CN106973055A - Meter register method and system - Google Patents
Meter register method and system Download PDFInfo
- Publication number
- CN106973055A CN106973055A CN201710196938.9A CN201710196938A CN106973055A CN 106973055 A CN106973055 A CN 106973055A CN 201710196938 A CN201710196938 A CN 201710196938A CN 106973055 A CN106973055 A CN 106973055A
- Authority
- CN
- China
- Prior art keywords
- data message
- meter reading
- data
- ammeter
- short message
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/12—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
-
- G—PHYSICS
- G08—SIGNALLING
- G08C—TRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
- G08C19/00—Electric signal transmission systems
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L63/00—Network architectures or network communication protocols for network security
- H04L63/08—Network architectures or network communication protocols for network security for authentication of entities
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L63/00—Network architectures or network communication protocols for network security
- H04L63/08—Network architectures or network communication protocols for network security for authentication of entities
- H04L63/083—Network architectures or network communication protocols for network security for authentication of entities using passwords
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L63/00—Network architectures or network communication protocols for network security
- H04L63/08—Network architectures or network communication protocols for network security for authentication of entities
- H04L63/0861—Network architectures or network communication protocols for network security for authentication of entities using biometrical features, e.g. fingerprint, retina-scan
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L63/00—Network architectures or network communication protocols for network security
- H04L63/08—Network architectures or network communication protocols for network security for authentication of entities
- H04L63/0876—Network architectures or network communication protocols for network security for authentication of entities based on the identity of the terminal or configuration, e.g. MAC address, hardware or software configuration or device fingerprint
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L63/00—Network architectures or network communication protocols for network security
- H04L63/10—Network architectures or network communication protocols for network security for controlling access to devices or network resources
Abstract
The invention provides a kind of meter register method and system, it is related to electric energy supply and administrative skill field, solves existing meter reading inefficiency, the unsafe technical problem of data.The meter register method includes:The information of meter reading personnel is stored;First timing parameter and second clock parameter are set;Calculate the 3rd data message for obtaining ammeter;3rd data message is stored;According to second clock parameter, data will be reminded to be sent in the form of the first short message to the mobile terminal of meter reading personnel;Chained address, which is accessed, according to first carries out one-time identity authentication;If after one-time identity authentication success, obtaining the geographical position of acquisition terminal;Secondary authentication is carried out according to the geographical position;If secondary authentication passes through, the 3rd data message is sent in the form of the second short message to the mobile terminal of meter reading personnel;Three authentications are carried out according to the second short message;If after three authentications success, checking the 3rd data message.
Description
Technical field
The present invention relates to electric energy supply and management domain, more particularly, to a kind of meter register method and system.
Background technology
In the meter reading management system in existing rural area, the meter register method mainly used is by being accomplished manually, i.e. meter reading
Personnel are needed to make an inventory the power consumption of user from house to house, and then power consumption is counted, and obtain inventory of paying the fees, and then impose electricity
Take, the meter reading statistical work for so resulting in administrative department is difficult, not only time and effort consuming, and inefficiency.In addition, meter reading
When personnel may make an inventory ammeter, when tired, error in reading, to misunderstand, omit be also to have generation, causes the dangerous of data, in addition
It is also possible that the leak of data tampering, has further resulted in the insecurity of data during manual metering.
The content of the invention
In view of this, it is an object of the invention to provide a kind of meter register method and system, worked with solving existing meter reading
Efficiency is low, the unsafe technical problem of data.
In a first aspect, the embodiments of the invention provide a kind of meter register method, including:
The information of meter reading personnel is stored, described information includes the information of mobile terminal of meter reading personnel, biological information;
First timing parameter and second clock parameter are set;
The first data message of the ammeter of the first timing parameter is read, the first data message includes ammeter ID and initial quantity of electricity
Value;
The second data message of the ammeter of second clock parameter is read, the second data message includes ammeter ID and terminates electricity
Value;
The 3rd data message for obtaining ammeter is calculated, the 3rd data message is stored, the 3rd data message includes electricity
Table id and power consumption;
According to second clock parameter, data will be reminded to be sent in the form of the first short message to the mobile terminal of meter reading personnel,
First short message includes second clock parameter corresponding scheduled date, the first access chained address and short message verification code;
Chained address, which is accessed, according to first carries out one-time identity authentication;
If after one-time identity authentication success, obtaining the geographical position of acquisition terminal;
Secondary authentication is carried out according to the geographical position;
If secondary authentication passes through, the 3rd data message is sent in the form of the second short message to the movement of meter reading personnel
Terminal, the second short message includes second and accesses chained address, the second short message verification code;
Three authentications are carried out according to the second short message;
If after three authentications success, checking the 3rd data message.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the first of first aspect, wherein, should
Method also includes:
Mobile terminal sends the 3rd data message to back-stage management central server.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of second of first aspect, wherein,
Described to be stored the information of meter reading personnel, described information includes the information of mobile terminal of meter reading personnel, biological information step
Before, in addition to:
Acquisition terminal information is stored, the acquisition terminal information includes the device coding of acquisition terminal and geographical position
Put.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the third of first aspect, wherein,
Before the first timing parameter of the setting and second clock parameter step, in addition to;
Meter reading instruction is sent to acquisition terminal.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the 4th of first aspect kind, wherein,
It is described to calculate the 3rd data message for obtaining ammeter, the 3rd data message is stored, the 3rd data message includes ammeter ID
After power consumption step, in addition to:
Acquisition terminal sends the 3rd data message to back-stage management central server.
Second aspect, the embodiment of the present invention also provides a kind of kilowatt meter reading-out system, using first aspect and its possible embodiment party
Method described in any one of formula, including:
Mobile terminal, acquisition terminal and back-stage management central server;
Wherein, the acquisition terminal includes:
Memory cell, for the information of meter reading personnel to be stored, described information includes the mobile terminal of meter reading personnel
Information, biological information, for being stored to the 3rd data message, the 3rd data message includes ammeter ID and power consumption;
Clock unit, for setting the first timing parameter and second clock parameter;
Collecting unit, the first data message of the ammeter for reading the first timing parameter, the first data message includes electricity
Table id and initial quantity of electricity value, the second data message of the ammeter for reading second clock parameter, the second data message include electricity
Table id and end charge value;
Control unit, the 3rd data message of ammeter is obtained for calculating;
Wireless transmission unit, for data according to second clock parameter, will to be reminded to be sent in the form of the first short message to copying
The mobile terminal of table personnel, the first short message accesses chained address and short including second clock parameter corresponding scheduled date, first
Believe identifying code, if passing through for secondary authentication, the 3rd data message is sent in the form of the second short message to meter reading personnel
Mobile terminal, the second short message include second access chained address, the second short message verification code;
Bio-identification unit, for carrying out secondary authentication according to the geographical position;
Wherein, the collecting unit, memory cell, clock unit, bio-identification unit, wireless transmission unit with control
Unit is connected;
The mobile terminal includes:
Network access unit, carries out one-time identity authentication, if one-time identity authentication for accessing chained address according to first
After success, the geographical position of acquisition terminal is obtained, for carrying out three authentications according to the second short message, for checking the 3rd number
It is believed that breath;
Receiving unit, for receiving the prompting data and the 3rd data message;
The back-stage management central server includes:
Server communication unit, for being communicated with the mobile terminal.
With reference to second aspect, the embodiments of the invention provide the possible embodiment of the first of second aspect, wherein, institute
Stating mobile terminal also includes:
Communication unit, the 3rd data message is sent to back-stage management central server.
With reference to second aspect, the embodiments of the invention provide the possible embodiment of second of second aspect, wherein, institute
Stating back-stage management central server also includes data storage, for being stored to acquisition terminal information, the acquisition terminal
The device coding of information including acquisition terminal and geographical position, for storing, the data of backup back-stage management central server.
With reference to second aspect, the embodiments of the invention provide the possible embodiment of the third of second aspect, wherein, institute
State server communication unit and be additionally operable to send meter reading instruction to acquisition terminal, remote control is carried out to acquisition terminal to realize.
With reference to second aspect, the embodiments of the invention provide the possible embodiment of the 4th of second aspect kind, wherein, institute
Wireless transmission unit is stated to be additionally operable to send the 3rd data message to back-stage management central server.
