CN106970537A - Electric power and communication semi-matter simulating system and construction method based on RTDS and SDH - Google Patents

Electric power and communication semi-matter simulating system and construction method based on RTDS and SDH Download PDF

Info

Publication number
CN106970537A
CN106970537A CN201710303295.3A CN201710303295A CN106970537A CN 106970537 A CN106970537 A CN 106970537A CN 201710303295 A CN201710303295 A CN 201710303295A CN 106970537 A CN106970537 A CN 106970537A
Authority
CN
China
Prior art keywords
sdh
communication
rtds
electric power
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710303295.3A
Other languages
Chinese (zh)
Other versions
CN106970537B (en
Inventor
童和钦
倪明
薛禹胜
罗剑波
赵丽莉
李悦岑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
Nanjing NARI Group Corp
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
Nanjing NARI Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Nari Technology Co Ltd, Nanjing NARI Group Corp filed Critical State Grid Corp of China SGCC
Priority to CN201710303295.3A priority Critical patent/CN106970537B/en
Publication of CN106970537A publication Critical patent/CN106970537A/en
Application granted granted Critical
Publication of CN106970537B publication Critical patent/CN106970537B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B17/00Systems involving the use of models or simulators of said systems
    • G05B17/02Systems involving the use of models or simulators of said systems electric

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses the electric power based on RTDS and SDH and communication semi-matter simulating system and construction method, belong to Simulating technique in Electric Power System field.The present invention includes electric power hardware-in-the-loop environment and communication hardware-in-the-loop environment, the electric power hardware-in-the-loop environment emulates end by RTDS real-time electric powers and second power equipment is constituted, the communication hardware-in-the-loop environment is made up of SDH networks in kind and communication simulation end, SDH networks in kind include the auxiliary device of SDH equipment, optical fiber and correlation, RTDS real-time electric powers emulation end is connected with second power equipment, communication simulation end is connected with SDH networks in kind and second power equipment respectively by protocol converter, and second power equipment is connected with SDH networks in kind;RTDS real-time electric powers emulation end, second power equipment and communication simulation end are by during gps clock school and synchronization.The present invention can effectively emulate the electric power and communication system of close coupling, while also providing an effective checksum test platform for second power equipment and corresponding communication interface.

Description

Electric power and communication semi-matter simulating system and construction method based on RTDS and SDH
Technical field
The invention belongs to Simulating technique in Electric Power System field, more precisely, RTDS and SDH is based on the present invention relates to one kind Electric power and communication semi-matter simulating system and construction method.
Background technology
Power system is one of mostly important national basis facility, and its safe and stable operation is related to each of national economy Individual link.With intelligent power grid technology development and power network physical message system development, power system and communication network With reference to more and more closely, power communication turns into the important infrastructure of modern power network, is to ensure electricity net safety stable economy fortune Capable important means.Especially intelligent grid and the energy internet just risen, are proposed higher to powerline network It is required that.Because power system is relied on the height of communication network, when power system or communication system are broken down, it is possible to meeting Trigger the cascading failure of another system, so as to cause directly influence on the monitoring system of power network, cause great economic loss.
Therefore, studying this power network and the complicated coupling system of communication network just has important realistic meaning, and emulates skill Art is the key technology of this coupling network of Quantitative Study.Generally it is difficult to simulate using the method for Computer simulation The important electric power and communication equipment of actual motion characteristic in kind(As receiving terminal is only receiving 3 continuously in actual stabilized control system Correct control command just confirm perform control command), the system of the result of emulation often with actual motion by larger gap, As a result often do not conform to the actual conditions.And use field experiment method, then it is difficult to test all operating modes of system, tests simultaneously When also need to stop transport corresponding electric power or communication line, so as to influence power generation.Further, since electric analog and communication simulation Simulation calculation speed it is different, it is difficult to the precise synchronization of electric analog and communication simulation is realized, using Computer simulation Technology is difficult to power network and probabilistic accurate simulation of communication network evolutionary process, and can not accurately reflect power network and logical The change procedure of cascading failure occurs for letter net.Therefore, general joint simulation method is difficult to while meeting power network and communication network The efficiency and accuracy of complicated coupling system emulation.
The content of the invention
The purpose of the present invention is:For prior art in the deficiency of the complicated coupling system emulation of power network and communication network, carry Go out a kind of electric power based on RTDS and SDH and communication semi-matter simulating system and construction method, target is to realize real-time electric power With the HWIL simulation of communication, a kind of semi-matter simulating system of the power transmission network safety and stability based on SDH communication networks is built.Should System both can be used for the emulation of accurate electric power and communication, and the change procedure of cascading failure occurs for simulating grid and communication network, It can also be used for testing the performance of second power equipment(Such as test safety and stability and control the control strategy of system, performance), also may be used With the reliability and validity of the interior communication agreement for testing second power equipment.
In the case of occurring cascading failure in electric power and communication, the simulation result of electric power should often be communicated The influence of simulation result, influences the simulation result of communication again, and Computer Simulation in addition also typically is difficult to consider that actual physics are set Standby performance.Therefore the present invention uses real-time simulation, while influenceing larger actual Power Secondary to set using on simulation result Standby and SDH network equipment, more accurately emulates power system and is issued from control is sampled, then communicated to control command by SDH Network transmission, and received and performed by another control device, the complete procedure that most control effect is shown at last.Its is specific Technical scheme is as follows:
The electric power based on RTDS and SDH and communication semi-matter simulating system of the present invention, including electric power hardware-in-the-loop environment and Communicate hardware-in-the-loop environment, and the electric power hardware-in-the-loop environment emulates end and second power equipment group by RTDS real-time electric powers Into the communication hardware-in-the-loop environment is made up of SDH networks in kind and communication simulation end, and SDH networks in kind include SDH The auxiliary device of equipment, optical fiber and correlation, RTDS real-time electric powers emulation end is connected with second power equipment, and communication simulation end passes through Protocol converter is connected with SDH networks in kind and second power equipment respectively, and second power equipment is connected with SDH networks in kind; RTDS real-time electric powers emulation end, second power equipment and communication simulation end are by during gps clock school and synchronization.
Furthermore, the second power equipment is connected with SDH networks in kind by E1 passages.
Furthermore, the protocol converter realizes the conversion of E1 channel datas and Ethernet data, wherein E1 passages Data are the data of SDH networks in kind or second power equipment side, and Ethernet data is the data of communication simulation side.
Furthermore, in running order GPS emulates end, electric power by Ethernet interface and RTDS real-time electric powers Secondary device and communication simulation end are calibrated and synchronous.
The construction method of the above-mentioned electric power based on RTDS and SDH and communication semi-matter simulating system, its content is:By RTDS Real-time electric power emulation end is connected with second power equipment sets up electric power hardware-in-the-loop environment, and SDH networks in kind are passed through into agreement Converter is connected with communication simulation end sets up communication hardware-in-the-loop environment, and second power equipment is passed through into E1 passages and SDH is real Thing network is connected and is connected by protocol converter with communication simulation end, SDH network in kind including SDH equipment, optical fiber and Related auxiliary device, the protocol converter realizes the conversion of E1 channel datas and Ethernet data, wherein E1 channel datas For SDH networks in kind or the data of second power equipment side, Ethernet data is the data of communication simulation side, and RTDS is electric in real time Power emulation end, second power equipment and communication simulation end are by during gps clock school and synchronization.
Furthermore, to be sent to RTDS by information during Ethernet interface high-ranking officers electric in real time by running order GPS Power emulation end, second power equipment and communication simulation end.
Beneficial effects of the present invention are as follows:The present invention emulates the HWIL simulation side in loop using equipment in kind is accessed Method, can effectively improve the accuracy and credibility of simulation result, and can be used to detect equipment in kind and system;Due to real-time It is the basic demand of HWIL simulation, all part unified physics clocks of system are synchronous, therefore can realize power network and communication Probabilistic accurate simulation of net evolutionary process, and accurately reflect the change of power network and communication network generation cascading failure Journey.The present invention can be used for the electric analog of multiple business type, including stabilized control system emulation, emulation of accurate spatial load forecasting etc., It can also be used for equipment test in kind, the checksum test tested, surely control definite value of such as stability control device.Sum it up, this Invention realizes the combination of SDH networks in kind and the emulation of RTDS real-time electric powers, can effectively emulate the electric power of close coupling and lead to Letter system, also provides an effective checksum test platform for second power equipment and corresponding communication interface.
Brief description of the drawings
Fig. 1 is electric power and communication semi-matter simulating system schematic diagram based on RTDS and SDH.
Embodiment
The present invention is described in further detail with reference to the accompanying drawings.
Embodiment 1:
The present embodiment is a kind of electric power based on RTDS and SDH and communication semi-matter simulating system, and its system is constituted such as Fig. 1 institutes Show, mainly by electric power hardware-in-the-loop environment and communication hardware-in-the-loop environment two large divisions, wherein electric power HWIL simulation ring Border emulates end by RTDS real-time electric powers and stability control device is constituted, and communication hardware-in-the-loop environment is imitative by SDH networks in kind and communication True end composition.
RTDS(Real Time Digital Simulator))Full name is Real Time Digital Simulator, uses this kind of real-time digital Emulator emulates end as RTDS real-time electric powers, can carry out real-time simulation to the equipment or net reaction for testing power system, It has been widely used at present in the emulation of secondary equipment in power system.Because RTDS simulations are real-time, therefore it can be straight Grounding connection is on second power equipment.
Second power equipment is the auxiliary that primary equipment in power system is supervised, measures, controls, protects or adjusted Equipment, such as electric power system stability control device.Electric power primary equipment is then to be directly used in production and the equipment using electric energy, all than control Loop processed(Secondary device)The high electrical equipment of voltage can be described as primary equipment.
SDH material object networks are the communication networks using SDH technology networkings.SDH(Synchronous Digital Hierarchy, SDH)Technology, defines according to ITU-T suggestion, is that the transmission of the digital signal of friction speed is carried For a technology of corresponding message structure, including multiplexing method and mapping method, and related synchronous method composition System.This technology can realize that network is effectively managed, real time business monitoring, dynamic network are safeguarded, different vendor equipment room The multiple functions such as intercommunication, can greatly improve network resource utilization, reduce administrative and maintenance expense, realize flexibility and reliability and efficient The network operation and maintenance, therefore be the focus of development and application of world today's message area in terms of transmission technology.
As shown in figure 1, the SDH of system networks in kind are made up of 3 SDH equipments, at least two SDH equipment matches somebody with somebody E1 interfaces Board, the STM-4 of three SDH equipments is connected by fiber optic network(622Mbps)Optical interface on board, constitutes one 622Mbps/SDH looped networks, the functions such as self-healing ring protection are realized by SDH webmastering softwares.Related board is auxiliary device.
E1 interfaces are the 30 tunnel pulse-code modulation PCM standards in Europe, and its speed is 2.048Mbit/s.An E1 time-division answers Use frame(Its length T=125us is the microsecond of sampling period 125)Be divided into 32 equal time slots altogether, the numbering of time slot be CH0 ~ CH31.Wherein time slot CH0 is used as frame synchronization, and time slot CH16 is used for transmitting signaling, is left CH1 ~ CH15 and CH17 ~ CH31 common 30 time slots are used as 30 speech channels.Each time slot transmission 8bit, therefore share 256bit.8000 frames are transmitted due to per second, because This PCM primary group E1 data transfer rate is exactly 2.048Mbit/s.
As shown in figure 1, there is 2 stability control devices in the system, 2 stability control devices emulate end phase with RTDS real-time electric powers Even.The signal of wherein one stability control device is output to the E1 boards of a SDH equipment by E1 interfaces, and another stability control device leads to Cross E1 interfaces with a protocol converter to be connected, the other end of the protocol converter is connected to the emulation of operation communication simulation software On the network interface card of computer.The simulation computer is communication simulation end.There is the SDH equipment with E1 interface boards to pass through for another E1 interfaces export 2Mbps data frames, by another protocol converter by E1 data frames switch to Ethernet data bag be output to it is logical On the network interface card at letter emulation end.Packet capturing software on communication simulation software reads network interface card input data bag, and by communication simulation software The protocol converter being connected with stability control device is output to by network interface card after processing, by protocol converter by the Ethernet data of output Bag switchs to E1 data frames and is output on stability control device.Stability control device, which is received, performs corresponding operation after data, and feeds back to RTDS In real-time electric power emulation end, emulated by RTDS real-time electric powers emulation end and export final result.
In said system, when RTDS real-time electric powers emulation end, second power equipment and communication simulation end are by gps clock school And synchronization.Information is sent to RTDS real-time electric powers by Ethernet interface and emulates end, electricity during in running order GPS high-ranking officers The simulation computer of power secondary device and operation communication simulation software, makes system operation in same physical time, it is ensured that whole Individual system operation in real-time simulation state by phy clock realize system between synchronization.
Although the present invention is disclosed as above with preferred embodiment, embodiment is not for limiting the present invention's.Not In the spirit and scope for departing from the present invention, any equivalence changes done or retouching also belong to the protection domain of the present invention.Cause The content that this protection scope of the present invention should be defined using claims hereof is standard.

Claims (6)

1. a kind of electric power based on RTDS and SDH and communication semi-matter simulating system, it is characterised in that:It is in kind imitative including electric power half True environment and communication hardware-in-the-loop environment, the electric power hardware-in-the-loop environment emulate end and electric power two by RTDS real-time electric powers Secondary device is constituted, and the communication hardware-in-the-loop environment is made up of SDH networks in kind and communication simulation end, SDH nets in kind Network includes the auxiliary device of SDH equipment, optical fiber and correlation, and RTDS real-time electric powers emulation end is connected with second power equipment, communicated Emulation end is connected with SDH networks in kind and second power equipment respectively by protocol converter, and second power equipment is in kind with SDH Network is connected;RTDS real-time electric powers emulation end, second power equipment and communication simulation end are by during gps clock school and synchronization.
2. the electric power according to claim 1 based on RTDS and SDH and communication semi-matter simulating system, it is characterised in that The second power equipment is connected with SDH networks in kind by E1 passages.
3. the electric power according to claim 2 based on RTDS and SDH and communication semi-matter simulating system, it is characterised in that The protocol converter realizes the conversion of E1 channel datas and Ethernet data, wherein E1 channel datas be SDH networks in kind or The data of second power equipment side, Ethernet data is the data of communication simulation side.
4. according to any described electric power and communication semi-matter simulating system based on RTDS and SDH of claim 1 ~ 3, its feature It is, in running order GPS emulates end, second power equipment and communication by Ethernet interface and RTDS real-time electric powers Emulation end is calibrated and synchronous.
5. the construction method of a kind of electric power based on RTDS and SDH and communication semi-matter simulating system, it is characterised in that by RTDS Real-time electric power emulation end is connected with second power equipment sets up electric power hardware-in-the-loop environment, and SDH networks in kind are passed through into agreement Converter is connected with communication simulation end sets up communication hardware-in-the-loop environment, and second power equipment is passed through into E1 passages and SDH is real Thing network is connected and is connected by protocol converter with communication simulation end, SDH network in kind including SDH equipment, optical fiber and Related auxiliary device, the protocol converter realizes the conversion of E1 channel datas and Ethernet data, wherein E1 channel datas For SDH networks in kind or the data of second power equipment side, Ethernet data is the data of communication simulation side, and RTDS is electric in real time Power emulation end, second power equipment and communication simulation end are by during gps clock school and synchronization.
6. the construction method of the electric power according to claim 5 based on RTDS and SDH and communication semi-matter simulating system, its It is characterised by:In running order GPS by information during Ethernet interface high-ranking officers be sent to RTDS real-time electric powers emulate end, Second power equipment and communication simulation end.
CN201710303295.3A 2017-05-03 2017-05-03 Electric power and communication semi-physical simulation system based on RTDS and SDH and construction method Active CN106970537B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710303295.3A CN106970537B (en) 2017-05-03 2017-05-03 Electric power and communication semi-physical simulation system based on RTDS and SDH and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710303295.3A CN106970537B (en) 2017-05-03 2017-05-03 Electric power and communication semi-physical simulation system based on RTDS and SDH and construction method

Publications (2)

Publication Number Publication Date
CN106970537A true CN106970537A (en) 2017-07-21
CN106970537B CN106970537B (en) 2020-04-14

Family

ID=59331807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710303295.3A Active CN106970537B (en) 2017-05-03 2017-05-03 Electric power and communication semi-physical simulation system based on RTDS and SDH and construction method

Country Status (1)

Country Link
CN (1) CN106970537B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108255070A (en) * 2017-12-28 2018-07-06 国电南瑞科技股份有限公司 Towards the HWIL simulation communication means of electric power stability control device
CN108650147A (en) * 2018-04-09 2018-10-12 中国电力科学研究院有限公司 Optical Transmission Network OTN semi-physical real-time simulation system and method
CN108696385A (en) * 2018-03-30 2018-10-23 中国电力科学研究院有限公司 The emulation mode of SDH Optical Transmission Network OTNs in electric system based on EXata
CN109274418A (en) * 2018-03-20 2019-01-25 全球能源互联网研究院有限公司 A kind of fiber optic communication Hardware In The Loop Simulation Method and device
CN111679655A (en) * 2020-06-18 2020-09-18 海南电网有限责任公司 Constant value calibration device of safety and stability control system
CN111917750A (en) * 2020-07-24 2020-11-10 国电南瑞科技股份有限公司 Data interaction method and interface for simulation communication network and simulation power network

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101825668A (en) * 2009-03-06 2010-09-08 华北电力科学研究院有限责任公司 Fault detection device and method of relay protection channel
US8885516B2 (en) * 2010-10-07 2014-11-11 Schweitzer Engineering Laboratories, Inc. Systems and methods for extending a deterministic fieldbus network over a wide area
CN105184029A (en) * 2015-10-30 2015-12-23 东南大学 Electric power communication hybrid system simulation platform and simulation method thereof
CN105974442A (en) * 2016-05-04 2016-09-28 广东工业大学 Satellite navigation system hardware-in-the-loop real-time simulation test platform and method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101825668A (en) * 2009-03-06 2010-09-08 华北电力科学研究院有限责任公司 Fault detection device and method of relay protection channel
US8885516B2 (en) * 2010-10-07 2014-11-11 Schweitzer Engineering Laboratories, Inc. Systems and methods for extending a deterministic fieldbus network over a wide area
CN105184029A (en) * 2015-10-30 2015-12-23 东南大学 Electric power communication hybrid system simulation platform and simulation method thereof
CN105974442A (en) * 2016-05-04 2016-09-28 广东工业大学 Satellite navigation system hardware-in-the-loop real-time simulation test platform and method thereof

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
WENJIE YU,等: "Impact of communication failures on power system security and stability defense system", 《IEEE》 *
刘静波,等: "基于RTDS的风电网侧变流器半实物实验", 《电力电子技术》 *
汤奕,等: "电力和信息通信系统混合仿真方法综述", 《电力系统自动化》 *
童和钦,等: "电网和通信网综合仿真研究", 《南方电网技术》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108255070A (en) * 2017-12-28 2018-07-06 国电南瑞科技股份有限公司 Towards the HWIL simulation communication means of electric power stability control device
CN109274418A (en) * 2018-03-20 2019-01-25 全球能源互联网研究院有限公司 A kind of fiber optic communication Hardware In The Loop Simulation Method and device
CN109274418B (en) * 2018-03-20 2022-03-08 全球能源互联网研究院有限公司 Optical fiber communication semi-physical simulation method and device
CN108696385A (en) * 2018-03-30 2018-10-23 中国电力科学研究院有限公司 The emulation mode of SDH Optical Transmission Network OTNs in electric system based on EXata
CN108650147A (en) * 2018-04-09 2018-10-12 中国电力科学研究院有限公司 Optical Transmission Network OTN semi-physical real-time simulation system and method
CN111679655A (en) * 2020-06-18 2020-09-18 海南电网有限责任公司 Constant value calibration device of safety and stability control system
CN111679655B (en) * 2020-06-18 2023-09-15 海南电网有限责任公司 Fixed value checking device of safety and stability control system
CN111917750A (en) * 2020-07-24 2020-11-10 国电南瑞科技股份有限公司 Data interaction method and interface for simulation communication network and simulation power network
CN111917750B (en) * 2020-07-24 2024-02-27 国电南瑞科技股份有限公司 Data interaction method and interface for simulation communication network and simulation power network

Also Published As

Publication number Publication date
CN106970537B (en) 2020-04-14

Similar Documents

Publication Publication Date Title
CN106970537A (en) Electric power and communication semi-matter simulating system and construction method based on RTDS and SDH
CN201518052U (en) Portable all-digital relay protection transient closed-loop tester
CN101727106B (en) Simulation test platform of process layer of digitalization transformer substation
CN203069709U (en) Intelligent transformer station relay protection device detector based on DDRTS
CN103616592A (en) Relay protection real-time digital dynamic simulation test system based on IEC 61850
CN103532790B (en) Transformer station process layer network performance quantitative testing system
CN207798999U (en) A kind of distribution automation system detection device
CN110943881B (en) Test system and method based on-site protection factory debugging
CN107818215A (en) A kind of secondary system of intelligent substation common hardware simulator and method
CN110596485B (en) Digital-analog integrated tester and digital-analog synchronous output method thereof
CN105203870A (en) Intelligent transformer substation secondary equipment integrated test system based on power line communication
CN110579658A (en) Automatic test system and test method for intelligent substation protection device
CN105606919A (en) Simulation closed-loop test method for layered distributed wireless network of intelligent transformer station
CN109639518A (en) Third generation intelligent substation entirety looped network test macro and its application method
CN108873734A (en) A kind of power distribution network information physical union simulation platform and method
CN109507627A (en) A kind of DC electronic transformer emulation mode
CN105259781A (en) Electric power system mixed simulation system for different types of real-time digital simulation apparatuses
CN204256149U (en) A kind of Performance Test System of merge cells tester
CN106771599B (en) The test device of intelligent substation synchronous phasor measuring device
CN101893695B (en) Analog sampling and protocol generating devices
CN105680441A (en) Simulated replacement technique-based simulated point-alignment device
CN107391352A (en) A kind of RTDS and stability control device data transmission method and its Transmission system
CN104601220B (en) LTE (Long Term Evolution) wireless communication intelligent substation test device
CN108062035A (en) Synchronisation control means based on transforming plant distributed emulation testing
CN201788275U (en) Analog sampling and protocol generating device

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant