CN106968934A CN201710283136.1A CN201710283136A CN106968934A CN 106968934 A CN106968934 A CN 106968934A CN 201710283136 A CN201710283136 A CN 201710283136A CN 106968934 A CN106968934 A CN 106968934A
Authority
CN
China
Prior art keywords
pump
tank
valve
switch valve
electric gate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710283136.1A
Other languages
Chinese (zh)
Other versions
CN106968934B (en
Inventor
林彦英
区国惟
叶志标
张展发
易亚军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Kenfulai Pump Co Ltd
Original Assignee
Guangdong Kenfulai Pump Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Kenfulai Pump Co Ltd filed Critical Guangdong Kenfulai Pump Co Ltd
Priority to CN201710283136.1A priority Critical patent/CN106968934B/en
Publication of CN106968934A publication Critical patent/CN106968934A/en
Application granted granted Critical
Publication of CN106968934B publication Critical patent/CN106968934B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B51/00Testing machines, pumps, or pumping installations

Abstract

The invention discloses a kind of pump cavitation surplus Auto-Test System and its method, including:Electric gate valve, flowmeter, pneumatic control valve are installed on the flow adjustment pipe of drain tank, water tank and connection drain tank and water tank, the pipeline;Pumping tank on water tank;Vavuum pump and vavuum pump is connected with pumping tank, exhaust pipe and its bye-pass equipped with switch valve;The motor electrically connected with vavuum pump;Electric gate valve and pressure transmitter and the inlet pipeline connected with the water inlet of tested water pump are installed;Electric gate valve, pressure transmitter and switch valve are installed on the outlet pipeline connected with the delivery port of tested water pump, the pipeline;Be integrated with data acquisition module and data control block and the observing and controlling cabinet being connected by parts such as signal wire and foregoing electric gate valve, pressure transmitters, observing and controlling cabinet and be additionally provided with networking output interface, for the industrial computer communication equipped with test program.Energy of the invention is automatic, quickly and accurately test pump cavitation surplus.