The embodiment of the present invention brings following beneficial effect:In meter register method provided in an embodiment of the present invention, it will copy first
The information of table personnel is stored, and then sets the first timing parameter and second clock parameter, reads the electricity of the first timing parameter
Second data message of the first data message of table and the ammeter of reading second clock parameter, the second data message includes ammeter
ID and end charge value, calculate the 3rd data message for obtaining ammeter, the 3rd data message are stored;Then according to second
Timing parameter, will remind data to be sent in the form of the first short message to the mobile terminal of meter reading personnel, reminds meter reading personnel's meter reading
Time is up, then carries out one-time identity authentication to meter reading personnel, obtains the geographical position of acquisition terminal, then carries out secondary body
Part certification, three authentications, three authentications can check the 3rd data message away from by rear.The present invention is by setting
One-time identity authentication, secondary authentication, the multistage identification authentication mode of three authentications, it is closely linked, it is progressive,
It ensure that the security of data.Meanwhile, the meter register method also reduces the meter reading pressure (work load) of meter reading personnel, improves
Operating efficiency, can also avoid all ammeters from sending the server load pressure caused to distal end back-stage management central server simultaneously
The problem of power is excessive.
Other features and advantages of the present invention will be illustrated in the following description, also, partly be become from specification
Obtain it is clear that or being understood by implementing the present invention.The purpose of the present invention and other advantages are in specification, claims
And specifically noted structure is realized and obtained in accompanying drawing.
To enable the above objects, features and advantages of the present invention to become apparent, preferred embodiment cited below particularly, and coordinate
Appended accompanying drawing, is described in detail below.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art
The accompanying drawing used required in embodiment or description of the prior art is briefly described, it should be apparent that, in describing below
Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid
Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the flow chart of meter register method provided in an embodiment of the present invention;
Fig. 2 is the particular flow sheet of meter register method provided in an embodiment of the present invention;
The detail flowchart that Fig. 3 is step S14 in Fig. 2;
Fig. 4 is the structural representation of kilowatt meter reading-out system provided in an embodiment of the present invention;
Fig. 5 is the structural representation of acquisition terminal in kilowatt meter reading-out system provided in an embodiment of the present invention.
Legend:1- mobile terminals;2- acquisition terminals;3- back-stage management central servers;20- memory cell;21- clock lists
Member;22- collecting units;23- control units;24- wireless transmission units;25- bio-identification units;26- power subsystems.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with accompanying drawing to the present invention
Technical scheme be clearly and completely described, it is clear that described embodiment is a part of embodiment of the invention, rather than
Whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creative work premise
Lower obtained every other embodiment, belongs to the scope of protection of the invention.
During current manual metering, inefficiency, meter reading data is dangerous, and based on this, the embodiment of the present invention is carried
A kind of meter register method and system supplied, to solve the unsafe technical problem of existing inefficiency, meter reading data.
Embodiment one:
The embodiments of the invention provide a kind of meter register method, as shown in figure 1, this method comprises the following steps:
S1:The information of meter reading personnel is stored.
Specifically, above- mentioned information includes the information of mobile terminal of meter reading personnel, wherein, biological information includes meter reading personnel's
Fingerprint, iris etc., information of mobile terminal include SIM card information (contact method), ID of mobile terminal etc..
S2:First timing parameter and second clock parameter are set.
S3:Read the first data message of the ammeter of the first timing parameter.
Above-mentioned first data message includes ammeter ID and initial quantity of electricity value.
S4:Read the second data message of the ammeter of second clock parameter.
Above-mentioned second data message includes ammeter ID and terminates charge value.
S5:The 3rd data message for obtaining ammeter is calculated, the 3rd data message is stored, the 3rd data message includes
Ammeter ID and power consumption.
Wherein, power consumption=end charge value-initial quantity of electricity value.
S6:According to second clock parameter, data will be reminded to be sent in the form of the first short message to the mobile end of meter reading personnel
End, the first short message includes second clock parameter corresponding scheduled date, the first access chained address and short message verification code.
Specifically, when second clock parameter arrives, that is, when reaching the scheduled date, acquisition terminal will remind data send to
The mobile terminal of meter reading personnel, reminding data is sent in the form of the first short message, and the content of the first short message includes second clock
Parameter corresponding scheduled date, first access chained address and short message verification code.
S7:Chained address, which is accessed, according to first carries out one-time identity authentication.
Logged in specifically, meter reading personnel opens mobile terminal according to the first access chained address, input meter reading personnel
Username and password, and the first short message verification code carry out one-time identity authentication.
S8:If after one-time identity authentication success, obtaining the geographical position of acquisition terminal.
If specifically, meter reading personnel has passed through one-time identity authentication, passing through network access back-stage management central server
The information of acquisition terminal is got, includes device id and the geographical position of acquisition terminal.
If meter reading personnel is not first by one-time identity authentication, return to step S7 carries out one-time identity authentication, root again
Chained address is accessed according to first, mobile terminal is opened and is logged in, the username and password of meter reading personnel is inputted, click is obtained again
Short message verification code is taken to ask to acquisition terminal and/or back-stage management central server, by acquisition terminal and/or back-stage management center
Server sends short message verification code again.One-time identity authentication can be carried out repeatedly, and number of times can be according to actual set, if all secondary
Number is used up, then locks personal information, is generated daily record and is sent to back-stage management central server.
S9:Secondary authentication is carried out according to geographical position.
Specifically, meter reading personnel reaches acquisition terminal, typing life according to the geographical position of the step S8 acquisition terminals obtained
Thing information (first typing finger print information, after fingerprint recognition, then by iris authentication), carries out secondary authentication.
S10:If secondary authentication passes through, the 3rd data message is sent in the form of the second short message to meter reading personnel's
Mobile terminal, the second short message includes second and accesses chained address, the second short message verification code.
Specifically, if meter reading personnel has passed through secondary authentication, acquisition terminal sends the 3rd data message to meter reading
The mobile terminal of personnel, while sending includes the second access chained address, the second short message of the second short message verification code.
If meter reading personnel is not first by secondary authentication, return to step S8 re-authentications, typing biological information can
Repeatedly to carry out secondary authentication until passing through, the number of times of secondary authentication can be according to actual set, if all number of times
Use up, then lock personal information, and generate daily record and be sent to back-stage management central server.It should be noted that fingerprint is known
Not Cai Yong state-of-the-art biological fingerprint identifier, false mould fingerprint can be evaded.
S11:Three authentications are carried out according to the second short message.
Specifically, meter reading personnel is according to the second short message, opening second by mobile terminal accesses chained address, inputs short message
Identifying code, carries out three authentications.
S12:If after three authentications success, checking the 3rd data message.
If specifically, three authentications of meter reading personnel can view the 3rd data letter in the terminal by rear
Breath.If the 3rd data message has missing, it can targetedly remove to check the ID and use of simultaneously manual transcription missing electric supply meter
Electricity, improves Information Security, while reducing workload, improves efficiency.
If meter reading personnel is not first by three authentications, return to step S11 carries out three authentications again, weight
It is new to obtain short message verification code.Open second and access chained address, click on acquisition short message verification code again and ask to acquisition terminal
And/or back-stage management central server, short message verification code is sent by acquisition terminal and/or back-stage management central server again.
Three authentications can be carried out repeatedly, and number of times, if all number of times are used up, can lock personal information according to actual set, raw
Into daily record and it is sent to back-stage management central server.
It is further, as shown in Fig. 2 meter register method provided in an embodiment of the present invention also includes:
S13:Mobile terminal sends the 3rd data message to back-stage management central server.
Specifically, meter reading personnel is sent the 3rd data message to back-stage management central server by mobile terminal, it is complete
Uploaded into teledata, it is necessary to illustrate, the 3rd data message here was arranged by meter reading personnel's supplement.
In meter register method provided in an embodiment of the present invention, the information of meter reading personnel is stored first, is then set
One timing parameter and second clock parameter, read the first data message of the ammeter of the first timing parameter and read second clock
Second data message of the ammeter of parameter, the second data message includes ammeter ID and terminates charge value, calculates and obtains the of ammeter
Three data messages, are stored to the 3rd data message;Then according to second clock parameter, data will be reminded with the first short message
Form is sent to the mobile terminal of meter reading personnel, reminds meter reading personnel's meter reading that time is up, then meter reading personnel is carried out once
Authentication, obtains the geographical position of acquisition terminal, then carries out secondary authentication, three authentications, three times identity is recognized
Card can check the 3rd data message away from by rear.The present invention by set one-time identity authentication, secondary authentication, three times
The multistage identification authentication mode of authentication, it is closely linked, it is progressive, it is ensured that the security of data.Meanwhile, the meter reading
Method also reduces the meter reading pressure (work load) of meter reading personnel, improves operating efficiency, all ammeters can also be avoided same
When send to distal end back-stage management central server the problem of server load pressure caused is excessive.
It is further, the meter register method, before step S1, in addition to:
S01:Acquisition terminal information is stored.
Specifically, back-stage management central server stores acquisition terminal information, above-mentioned acquisition terminal information includes collection
The device coding (ID) of terminal and geographical position, back-stage management central server are used to carry out remote control to acquisition terminal.
It is further, the meter register method, before step S2, in addition to:
S02:Meter reading instruction is sent to acquisition terminal.
Specifically, back-stage management central server actively sends meter reading instruction to acquisition terminal, above-mentioned meter reading instruction includes
Starting clock parameter and terminate timing parameter, so as to realize the remote control to acquisition terminal, realize the active of arbitrary period
Meter reading, available for data investigation, commissioning device etc..
It is further, the meter register method, after step s 5, in addition to:
S06:Acquisition terminal sends the 3rd data message to back-stage management central server.
Specifically, acquisition terminal sends the 3rd data message to back-stage management central server, it is necessary to illustrate, this
3rd data message at place is to supplement to arrange without meter reading personnel, and back-stage management central server is carried out to the 3rd data message
Data storage and backup, are contrasted available for the 3rd data message arranged with the supplement that meter reading personnel sends, prevent from copying
Table personnel's altered data, is further ensured that the security and accuracy of data.
Further, the meter register method can also include:
S14:Obtain the line loss data of power transmission lines.
As shown in figure 3, the step S14 in the present embodiment specifically includes following steps:
S31:Gather the electric energy of the ammeter of the user side of power transmission lines.
Specifically, acquisition terminal can gather each phase electric energy of the ammeter of power transmission lines user side.
Single-phase electric meter or three-phase kilowatt-hour meter are mounted in each subscriber household, is entered for the electricity consumption situation to each family
Row metering.
For single-phase electric meter, because it is only capable of being arranged in the phase in three phase mains, so during electric energy metrical,
Only it is to be understood that phase where single-phase electric meter, its positive active total electric energy is the electric energy metrical value in the phase.
For three-phase kilowatt-hour meter, because its own directly can be measured to each phase in three phase mains, it is possible to point
The electric energy metrical value in each phase is not recorded, while different data item can also be used to characterize the electric energy metrical value in different phases,
So three-phase kilowatt-hour meter can directly obtain on positive active total electric energy and different split-phases on three-phase where it is positive it is active always
Electric energy.
The split-phase where it can not be known due to single-phase electric meter itself, so using low pressure carrier wave in embodiments of the present invention
Mode, the mode of also referred to as power line communication (Power Line Communication, abbreviation PLC) gather single-phase electric meter and
The voltameter value of three-phase kilowatt-hour meter, using the mode of low pressure carrier wave, can not only identify the phase that single-phase electric meter is distributed, and
And the energy data in the different phases of three-phase kilowatt-hour meter can also be transmitted respectively.
S32:Gather the electric energy of each phase of the transformer side of power transmission lines.
Specifically three-phase table of merit rating can be installed in transformer side, using three-phase table of merit rating come direct metering transformer side three-phase
In each phase total electric energy.Three-phase table of merit rating is connected with acquisition terminal communication, can be connected with wire communication, can also wireless telecommunications
Connection, preferably three-phase table of merit rating is communicated wirelessly by wireless device (such as WiFi, GRPS) with acquisition terminal and is connected,
Realize bi-directional data and signal transmission.
S33:According to the electric energy of each phase of user side and the electric energy of each phase of transformer side, power transmission lines are calculated
Each phase line loss data.
For each phase in power transmission line, by the difference of the electric energy of calculating transformer side and the electric energy of user side,
The line loss data of the phase can be obtained.
Embodiment two:
The embodiment of the present invention also provides a kind of kilowatt meter reading-out system, using the meter register method described in embodiment one.As shown in figure 4,
The system includes mobile terminal 1, acquisition terminal 2 and back-stage management central server 3.
Wherein, acquisition terminal 2, as shown in figure 5, including:
Memory cell 20, for the information of meter reading personnel to be stored, described information includes the mobile end of meter reading personnel
Client information, biological information, for being stored to the 3rd data message, the 3rd data message includes ammeter ID and power consumption.
Clock unit 21, for setting the first timing parameter and second clock parameter.
Collecting unit 22, the first data message of the ammeter for reading the first timing parameter, the first data message includes
Ammeter ID and initial quantity of electricity value, the second data message of the ammeter for reading second clock parameter, the second data message include
Ammeter ID and end charge value;It should be noted that collecting unit 22 is N number of, N represents ammeter number, each collecting unit 22 with
On the ammeter of each user.Collecting unit 22 includes communication module (being not shown in the drawing), for entering with acquisition terminal
Row data transfer and communication.
Control unit 23, the 3rd data message of ammeter is obtained for calculating.
Wireless transmission unit 24, for according to second clock parameter, will remind data sent in the form of the first short message to
The mobile terminal of meter reading personnel, the first short message include the second clock parameter corresponding scheduled date, first access chained address and
Short message verification code, if passing through for secondary authentication, the 3rd data message is sent in the form of the second short message to meter reading people
The mobile terminal of member, the second short message includes second and accesses chained address, the second short message verification code.
It is further that wireless transmission unit 24 is additionally operable to send the 3rd data message to back-stage management center service
Device.
Bio-identification unit 25, for carrying out secondary authentication according to the geographical position.
Wherein, memory cell 20, clock unit 21, collecting unit 22, wireless transmission unit 24, bio-identification unit 25 are equal
It is connected with control unit 23.
Preferably, acquisition terminal 2 also includes power subsystem 26, and power subsystem 26 is connected with control unit 23, is used for
Electric power support is provided for control unit 23.
Mobile terminal 1 includes:
Network access unit, carries out one-time identity authentication, if one-time identity authentication for accessing chained address according to first
After success, the geographical position of acquisition terminal is obtained, for carrying out three authentications according to the second short message, for checking the 3rd number
It is believed that breath.
Receiving unit, for receiving foregoing prompting data and the 3rd data message.
It is further that mobile terminal 1 also includes:
Communication unit, the 3rd data message is sent to back-stage management central server.
Preferably, mobile terminal 1 is mobile phone.
Back-stage management central server 3 includes:
Server communication unit, for being communicated with mobile terminal 1.
It is further that server communication unit is additionally operable to send meter reading instruction to acquisition terminal, to realize to collection eventually
End carries out remote control.
Preferably, back-stage management central server 3 also includes data storage, for being deposited to acquisition terminal information
Storage, the device coding of the acquisition terminal information including acquisition terminal and geographical position, for storing, backup back-stage management center
The data of server.It should be noted that acquisition terminal is multiple, (such as power transformation in rural area street of a target area is distributed in
Room), the collecting unit of acquisition terminal can be installed on the ammeter of each user.
It is further that back-stage management central server 3 also includes processor.
Meter register method and the computer program product of system that the embodiment of the present invention is provided, including store program generation
The computer-readable recording medium of code, the instruction that described program code includes can be used for performing described in previous methods embodiment
Method, implements and can be found in embodiment of the method, will not be repeated here.
It is apparent to those skilled in the art that, for convenience and simplicity of description, the system of foregoing description
Specific work process, may be referred to the corresponding process in preceding method embodiment, will not be repeated here.
If the function is realized using in the form of SFU software functional unit and is used as independent production marketing or in use, can be with
It is stored in a computer read/write memory medium.Understood based on such, technical scheme is substantially in other words
The part contributed to prior art or the part of the technical scheme can be embodied in the form of software product, the meter
Calculation machine software product is stored in a storage medium, including some instructions are to cause a computer equipment (can be individual
People's computer, server, or network equipment etc.) perform all or part of step of each of the invention embodiment methods described.
And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited
Reservoir (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with the medium of store program codes.
Finally it should be noted that:Embodiment described above, is only the embodiment of the present invention, to illustrate the present invention
Technical scheme, rather than its limitations, protection scope of the present invention is not limited thereto, although with reference to the foregoing embodiments to this hair
It is bright to be described in detail, it will be understood by those within the art that:Any one skilled in the art
The invention discloses technical scope in, it can still modify to the technical scheme described in previous embodiment or can be light
Change is readily conceivable that, or equivalent substitution is carried out to which part technical characteristic;And these modifications, change or replacement, do not make
The essence of appropriate technical solution departs from the spirit and scope of technical scheme of the embodiment of the present invention, should all cover the protection in the present invention
Within the scope of.Therefore, protection scope of the present invention described should be defined by scope of the claims.
Claims (10)
1. a kind of meter register method, it is characterised in that including:
The information of meter reading personnel is stored, described information includes the information of mobile terminal of meter reading personnel, biological information;
First timing parameter and second clock parameter are set;
The first data message of the ammeter of the first timing parameter is read, the first data message includes ammeter ID and initial quantity of electricity value;
The second data message of the ammeter of second clock parameter is read, the second data message includes ammeter ID and terminates charge value;
The 3rd data message for obtaining ammeter is calculated, the 3rd data message is stored, the 3rd data message includes ammeter ID
And power consumption;
According to second clock parameter, data will be reminded to be sent in the form of the first short message to the mobile terminal of meter reading personnel, first
Short message includes second clock parameter corresponding scheduled date, the first access chained address and short message verification code;
Chained address, which is accessed, according to first carries out one-time identity authentication;
If after one-time identity authentication success, obtaining the geographical position of acquisition terminal;
Secondary authentication is carried out according to the geographical position;
If secondary authentication passes through, the 3rd data message was sent in the form of the second short message to the mobile end of meter reading personnel
End, the second short message includes second and accesses chained address, the second short message verification code;
Three authentications are carried out according to the second short message;
If after three authentications success, checking the 3rd data message.
2. according to the method described in claim 1, it is characterised in that also include:
Mobile terminal sends the 3rd data message to back-stage management central server.
3. it is according to the method described in claim 1, it is characterised in that stored the information of meter reading personnel described, described
Information is included before the information of mobile terminal of meter reading personnel, biological information step, in addition to:
Acquisition terminal information is stored, the acquisition terminal information includes device coding and the geographical position of acquisition terminal.
4. according to the method described in claim 1, it is characterised in that in the first timing parameter of the setting and second clock parameter
Before step, in addition to;
Meter reading instruction is sent to acquisition terminal.
5. it is according to the method described in claim 1, it is characterised in that obtain the 3rd data message of ammeter in the calculating, right
3rd data message is stored, and the 3rd data message is included after ammeter ID and power consumption step, in addition to:
Acquisition terminal sends the 3rd data message to back-stage management central server.
6. a kind of kilowatt meter reading-out system of the meter register method described in use claim any one of 1-5, it is characterised in that including:
Mobile terminal, acquisition terminal and back-stage management central server;
The acquisition terminal includes:
Memory cell, for the information of meter reading personnel to be stored, information of mobile terminal of the described information including meter reading personnel,
Biological information, for being stored to the 3rd data message, the 3rd data message includes ammeter ID and power consumption;
Clock unit, for setting the first timing parameter and second clock parameter;
Collecting unit, the first data message of the ammeter for reading the first timing parameter, the first data message includes ammeter ID
With initial quantity of electricity value, the second data message of the ammeter for reading second clock parameter, the second data message includes ammeter ID
With end charge value;
Control unit, the 3rd data message of ammeter is obtained for calculating;
Wireless transmission unit, for according to second clock parameter, data will be reminded to be sent in the form of the first short message to meter reading people
The mobile terminal of member, the first short message includes second clock parameter corresponding scheduled date, the first access chained address and short message and tested
Code is demonstrate,proved, if passing through for secondary authentication, the 3rd data message is sent in the form of the second short message to the shifting of meter reading personnel
Dynamic terminal, the second short message includes second and accesses chained address, the second short message verification code;
Bio-identification unit, for carrying out secondary authentication according to the geographical position;
Wherein, the collecting unit, memory cell, clock unit, bio-identification unit, wireless transmission unit be and control unit
It is connected;
The mobile terminal includes:
Network access unit, one-time identity authentication is carried out for accessing chained address according to first, if one-time identity authentication success
Afterwards, the geographical position of acquisition terminal is obtained, for carrying out three authentications according to the second short message, for checking that the 3rd data are believed
Breath;
Receiving unit, for receiving the prompting data and the 3rd data message;
The back-stage management central server includes:
Server communication unit, for being communicated with the mobile terminal.
7. system according to claim 6, it is characterised in that the mobile terminal also includes:
Communication unit, the 3rd data message is sent to back-stage management central server.
8. system according to claim 6, it is characterised in that the back-stage management central server also includes data storage
Device, for being stored to acquisition terminal information, the acquisition terminal information includes the device coding of acquisition terminal and geographical position
Put, for storing, the data of backup back-stage management central server.
9. system according to claim 6, it is characterised in that the server communication unit is additionally operable to send meter reading instruction
To acquisition terminal, remote control is carried out to acquisition terminal to realize.
10. system according to claim 6, it is characterised in that the wireless transmission unit is additionally operable to believe the 3rd data
Breath is sent to back-stage management central server.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710196938.9A CN106973055B (en) | 2017-03-29 | 2017-03-29 | Meter reading method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710196938.9A CN106973055B (en) | 2017-03-29 | 2017-03-29 | Meter reading method and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106973055A true CN106973055A (en) | 2017-07-21 |
CN106973055B CN106973055B (en) | 2020-01-07 |
Family
ID=59336187
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710196938.9A Active CN106973055B (en) | 2017-03-29 | 2017-03-29 | Meter reading method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106973055B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112039664A (en) * | 2020-08-31 | 2020-12-04 | 宁夏隆基宁光仪表股份有限公司 | Data communication method and system suitable for intelligent electric meter |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030058129A1 (en) * | 2001-09-25 | 2003-03-27 | Lg Electronics Inc. | Automatic meter reading system and method using telephone line |
JP2009129203A (en) * | 2007-11-22 | 2009-06-11 | Chugoku Electric Power Co Inc:The | Electric charge environmental discount system |
CN102831756A (en) * | 2012-09-20 | 2012-12-19 | 哈尔滨电业局 | Mobile terminal positioning electric utility meter reading method and meter reading system |
CN103065451A (en) * | 2012-12-27 | 2013-04-24 | 广州南方电力集团科技发展有限公司 | Mobile self-service meter-reading device |
CN103927860A (en) * | 2014-04-04 | 2014-07-16 | 上海君世电气科技有限公司 | GPS (Global Position System)-positioned meter reading smart handheld machine and meter reading system |
CN104182839A (en) * | 2014-08-26 | 2014-12-03 | 国家电网公司 | Electric marketing service expansion mobile application system and work method thereof |
-
2017
- 2017-03-29 CN CN201710196938.9A patent/CN106973055B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030058129A1 (en) * | 2001-09-25 | 2003-03-27 | Lg Electronics Inc. | Automatic meter reading system and method using telephone line |
JP2009129203A (en) * | 2007-11-22 | 2009-06-11 | Chugoku Electric Power Co Inc:The | Electric charge environmental discount system |
CN102831756A (en) * | 2012-09-20 | 2012-12-19 | 哈尔滨电业局 | Mobile terminal positioning electric utility meter reading method and meter reading system |
CN103065451A (en) * | 2012-12-27 | 2013-04-24 | 广州南方电力集团科技发展有限公司 | Mobile self-service meter-reading device |
CN103927860A (en) * | 2014-04-04 | 2014-07-16 | 上海君世电气科技有限公司 | GPS (Global Position System)-positioned meter reading smart handheld machine and meter reading system |
CN104182839A (en) * | 2014-08-26 | 2014-12-03 | 国家电网公司 | Electric marketing service expansion mobile application system and work method thereof |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112039664A (en) * | 2020-08-31 | 2020-12-04 | 宁夏隆基宁光仪表股份有限公司 | Data communication method and system suitable for intelligent electric meter |
CN112039664B (en) * | 2020-08-31 | 2024-04-16 | 宁夏隆基宁光仪表股份有限公司 | Data communication method and system suitable for intelligent ammeter |
Also Published As
Publication number | Publication date |
---|---|
CN106973055B (en) | 2020-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2011132572A1 (en) | Power control system and power control method | |
US20160187864A1 (en) | Apparatus and System for Providing Energy Information | |
Singhal et al. | Anytime anywhere-remote monitoring of attendance system based on RFID using GSM network | |
Ahammed et al. | Ensuring power quality and demand-side management through IoT-based smart meters in a developing country | |
US10354520B2 (en) | Power line communication over disconnected service lines | |
CN103500400A (en) | Multi-application mobile payment system and safety method | |
CN103810793A (en) | Intelligent power purchase management system and power purchase method thereof | |
CN108550034A (en) | A kind of intelligent water meter system of the light wallet of band | |
Agyeman et al. | Design and implementation of an IoT-based energy monitoring system for managing smart homes | |
CN105405012A (en) | Smart IC card and payment processing method | |
CN102289721A (en) | Carbon emission monitoring and measuring service system for daily life | |
CN108629660A (en) | A kind of shared charger baby based on mobile terminal electricity leases configuration method, device and its system | |
CN112019570A (en) | Prepayment management system and edge computing communication terminal | |
CN108110898A (en) | Long-distance intelligent power consuming administrative system based on internet | |
CN104636900B (en) | The control method and system of highly reliable express box | |
CN106973055A (en) | Meter register method and system | |
Azasoo et al. | Smart metering: A GSM approach in Ghana | |
CN101661591A (en) | Energy management device, method and system thereof | |
CN202067348U (en) | Electrical invoice management system | |
CN207233110U (en) | A kind of charging wire is self-service to lease terminal | |
JP2017134550A (en) | Electricity contract management device | |
CN102546561B (en) | Terminal unit, server, information processing system and information processing method thereof | |
CN201936397U (en) | Wireless tax declaration device | |
CN115225982A (en) | Data transmission method and device of distributed energy transaction system | |
CN111815932A (en) | Block chain-based electricity consumption information acquisition method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |