CN106979162B - Pump closed testing bench control system and test method - Google Patents

Pump closed testing bench control system and test method Download PDF

Info

Publication number
CN106979162B
CN106979162B CN201710286211.XA CN201710286211A CN106979162B CN 106979162 B CN106979162 B CN 106979162B CN 201710286211 A CN201710286211 A CN 201710286211A CN 106979162 B CN106979162 B CN 106979162B
Authority
CN
China
Prior art keywords
pump
test
valve
measured
personal computer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710286211.XA
Other languages
Chinese (zh)
Other versions
CN106979162A (en
Inventor
区国惟
林彦英
易亚军
邬江
叶志标
张展发
招广志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zunyi Kenflo Pump Co Ltd
Guangdong Kenfulai Pump Co Ltd
Original Assignee
Zunyi Kenflo Pump Co Ltd
Guangdong Kenfulai Pump Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zunyi Kenflo Pump Co Ltd, Guangdong Kenfulai Pump Co Ltd filed Critical Zunyi Kenflo Pump Co Ltd
Priority to CN201710286211.XA priority Critical patent/CN106979162B/en
Publication of CN106979162A publication Critical patent/CN106979162A/en
Application granted granted Critical
Publication of CN106979162B publication Critical patent/CN106979162B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D15/00Control, e.g. regulation, of pumps, pumping installations or systems
    • F04D15/0088Testing machines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Control Of Positive-Displacement Pumps (AREA)

Abstract

The invention belongs to parallel water pump technical fields, and in particular to a kind of pump closed testing bench control system and test method;Pump closed testing bench control system of the invention includes test device and control system, and wherein test device includes water tank, drain tank, pumping tank and gas-liquid separator and each connecting line;Control system includes control cabinet and industrial personal computer, is coupled between control cabinet and industrial personal computer by Ethernet and realizes communication;The present invention solves the all-round property testing of present water pump and cavitation test needs manually to test or the poor status of automatic test, whole test process are automatically performed by this TT&C system, institute's measured data can also timely feedback, it is fully automated the test process of water pump, is intelligent, the present invention improves the accuracy of test result not only significantly, and reduce the labor intensity of tester, improve the working environment of tester, testing efficiency is significantly improved, testing cost is reduced.

Description

Pump closed testing bench control system and test method
Technical field
The invention belongs to parallel water pump technical fields, and in particular to a kind of pump closed testing bench control system and test side Method.
Background technique
Parallel water pump has irreplaceable role for the theoretical research of water pump and the perfect of design.Currently, water pump is surveyed Trial assembly, which is set mainly, two class of closed circuit experimental rig and open type pond experimental rig.With regard to closed circuit experimental rig in parallel water pump In application for, presently mainly operated by manually.Manually-operated test (hereinafter referred to as manual testing) exists Measurement error is big, the more difficult judgement of test macro stability, data are computationally intensive, tester large labor intensity and working environment The defects of poor.
In order to overcome the technological deficiency of manual testing, for many years, the research staff of parallel water pump technical field is showing always The Auto-Test System and method (hereinafter referred to as automatic test) of water pump are studied on the basis of some closed circuit experimental rigs, And achieve some achievements.However, existing automatic test that there are still integration degrees is low, data transmission synchronization difference and The defects of low measurement accuracy.And these defects also significantly limit automatic test in the application of parallel water pump technical field.
Summary of the invention
It is an object of the invention to overcome, integration degree present in existing automatic test is low, data transmission synchronization The defects of difference and low measurement accuracy.
In order to achieve the above functions, present invention provide the technical scheme that
A kind of pump closed testing bench control system includes test device and control system, in which:
The test device includes water tank, drain tank, pumping tank and gas-liquid separator, the water tank and pump to be measured Between be provided with the inlet pipeline on 1 tunnel or more, set gradually on the inlet pipeline along the direction of the inlet pipeline water flow Electric gate valve, pressure sensor, motor and torque rotary speed sensor, the motor is by Frequency Converter Control;Pump to be measured and the row The discharge pipe line on 1 tunnel or more is provided between tank out, along the direction of the discharge pipe line water flow on the discharge pipe line according to Secondary setting electric gate valve and pressure sensor;Pass through flow regulation pipe more than 1 tunnel between the drain tank and the water tank Road connection sets gradually electric gate valve, stream along the direction of the flow adjustment pipe water flow on the flow regulation pipe road Meter and pneumatic control valve;The pumping tank is mounted on the top of the water tank, and the pumping tank is equipped with exhaust pipe, institute State and be provided with pneumatic on-off valve on exhaust pipe and connect with vacuum pump air entry, the gas outlet of the vacuum pump by pipeline with The gas-liquid separator is connected, and air extraction pipeline is connected on the exhaust pipe, is installed on the air extraction pipeline There is pneumatic on-off valve;It is also connected by water supply pipe between the vacuum pump and gas-liquid separator, the gas-liquid separator and institute It states and is connected separately with liquidometer on water tank;Temperature pick-up for testing water temperature in water tank is installed on the water tank Device;It is respectively arranged on the water tank, the drain tank, the gas-liquid separator and the replenishing line for being evacuated tank pneumatic Switch valve;
The control system includes control cabinet and industrial personal computer, is joined between the control cabinet and the industrial personal computer by Ethernet It connects;The control cabinet includes analog data collection card, analog data signal controller, digital signal acquiring card and number letter Number control card, the control cabinet acquire the pressure sensor, flowmeter, described by the analog data collection card The data and the frequency converter frequency feedback data that torque rotary speed sensor and the temperature transmitter measure, are transferred to institute Industrial personal computer processing and feedback are stated, and control signal is exported to the gas in the test device by analog data signal controller Dynamic regulating valve and frequency converter are to adjust the water flow in flow adjustment pipe and set the revolving speed of frequency converter;The control cabinet passes through Digital signal acquiring card acquires the status signal of the electric gate valve, the operating state signal of the frequency converter and the liquid level The liquid level indication signal of meter is transferred to the industrial personal computer processing and feedback, and passes through the Digital Signals card output signal Control the start and stop of the switch and the frequency converter and the vacuum pump of the electric gate valve and the pneumatic on-off valve.
Preferably, it is additionally provided with manual normally closed switch valve on the inlet pipeline of the test device, it is described normally closed manually to open Valve is closed between the electric gate valve and the pressure sensor.
Preferably, manual tonifying Qi pipeline is provided on the pumping tank, the manual blowdown pipe road is equipped with manually often Close switch valve.