Description

Pump cavitation surplus Auto-Test System and its method
Technical field
The invention belongs to parallel water pump technical field, and in particular to a kind of pump cavitation surplus Auto-Test System and its side Method.
Background technology
Pump cavitation surplus test be one of basic work of testing water pump, be water pump whole production procedure in Important part.Water pump in the course of the work, often produces cavitation phenomenons, so that right because of fluid local pressure decline in pump Pump part or even pump case have detrimental effect, and water pump cisco unity malfunction can be caused when serious, and the net positive suction head of pump is gone back at present It can not be tried to achieve by theoretical calculation.
At present, pump cavitation experimental test gradually lowers pump mostly by adjusting the valve being arranged on inlet pipeline Inlet pressure, while regulation is arranged on the valve on outlet pipeline, to keep flow constant, treats that lift decrease beyond 3%, then Cavitation experiment terminates.Whole process of the test need to adjust two parameters of inlet pressure and flow simultaneously, and not only measurement error is big, efficiency It is low, and tester's labor intensity is big.
The content of the invention
It is an object of the invention to overcome, the existing test error of existing pump cavitation experiment is big, efficiency is low and works The big defect of intensity, so as to improve the precision and automaticity of test.In order to realize this purpose, the present invention proposes one kind Pump cavitation surplus Auto-Test System, it includes components described below:
(1) pacify on the flow adjustment pipe of drain tank, water tank and connection drain tank and water tank, flow adjustment pipe Equipped with electric gate valve, flowmeter, pneumatic control valve,
(2) it is arranged on the pumping tank on the water tank;
(3) switch valve is housed on vavuum pump and the exhaust pipe for connecting vavuum pump with the pumping tank, exhaust pipe, It is additionally provided with exhaust pipe on a straight open to atmosphere bye-pass, bye-pass and is also equipped with switch valve;
(4) motor electrically connected with the vavuum pump;
(5) electric gate valve is installed on the inlet pipeline connected with the water inlet of tested water pump, inlet pipeline and pressure becomes Send device;
(6) electric gate valve, pressure inverting are installed on the outlet pipeline connected with the delivery port of tested water pump, outlet pipeline Device and switch valve;
(7) observing and controlling cabinet, it passes through signal wire and foregoing each electric gate valve, pressure transmitter, switch valve, flowmeter, pneumatic Regulating valve is connected, and is integrated with data acquisition module and data control block, observing and controlling cabinet in observing and controlling cabinet and is additionally provided with network output and connects Mouthful, for the industrial computer communication equipped with test program.
On the basis of above-mentioned technical proposal, the present invention can add following technological means, preferably to solve the present invention Technical problem to be solved:
Switch valve is also associated with the pumping tank, it is to give pumping tank tonifying Qi that it, which is acted on,.
Further, temperature transmitter is also equipped with the water tank, for measuring the temperature of a liquid in real time.
It is engaged with above-mentioned pump cavitation surplus Auto-Test System, more than a kind of pump cavitation The method of testing of amount, it comprises the steps:
Step one, industrial computer is according to performance test results, with fitting of a polynomial flow-lift curve Q-H, and will be whole bent Line obtains Q-H along the translation 3% downwards of ordinate direction3Curve;
Step 2, the opening value that result gives pneumatic control valve is recorded according to performance test;
Step 3, after pump cavitation surplus test system is stable, starts vavuum pump;
Step 4, opens the switch valve on exhaust pipe, and the switch valve closed on bye-pass, vavuum pump comes into operation;
Step 5, continuous acquisition pressure transmitter, flowmeter, the signal of torque rotary speed sensor, and calculate raise in real time Journey value Ha
Step 6, industrial computer is according to Q-H3Curve representation formula and the actual flow value collected in real time, it is real-time by interpolation Calculate corresponding lift determining reference value Ht
Step 7, real time contrast HaAnd HtValue;
Step 8, works as Ha≤HtWhen, the switch valve closed on exhaust pipe opens the switch valve on bye-pass;
Step 9, opens the switch valve on pumping tank, and tonifying Qi is carried out to pumping tank, and tonifying Qi is closed after terminating on pumping tank Switch valve;
Step 10, into next operating mode experimental tests, repeats the second to the 9th step, until all operating points have been tested Finish;
Step 11, draws flow-net positive suction head Q-NPSH curves;
Step 12, substitutes into Q-NPSH curve representation formulas by one group of flow targets operating mode value to be measured, then can try to achieve one group Net positive suction head value.
The present invention has following beneficial effects:
