CN106978805A - A kind of inflation soil compaction anchor pole - Google Patents
A kind of inflation soil compaction anchor pole Download PDFInfo
- Publication number
- CN106978805A CN106978805A CN201610047963.6A CN201610047963A CN106978805A CN 106978805 A CN106978805 A CN 106978805A CN 201610047963 A CN201610047963 A CN 201610047963A CN 106978805 A CN106978805 A CN 106978805A
- Authority
- CN
- China
- Prior art keywords
- soil compaction
- anchor
- steel disc
- inflation
- anchor pole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a kind of inflation soil compaction anchor pole, it is adaptable to the protection of the soil property of architecture Foundation Pit Engineering or soft soil-slope, it can also be used to the reinforcement of other interim side slopes.The anchoring section of anchor pole is mainly made up of soil compaction cylinder mechanism and inflation mechanism.It is inflated by the rubber pneumatic bag to inflation mechanism, the soil compaction steel disc of soil compaction cylinder mechanism is compressed into anchor hole Tu Bi, produce anchoring frictional force, then is delivered to by lacing wire outside hole and reaches anchoring effect.Front and rear end-stopping plate, side guard plate and the rubber sheath set outside rubber pneumatic bag, the large scale of air bag can be coordinated to expand, and the termination extrusion deformation effectively after limitation expansion, therefore the blowing pressure of air bag can be significantly increased, so as to improve the anti-pulling capacity of single anchor rod, on-the-spot test finds the bearing capacity of this anchor pole up to tens of tons.This anchor bolt construction is quick, high capacity and is conveniently adjusted, and can be reclaimed completely after air bag deflation, economy, can be for substituting the common grouted anchor bar in soil level sideslope.
Description
Technical field
The present invention proposes a kind of inflation soil compaction anchor pole, soil property or protection, reinforcing and the rescue of soft soil-slope available for building foundation pit supporting engineering.Common grouted anchor bar can be replaced, engineering application value is high.
Background technology
Existing anchor pole is mainly preexisting hole grouted anchor bar, relies on the rubbing action between the slip casting Seed harvest and Rock And Soil of anchoring section and produces anchor force.General preexisting hole grouted anchor bar has following three shortcomings:One is that under given geological conditions, the increase of anchor force can only be by increasing the parameters such as bolt diameter, length, and the tune increasing of these parameters result in huge economic waste, increases rock-bolt length sometimes and is also limited by peripheral space;Two be that the lacing wire of anchor pole and slip casting Seed harvest are all deposited in the soil body of underground after anchoring task is completed, and the later development to the periphery underground space, which is utilized, causes obstacle.Three be that bolt grouting construction is completed and slip casting Seed harvest is reached after some strength, could form anchor force, cause construction speed slow;The completion moreover, anchor pole is once constructed, anchor force can not then increase, and when the dangerous situations such as sliding trend occurs in side slope, it is entirely possible to avoid the further unstability of side slope if can take measures to adjust the anchor force for increasing anchor pole.
Inflation anchor bar can effectively solve the above mentioned problem of grouted anchor bar.But existing inflation anchor bar is all much that rubber fixation colligation is formed into anchoring section in hollow pull rod, the problem of being primarily present two aspects:One is the failure to limitation rubber pneumatic bag expands to two ends, and air bag diameter increases during air pressure increase, and termination position is to aperture bottom hole dilatancy, the easy Explosive Failure of air bag, therefore air bag internal pressure very little, and anchor force is low;Two be that the side rubber of air bag is directly contacted with anchor hole Tu Bi, and anchor force needs all to be delivered on rubber so that deformation of the air bag along pull bar direction is very big, and to a certain extent, the wall thickness for also resulting in air bag rubber is thinning for pulling force increase, so as to occur Explosive Failure.Therefore, conception at present only with respect to inflation anchor bar and test report, the rarely seen engineer applied on inflation anchor bar.
A kind of inflation soil compaction anchor pole proposed by the present invention has following features:One is to be provided with front and rear end-stopping plate, side guard plate and rubber sheath for air bag, it can adapt to large range of be radially expanded deformation (air bag expansion generally reaches more than 2 times of diameters), and the termination extrusion linear deformation after air bag expansion is effectively limit, therefore can be with the blowing pressure of augmented airbag;Two be to set side soil compaction steel disc for air bag, and soil compaction steel disc is compressed anchor hole Tu Bi and produces frictional force by air bag, and frictional force is passed to pull bar (or lacing wire) by soil compaction steel disc again, and air bag rubber no longer tension is also just difficult thinning failure;Three be lose heart after inflation soil compaction anchor pole can realize complete recovery.Therefore inflation soil compaction anchor pole can avoid the defect of preexisting hole grouted anchor bar and existing inflation anchor bar completely.
The content of the invention
The invention provides a kind of inflation soil compaction anchor pole so that the anchor force that the anchor pole in soil layer can not only be according to needed for being provided engineering actual demand in good time, and can be with recycling.
A kind of inflation soil compaction anchor pole, is made up of the anchor mechanism (1) of hole outer portion, the pulling force transmission mechanism (2) of free segment part, the soil compaction cylinder mechanism (3) of anchoring section part and inflation mechanism (4) and its (5) five parts of attached loading line.
The pulling force transmission mechanism (2) includes lacing wire and branch sleeve, and lacing wire is typically formed by 2~3 reinforcing bar concatenations, connected in screw shell mode;The purpose of lacing wire concatenation is to carry out segmentation recovery in relative narrow space for convenience.Lacing wire front end connection soil compaction cylinder mechanism, rear end is extended to outside hole and anchor mechanism (1) grappling;
The soil compaction cylinder mechanism (3) is wrapped on the outside of the inflation mechanism (4).The soil compaction cylinder mechanism (3) includes soil compaction steel disc, cement mortar calculus thin layer, front-end bracket, rear end support, limits swollen steel cable.
The soil compaction steel disc be 1 meter~2 meters of joint length, section be in arc-shaped steel disc;One soil compaction cylinder mechanism (3) includes one group of soil compaction steel disc, and one group of quantity is at least 2 or more, and one group of soil compaction steel disc is annularly arranged around a certain axis, forms the cylinder of a joint close;The diameter of the cylinder of joint close before inflation is usually 100 millimeters~300 millimeters.
The rear ends of every soil compaction steel disc are fixed with a support;The section of support is sector, and length is 2 centimetres~10 centimetres;The outside cambered surface of support is fixedly connected with the inner arc side of soil compaction steel disc;A short column is crowded around into the pack support of soil compaction steel disc quantity identical one, it acts on the hollow cylinder two ends for being to surround in soil compaction steel disc and respectively forms a blockage body;The hollow part of cylinder is just used for placing inflation mechanism;During inflation, the blockage body restricted charging expansion mechanism that support is crowded around is moved or deformed to two ends, while can also ensure that soil compaction steel disc by cylinder center's radial dilatation laterally, prevents from producing between soil compaction steel disc the phenomenon of juxtaposition.
The inflation mechanism (4) includes rubber pneumatic bag, front and back end rubber sheath, front and rear end-stopping plate, front and rear side guard plate, the rubber pneumatic bag is connected by valve with loading line (5), and front and back end rubber sheath, front and rear end-stopping plate, front and rear side guard plate are wrapped in the two ends of rubber pneumatic bag successively;
On the outside of the post of cylindric rubber pneumatic bag near the position of balloon ends, a cylindrical section shape rubber sheath is each provided with.Cylindric rubber sheath internal diameter is identical with the external diameter of rubber pneumatic bag, and rubber pneumatic bag is formd thickening protective layer by sheath close to the position of rear and front end, it is ensured that rubber pneumatic bag will not cause air bag to explode when expanding because side guard plate opens the gap to be formed.
End-stopping plate is arranged on the rear and front end of cylindrical rubber air bag, rounded, and reserved aperture is provided with circular end-stopping plate, is easy to the valve of rubber pneumatic bag to extend there through;When using punching rubber pneumatic bag, pull bar is also required to extend there through.
Rubber pneumatic bag side is provided with some blocks of side guard plates and is connected with front and rear end-stopping plate;Every block of side guard plate is made up of two section steel discs;First segment steel disc is shorter thicker, and second section steel disc is longer.First segment steel disc one end of side guard plate is connected by the rounded outer edge of hinged-support and end-stopping plate, and the other end can be rotated freely by being hinged second section steel disc, the other end of second section steel disc.Rubber pneumatic bag to post side expand when, diameter increase, the first segment steel disc of side guard plate open block increase diameter two ends, second section steel disc by air bag press to soil compaction steel disc formation frictional resistance, with end-stopping plate collective effect, block the passage that air bag expands to two ends.
The loading line (5) includes charge valve, air gauge, inflated hose, valve.When this inflation anchor pole works, the rubber pneumatic bag of inflation mechanism (4) is inflated or lost heart by loading line (5), so that inflation mechanism (4) is radially expanded or shunk, so that soil compaction cylinder mechanism (3) departs from anchor hole hole wall (6) contact squeeze or with anchor hole hole wall (6).Frictional force between soil compaction steel disc and anchor hole hole wall (6) is by lacing wire or passes through the pull bar of punching rubber pneumatic bag and is delivered to aperture, it is locked in again by anchor mechanism (1) on the Guan Liang specially set or waling, forms complete anchor and draw stress system.
Anchor recovering is mainly completed by lacing wire;When anchor pole completes anchoring work, after gas and release anchorage in discharge air bag, rubber pneumatic bag, which loses heart, to be shunk, air bag lateral wall, side guard plate, soil compaction steel disc and Tu Bi are mutually disengaged, now firmly pulled back outside hole one group of lacing wire being fixed on soil compaction steel disc, preformation hole can integrally be extracted by soil compaction cylinder mechanism (3) and inflation mechanism (4), realize the recovery of inflation anchor bar.
It is preferred that, lacing wire can also be made up of steel strand wires or steel wire rope;When lacing wire is made up of steel wire rope, branch sleeve can be cancelled.
It is preferred that, when soil compaction steel disc is that joint length does not reach design requirement, it can be connected in series, serial arrangement can be that screw rod connection or screw rod add auxiliary steel disc connection.
It is preferred that, in order to improve the frictional force between soil compaction steel disc and the native wall of anchor hole, the surface on the outside of soil compaction steel disc is fixed with cement mortar calculus thin layer, and the shape and length of mortar calculus thin layer are identical with soil compaction steel disc;More preferred, it can lay finer wire net in mortar calculus thin layer and shaping is poured together with cement mortar.
It is preferred that, when the soil compaction steel disc quantity of soil compaction cylinder mechanism reaches 8 or the above, it is in flat rectangle that the section configuration of soil compaction steel disc, which can be, now, the section of front and back end support is then isosceles triangle, and the bottom of isosceles triangle is fixedly connected with soil compaction steel disc medial surface.
It is preferred that, the fan-shaped top of the rear end support section is provided with future insufficiency, and when one group of rear end support crowds around into short column, future insufficiency has then synthesized the center reserving hole channel of short column, and the inflated hose is passed through from reserving hole channel.
It is preferred that, between the soil compaction steel disc or one group of rear end support has a spacing steel cable connection between segment and segment, respectively, with one group of spacing steel cable of soil compaction steel disc quantity identical by between soil compaction steel disc or rear end support is annularly connected;Its effect is that maximum swelling displacement is limited by spacing steel cable length when soil compaction steel disc and support outwards expand.
It is preferred that, the rubber pneumatic bag can become the columned rubber pneumatic bag of punching.Now the inflation mechanism is in addition to including punching rubber pneumatic bag, front and back end rubber sheath, front and rear end-stopping plate, front and rear side guard plate, in addition to pull bar.The hollow pull rod passes through the hollow duct of punching rubber pneumatic bag, and front and rear end-stopping plate and rubber pneumatic bag etc. are directly connected to so that the global facility that whole inflation mechanism formation one can be assembled;Soil compaction cylinder mechanism now can cancel front and back end support.
More preferred, when the use columned rubber pneumatic bag of punching, pull bar through the hollow duct of punching rubber pneumatic bag, which connects inflation mechanism, to be formed after a global facility, pull bar makes hollow form, and it is connected with each other by sleeve, outside free segment to the anchor hole for extending through anchor hole, pulling force transmission mechanism can be replaced;Now, the soil compaction steel disc in soil compaction cylinder mechanism should be integrated with the second section Interal fixation on the side guard plate at punching rubber pneumatic bag end, and the lacing wire being connected with soil compaction steel disc, then can be designed to steel cable, play the transmission of auxiliary pulling force and auxiliary recovery is used.
The beneficial effects of the invention are as follows 1. front and rear end-stopping plate limits rubber pneumatic bag and expanded to two ends, and frictional force is passed to lacing wire or pull bar by soil compaction steel disc, and air bag rubber not tension, internal pressure can be significantly increased, and anchor force accordingly increases;2. because of the effect of rubber sheath, during anchor pole use, anchor force can be increased by increasing air bag internal pressure, anchor rod anchored section of length can significantly reduce, so as to reduce the influence to periphery, and increasing anchor force can also be in particular cases adjusted as self a kind of remedial measure;3. anchor pole is main in factory-assembled, and engineering site can directly be inserted after anchor hole and inflated, and can quickly form anchor force, maintained original stable state beneficial to slope soil, also be suitable as reinforcement for rushing danger measure when dangerous situation occurs in slope project;4. after the completion of construction, anchor pole can be recycled completely, do not stayed any works among the soil body of underground, will not be hindered the development and utilization of the later stage underground space, environmental protection.
Brief description of the drawings
Fig. 1 is the basic structure schematic diagram of this patent embodiment one.
Fig. 2 is the front-end bracket schematic diagram in this patent embodiment one.
Fig. 3 is rear end support and its spacing steel cable schematic diagram in this patent embodiment one.
Fig. 4 is end-stopping plate and side guard plate and its schematic diagram of interconnection in this patent embodiment one
Fig. 5 is the structural representation of this patent embodiment two.
Fig. 6 is the schematic diagram of the punching rubber pneumatic bag of this patent embodiment two.
Fig. 7 is the structural representation of this patent embodiment three.
Fig. 8 is the structural representation of this patent example IV.
In figure:1. anchor mechanism:11. the pulling force transmission mechanism of 12. anchor slab of anchorage 2.:21. the soil compaction cylinder mechanism of 22. branch sleeve of lacing wire, 23. pull bar 3.:31. limit the inflation mechanism of 33. soil compaction steel disc of swollen 32. rear end support of steel cable, 34. 35. front-end bracket of cement mortar Seed harvest thin layer 4.:41. after the loading line of 47. front end baffle of end-stopping plate 42. rear end side guard plate, 43. rear end rubber sheath, 44. rubber pneumatic bag, 45. front end side guard plate, 46. front end rubber sheath 5.:51. the anchor hole hole wall of 54. valve of charge valve 52. air gauge, 53. inflated hose 6.
Embodiment
In order that the objects, technical solutions and advantages of the present invention are more clearly understood that, below in conjunction with drawings and Examples, the present invention will be described in further detail:
Embodiment one
A kind of inflation anchor pole, including the anchor mechanism (1) being sequentially connected, pulling force transmission mechanism (2), soil compaction cylinder mechanism (3), inflation mechanism (4) and attached loading line (5), the pulling force transmission mechanism (2) includes lacing wire (21) and sleeve (22), is responsible for connection anchor mechanism (1) and the soil compaction cylinder mechanism (3);The soil compaction cylinder mechanism (3) includes limiting swollen steel cable (31), rear end support (32), soil compaction steel disc (33), cement mortar calculus thin layer (34), front-end bracket (35), the front and back end support (35,33) is fixedly connected with the two ends of soil compaction steel disc (33) and surrounds a two ends and have respectively places the inflation mechanism (4) in the hollow cylinder of blockage body, this hollow cylinder;The inflation mechanism (4) includes rear end-stopping plate (41), rear end side guard plate (42), rear end rubber sheath (43), rubber pneumatic bag (44), front end side guard plate (45), front end rubber sheath (46), front end baffle (47), end-stopping plate (47 before and after described, 41) two ends of rubber pneumatic bag (44) are arranged on, the front and back end rubber sheath (46, 43), front and back end side guard plate (45, 42) the post side two ends of rubber pneumatic bag (44) are successively set on, the inflation mechanism (4) is connected with the valve (54) of the loading line (5);The loading line (5) includes charge valve (51), air gauge (52), inflated hose (53), valve (54).
When anchor pole works, inflation mechanism (4) is inflated or lost heart by the loading line (5), so that inflation mechanism (4) is radially expanded or shunk, so that soil compaction cylinder mechanism (3) departs from anchor hole hole wall (6) contact squeeze or with anchor hole hole wall (6), produce frictional force, anchor mechanism outside hole (1) is delivered to by pulling force transmission mechanism (2) to lock, and is formed anchor and is drawn stress system.
Specifically, the soil compaction steel disc (33) includes the steel disc that more than 2 sections are in arc-shaped, the shape of the cement mortar calculus thin layer (34) is identical with soil compaction steel disc (33), soil compaction steel disc (33), cement mortar calculus thin layer (34) surround the outside of inflation device (4) successively, form a thin cylinder for having longitudinal joint.
Specifically, the front and back end rubber sheath (46,43) is cylindrical, rubber sheath (46,43) internal diameter in front and back end is identical with the external diameter of rubber pneumatic bag (44), is just enclosed on rubber pneumatic bag (44) post side two ends;End-stopping plate (47,41) is rounded before and after described, it is separately positioned on the rear and front end of rubber pneumatic bag (44), reserved aperture is provided with the rear end-stopping plate (41), is easy to the valve (54) of loading line (5) to extend there through;Front and rear each one group of side guard plate (45,42) is connected with front and rear end-stopping plate (47,41) by hinged-support, and front and rear side guard plate (45,42) is uniformly distributed in rubber pneumatic bag (44) post side,
More specifically, every front and rear side guard plate (45,42) is made up of two section steel discs, first segment steel disc is shorter thicker, second section steel disc is longer, one end of side guard plate first segment steel disc is connected by the rounded outer edge of hinged-support and end-stopping plate, its other end can be rotated freely by being hinged second section steel disc, the other end of second section steel disc.
In order that the coefficient of friction of soil compaction expansion mechanism (3) and anchor hole hole wall (6) increases, described cement mortar calculus thin layer (34) and finer wire net are poured into shaping, and by pasting or being bolted to the outside of soil compaction steel disc (33).
The specific constructing operation step of the present embodiment is realized in:
The first step:Using rig in the position drilling and forming hole being pre-designed;
Second step:Assembling inflation mechanism (4) simultaneously connects loading line (5):First rubber sheath (43,46), front and rear end-stopping plate (41,47) and side apron (42,45) are enclosed on rubber pneumatic bag (44), it is then that front and rear end-stopping plate (41,47) is fixed;Connect the loading line (5) of rubber pneumatic bag (44);
3rd step:The soil compaction cylinder mechanism (3) of anchor pole is assembled, connection pulling force transmission mechanism (2) simultaneously integrally loads auxiliary sleeve pipe:The inflation mechanism (4) assembled is rolled into drum with one group of soil compaction steel disc (33);Lacing wire (21) and branch sleeve (22) are connected with soil compaction steel disc (33) or its rear end bearing (32);The pulling force transmission mechanism (2) of anchor pole and its soil compaction cylinder mechanism (3) of connection are entangled with the auxiliary thin wall casing of a length internal diameter suitably again;
4th step:The auxiliary sleeve pipe that pulling force transmission mechanism (2), soil compaction cylinder mechanism (3) and inflation mechanism (4) will be wrapped in integrally is sent into the anchor hole that the first step is pre-milled, confirm that anchor pole is reached after design attitude, extract auxiliary thin wall casing out;
5th step:Rubber pneumatic bag (44) is inflated by loading line (5), rubber pneumatic bag (44) expands under gas pressure causes the soil compaction steel disc (33) of soil compaction cylinder mechanism (3) to be close together with anchor hole Tu Bi (6), forms anchor force;
6th step:The works such as the Guan Liang or waling in lacing wire (21) and side slope are locked by anchor mechanism (1) outside anchor hole, reach anchoring effect;Design the blowing pressure is checked after grappling daily, is supplemented when not enough;Increasing anchoring pulling force can also be adjusted by increasing the pressure in rubber pneumatic bag (44) outside hole if necessary;
7th step:After the completion of anchoring task, the air in charge valve (51) drainage rubber pneumatic bag (44) outside by anchor hole, contacted so that soil compaction steel disc (33) is mutually disengaged with anchor hole Tu Bi (6), then pull back lacing wire (21), the soil compaction cylinder mechanism (3) of pulling force transmission mechanism (2) and its connection is segmented extraction from anchor hole;
8th step:The anchor hole hole vacated by anchor pole recycled in its entirety is backfilled with soil.
The concrete structure of embodiment is shown in Fig. 1
Embodiment two
A kind of inflation anchor pole, including the anchor mechanism (1) being sequentially connected, pulling force transmission mechanism (2), soil compaction cylinder mechanism (3), inflation mechanism (4) and attached loading line (5), as shown in figure 5, the structure and embodiment one of the anchor mechanism (1) and loading line (5) are essentially identical;Unlike:Rubber pneumatic bag in the inflation mechanism (4) is punching rubber pneumatic bag (44), and the soil compaction cylinder mechanism (3) reduces rear end support (32) component;Increase pull bar (23), the pull bar (23) passes through the hollow part of punching rubber pneumatic bag (44), and the rear end-stopping plate (41), punching rubber pneumatic bag (44), front end baffle (47) are fixed into an entirety;Pull bar (23) limits the passage that punching rubber pneumatic bag (44) expands to two ends, and punching rubber pneumatic bag (44) can only be radially expanded.
For the ease of pull bar (23) by front and rear end-stopping plate (41,47), the center position of front and rear end-stopping plate (41,47) need to be provided with reserving hole.
For the ease of loading line valve (54) by rear end-stopping plate (41), open up a hole with valve (54) relevant position on the rear end-stopping plate (41,47).
The specific constructing operation step of the present embodiment and embodiment one are essentially identical;Unlike:
Second step:Assembling inflation mechanism (4) simultaneously connects loading line (5):First rubber sheath (43,46), front and rear end-stopping plate (41,47) and side apron (42,45) are enclosed on punching rubber pneumatic bag (44), then rear end-stopping plate (41), punching rubber pneumatic bag (44), front end baffle (47) are sequentially passed through with pull bar (23), and they are fixed into an entirety with nut;The loading line (5) of rubber pneumatic bag (44) is connected by valve (54) again;
7th step:After the completion of anchoring task, drainage completes the air in rubber pneumatic bag (44), can be according to embodiment one the step of, pulling force transmission mechanism (2) and its soil compaction cylinder mechanism (3) and inflation mechanism (4) of connection are segmented extraction from anchor hole;The inflation mechanism (4) that first can also be fixed by pull bar (23) and with pull bar is extracted, and is then again segmented the soil compaction steel disc (33) of lacing wire (21) and its connection and is extracted.
Embodiment three
A kind of inflation anchor pole, as shown in Figure 7:The structure of its structure and embodiment two is essentially identical, unlike:Soil compaction expansion mechanism (3) only includes soil compaction steel disc (33);And second piece of steel disc of front end side guard plate (45) is integrated with the soil compaction steel disc (33);Pull bar (23) extends outside anchor hole and anchor mechanism is locked.
Compared with the first two embodiment, above-mentioned construction adds the pipeline of the anchoring pulling force of inflation anchor pole:In preceding two embodiment, frictional force of the pulling force between soil compaction steel disc (33) and anchor hole Tu Bi (6) is anchored to produce, it is directly delivered to outside hole and is locked by lacing wire (21), in the present embodiment, anchoring pulling force can be both delivered to outside hole by original pipeline, front end baffle (47) can also be delivered to by first piece of steel disc of the front end side guard plate (45) being hinged with soil compaction steel disc (33), then anchor mechanism (1) is delivered to by the pull bar (23) through front end baffle (47) and is locked;Now lacing wire (21) is only worked when reclaiming anchor pole, its tension common with pull bar (23), to withdraw the soil compaction expansion mechanism (3) of soil compaction steel disc (33) and its parcel.
The step of implementation steps of the present embodiment are with embodiment two are essentially identical, unlike:
Second step needs to merge implementation with the 3rd step:Assembling inflation mechanism (4) simultaneously connects loading line (5):First first piece of steel disc of front end side guard plate (45) and soil compaction steel disc (33) are hinged, then rear end-stopping plate (41), punching rubber pneumatic bag (44), front end baffle (47) are sequentially passed through with pull bar (23), and they are fixed into an entirety with nut;Now soil compaction steel disc (33) is hinged by side guard plate (45) with front end baffle (47), connects loading line (5);It is overall to load auxiliary sleeve pipe:
7th step:After the completion of anchoring task, drainage completes the air in rubber pneumatic bag (44), while pull back lacing wire (21) and pull bar (23), the overall soil compaction expansion mechanism (3) by soil compaction steel disc (33) and its parcel are segmented extraction from anchor hole.
Example IV
The present embodiment and the structure and implementation steps of embodiment three are substantially the same, as shown in figure 8, difference part is:The soil compaction steel disc (33) and second piece of steel disc of rear end side guard plate are integrated, by first piece of steel disc for being hinged rear end side guard plate.
Compared with preceding embodiment three, in the present embodiment, anchoring pulling force can be delivered to rear end-stopping plate (41) by first piece of steel disc of the rear end side guard plate (42) being hinged with soil compaction steel disc (33), then be delivered to anchor mechanism outside hole (1) locking by the pull bar (23) through rear end-stopping plate (41).
It is understood that for the person of ordinary skill of the art, other various corresponding changes and deformation can be made with technique according to the invention design, and all these changes and deformation should all belong to the protection domain of the claims in the present invention.
Claims (10)
1. a kind of inflation soil compaction anchor pole, it is characterised in that:Pulling force transmission mechanism (2) including free section, anchor rod anchored section of soil compaction cylinder mechanism (3) and inflation mechanism (4) and its attached loading line (5);The pulling force transmission mechanism (2) includes lacing wire (21) and branch sleeve (22), connects the soil compaction cylinder mechanism (3) of anchoring section, and extends to anchor mechanism outside hole (1) locking;The soil compaction cylinder mechanism (3) includes one group of shape identical soil compaction steel disc (33), cement mortar calculus thin layer (34), front-end bracket (35), rear end support (32), limits swollen steel cable (31), is wrapped in the outside of inflation mechanism (4);The inflation mechanism (4) includes rubber pneumatic bag (44), front and back end rubber sheath (43,46), front and rear end-stopping plate (41,47), front and rear side guard plate (42,45), and the loading line (5) includes charge valve (51), air gauge (52), inflated hose (53), valve (54);Rubber pneumatic bag (44) is inflated or lost heart by loading line (5), so that rubber pneumatic bag (44) is radially expanded or shunk, so that the soil compaction steel disc (33) and cement mortar calculus thin layer (34) of soil compaction cylinder mechanism (3) depart from anchor hole hole wall (6) contact squeeze or with anchor hole hole wall (6).
2. inflation soil compaction anchor pole according to claim 1, it is characterised in that one group of soil compaction steel disc (33) of this anchor pole is arranged around on the outside of inflation mechanism (4), forms a thin cylinder for having longitudinal joint;The number of longitudinal joint is identical with the quantity of soil compaction steel disc (33) on cylinder, and at least 2;Single soil compaction steel disc (33) is elongated, and its section is in arc-shaped, and one group of circular arc just surrounds a circle.
3. inflation soil compaction anchor pole according to claim 1, it is characterised in that every soil compaction steel disc (33) outer surface is fixed with one layer of cement mortar calculus thin layer (34).
4. inflation soil compaction anchor pole according to claim 1, it is characterised in that:Front and back end support (35,32) is in segment shape, is separately fixed at the rear and front end of every soil compaction steel disc (33);The section of front-end bracket (35) is sector;The section of rear end support (32) is provided with future insufficiency for fan-shaped top;Single support (35,32) is fixedly connected with the medial surface of soil compaction steel disc (33);One group of front-end bracket (35) crowds around into a front end short column, and one group of rear end support (32) crowds around into a rear end short column, and future insufficiency is then encircled into the center reserving hole channel of rear end short column;The rear and front end for the cylinder that front and back end short column is surrounded in soil compaction steel disc (33) forms plug in cylinder.
5. inflation soil compaction anchor pole according to claim 1, it is characterised in that:There is a swollen steel cable (31) of limit to link between two adjacent soil compaction steel discs (33) or rear end support (32), the quantity for limiting swollen steel cable (31) is identical with the quantity of soil compaction steel disc (33), and one group of soil compaction steel disc (33) or rear end support (32) are connected into annular arrangement by one group of swollen steel cable of limit (31).
6. described inflation soil compaction anchor pole is required according to right 1, it is characterised in that:The rubber pneumatic bag (44) of this anchor pole can both make common cylindric closed rubber pneumatic bag, can also make the cylindric closed rubber pneumatic bag of punching;The center of the cylindric rubber pneumatic bag of punching is reserved with duct, facilitates pull bar (23) to extend there through.
7. inflation soil compaction anchor pole according to claim 1, it is characterised in that:Front and back end rubber sheath (43,46) shape of this anchor pole is identical, cylindrical, is arranged on the post side of rubber pneumatic bag (44) rear and front end;Rubber sheath (43,46) internal diameter in front and back end is identical with the external diameter of rubber pneumatic bag (44); just it is enclosed on the outside of rubber pneumatic bag (44), rubber pneumatic bag (44) is formd into thickening protective layer with the position that front and rear side guard plate (42,45) is in contact.
8. inflation soil compaction anchor pole according to claim 1, it is characterised in that:The front and rear end-stopping plate (41,47) of this anchor pole is rounded, is separately positioned on the rear and front end of rubber pneumatic bag (44);Being provided with reserved aperture on circular front and rear end-stopping plate (41,47) is easy to pull bar (23) and valve (54) to extend there through.
9. inflation soil compaction anchor pole according to claim 1, it is characterised in that:Side guard plate (42,45) before and after some strip identicals is respectively arranged with the outside of the rubber sheath (43,46) of this anchor pole, every side guard plate (42,45) is hinged by two section steel discs and constituted;First segment steel disc is shorter thicker, and second section steel disc is longer;Front side backplate (45) is arranged on the outside left of front end rubber sheath (46), and first segment steel disc is hinged with front end baffle (47), and the other end of second section steel disc can be rotated freely;Rear side backplate (42) is in the outside left of rear end rubber sheath (43), and first segment steel disc is hinged with rear end-stopping plate (41), and the other end of second section steel disc can be rotated freely.
10. a kind of process of inflation soil compaction anchor bolt construction, using the inflation soil compaction anchor pole described in claim 1, comprises the following steps:
The first step:Using rig in the position drilling and forming hole being pre-designed;
Second step:Assembling inflation mechanism (4) simultaneously connects loading line (5):First rubber sheath (43,46), front and rear end-stopping plate (41,47) and side apron (42,45) are enclosed on rubber pneumatic bag (44), it is then that front and rear end-stopping plate (41,47) is fixed;Connect the loading line (5) of rubber pneumatic bag (44);
3rd step:The soil compaction cylinder mechanism (3) of anchor pole is assembled, connection pulling force transmission mechanism (2) simultaneously integrally loads auxiliary sleeve pipe:The inflation mechanism (4) assembled is rolled into drum with one group of soil compaction steel disc (33);Lacing wire (21) and branch sleeve (22) are connected with soil compaction steel disc (33) or its rear end bearing (32);The pulling force transmission mechanism (2) of anchor pole and its soil compaction cylinder mechanism (3) of connection are entangled with the auxiliary thin wall casing of a length internal diameter suitably again;
4th step:The auxiliary sleeve pipe that pulling force transmission mechanism (2), soil compaction cylinder mechanism (3) and inflation mechanism (4) will be wrapped in integrally is sent into the anchor hole that the first step is pre-milled, confirm that anchor pole is reached after design attitude, extract auxiliary thin wall casing out;
5th step:Rubber pneumatic bag (44) is inflated by loading line (5), rubber pneumatic bag (44) expands under gas pressure causes the soil compaction steel disc (33) of soil compaction cylinder mechanism (3) to be close together with anchor hole Tu Bi (6), forms anchor force;
6th step:The works such as the Guan Liang or waling in lacing wire (21) and side slope are locked by anchor mechanism (1) outside anchor hole, reach anchoring effect;Design the blowing pressure is checked after grappling daily, is supplemented when not enough;Increasing anchoring pulling force can also be adjusted by increasing the pressure in air bag (44) outside hole if necessary;
7th step:After the completion of anchoring task, the air in charge valve (51) drainage rubber pneumatic bag (44) outside by anchor hole, contacted so that soil compaction steel disc (33) is mutually disengaged with anchor hole Tu Bi (6), then pull back lacing wire (21), the soil compaction cylinder mechanism (3) of pulling force transmission mechanism (2) and its connection is segmented extraction from anchor hole;
8th step:The anchor hole hole vacated by anchor pole recycled in its entirety is backfilled with soil.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610047963.6A CN106978805A (en) | 2016-01-16 | 2016-01-16 | A kind of inflation soil compaction anchor pole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610047963.6A CN106978805A (en) | 2016-01-16 | 2016-01-16 | A kind of inflation soil compaction anchor pole |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106978805A true CN106978805A (en) | 2017-07-25 |
Family
ID=59340706
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610047963.6A Pending CN106978805A (en) | 2016-01-16 | 2016-01-16 | A kind of inflation soil compaction anchor pole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106978805A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110130332A (en) * | 2019-05-07 | 2019-08-16 | 兰州理工大学 | A kind of ground anchored structure |
CN110273445A (en) * | 2019-02-17 | 2019-09-24 | 南平市建阳区汽车锻压件厂 | Underground cross-drilled hole construction equipment and underground cross-drilled hole construction method |
CN110359853A (en) * | 2019-07-13 | 2019-10-22 | 江龙 | Adaptive half soil compaction is bored and its foundation pile bore forming method |
CN111794206A (en) * | 2020-07-20 | 2020-10-20 | 兰州理工大学 | Earthen site anchoring and grouting system and anchoring and grouting method thereof |
CN112177428A (en) * | 2020-09-15 | 2021-01-05 | 四川六九一二科技有限公司 | A physiosis formula ground nail for trompil operating mode in advance |
CN112921898A (en) * | 2021-03-18 | 2021-06-08 | 浙江同济科技职业学院 | Embedded grouting slope reinforcing planting box and construction method thereof |
CN113639908A (en) * | 2021-06-24 | 2021-11-12 | 广西北投交通养护科技集团有限公司 | Multi-section self-adaptive expansion anchor rod stress detection method |
CN113756338A (en) * | 2021-09-10 | 2021-12-07 | 中铁建工集团有限公司 | Municipal building's side slope reinforcing apparatus |
WO2023019869A1 (en) * | 2021-08-17 | 2023-02-23 | 王哲 | Combined structure, volume compensation device having housing, and manufacturing method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2385083Y (en) * | 1999-04-06 | 2000-06-28 | 四川省建筑科学研究院 | Air bag plugging prestressed anchor rod |
JP2001032273A (en) * | 1999-07-27 | 2001-02-06 | Ohbayashi Corp | Antifreeze anchoring structure of ground anchor |
CN101086159A (en) * | 2006-06-07 | 2007-12-12 | 山东大学 | Annular extension limit flexible pressurized grouting bolt |
CN201620902U (en) * | 2010-01-10 | 2010-11-03 | 张士林 | Plastic expansion-shell-type air bag anchor bolt |
CN203515625U (en) * | 2013-08-28 | 2014-04-02 | 王新丰 | Flexible metal anchor rod |
-
2016
- 2016-01-16 CN CN201610047963.6A patent/CN106978805A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2385083Y (en) * | 1999-04-06 | 2000-06-28 | 四川省建筑科学研究院 | Air bag plugging prestressed anchor rod |
JP2001032273A (en) * | 1999-07-27 | 2001-02-06 | Ohbayashi Corp | Antifreeze anchoring structure of ground anchor |
CN101086159A (en) * | 2006-06-07 | 2007-12-12 | 山东大学 | Annular extension limit flexible pressurized grouting bolt |
CN201620902U (en) * | 2010-01-10 | 2010-11-03 | 张士林 | Plastic expansion-shell-type air bag anchor bolt |
CN203515625U (en) * | 2013-08-28 | 2014-04-02 | 王新丰 | Flexible metal anchor rod |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110273445A (en) * | 2019-02-17 | 2019-09-24 | 南平市建阳区汽车锻压件厂 | Underground cross-drilled hole construction equipment and underground cross-drilled hole construction method |
CN110273445B (en) * | 2019-02-17 | 2021-10-08 | 南平市建阳区汽车锻压件厂 | Underground cross bore construction method |
CN110130332A (en) * | 2019-05-07 | 2019-08-16 | 兰州理工大学 | A kind of ground anchored structure |
CN110359853A (en) * | 2019-07-13 | 2019-10-22 | 江龙 | Adaptive half soil compaction is bored and its foundation pile bore forming method |
CN111794206A (en) * | 2020-07-20 | 2020-10-20 | 兰州理工大学 | Earthen site anchoring and grouting system and anchoring and grouting method thereof |
CN112177428A (en) * | 2020-09-15 | 2021-01-05 | 四川六九一二科技有限公司 | A physiosis formula ground nail for trompil operating mode in advance |
CN112921898A (en) * | 2021-03-18 | 2021-06-08 | 浙江同济科技职业学院 | Embedded grouting slope reinforcing planting box and construction method thereof |
CN113639908A (en) * | 2021-06-24 | 2021-11-12 | 广西北投交通养护科技集团有限公司 | Multi-section self-adaptive expansion anchor rod stress detection method |
WO2023019869A1 (en) * | 2021-08-17 | 2023-02-23 | 王哲 | Combined structure, volume compensation device having housing, and manufacturing method |
CN113756338A (en) * | 2021-09-10 | 2021-12-07 | 中铁建工集团有限公司 | Municipal building's side slope reinforcing apparatus |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106978805A (en) | A kind of inflation soil compaction anchor pole | |
CN207828965U (en) | A kind of pouch expansion variable diameters steel reinforcement cage and anchor pole or pile foundation | |
WO2020238501A1 (en) | Full-assembly pressure-bearing type variable-diameter steel cage expansion head anchor rod pile system | |
CN107542087A (en) | A kind of pouch expansion variable diameters steel reinforcement cage and anchor pole or pile foundation | |
CN107642360B (en) | Full-section advanced pre-grouting construction method | |
CN107119680A (en) | A kind of anchor pole or pile foundation variable diameters steel reinforcement cage and application | |
CN107060774A (en) | A kind of anti-tunnel portal wall damage device and construction method | |
CN102051880B (en) | Detachable anchor | |
CN206736901U (en) | A kind of anchor pole or pile foundation variable diameters steel reinforcement cage | |
CN113653520B (en) | Opposite-pulling yielding grouting anchor cable and supporting method thereof | |
CN104100273A (en) | Reverse towing device capable of reducing longitudinal deformation of soil when box culvert is jacked in | |
CN108086334A (en) | A kind of recyclable quick prestress anchorage cable and its construction method | |
CN201924356U (en) | Detachable anchor rod | |
CN109113749A (en) | Four line large section railway tunnel construction method of weak surrounding rock | |
CN206521873U (en) | A kind of reducing steel reinforcement cage and its enlarging anchor rod or pile foundation | |
CN108590667A (en) | Tunnel excavation and preliminary bracing method based on the analysis of country rock subregion failure evolvement | |
CN106939601A (en) | A kind of hydraulic buckling recovery type soil compaction anchor pole | |
Xiao et al. | Experimental study of an inflatable recyclable anchor | |
CN112943327A (en) | Underground chamber active controllable yielding support system and method for stratum support | |
CN108868855A (en) | Grouted anchor bar-anchor cable combined support structure | |
CN211448692U (en) | Multistage anti supporting construction that lets of high ground stress soft rock large deformation tunnel | |
CN213233429U (en) | Full-assembly pressure-bearing type variable-diameter steel reinforcement cage enlarged footing anchor pile system | |
CN210829268U (en) | Vertical shaft composite supporting structure suitable for deep stratum and high-stress area of mine | |
Bakhshi et al. | Developments in design for fiber reinforced concrete tunnel segments | |
CN208668408U (en) | The passive type of follow-up synchronous with whirl spraying anchor cable is without structure type umbrella enlarged footing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170725 |
|
WD01 | Invention patent application deemed withdrawn after publication |