Preferably, the test device includes 3 road inlet pipelines, 3 road discharge pipe lines and 6 road flow adjustment pipes, each pipe The caliber on road is different.
Preferably, the control cabinet is NIcDAQ cabinet.
The present invention also provides a kind of test methods using above-mentioned pump closed testing bench control system, including following step It is rapid:
(1) pump to be measured is connect with inlet pipeline and discharge pipe line;
(2) test program on opening industrial personal computer, fills in relevant parameter, the model including pump to be measured, and rated speed is specified Flow, impeller diameter, trial operation pneumatic control valve aperture;
(3) test program is run, initialization test interface, test program is according to the model of pump to be measured, rated speed and leaf Wheel diameter automatically selects this test used inlet pipeline, discharge pipe line and flow adjustment pipe, and transmits a signal to each The signal receiver of electric gate valve, then the electric gate valve on the used pipeline of this test automatically opens, this non-test is used Electric gate valve be automatically closed;Electric gate valve has working condition feedback function, can then find to survey in time by test interface Choosing whether for test tube road is correct;Meanwhile test program is automatically according to test device level condition, decide whether to carry out fluid infusion and Tonifying Qi operation;
(4) start pump to be measured, industrial personal computer sends control signals to frequency converter, and the signal includes the amount of starting switch control letter Number and revolving speed set Analog control signal, frequency converter exports corresponding power according to control signal to drive pump to be measured;
(5) carry out trial operation, artificial contrast's industrial personal computer the parameter value that shows of collected parameter value and field instrument, really It is normal to protect each sensor signal transmission, after pump operation to be measured is stablized, opens exhaust valve, pipeline is exhausted;
(6) it is tested for the property experiment, the test program on industrial personal computer compares flow target value and flow actual value automatically, Output control signal, pneumatic control valve automatically adjust aperture according to control signal value size, TT&C system are made to reach target operating condition State, industrial personal computer record revolving speed, power, inlet pressure, outlet pressure and flow value of the pump to be measured under different operating conditions, and to this A little data are handled, to judge whether pump to be measured meets design requirement;
(7) after performance test, cavitation experiment is if desired carried out, then vacuum pump is started by industrial personal computer, to true After sky pump runs well, start cavitation experiment, the test program output control signal on industrial personal computer control pump to be measured flow and Inlet pressure, pneumatic control valve automatically adjusts aperture according to control signal value size, and inlet pressure is vacuumized by vacuum pump Mode, test program compares inlet pressure target value and inlet pressure actual value automatically, selection starting pumping tank exhaust pipe On pneumatic on-off valve or air extraction pipeline on pneumatic on-off valve, adjust flow and inlet pressure and reach goal-selling After value, after test system to be measured is stablized, revolving speed, power, inlet pressure, outlet pressure and stream of the pump to be measured under different operating conditions are recorded Magnitude, and these data are handled, to judge whether pump to be measured meets design requirement;
(8) test terminates, and closes pump, vacuum pump and industrial personal computer to be measured.
The beneficial effects of the present invention are: pump closed testing bench control system of the invention and test method solve now It needs manually to carry out test or the poor status of automatic test in all-round property testing and the cavitation test of water pump, entirely Portion's test process is automatically performed by this TT&C system, and institute's measured data can also timely feedback, and keeps the test process of water pump fully automated Change, is intelligent, the present invention improves the accuracy of test result not only significantly, but also the labour for reducing tester is strong Degree, improves the working environment of tester, significantly improves testing efficiency, reduces testing cost.
Detailed description of the invention
Fig. 1 is TT&C system functional block diagram of the invention;
Fig. 2 is the structural schematic diagram of test device;
Fig. 3 is test flow chart of the invention.
Specific embodiment
1 to attached drawing 3, the present invention is further elaborated with reference to the accompanying drawing:
A kind of pump closed testing bench control system as depicted in figs. 1 and 2, including test device and control system, Fig. 2 For the top view of test device, test device includes water tank 5, drain tank 4, is evacuated tank 6, vacuum pump 2, gas-liquid separator 3, with And each connecting line, wherein connecting line includes the inlet pipeline for connecting pump 1 and water tank 5 to be measured, 1 rear end of pump to be measured and discharge The flow adjustment pipe between discharge pipe line and displacement can 4 and water tank 5 between tank 4.
Entire test device one shares three road inlet pipelines, three road discharge pipe lines and six road flow adjustment pipes.Test When, according to the model specification and the parameter selections such as rated speed and metered flow inlet pipeline all the way of pump 1 to be measured, drainpipe all the way Road and all the way flow adjustment pipe, inlet pipeline, discharge pipe line, flow adjustment pipe constitute entire test pipeline.Start to be measured After pump 1, water flow enters pump 1 to be measured and obtains after flowing through inlet pipeline from water tank 5 is discharged into drain tank 4 from discharge pipe line after energy, Water tank 5 is flowed back to using flow adjustment pipe, to form a closed circuit.
Gas-liquid separator 3 is connect with the outlet of vacuum pump 2, and pumping tank 6 is connected by the import of exhaust pipe and vacuum pump 2 It connects, there is an open osculum on 3 top of gas-liquid separator, during cavitation testing experiment, need to start vacuum pump 2, suction is taken out Air in gas tank 6, to reduce the inlet pressure of pump 1 to be measured.The gas (containing part water) that vacuum pump 2 aspirates passes through gas-liquid Separator 3 carries out gas-liquid separation, and gas is discharged to airport by the osculum on 3 top of gas-liquid separator, and liquid portion stays in gas In liquid/gas separator 3.In addition, having a water supply pipe between gas-liquid separator 3 and vacuum pump 2, to provide working solution to vacuum pump 2. Each inlet pipeline, discharge pipe line, flow regulation pipe road are connected separately with the electric gate valves 501 of different bores to electric gate valve 512, wherein electric gate valve 501 to electric gate valve 506 is respectively placed in each flow adjustment pipe front end, and electric gate valve 507 is to electronic Gate valve 509 is respectively placed in each inlet pipeline front end, and electric gate valve 510 to electric gate valve 512 is respectively placed in each discharge pipe line front end. Corresponding electric gate valve is opened on the pipeline used during test, and the electric gate valve on the non-test pipeline used closes It closes.Six roads flow adjustment pipe rear end are connected separately with a pneumatic control valve 601 to pneumatic control valve 606, caliber size from Pneumatic control valve 601 to pneumatic control valve 606 is sequentially increased, and during test, by adjusting pneumatic control valve opening value, then may be used To obtain different flow rate working conditions points, to measure revolving speed, power, lift, effect of the pump 1 to be measured under different flow operating condition Rate.Pneumatic on-off valve 701 is placed on the replenishing line of gas-liquid separator 3, and pneumatic on-off valve 702 is placed in the exhaust tube of pumping tank 6 On the road, pneumatic on-off valve 703 is placed on air extraction pipeline, pneumatic on-off valve 704 in pumping tank 6 on replenishing line on, gas Dynamic switch valve 705 is placed in the blowdown pipe road on pumping tank 6, and pneumatic on-off valve 706 is placed in the exhaust outlet of 1 discharge pipe line of pump to be measured On.Manual normally closed switch valve 901 to manual normally closed switch valve 903 is placed on the leakage fluid dram of 1 inlet pipeline of pump to be measured, normally closed manually Switch valve 904 is placed in the manual blowdown pipe road of pumping tank 6, is spare duct, and manual normally closed switch valve 905 is opened with normally closed manually Valve 906 is closed to be respectively placed in the fluid infusion on water tank 5 and drain tank 4.Flowmeter 101 to flowmeter 106 is six not same amounts The flowmeter of journey range is respectively placed on six road flow adjustment pipes between electric gate valve and pneumatic control valve, is met different The measurement request of the flow of the pump to be measured 1 of specifications and models.Pressure sensor 201 to pressure sensor 204 is four different ranges The pressure sensor of range, wherein pressure sensor 201 is placed on 1 inlet pipeline of pump to be measured, to measure 1 inlet-pressure of pump to be measured Power, pressure sensor 202 to pressure sensor 204 are respectively placed on three road discharge pipe lines, meet the survey of the different lifts of pump 1 to be measured Amount requires.Temperature transmitter 301 is connected with water tank 5, the water temperature for measuring system.Torquemeter 401 and torque rotary speed pass Sensor (not shown) matches, for measuring the revolving speed and power of water pump.Motor 801 to motor 803 is different model Motor, motor connect using variable frequency starting mode with frequency converter.Test device further includes two liquidometers, wherein liquidometer LG1 is connect with gas-liquid separator 3, water level and the output of water level high-low signal on real-time display gas-liquid separator 3;Liquid Position meter LG2 connect with water tank 5 and is placed on pumping tank 6, and function is similar with liquidometer LG1.
In addition, inlet pipeline, the number of discharge pipe line and flow adjustment pipe and caliber can be according in actual use It needs the model of pump to be measured 1 of different flow to be tested, bore to arrange in pairs or groups, can increase accordingly or reduce to meet test need It asks.
Control system includes control cabinet and industrial personal computer, and control cabinet using NIcDAQ cabinet and is built in survey in the present embodiment It tries in cabinet, is coupled between NIcDAQ cabinet and industrial personal computer by Ethernet and realize communication;NIcDAQ cabinet includes analog data Capture card, analog data signal controller, digital signal acquiring card and digital signal controller, NIcDAQ cabinet pass through simulation Data that amount data collecting card acquisition pressure sensor, flowmeter, torque rotary speed sensor and temperature transmitter measure and Frequency converter frequency feedback data is transferred to industrial personal computer processing and feedback, and passes through the output control of analog data signal controller Signal in test device pneumatic control valve and frequency converter with adjust the water flow in flow adjustment pipe and setting frequency converter Revolving speed;NIcDAQ cabinet acquires the operating status letter of the status signal of electric gate valve, frequency converter by digital signal acquiring card Number and liquidometer liquid level indication signal, be transferred to industrial personal computer processing and feedback, and by Digital Signals card output letter Number control electric gate valve and pneumatic on-off valve switch and frequency converter and vacuum pump start and stop.
Test program based on labview software programming is installed, test program part mainly includes test in industrial personal computer Interface, test macro status display, the adjusting of test macro operating condition, the storage of test macro judgement of stability, test data.It is logical The program on modification industrial personal computer is crossed, then the TT&C system of different function can be achieved.
As shown in figure 3, being described below the present invention is based on the test method of above-mentioned TT&C system, the test method is as above-mentioned The working principle of TT&C system, the steps include:
(1) pump to be measured is connect with inlet pipeline and discharge pipe line;
(2) test program on opening industrial personal computer, fills in relevant parameter, the model including pump to be measured, and rated speed is specified Flow, impeller diameter, trial operation pneumatic control valve aperture etc.;
(3) test program is run, initialization test interface, test program is according to the model of pump to be measured, rated speed and leaf Wheel diameter automatically selects this test used inlet pipeline, discharge pipe line and flow adjustment pipe, and transmits a signal to each The signal receiver of electric gate valve, then the electric gate valve on the used pipeline of this test automatically opens, this non-test is used Electric gate valve be automatically closed;Electric gate valve has working condition feedback function, can then find to survey in time by test interface Choosing whether for test tube road is correct;Meanwhile test program is automatically according to test device level condition, decide whether to carry out fluid infusion and Tonifying Qi operation;
(4) start pump to be measured, industrial personal computer sends control signals to frequency converter, and the signal includes the amount of starting switch control letter Number and revolving speed set Analog control signal, frequency converter exports corresponding power according to control signal to drive pump to be measured;
(5) carry out trial operation, artificial contrast's industrial personal computer the parameter value that shows of collected parameter value and field instrument, really It is normal to protect each sensor signal transmission, after pump operation to be measured is stablized, opens exhaust valve, pipeline is exhausted;
(6) it is tested for the property experiment, the test program on industrial personal computer compares flow target value and flow actual value automatically, Output control signal, pneumatic control valve automatically adjust aperture according to control signal value size, TT&C system are made to reach target operating condition State records revolving speed, power, inlet pressure, outlet pressure and flow value of the pump to be measured under different operating conditions, and to these data It is handled, obtains performance test curve, to judge whether pump to be measured meets design requirement;
(7) after performance test, cavitation experiment is if desired carried out, then vacuum pump is started by industrial personal computer, to true After sky pump runs well, start cavitation experiment, the test program output control signal on industrial personal computer control pump to be measured flow and Inlet pressure, pneumatic control valve automatically adjust aperture, flow regulative mode and performance test process according to control signal value size In flow regulative mode it is similar, for inlet pressure in such a way that vacuum pump vacuumizes, test program compares inlet pressure automatically Target value and inlet pressure actual value, selection starting are evacuated on the pneumatic on-off valve or air extraction pipeline on tank exhaust pipe After pneumatic on-off valve, adjusting flow and inlet pressure reach predetermined target value, after test system to be measured is stablized, pump to be measured is recorded Revolving speed, power, inlet pressure, outlet pressure and flow value under different operating conditions, and these data are handled, with judgement Whether pump to be measured meets design requirement;
(8) test terminates, and closes pump, vacuum pump and industrial personal computer to be measured.
Embodiment described above, only preferred embodiments of the invention, be not to limit practical range of the invention, therefore it is all according to The equivalent change or modification that structure, feature and principle described in scope of the present invention patent is done, should be included in the present invention In patent claim.

Claims (6)

1. a kind of pump closed testing bench control system, it is characterised in that: including test device and control system, in which:
The test device includes water tank, drain tank, pumping tank and gas-liquid separator, is set between the water tank and pump to be measured It is equipped with the inlet pipeline on 1 tunnel or more, is set gradually on the inlet pipeline along the direction of the inlet pipeline water flow electronic Gate valve, pressure sensor, motor and torque rotary speed sensor, the motor is by Frequency Converter Control;Pump to be measured and the drain tank Between be provided with the discharge pipe line on 1 tunnel or more, successively set on the discharge pipe line along the direction of the discharge pipe line water flow Set electric gate valve and pressure sensor;Connected between the drain tank and the water tank by flow adjustment pipe more than 1 tunnel It connects, sets gradually electric gate valve, flowmeter on the flow regulation pipe road along the direction of the flow adjustment pipe water flow And pneumatic control valve;The pumping tank is mounted on the top of the water tank, and the pumping tank is equipped with exhaust pipe, the pumping Be provided with pneumatic on-off valve on air pipe and connect with vacuum pump air entry, the gas outlet of the vacuum pump by pipeline with it is described Gas-liquid separator is connected, and air extraction pipeline is connected on the exhaust pipe, is equipped with gas on the air extraction pipeline Dynamic switch valve;It is also connected by water supply pipe between the vacuum pump and gas-liquid separator, the gas-liquid separator and the storage Liquidometer is connected separately on water pot;Temperature transmitter for testing water temperature in water tank is installed on the water tank;Institute It states and is respectively arranged with jettron on the replenishing line of water tank, the drain tank, the gas-liquid separator and the pumping tank Valve;
The control system includes control cabinet and industrial personal computer, is coupled between the control cabinet and the industrial personal computer by Ethernet; The control cabinet includes analog data collection card, analog data signal controller, digital signal acquiring card and digital signal Control card, the control cabinet acquire the pressure sensor, the flowmeter, described turn by the analog data collection card The data and the frequency converter frequency feedback data that square speed probe and the temperature transmitter measure are transferred to described Industrial personal computer processing and feedback, and control signal is exported to pneumatic in the test device by analog data signal controller Regulating valve and frequency converter are to adjust the water flow in flow adjustment pipe and set the revolving speed of frequency converter;The control cabinet passes through number Word data acquisition card acquires the operating state signal and the liquidometer of the status signal of the electric gate valve, the frequency converter Liquid level indication signal, be transferred to industrial personal computer processing and feedback, and pass through the Digital Signals card output signal control Make the start and stop of the switch and the frequency converter and the vacuum pump of the electric gate valve and the pneumatic on-off valve.
2. pump closed testing bench control system as described in claim 1, it is characterised in that: the water inlet pipe of the test device Road is additionally provided with manual normally closed switch valve, and the manual normally closed switch valve is located at the electric gate valve and the pressure sensor Between.
3. pump closed testing bench control system as described in claim 1, it is characterised in that: be provided with hand on the pumping tank Dynamic tonifying Qi pipeline, the manual blowdown pipe road are equipped with manual normally closed switch valve.
4. pump closed testing bench control system as described in claim 1, it is characterised in that: the test device includes 3 tunnels The caliber of inlet pipeline, 3 road discharge pipe lines and 6 road flow adjustment pipes, each pipeline is different.
5. the pump closed testing bench control system as described in Claims 1-4 any one, it is characterised in that: the control Case is NIcDAQ cabinet.
6. a kind of test method using pump closed testing bench control system described in Claims 1 to 4 any one, special Sign is: the following steps are included:
(1) pump to be measured is connect with inlet pipeline and discharge pipe line;
(2) test program on industrial personal computer is opened, relevant parameter is filled in, the model including pump to be measured, rated speed, specified stream Amount, impeller diameter, trial operation pneumatic control valve aperture;
(3) test program is run, initialization test interface, for test program according to the model of pump to be measured, rated speed and impeller are straight Diameter automatically selects this test used inlet pipeline, discharge pipe line and flow adjustment pipe, and transmits a signal to each electronic The signal receiver of gate valve, then the electric gate valve on the used pipeline of this test automatically opens, the electricity of this non-test Dynamic gate valve is automatically closed;Electric gate valve has working condition feedback function, can then find testing tube in time by test interface Choosing whether for road is correct;Meanwhile test program decides whether to carry out fluid infusion and tonifying Qi automatically according to test device level condition Operation;
(4) start pump to be measured, industrial personal computer sends control signals to frequency converter, the signal include the amount of starting switch control signal and Revolving speed sets Analog control signal, and frequency converter exports corresponding power according to control signal to drive pump to be measured;
(5) trial operation, the parameter value that shows of artificial contrast's industrial personal computer institute collected parameter value and field instrument, it is ensured that respectively are carried out Sensor signal transmission is normal, after pump operation to be measured is stablized, opens exhaust valve, pipeline is exhausted;
(6) it is tested for the property experiment, the test program on industrial personal computer compares flow target value and flow actual value automatically, output Signal is controlled, pneumatic control valve automatically adjusts aperture according to control signal value size, TT&C system is made to reach target operating condition state, Industrial personal computer records revolving speed, power, inlet pressure, outlet pressure and flow value of the pump to be measured under different operating conditions, and to these numbers According to being handled, to judge whether the comprehensive performance of pump to be measured meets design requirement;
(7) after performance test, cavitation experiment is if desired carried out, then vacuum pump is started by industrial personal computer, to vacuum pump After normal operation, start cavitation experiment, the test program output control signal on industrial personal computer controls flow and the import of pump to be measured Pressure, pneumatic control valve automatically adjust aperture, and the side that inlet pressure is vacuumized by vacuum pump according to control signal value size Formula, test program compare inlet pressure target value and inlet pressure actual value automatically, and selection starting is evacuated on tank exhaust pipe Pneumatic on-off valve on pneumatic on-off valve or air extraction pipeline, adjusts flow and inlet pressure reaches predetermined target value Afterwards, after test system to be measured is stablized, revolving speed, power, inlet pressure, outlet pressure and flow of the pump to be measured under different operating conditions are recorded Value, and these data are handled, to judge whether pump to be measured meets design requirement;
(8) test terminates, and closes pump, vacuum pump and industrial personal computer to be measured.
CN201710286211.XA 2017-04-26 2017-04-26 Pump closed testing bench control system and test method Active CN106979162B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710286211.XA CN106979162B (en) 2017-04-26 2017-04-26 Pump closed testing bench control system and test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710286211.XA CN106979162B (en) 2017-04-26 2017-04-26 Pump closed testing bench control system and test method

Publications (2)

Publication Number Publication Date
CN106979162A CN106979162A (en) 2017-07-25
CN106979162B true CN106979162B (en) 2018-12-04

Family

ID=59341451

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710286211.XA Active CN106979162B (en) 2017-04-26 2017-04-26 Pump closed testing bench control system and test method

Country Status (1)

Country Link
CN (1) CN106979162B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107605722A (en) * 2017-10-20 2018-01-19 四川川润液压润滑设备有限公司 A kind of efficiency of pump detection means and its detection method
CN109114012B (en) * 2018-07-17 2021-01-05 江苏大学 Automatic testing device and method for vane pump
CN109236684A (en) * 2018-10-10 2019-01-18 江苏大学 A kind of pump cavitation state monitoring apparatus and method
CN109709993A (en) * 2018-12-29 2019-05-03 江苏和顺环保有限公司 Liquid level intelligent control method
CN109869325B (en) * 2019-01-29 2019-10-22 山东省农业机械科学研究院 A kind of pump performance automatic test approach and system
CN110566797A (en) * 2019-10-21 2019-12-13 德阳东汽电站机械制造有限公司 Lubricating oil station performance test system and method
CN111089065A (en) * 2019-12-31 2020-05-01 洪恩流体科技有限公司 Equipment, system, method and terminal for automatically detecting characteristics of fire pump
CN112327951A (en) * 2020-12-04 2021-02-05 中国船舶工业集团公司第七0八研究所 Automatic flow control system for water pump hydraulic performance test bed
CN114607590A (en) * 2020-12-08 2022-06-10 南京中船绿洲机器有限公司 Electrical control method based on simultaneous test for marine air compressor
CN113236600A (en) * 2021-06-03 2021-08-10 马震 Pump shaft maintenance strengthening method
CN114151361A (en) * 2021-11-30 2022-03-08 浙江方威检验检测技术有限公司 Factory-leaving detection system for water pump manufacturing automation factory
CN114383664A (en) * 2022-01-18 2022-04-22 北矿机电科技有限责任公司 Automatic measurement system and method for flotation bubble load
CN114593879A (en) * 2022-01-28 2022-06-07 苏州恩都法汽车系统有限公司 Valve test equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635559A (en) * 2012-04-10 2012-08-15 山东省农业机械科学研究所 Closed pipeline device of pump test system
CN203098311U (en) * 2013-03-07 2013-07-31 山东省农业机械科学研究所 Precise closed-type test pipeline of water pump test stand
CN106368960A (en) * 2016-10-27 2017-02-01 广东肯富来泵业股份有限公司 Device and method for detecting critical cavitation point of centrifugal pump
CN206801901U (en) * 2017-04-26 2017-12-26 广东肯富来泵业股份有限公司 Pump closed testing bench control system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001271761A (en) * 2001-02-13 2001-10-05 Kichinosuke Yamamoto Pump effective power deciding method and pump effective power testing method
US7637723B2 (en) * 2005-07-25 2009-12-29 Emerson Electric Co Cavitation detection device and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635559A (en) * 2012-04-10 2012-08-15 山东省农业机械科学研究所 Closed pipeline device of pump test system
CN203098311U (en) * 2013-03-07 2013-07-31 山东省农业机械科学研究所 Precise closed-type test pipeline of water pump test stand
CN106368960A (en) * 2016-10-27 2017-02-01 广东肯富来泵业股份有限公司 Device and method for detecting critical cavitation point of centrifugal pump
CN206801901U (en) * 2017-04-26 2017-12-26 广东肯富来泵业股份有限公司 Pump closed testing bench control system

Also Published As

Publication number Publication date
CN106979162A (en) 2017-07-25

Similar Documents

Publication Publication Date Title
CN106979162B (en) Pump closed testing bench control system and test method
CN206801901U (en) Pump closed testing bench control system
CN103471686B (en) A kind of gas flow standard device and application process thereof
CN106968934B (en) Pump cavitation surplus Auto-Test System and its method
CN104234820B (en) A kind of two turbocharging systems test device and method of testing thereof
CN106351614A (en) Preferred pipe column water drainage gas production simulation device and experiment method
CN106501155A (en) Rock core gas liquid two purpose permeability test device and reservoir damage evaluation method
CN205844014U (en) A kind of drilling fluid online quantitative collection transmitting device
CN104595172B (en) Water pump Auto-Test System
CN205937308U (en) Servovalve nozzle test system
CN108222926A (en) Relief well kill-job analogue experiment installation and method
CN206161492U (en) Can realize becoming penetrant unit of water pressure effect
CN104481971B (en) Torque-type hydraulic pump and hydraulic motor power recovery test platform
CN103499373A (en) Automobile oil tank truck capacity automatic inspection device with self-calibration function and inspection method
CN108301821A (en) Horizontal well takes liquid visual experimental apparatus and method
CN103995544A (en) Control device and method for unsteady flow pumping test flow constancy
CN202210005U (en) Heat energy meter flow full-automatic detection device
CN206709891U (en) A kind of laboratory testing rig of underground drip irrigation system clogging against negative pressure
CN108708709B (en) The device and method of pit shaft inner ring film thickness where measuring vortex drainage gas production tool
CN102305676B (en) Automatic calibrating apparatus on flow of heat energy meter
CN206192840U (en) Dual -purpose permeability testing arrangement of rock core gas -liquid
CN109114012A (en) A kind of vane pump automatic testing equipment and method
CN108775948A (en) A kind of semi-automatic liquid level meter checking device
CN105043600B (en) Intelligent heavy caliber calorimeter detection device and method
CN108843315B (en) Sensing type comprehensive automatic metering device and oil quality calculation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 528131 No. 1 and 3 Hui Cai road, Bai Ni Town, Sanshui District, Foshan, Guangdong

Applicant after: GUANGDONG KENFULAI PUMP CO., LTD.

Applicant after: ZUNYI KENFLO PUMP CO., LTD.

Address before: 528000 14 Riverside Road, Chancheng District, Foshan, Guangdong

Applicant before: GUANGDONG KENFULAI PUMP CO., LTD.

Applicant before: ZUNYI KENFLO PUMP CO., LTD.