Integrated use of the invention based on computer technology, automatic control technology and sensor technology, can be automatic, fast Speed, exactly test pump cavitation surplus, so as to drastically increase the testing efficiency and measuring accuracy of pump cavitation surplus, drop The low labor intensity of tester, improves the working environment of tester.
Brief description of the drawings
Fig. 1 for the present invention in pump cavitation surplus test system structural representation;
Fig. 2 for the present invention in pump cavitation surplus method of testing flow chart;
Fig. 3 is the test result data processing figure in one embodiment of the present of invention;
Fig. 4 is the pump cavitation trial curve figure in one embodiment of the present of invention.
Embodiment
Two embodiments of the present invention are discussed in detail below in conjunction with accompanying drawing.
Embodiment 1
As shown in figure 1, a kind of pump cavitation surplus Auto-Test System, it includes components described below:
(1) drain tank 1, water tank 2 and the flow adjustment pipe 3 for connecting drain tank 1 with water tank 2, Flow-rate adjustment Electric gate valve 301, flowmeter 302, pneumatic control valve 303 are sequentially installed with pipeline 3.The main function of electric gate valve 301 is, When needing maintenance pipeline or instrument, for blocking the current in flow adjustment pipe 3.Flowmeter 302 is used to measure tested water The flow of pump 10.Pneumatic control valve 303 is used to adjust the water-carrying capacity in flow adjustment pipe 3.Temperature is also equipped with water tank 2 Transmitter 201, for measuring the temperature of a liquid in real time.
(2) be arranged on the water tank 2 on pumping tank 4, pumping tank 4 on be also associated with switch valve 401, its act on be to It is evacuated the tonifying Qi of tank 4.
(3) it is equipped with and opens on vavuum pump 5 and the exhaust pipe 6 for connecting vavuum pump 5 with the pumping tank 4, exhaust pipe 6 Close valve 601;It is additionally provided with exhaust pipe 6 on a straight open to atmosphere bye-pass 602, bye-pass 602 and switch valve 603 is housed;
(4) motor 7 electrically connected with the vavuum pump 5, vavuum pump 5 is driven by motor 7, opens opening on exhaust pipe 6 Valve 601 is closed, then pumping tank 4 can be evacuated, so as to reduce the pressure of tested pump intake;When on opening bye-pass 602 Switch valve 603, close exhaust pipe 6 on switch valve 601 when, vavuum pump 5 does not come into operation, and the present embodiment passes through the two The switching of switch valve and avoid frequent starting, stop motor 7.
(5) He of electric gate valve 801 is installed on the inlet pipeline 8 connected with the water inlet of tested water pump 10, inlet pipeline 8 Pressure transmitter 802;The current that electric gate valve 801 is blocked when being mainly used in mounting and dismounting water pump 10 to be measured in inlet pipeline 8, Pressure transmitter 802 is used for the pressure for measuring the water inlet of tested water pump 10, and pressure signal is changed into electric signal.
(6) be provided with the outlet pipeline 9 connected with the delivery port of tested water pump 10, outlet pipeline 9 electric gate valve 901, Pressure transmitter 902 and switch valve 903.The main function of electric gate valve 901 is, when needing maintenance pipeline or instrument, to be used for The current blocked in outlet pipeline 9.Pressure transmitter 902 is used for the pressure for measuring the water outlet of tested water pump 10, and will pressure Force signal is changed into electric signal.Switch valve 903 is used to be vented to outlet pipeline 9 in process of the test.
(7) observing and controlling cabinet, it passes through signal wire and foregoing each electric gate valve, pressure transmitter, switch valve, flowmeter, pneumatic Regulating valve is connected, and is integrated with data acquisition module and data control block, observing and controlling cabinet in observing and controlling cabinet and is additionally provided with network output and connects Mouthful, for the industrial computer communication equipped with test program.
During pump cavitation surplus test system work of the present invention, first tested water pump 10 and pump motor 11 are turned by torque Fast sensor 12 is connected, and pump motor 11 drives water pump 10 to operate after starting.In process of the test, water outlet of the water from tested water pump 10 Mouth discharge, enters drain tank 1 through outlet pipeline 9, then flows into water tank 2 through flow adjustment pipe 3, forms a closed system. When testing pump cavitation surplus, start motor 7, open the switch valve 601 on exhaust pipe 6, the switch closed on bye-pass 602 Valve 603, vavuum pump 2 is come into operation, and pumping tank 4 is evacuated, so that the purpose of the tested pump intake pressure of regulation is reached, When the reduction of tested pump intake pressure value causes water pump to occur cavitation, the cavitation experiment of the operating point terminates.Under entrance Before the experiment of one operating point, the switch valve 601 closed on exhaust pipe 6 opens the switch valve 603 on bye-pass 602, then very Empty pump 5 does not come into operation.It is foregoing each electric gate valve, pressure transmitter, switch valve, flowmeter, pneumatic in whole test process The signal wire of regulating valve is linked into the data acquisition module of observing and controlling cabinet, and data acquisition module is defeated by the signal of above-mentioned each transmitter Enter into industrial computer and carry out data processing.According to the instruction sent after industrial computer processing data, data control block is controllable each The working condition of electric gate valve, switch valve and pneumatic control valve.
Embodiment 2
Involved by embodiment 2 is pump cavitation surplus method of testing, that is, the method part in the present invention.Generally Come, before pump cavitation experiment is carried out, advanced water-filling pump performance test (abbreviation performance test), result of performance test can be with Obtain one group of flow, lift data.Carry out cavitation experiment when, can by flow, lift data by fitting of a polynomial into a flow- Head curve Q-H, and the curve translates downwards along ordinate to 3% (even if the also institute in a coordinate system of the every bit on the curve 3%) corresponding height value H declines, and obtains cavitation experiment judgment standard curve Q-H3.In addition, during performance test, can also One group of flow, valve opening data, i.e. one valve opening value of each target flow value correspondence are obtained, these data are to cavitation Experiment is also useful.In a word, the present invention makes full use of performance test results, can improve cavitation experiment efficiency, saves regulation Time.
Net positive suction head test system of the present invention, the side of unit fixed on water pump suction pressure is reduced using vavuum pump to the pumping of pumping tank Formula, whole process of the test system pipeline resistance keeps constant, and system tends to dynamic equilibrium.Therefore, start after vavuum pump, industrial computer Start each transmitter reading of continuous acquisition, and calculate the lift value H of water pump in real timea.Meanwhile, industrial computer is according to Q-H3Curve Expression formula and the actual flow value collected in real time, corresponding lift determining reference value H is calculated by interpolation in real timet.With Vacuum gradually rises in pumping of the vavuum pump to pumping tank, pumping tank, and unit fixed on water pump suction pressure gradually lowers, and survey calculation is obtained Lift value HaIt is gradually reduced;And meter readings are also gradually reduced, then the benchmark lift value H that interpolation calculation is drawntAlso gradually subtract It is small.Two lift value sizes of industrial computer real time contrast, until working as Ha≤HtWhen, then the cavitation experiment of the operating point terminates.Then enter Enter the experiment of next operating mode.
Due to having tested after an operating point, pumping tank has formed vacuum state, therefore is entering next operating point Cavitation experiment before, pumping tank need to be carried out tonifying Qi to its it is internal reach atmospheric pressure state, during tonifying Qi, vavuum pump must It must stop to pumping tank pumping.For the present embodiment, by switching switch valve 601 and bye-pass on exhaust pipe 6 The working condition of switch valve 603 on 602, and frequent starting vavuum pump is avoided, that is, open switch valve 601, closing switch valve 603, vavuum pump is evacuated to pumping tank;Closing switch valve 601, opens switch valve 603, and vavuum pump stops taking out pumping tank Gas, equivalent to stopping vaccum pump motor.
The general principle for the method for testing being described above in the present invention, its job step is specifically introduced below in conjunction with accompanying drawing Suddenly;
The method that a kind of pump cavitation surplus test system shown in utilization Fig. 1 is tested pump cavitation surplus, its Workflow is as shown in Fig. 2 specifically include following step:
Step one, industrial computer is according to performance test results, with fitting of a polynomial flow-lift curve Q-H, and will be whole bent Line obtains Q-H along the translation 3% downwards of ordinate direction3Curve;
Step 2, the opening value that result gives pneumatic control valve 303 is recorded according to performance test;
Step 3, after pump cavitation surplus test system is stable, starts vavuum pump 5;
Step 4, opens the switch valve 601 of exhaust pipe 6, and the switch valve 603 closed on bye-pass 602, vavuum pump 5 is thrown Enter to use;
Step 5, continuous acquisition pressure transmitter 802,902, flowmeter 302, the signal of torque rotary speed sensor 12, and Calculate lift value H in real timea
Step 6, industrial computer is according to Q-H3Curve representation formula and the actual flow value collected in real time, it is real-time by interpolation Calculate corresponding lift determining reference value Ht
Step 7, real time contrast HaAnd HtValue;
Step 8, works as Ha≤HtWhen, the switch valve 601 of exhaust pipe 6 is closed, the switch valve 603 on bye-pass 602 is opened;
Step 9, opens the switch valve 401 on pumping tank 4, carries out tonifying Qi to pumping tank, tonifying Qi terminates rear closing switch valve 401;
Step 10, into next operating mode experimental tests, repeats the second to the 9th step, until all operating points have been tested Finish;
Step 11, draws flow-net positive suction head Q-NPSH curves, and the curve is as shown in Figure 4;
Step 12, substitutes into Q-NPSH curve representation formulas by one group of flow targets operating mode value to be measured, then can try to achieve one group Net positive suction head value.
The test of pump cavitation surplus can be completed by above-mentioned 12 steps, test result is after data processing, such as Shown in Fig. 3.

Claims (4)

1. a kind of pump cavitation surplus Auto-Test System, it includes components described below:
(1) it is provided with the flow adjustment pipe of drain tank, water tank and connection drain tank and water tank, flow adjustment pipe Electric gate valve, flowmeter, pneumatic control valve;
(2) it is arranged on the pumping tank on the water tank;
(3) switch valve, pumping are housed on vavuum pump and the exhaust pipe for connecting vavuum pump with the pumping tank, exhaust pipe It is additionally provided with pipeline on a straight open to atmosphere bye-pass, bye-pass and is also equipped with switch valve;
(4) motor electrically connected with the vavuum pump;
(5) electric gate valve and pressure transmitter are installed on the inlet pipeline connected with the water inlet of tested water pump, inlet pipeline;
(6) be provided with the outlet pipeline connected with the delivery port of tested water pump, outlet pipeline electric gate valve, pressure transmitter and Switch valve;
(7) observing and controlling cabinet, it passes through signal wire and foregoing each electric gate valve, pressure transmitter, switch valve, flowmeter, pneumatic regulation Valve is connected, and is integrated with observing and controlling cabinet on data acquisition module and data control block, observing and controlling cabinet and is additionally provided with networking output interface, is used In with the industrial computer communication equipped with test program.
2. pump cavitation surplus Auto-Test System as claimed in claim 1, it is characterised in that:It is also connected with the pumping tank There is switch valve, it is to give pumping tank tonifying Qi that it, which is acted on,.
3. pump cavitation surplus Auto-Test System as claimed in claim 1 or 2, it is characterised in that:On the water tank also Temperature transmitter is installed, for measuring the temperature of a liquid in real time.
4. a kind of method of testing of pump cavitation surplus, it comprises the steps:
Step one, industrial computer is according to performance test results, with fitting of a polynomial flow-lift curve Q-H, and by whole curve edge The translation 3% downwards of ordinate direction, obtains Q-H3Curve;
Step 2, the opening value that result gives pneumatic control valve is recorded according to performance test;
Step 3, after pump cavitation surplus Auto-Test System is stable, starts vavuum pump;
Step 4, opens the switch valve on exhaust pipe, and the switch valve closed on bye-pass, vavuum pump comes into operation;
Step 5, continuous acquisition pressure transmitter, flowmeter, the signal of torque rotary speed sensor, and lift value is calculated in real time Ha
Step 6, industrial computer is according to Q-H3Curve representation formula and the actual flow value collected in real time, are calculated in real time by interpolation Corresponding lift determining reference value Ht
Step 7, real time contrast HaAnd HtValue;
Step 8, works as Ha≤HtWhen, the switch valve closed on exhaust pipe opens the switch valve on bye-pass;
Step 9, opens the switch valve on pumping tank, and tonifying Qi, the switch that tonifying Qi is closed after terminating on pumping tank are carried out to pumping tank Valve;
Step 10, into next operating mode experimental tests, repeats the second to the 9th step, until all operating points are completed;
Step 11, draws flow-net positive suction head Q-NPSH curves;
Step 12, substitutes into Q-NPSH curve representation formulas by one group of flow targets operating mode value to be measured, then can try to achieve one group of cavitation Margin value.
CN201710283136.1A 2017-04-26 2017-04-26 Pump cavitation surplus Auto-Test System and its method Active CN106968934B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710283136.1A CN106968934B (en) 2017-04-26 2017-04-26 Pump cavitation surplus Auto-Test System and its method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710283136.1A CN106968934B (en) 2017-04-26 2017-04-26 Pump cavitation surplus Auto-Test System and its method

Publications (2)

Publication Number Publication Date
CN106968934A true CN106968934A (en) 2017-07-21
CN106968934B CN106968934B (en) 2018-12-18

Family

ID=59333400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710283136.1A Active CN106968934B (en) 2017-04-26 2017-04-26 Pump cavitation surplus Auto-Test System and its method

Country Status (1)

Country Link
CN (1) CN106968934B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107676272A (en) * 2017-09-14 2018-02-09 江苏大学 A kind of fast adjuster of Working Conditions of Centrifugal Injection Pumps
CN108678939A (en) * 2018-05-09 2018-10-19 山东省农业机械科学研究院 The detection method and system of pump cavitation margin value
CN108825483A (en) * 2018-05-25 2018-11-16 江苏大学 A kind of pump full working scope testing stand
CN109162910A (en) * 2018-06-29 2019-01-08 武汉船用机械有限责任公司 A kind of test device and test method of Cargo Oil Pump performance
CN110566474A (en) * 2019-10-15 2019-12-13 中国计量大学 Water pump test device capable of measuring wide lift range
CN112102697A (en) * 2020-07-29 2020-12-18 北京化工大学 Multifunctional experimental device for fault self-healing regulation and control and process control of centrifugal pump
CN112814885A (en) * 2020-08-05 2021-05-18 昆明嘉和科技股份有限公司 High-precision automatic test equipment and method for industrial pump
CN109371476B (en) * 2018-08-20 2021-08-10 宁波卓成化纤有限公司 Temperature control method by using temperature control system with multipoint temperature difference of one biphenyl furnace
CN114837931A (en) * 2022-06-09 2022-08-02 湖南高创翔宇科技有限公司 Fuel pump test system and method
CN114876822A (en) * 2022-06-01 2022-08-09 江苏大学 Centrifugal pump gas injection cavitation performance testing system and testing method capable of achieving uniform gas filling
CN116146501A (en) * 2023-01-03 2023-05-23 广州市昕恒泵业制造有限公司 Control system and method capable of reducing pump cavitation and changing pumping medium characteristics

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1257287A2 (en) * 1985-01-04 1986-09-15 Предприятие П/Я В-2504 Method of cavitation testing of pump
KR20100122698A (en) * 2009-05-13 2010-11-23 한국항공우주연구원 Testing method and test stand for the determination of the cavitation characteristics of pump
CN102022348A (en) * 2010-12-07 2011-04-20 北京航空航天大学 Water pump cavitation measuring method
CN102338074A (en) * 2010-07-23 2012-02-01 北京航天动力研究所 Sealing type test device and method applicable to various types of oil pumps
CN102635559A (en) * 2012-04-10 2012-08-15 山东省农业机械科学研究所 Closed pipeline device of pump test system
CN202402266U (en) * 2011-11-16 2012-08-29 北京航天动力研究所 Open and closed pump test control system
CN103277294A (en) * 2013-06-14 2013-09-04 武汉大学 Multifunctional water pump experiment table
CN103967806A (en) * 2014-04-16 2014-08-06 浙江大学 Water pump cavitation testing method and device
CN205154670U (en) * 2015-12-07 2016-04-13 榆林学院 Centrifugal pump cavitation is comprehensive experiment system for experiment
CN105909536A (en) * 2016-05-10 2016-08-31 浙江理工大学 Gas-liquid two-phase flow performance testing system and method for centrifugal pump
CN206801840U (en) * 2017-04-26 2017-12-26 广东肯富来泵业股份有限公司 Pump cavitation surplus Auto-Test System

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1257287A2 (en) * 1985-01-04 1986-09-15 Предприятие П/Я В-2504 Method of cavitation testing of pump
KR20100122698A (en) * 2009-05-13 2010-11-23 한국항공우주연구원 Testing method and test stand for the determination of the cavitation characteristics of pump
CN102338074A (en) * 2010-07-23 2012-02-01 北京航天动力研究所 Sealing type test device and method applicable to various types of oil pumps
CN102022348A (en) * 2010-12-07 2011-04-20 北京航空航天大学 Water pump cavitation measuring method
CN202402266U (en) * 2011-11-16 2012-08-29 北京航天动力研究所 Open and closed pump test control system
CN102635559A (en) * 2012-04-10 2012-08-15 山东省农业机械科学研究所 Closed pipeline device of pump test system
CN103277294A (en) * 2013-06-14 2013-09-04 武汉大学 Multifunctional water pump experiment table
CN103967806A (en) * 2014-04-16 2014-08-06 浙江大学 Water pump cavitation testing method and device
CN205154670U (en) * 2015-12-07 2016-04-13 榆林学院 Centrifugal pump cavitation is comprehensive experiment system for experiment
CN105909536A (en) * 2016-05-10 2016-08-31 浙江理工大学 Gas-liquid two-phase flow performance testing system and method for centrifugal pump
CN206801840U (en) * 2017-04-26 2017-12-26 广东肯富来泵业股份有限公司 Pump cavitation surplus Auto-Test System

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107676272B (en) * 2017-09-14 2019-05-31 江苏大学 A kind of fast adjuster of Working Conditions of Centrifugal Injection Pumps
CN107676272A (en) * 2017-09-14 2018-02-09 江苏大学 A kind of fast adjuster of Working Conditions of Centrifugal Injection Pumps
CN108678939A (en) * 2018-05-09 2018-10-19 山东省农业机械科学研究院 The detection method and system of pump cavitation margin value
CN108825483A (en) * 2018-05-25 2018-11-16 江苏大学 A kind of pump full working scope testing stand
CN109162910A (en) * 2018-06-29 2019-01-08 武汉船用机械有限责任公司 A kind of test device and test method of Cargo Oil Pump performance
CN109371476B (en) * 2018-08-20 2021-08-10 宁波卓成化纤有限公司 Temperature control method by using temperature control system with multipoint temperature difference of one biphenyl furnace
CN110566474A (en) * 2019-10-15 2019-12-13 中国计量大学 Water pump test device capable of measuring wide lift range
CN112102697A (en) * 2020-07-29 2020-12-18 北京化工大学 Multifunctional experimental device for fault self-healing regulation and control and process control of centrifugal pump
CN112814885A (en) * 2020-08-05 2021-05-18 昆明嘉和科技股份有限公司 High-precision automatic test equipment and method for industrial pump
CN114876822A (en) * 2022-06-01 2022-08-09 江苏大学 Centrifugal pump gas injection cavitation performance testing system and testing method capable of achieving uniform gas filling
CN114837931A (en) * 2022-06-09 2022-08-02 湖南高创翔宇科技有限公司 Fuel pump test system and method
CN114837931B (en) * 2022-06-09 2024-03-22 湖南高创翔宇科技有限公司 Fuel pump testing system and method
CN116146501A (en) * 2023-01-03 2023-05-23 广州市昕恒泵业制造有限公司 Control system and method capable of reducing pump cavitation and changing pumping medium characteristics
CN116146501B (en) * 2023-01-03 2024-01-12 广州市昕恒泵业制造有限公司 Control system and method capable of reducing pump cavitation and changing pumping medium characteristics

Also Published As

Publication number Publication date
CN106968934B (en) 2018-12-18

Similar Documents

Publication Publication Date Title
CN106968934A (en) Pump cavitation surplus Auto-Test System and its method
CN106979162B (en) Pump closed testing bench control system and test method
CN206801840U (en) Pump cavitation surplus Auto-Test System
CN110242552B (en) Water pump performance test system
CN203745051U (en) Two-position one-way reversing valve type pVTt-method gas flow device
CN106368960A (en) Device and method for detecting critical cavitation point of centrifugal pump
CN103837214A (en) Combined container type gas flow detection device by pVTt method
CN107061095A (en) A kind of combined type fuel injector fuel injection characteristic measurement apparatus and measuring method
CN203837782U (en) Diaphragm gas meter metering performance isothermal calibrating apparatus under conditions of limiting temperature
CN102183284A (en) Liquid flow standard calibration device
CN103837215B (en) Commutation valve type p.V.T.t method gas flow meter
CN106706290A (en) Water flow rate testing device of turbine blade of aviation engine
CN104034377A (en) Air compressor flow measurement device and calibration system and method thereof
CN108827641A (en) A kind of high back pressure diesel engine bench experiment simulator
CN206801901U (en) Pump closed testing bench control system
CN112254971A (en) Test system and method for simulating performance of ventilating bearing cavity of oil pump of aircraft engine
CN106153161B (en) Instrument detection device
CN107131917B (en) A kind of measurement method and measuring device of the specified guide vane water leakage of the hydraulic turbine
CN108775948A (en) A kind of semi-automatic liquid level meter checking device
CN107121996B (en) Constant temperature and humidity control device and control method
CN109114012A (en) A kind of vane pump automatic testing equipment and method
CN212296825U (en) Water pump test bed capable of testing pressure value adjustment
CN110005603B (en) Device and method for testing air exhaust performance of micro vacuum pump
CN203785711U (en) Gas pumping speed measuring device for vacuum-pumping system in vacuum equipment
CN107782560A (en) A kind of bypass type booster fault detection method and device

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 528131 No. 1 and 3 Hui Cai road, Bai Ni Town, Sanshui District, Foshan, Guangdong

Applicant after: GUANGDONG KENFULAI PUMP CO., LTD.

Address before: 528000 14 Riverside Road, Chancheng District, Foshan, Guangdong