for reverse-construction concrete-filled steel tubular column and sequential-construction steel tubular column
KR101680794B1 (en) Basic structure for constructing a caisson foundation and the construction method using the same
CN211735433U (en) Inter-pile soil retaining wall structure
JP2018159180A (en) Building foundation structure and construction method thereof
JP7102062B2 (en) Building joint structure
CN103397650B (en) A kind of large-scale steel cylinder cofferdam structure
CN105780938A (en) Vertical construction seam construction method of core tube bottom board for super high-rise
CN207193988U (en) Raked pile
CN206279522U (en) Ground-connecting-wall steel reinforcement cage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination