CN106970952A - Report form generation method and system - Google Patents
Report form generation method and system Download PDFInfo
- Publication number
- CN106970952A CN106970952A CN201710139112.9A CN201710139112A CN106970952A CN 106970952 A CN106970952 A CN 106970952A CN 201710139112 A CN201710139112 A CN 201710139112A CN 106970952 A CN106970952 A CN 106970952A
- Authority
- CN
- China
- Prior art keywords
- terminal
- report
- report messages
- server
- personal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/245—Query processing
- G06F16/2457—Query processing with adaptation to user needs
- G06F16/24578—Query processing with adaptation to user needs using ranking
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/248—Presentation of query results
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Computational Linguistics (AREA)
- Data Mining & Analysis (AREA)
- Databases & Information Systems (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of report form generation method and system, Report Server Management efficiency can be effectively improved by aiming to provide it, the problem of report generation review efficiency is unhappy is solved, during its drip irrigation device is the database uploaded onto the server according to the personal report messages of real-time typing on project director at the scene user terminal with stacking-type;Request command is sent to server by the request command operated according to auditor in terminal, and server is transferred the personal report messages asked and transmitted to terminal, and the terminal passes through the personal report messages of data parsing displaying.
Description
Technical field
The present invention relates to the generation method of the online management of acceptance of engineering quality form and system.
Background technology
Chinese patent CN1351304A discloses a kind of engineering quality control method of architectural engineering.This method, which is utilized, to be contained
Checking list for project table is examined, each inspection project to each operation field carries out good and bad examination., will by communication line
Terminal A1, A2, the A3 game server S of checklist after examination from operation field.In the server S, according to each operation
Checking list for scene, calculates disqualification rate and the preservation of each inspection project.Constructor is by communication line, from terminal A
The disqualification rate for the inspection project of reading, so as to accordingly carry out the improvement of engineering construction for each inspection project.
But the management for acceptance of engineering quality form or the paper list by buying national quality acceptance specification,
Acceptance of engineering quality data are filled in by project director, acceptance of engineering quality form is then transferred into supervisor and construction unit
Audited step by step, such way to manage has management and maintenance cost height, the examination and approval work effect of acceptance of engineering quality form
The defects such as the conclusion and arrangement that rate is low, be unfavorable for acceptance of engineering quality form, the management work band to acceptance of engineering quality form
Difficulty is carried out;Comparison of item in form is more, and row's choosing manually is carried out for needing some projects that emphasis is audited to be required for every time,
Workload is thereby increased, operating efficiency is reduced.
The content of the invention
The purpose of the present invention is intended at least solve one of above-mentioned technological deficiency, can effectively improve Report Server Management efficiency.
The present invention above-mentioned technical purpose technical scheme is that:A kind of report form generation method, bag
Include following steps:
Step 1, clothes are uploaded to stacking-type according to the personal report messages of real-time typing on project director at the scene user terminal
It is engaged in the database of device;
Step 2, request command is sent to server by the request command operated according to auditor in terminal, and server is transferred
The personal report messages asked simultaneously are transmitted to terminal, and the terminal passes through the personal report messages of data parsing displaying.
By above-mentioned setting, personal report messages can just be carried out data transmission by network, and be uploaded to service
In device, carry out transferring examination & verification for the auditor in terminal, realize the efficiency of data real-time update, information transmission it is quick
Property.
Can be preferably as concrete scheme of the invention:Before being uploaded after typing in step 1, onsite user end will be individual
In people's report messages:Name, project name, time, index, fund, extract and back up and generate key message mark, this is closed
Key information mark and corresponding personal report messages binding.
It is compared to the prior art, it is clear that extracted the partial information in personal report messages, raw by above-mentioned setting
Into key message mark, it is only necessary to anticipate the important data of sub-fraction, targetedly handle, therefore saved substantial amounts of
Cpu resource and disc array resource etc., advantage is clearly.
Can be preferably as concrete scheme of the invention:In step 2, the request command of auditor is recorded
And historical requests information is generated, upload onto the server carry out data backup in real time to historical requests information.
By above-mentioned setting, the examination & verification custom to different auditors can be different, also can for the request command of transmission
It is different, so the operation to auditor carries out data preservation.
Can be preferably as concrete scheme of the invention:In step 2, please to identical according to historical requests information
Ask order to carry out data statistics and real-time update, generate the weight sequencing of corresponding requests.
By above-mentioned setting, classification statistics is carried out to request command by weight sequencing, can be asked according to newest history
Information is sought, the request command for meeting auditor's operating habit is inferred, so as to improve the operating efficiency of auditor.
Can be preferably as concrete scheme of the invention:In step 2, terminal is according to the weight sequencings pair of corresponding requests
Key message mark is screened, sorted, to show with people's report messages.
By above-mentioned setting, the speed of report generation can be effectively improved, and has been avoided that blindness collects initial data,
Can effectively save system resource.
Can be preferably as concrete scheme of the invention:The generating mode of the weight sequencing is:To key message mark
Information in will is often retrieved 1 time, and corresponding informance mark adds 1, and the retrieval number of times of 5 class key message marks is carried out into Accumulating generation tires out
Evaluation, the proportion that corresponding informance mark accounts for aggregate-value is bigger, then weight is bigger, sorts forward.
Another aspect of the present invention also proposes a kind of report generating system, including onsite user end, is adopted to real-time typing
Collect the personal report messages of project director, by personal report messages:Name, project name, time, index, fund, are carried
Take and back up and generate key message mark, this key message mark and corresponding personal report messages are bound, with stacking-type
In the database for reaching server;
Server, transfers the personal report messages asked, and transmit to terminal;
Terminal, is parsed by data, and the request command of auditor is recorded and historical requests information is generated, please to history
Ask information to upload onto the server in real time carry out data backup, according to historical requests information, data are carried out to identical request command
Count and real-time update, generate the weight sequencing of corresponding requests, key message mark is entered according to the weight sequencing of corresponding requests
Row screening, sequence, to show with people's report messages.
By above-mentioned setting, the above method proposed by the present invention does not interfere with system to the change very little of existing system
Compatibility, and realize simple, efficient report generation there is provided the effective report messages of auditor.
In summary, the invention has the advantages that:By predicting and determining the next request command of user, to form
Information arrangement carry out effectively screen and sort, suitable form is generated in advance, the speed of report generation can be effectively improved
Degree, and it has been avoided that blindness collects initial data, can effectively save system resource.
Brief description of the drawings
Fig. 1 is the structure chart of report generating system;
Fig. 2 is the schematic flow sheet of report form generation method.
1 in figure, onsite user end;2nd, server;3rd, terminal.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
Embodiment 1:
A kind of report generating system, as shown in figure 1, including onsite user end 1, server 2, terminal 3.Onsite user end 1 is to set
The computer on engineering ground is put, project director can carry out typing to its engineering form in time.Engineering ground is more, and is not
When concentrating in together, then onsite user end 1 can be dispersed on different construction sites with multiple.Server 2 can
To carry out concentration convergence to the logging data at scattered onsite user end 1.Data storage is carried out by database.Using stacking-type
Storage mode, to reduce amount of storage.
Onsite user end 1, the personal report messages to real-time typing gathering project director.In personal report messages
Content is more, but by personal report messages:Name, project name, time, index, fund, as key message, and
Extract and back up and generate key message mark, be also to be examined by inputting key message when auditor makes requests on
Rope.
This key message mark and corresponding personal report messages are bound in onsite user end 1, and clothes are uploaded to stacking-type
It is engaged in the database of device 2.The information of personal form so can be directly inquired by key message mark, so that more quick
Transfer this people's report messages data.
Server 2, transfers the personal report messages asked, and transmit to terminal 3.Server 2 can be carried out to data
Finishing analysis.
Terminal 3, is parsed by data, and the request command of auditor is recorded and historical requests information is generated, right
Historical requests information is uploaded onto the server 2 carry out data backups in real time, and according to historical requests information, identical request command is entered
Line number according to statistics and real-time update, generates the weight sequencing of corresponding requests, according to the weight sequencing of corresponding requests to key message
Mark is screened, sorted, to show with people's report messages.
Embodiment 2:
As shown in Fig. 2 a kind of report form generation method, as shown in Fig. 2 comprising the following steps:
Step 1, according to the personal report messages of real-time typing on project director at the scene user terminal 1;Onsite user end 1 will be individual
In people's report messages:Name, project name, time, index, fund, extract and back up and generate key message mark, this is closed
Key information mark and corresponding personal report messages binding;Uploaded onto the server with stacking-type in 2 database.
Step 2, request command is sent to server 2 by the request command operated according to auditor in terminal 3, to examining
The request command of core personnel is recorded and generates historical requests information, and historical requests information is uploaded onto the server in real time and 2 entered
Row data backup.Server 2 is transferred the personal report messages asked and transmitted to terminal 3, and the terminal 3 is parsed by data
The personal report messages of displaying.According to historical requests information, data statistics and real-time update, generation are carried out to identical request command
The weight sequencing of corresponding requests.Terminal 3 is screened to key message mark according to the weight sequencing of corresponding requests, sorted, with
Display is with people's report messages.The generating mode of the weight sequencing is:Information in key message mark is often retrieved 1 time, it is right
Answer Information sign plus 1, the retrieval number of times of 5 class key message marks is subjected to Accumulating generation aggregate-value, corresponding informance mark accounts for tired
The proportion of evaluation is bigger, then weight is bigger, sorts forward.
For example:Personal report messages are entered into server 2 and stored by onsite user end 1, and this process is independent
, it does not interfere with each other to each other.Real-time update newest typing information in database.
Auditor is operated in terminal 3, and terminal 3 can also be computer.Auditor is stepped on by its account
Record in this system, then send key message request, for example:Zhang San is inquired about, now server 2 transfers key from database
Information sign is the form of Zhang San, is shown.At the same time, the auditor of this account can be also recorded in terminal 3 to key
Information name searching is crossed 1 time.When this auditor it is secondary this key message is retrieved when, then the key message mark of name
It will continue cumulative.It can thus be seen that this auditor more habitually carries out report query with name, so terminal 3
On key message can be ranked up by way of weight sequencing, then name is arranged in first, it is other after
Historical record be updated arrangement position.Because name is arranged in first, so, when auditor is crucial without sending
When information request command, before and after the form that display is now given tacit consent in terminal 3 is exactly the arrangement according to its key message mark
Presented.
If in the operating process in later stage, the retrieval habit of auditor also slowly changes, then this weight sequencing is also sent out
Raw transformation, can meet the requirement of auditor, improve its operating efficiency.
Examination & verification custom to different auditors can be different, also can be different for the request command of transmission, so right
The operation of auditor carries out data preservation.Personal report messages can just be carried out data transmission by network, and be uploaded
Into server 2, carry out transferring examination & verification for the auditor in terminal 3, realize the efficiency of data real-time update, information transmission
Rapidity.
Compared to the prior art, it is clear that extracted the partial information in personal report messages, key message mark is generated
Will, it is only necessary to anticipate the important data of sub-fraction, targetedly handle, therefore saved substantial amounts of cpu resource and magnetic
Disk array resource etc., advantage is clearly.Classification statistics is carried out to request command by weight sequencing, can be gone through according to newest
History solicited message, infers the request command for meeting auditor's operating habit, so as to improve the operating efficiency of auditor.
The speed of report generation can be effectively improved, and has been avoided that blindness collects initial data, can effectively save system
System resource.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art
Member can make the modification without creative contribution to the present embodiment as needed after this specification is read, but as long as at this
All protected in the right of invention by Patent Law.
Claims (7)
1. a kind of report form generation method, it is characterised in that comprise the following steps:
Step 1, it is uploaded to according to the personal report messages of real-time typing on project director at the scene user terminal (1) with stacking-type
In the database of server (2);
Step 2, request command is sent to server (2) by the request command operated according to auditor in terminal (3), service
Device (2) is transferred the personal report messages asked and transmitted to terminal (3), and the terminal (3) is personal by data parsing displaying
Report messages.
2. report form generation method according to claim 1, it is characterised in that:Before being uploaded after typing in step 1, scene
User terminal (1) is by personal report messages:Name, project name, time, index, fund, extract and back up and generate crucial letter
Breath mark, this key message mark and corresponding personal report messages are bound.
3. report form generation method according to claim 2, it is characterised in that:In step 2, the request to auditor is ordered
Make and recorded and generated historical requests information, upload onto the server (2) progress data backup in real time to historical requests information.
4. report form generation method according to claim 3, it is characterised in that:In step 2, according to historical requests information,
Data statistics and real-time update are carried out to identical request command, the weight sequencing of corresponding requests is generated.
5. report form generation method according to claim 4, it is characterised in that:In step 2, terminal (3) please according to correspondence
The weight sequencing asked is screened to key message mark, sorted, to show with people's report messages.
6. report form generation method according to claim 5, it is characterised in that:The generating mode of the weight sequencing is:It is right
Information in key message mark is often retrieved 1 time, and corresponding informance mark adds 1, and the retrieval number of times of 5 class key message marks is carried out
Accumulating generation aggregate-value, the proportion that corresponding informance mark accounts for aggregate-value is bigger, then weight is bigger, sorts forward.
7. a kind of report generating system, it is characterised in that:Including
Onsite user end (1), to the personal report messages of real-time typing gathering project director, by personal report messages
's:Name, project name, time, index, fund, extract to back up and simultaneously generate key message mark, by this key message mark and
In corresponding personal report messages binding, the database of (2) that uploaded onto the server with stacking-type;
Server (2), transfers the personal report messages asked, and transmit to terminal (3);
Terminal (3), is parsed by data, and the request command of auditor is recorded and historical requests information is generated, to going through
History solicited message upload onto the server in real time (2) carry out data backup, according to historical requests information, identical request command is entered
Line number according to statistics and real-time update, generates the weight sequencing of corresponding requests, according to the weight sequencing of corresponding requests to key message
Mark is screened, sorted, to show with people's report messages.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710139112.9A CN106970952A (en) | 2017-03-09 | 2017-03-09 | Report form generation method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710139112.9A CN106970952A (en) | 2017-03-09 | 2017-03-09 | Report form generation method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106970952A true CN106970952A (en) | 2017-07-21 |
Family
ID=59329455
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710139112.9A Pending CN106970952A (en) | 2017-03-09 | 2017-03-09 | Report form generation method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106970952A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110633967A (en) * | 2019-09-18 | 2019-12-31 | 重庆欣业邦网络技术有限公司 | Payment scheme intelligent adjustment system and method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101286150A (en) * | 2007-04-10 | 2008-10-15 | 阿里巴巴集团控股有限公司 | Method and device for creating updated parameter, method and device for displaying relevant key words |
CN102810094A (en) * | 2011-05-31 | 2012-12-05 | 中兴通讯股份有限公司 | Report generation method and device |
CN103136619A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for engineering quality acceptance report form |
-
2017
- 2017-03-09 CN CN201710139112.9A patent/CN106970952A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101286150A (en) * | 2007-04-10 | 2008-10-15 | 阿里巴巴集团控股有限公司 | Method and device for creating updated parameter, method and device for displaying relevant key words |
CN102810094A (en) * | 2011-05-31 | 2012-12-05 | 中兴通讯股份有限公司 | Report generation method and device |
CN103136619A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for engineering quality acceptance report form |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110633967A (en) * | 2019-09-18 | 2019-12-31 | 重庆欣业邦网络技术有限公司 | Payment scheme intelligent adjustment system and method |
CN110633967B (en) * | 2019-09-18 | 2023-01-24 | 重庆欣业邦网络技术有限公司 | Payment scheme intelligent adjustment system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109859829B (en) | Medical equipment repair system based on WeChat public platform and operation method thereof | |
US7957990B2 (en) | System and method for managing asset installation and evaluation | |
CN106886962A (en) | training process management method, device and system | |
CN111080222A (en) | Approval method and approval system | |
EP1669918A2 (en) | Rubricone performance assessment system | |
CN107516165A (en) | A kind of project supervision KXG based on BIM | |
CN110991486A (en) | Method and device for controlling quality of multi-person collaborative image annotation | |
CN112150331A (en) | Education target-oriented education resource remote sharing system for hierarchical distribution | |
CN108573347A (en) | Enterprise personnel develops channel system | |
CN104598584B (en) | A kind of processing method and equipment of information system examination data | |
CN112232710A (en) | 6S field management system and method | |
CN106228381A (en) | A kind of web advertisement jettison system and method that can certainly investigate problem | |
CN109345071A (en) | Double random disclosures make calls and investigate verifying system | |
CN111582511A (en) | Operation and maintenance system of new retail automatic management platform and use method | |
CN112465293A (en) | Self-evaluation system for measuring and collecting operation and maintenance professional skills | |
CN107918370A (en) | Robot production data processing method, device, computer equipment and storage medium | |
CN106970952A (en) | Report form generation method and system | |
CN110443730A (en) | Grinding based on SAAS learns service system and device | |
CN108764673A (en) | A kind of patent trusteeship service platform and the data interactive method based on platform | |
CN117274000A (en) | Training management system for medicine enterprise | |
CN108074108A (en) | A kind of display methods and its terminal of net recommendation | |
CN107563671A (en) | A kind of enterprise's test and appraisal planning service system based on internet | |
WO2023045577A1 (en) | College student innovation and entrepreneurship credit management system and method based on blockchain technology | |
CN110619456A (en) | Sensory evaluation data acquisition method and system based on mobile terminal | |
CN111105198A (en) | Instant question-answering platform system based on network |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170721 |
|
RJ01 | Rejection of invention patent application after publication |