CN106968281A - A kind of U-lag groover - Google Patents

A kind of U-lag groover Download PDF

Info

Publication number
CN106968281A
CN106968281A CN201710214670.7A CN201710214670A CN106968281A CN 106968281 A CN106968281 A CN 106968281A CN 201710214670 A CN201710214670 A CN 201710214670A CN 106968281 A CN106968281 A CN 106968281A
Authority
CN
China
Prior art keywords
substrate
guide rod
fixed
latch
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710214670.7A
Other languages
Chinese (zh)
Inventor
陈福坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU KEHONG GEOTECHNICAL ENGINEERING Co Ltd
Original Assignee
JIANGSU KEHONG GEOTECHNICAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU KEHONG GEOTECHNICAL ENGINEERING Co Ltd filed Critical JIANGSU KEHONG GEOTECHNICAL ENGINEERING Co Ltd
Priority to CN201710214670.7A priority Critical patent/CN106968281A/en
Publication of CN106968281A publication Critical patent/CN106968281A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/02Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01CPLANTING; SOWING; FERTILISING
    • A01C5/00Making or covering furrows or holes for sowing, planting or manuring
    • A01C5/06Machines for making or covering drills or furrows for sowing or planting
    • A01C5/062Devices for making drills or furrows
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • E02B11/02Drainage device- laying apparatus, e.g. drainage ploughs

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Soil Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental Sciences (AREA)
  • Soil Working Implements (AREA)

Abstract

The invention discloses a kind of U-lag groover, including mobile vehicle, installation base plate, motor, first arc-shaped guide plate, second arc-shaped guide plate, rotating shaft, helical blade necking tool, U-frame, press section, press section includes mobile jib, first guide rod, second guide rod, first limited block, second limited block, first U-bracket, first pressure roller, second U-bracket, second pressure roller, the first compression spring being located between the first U-bracket and mobile jib is cased with first guide rod, the second compression spring being located between the second U-bracket and mobile jib is cased with second guide rod;The U-frame is located between the rotating shaft and the press section.The groover fluting shapeliness of the present invention, and residual soil can be removed.

Description

A kind of U-lag groover
Technical field
The present invention relates to technical field of water conservancy machinery, and in particular to a kind of U-lag groover.
Background technology
Groover be water conservancy and agriculture field through commonly used engineering machinery, and according to different fluting needs, fluting Shape can be rectangle, it is V-arrangement, U-shaped etc., therefore be divided into many different types of groovers, existing fluting owner To be cut the earth by necking tool, and it is moulding using rectangle frame or U-frame progress, but moulding effect is not ideal enough sometimes.
The content of the invention
Goal of the invention:It is contemplated that overcoming the defect of prior art, there is provided a kind of U-lag groover.
Technical scheme:A kind of U-lag groover, including mobile vehicle, be connected with mobile vehicle installation base plate, be fixed on Motor on installation base plate, the first arc-shaped guide plate being fixed on below installation base plate, it is fixed on below installation base plate Second arc-shaped guide plate, the rotating shaft driven by the motor, the helical blade being arranged in rotating shaft, it is arranged on helical blade On necking tool, be fixedly connected with installation base plate below the installation base plate U-frame, installed in installation base plate lower section The press section being fixedly connected with installation base plate, the press section include be fixedly connected with installation base plate mobile jib, be fixed on mobile jib First guide rod of side, the second guide rod for being fixed on mobile jib opposite side, the first limited block for being fixed on the first guide rod end, fixation The second limited block in the second guide rod end, it is enclosed on the first U-shaped branch that can be slided on first guide rod along the first guide rod Frame, the first pressure roller being arranged between two arms of the first U-bracket, it is enclosed on second guide rod and can be slided along the second guide rod It is cased with being located on dynamic the second U-bracket, the second pressure roller being arranged between two arms of the second U-bracket, first guide rod Be cased with being located on the first compression spring between first U-bracket and mobile jib, second guide rod the second U-bracket and mobile jib it Between the second compression spring;The U-frame is located between the rotating shaft and the press section.
Further, two the first guide rods and two the second guide rods are fixed with the mobile jib, the first U-bracket has two The individual first through hole passed through by the first guide rod, the second U-bracket has two the second through holes passed through by the second guide rod, Mei Ge It is cased with being cased with second compression spring on first compression spring, each second guide rod on one guide rod.
Further, the installation base plate be further fixed on be located at installation base plate below suction section, the extruded parts in Between the U-frame and the suction section, the suction section includes the first suction tube and the second suction tube, first suction tube Include having in the first bend pipe of first level pipe, the first vertical tube, connection first level pipe and the first vertical tube, the first level pipe There are the first blower fan, the bottom flare of first vertical tube;Second suction tube include the second horizontal tube, the second vertical tube, Connecting has the second blower fan, second vertical tube in the second bend pipe of the second horizontal tube and the second vertical tube, second horizontal tube Bottom flare.
Further, the installation base plate includes the first substrate and second substrate being hinged, and the motor is consolidated Determine on the first substrate, the U-frame, press section and suction section are each attached on second substrate;The first substrate side is solid Surely there is the first fixed block with the first jack, the second substrate side is fixed with the second fixed block with third through-hole, Be inserted with the first latch in the third through-hole, the end of first latch has the first limited cap, first limited cap and The first extension spring being enclosed on first latch is connected between second fixed block;The upper surface of the first substrate also has There is the second jack, the second substrate, which has, is inserted with the second latch in fourth hole, the fourth hole, second latch ends Portion has the second limited cap, and the second stretching bullet being enclosed on the second latch is connected between the second substrate and the second limited cap Spring;First and second substrate is in first state and the second state, the first state, the first latch insertion First jack, second latch is not inserted into the second jack, and the angle of the first and second substrate angle that is in is 180 degree;It is described In second state, first latch is not inserted into the first jack, and second latch inserts the second jack, and described first and second The angle that substrate is in is 0 degree.
Further, the quantity of first latch, the first fixed block, the first extension spring and the second fixed block is two It is individual;Two the first fixed blocks are fixed on two relative sides of first substrate;Second latch, the second jack, four-way The quantity of hole and the second extension spring is two.
Further, the thickness of first and second substrate is equal, in the first state, the upper surface of first and second substrate Flush and lower surface is flushed.
Further, the side wall of first vertical tube has multiple first suckers, and the side wall of second vertical tube is with more Individual second sucker.
Further, the mobile vehicle is creeper truck.
Beneficial effect:The groover of the present invention, is broken ground by necking tool, after being crushed using helical blade and guide plate Soil is delivered to both sides, and moulding using U-frame, is compressed using pressure roller, and suction section can aspirate what is remained in groove Hack, moulding effect of ditching are good.
Brief description of the drawings
Fig. 1 is groover first state schematic diagram;
Fig. 2 is the view of groover second;
Fig. 3 is that first and second arc-shaped guide plate arranges schematic diagram;
Fig. 4 is U-frame schematic diagram;
Fig. 5 is press section schematic diagram;
Fig. 6 is suction section schematic diagram.
Embodiment
Reference:1.1 first substrate;1.2 second substrate;1.1.1 the second jack;2 motors;5.1 first arcs Guide plate;5.2 second arc-shaped guide plates;6 rotating shafts;6.1 helical blade;6.2 necking tool;7U shape frames;8 press sections;10 suction sections; 4.1 first fixed blocks;4.2 second fixed blocks;4.3 first limited caps;4.4 first latches;4.5 first extension springs;3.1 second Latch;3.2 second limited caps;3.3 second extension springs;8.3 mobile jib;8.1.1 the first U-bracket;8.1.2 the first pressure roller; 8.1.3 the first guide rod;8.1.4 the first limited block;8.1.5 the first compression spring;8.2.1 the second U-bracket;8.2.2 second press Roller;8.2.3 the second guide rod;8.2.4 the second limited block;8.2.5 the second compression spring;10.1 the first suction tube;10.2 second takes out Suction pipe;10.3 the first blower fan;10.4 the second blower fan.
A kind of U-lag groover, including mobile vehicle, be connected with mobile vehicle installation base plate, be fixed on installation base plate On motor 2, be fixed on below installation base plate the first arc-shaped guide plate 5.1, be fixed on below installation base plate second Arc-shaped guide plate 5.2, the rotating shaft 6 driven by the motor, the helical blade 6.1 being arranged in rotating shaft, it is arranged on spiral Necking tool 6.2 on blade, the U-frame 7 being fixedly connected below the installation base plate with installation base plate, installed in installation The press section 8 being fixedly connected below substrate with installation base plate, the press section includes the mobile jib being fixedly connected with installation base plate 8.3rd, the first guide rod 8.1.3 for being fixed on the side of mobile jib 8.3, the second guide rod 8.2.3 for being fixed on mobile jib opposite side, it is fixed on First limited block 8.1.4 of one guide rod end, the second limited block 8.2.4 for being fixed on the second guide rod end, it is enclosed on described first The the first U-bracket 8.1.1 that can be slided on guide rod along the first guide rod, the be arranged between two arms of the first U-bracket One pressure roller 8.1.2, it is enclosed on second guide rod the second U-bracket 8.2.1 that can be slided along the second guide rod, is arranged on the Be cased with being located on the second pressure roller 8.2.2 between two arms of U-bracket two, first guide rod the first U-bracket and mobile jib it Between the first compression spring, the second compression spring being located between the second U-bracket and mobile jib is cased with second guide rod;Institute U-frame is stated to be located between the rotating shaft and the press section.Two the first guide rods are fixed with the mobile jib and two second are led Bar, the first U-bracket has two first through hole passed through by the first guide rod, and the second U-bracket has two by the second guide rod It is cased with being cased with one second on first compression spring, each second guide rod on the second through hole passed through, each first guide rod Compression spring.The installation base plate is further fixed on being located at the suction section 10 below installation base plate, and the extruded parts is in the U-shaped Between frame and the suction section, the suction section includes the first suction tube 10.1 and the second suction tube 10.2, first suction Pipe is included in the first bend pipe of first level pipe, the first vertical tube, connection first level pipe and the first vertical tube, the first level pipe With the first blower fan 10.3, the bottom flare of first vertical tube;Second suction tube includes the second horizontal tube, second There is the second blower fan 10.4 in second bend pipe of vertical tube, the second horizontal tube of connection and the second vertical tube, second horizontal tube, it is described The bottom flare of second vertical tube.The installation base plate includes the first substrate and second substrate being hinged, the driving Motor is fixed on the first substrate, and the U-frame, press section and suction section are each attached on second substrate;The first substrate Side is fixed with the first fixed block with the first jack, and it is solid that the second substrate side is fixed with second with third through-hole Determine to be inserted with the first latch in block, the third through-hole, the end of first latch has the first limited cap, and described first is spacing The first extension spring being enclosed on first latch is connected between cap and the second fixed block;The upper surface of the first substrate Also there is the second jack, the second substrate, which has, is inserted with the second latch in fourth hole, the fourth hole, described second inserts Pin end has the second limited cap, and second be enclosed on the second latch is connected between the second substrate and the second limited cap and is drawn Stretch spring;First and second substrate is in first state and the second state, the first state, first latch Insert the first jack, second latch is not inserted into the second jack, and the angle of the first and second substrate angle that is in is 180 degree; In second state, first latch is not inserted into the first jack, and second latch inserts the second jack, and described the First, the angle that two substrates are in is 0 degree.First latch, the first fixed block, the number of the first extension spring and the second fixed block Amount is two;Two the first fixed blocks are fixed on two relative sides of first substrate;Second latch, second insert The quantity in hole, fourth hole and the second extension spring is two.The thickness of first and second substrate is equal, first shape In state, the upper surface flush and lower surface of first and second substrate are flushed.The side wall of first vertical tube has multiple first suckers, The side wall of second vertical tube has multiple second suckers.The mobile vehicle is creeper truck.
During fluting operation, first and second substrate is in the first state shown in Fig. 1, and necking tool breaks ground, and helical blade will be broken Soil block afterwards is delivered to ground and dished out under the guiding of first and second guide plate to both sides, and with the movement of mobile vehicle, U-frame is preliminary to U-lag progress moulding, and press section carries out further compacting of pressurizeing to the two side of U-lag, increases moulding effect Really.Two suction tubes can drain into the hack suction of residual the both sides of U-lag, and horn opening can be drawn relatively large broken Soil, first and second sucker can draw the hack of fritter, and the debris that U-shaped groove sidewall can not be compacted (such as finger stone) Also it can be suctioned out by first and second sucker.
Before fluting operation, a hole can be dug first with other machinery, lower helical blade, U-frame, extruding is large enough to hold Portion and suction section, in this case, directly make groover carry out fluting operation with first state.If the machinery do not digged pit is set It is standby, it can proceed as follows:Groover is first switched into the second state as shown in Fig. 2 being cut the earth using helical blade, and it is mobile The segment distance of mobile vehicle one, formed with certain length preliminary groove (length be large enough to hold lower helical blade, U-frame, Press section and suction section), groover is next switched into first state, mobile mobile vehicle is slotted accordingly Operation.
Although the present invention is illustrated and described with regard to preferred embodiment, it is understood by those skilled in the art that Without departing from scope defined by the claims of the present invention, variations and modifications can be carried out to the present invention.

Claims (8)

1. a kind of U-lag groover, it is characterised in that the installation base plate that is connected including mobile vehicle, with mobile vehicle, be fixed on Motor on installation base plate, the first arc-shaped guide plate being fixed on below installation base plate, it is fixed on below installation base plate Second arc-shaped guide plate, the rotating shaft driven by the motor, the helical blade being arranged in rotating shaft, it is arranged on helical blade On necking tool, be fixedly connected with installation base plate below the installation base plate U-frame, installed in installation base plate lower section The press section being fixedly connected with installation base plate, the press section include be fixedly connected with installation base plate mobile jib, be fixed on mobile jib First guide rod of side, the second guide rod for being fixed on mobile jib opposite side, the first limited block for being fixed on the first guide rod end, fixation The second limited block in the second guide rod end, it is enclosed on the first U-shaped branch that can be slided on first guide rod along the first guide rod Frame, the first pressure roller being arranged between two arms of the first U-bracket, it is enclosed on second guide rod and can be slided along the second guide rod It is cased with being located on dynamic the second U-bracket, the second pressure roller being arranged between two arms of the second U-bracket, first guide rod Be cased with being located on the first compression spring between first U-bracket and mobile jib, second guide rod the second U-bracket and mobile jib it Between the second compression spring;The U-frame is located between the rotating shaft and the press section.
2. U-lag groover according to claim 1, it is characterised in that two the first guide rods are fixed with the mobile jib With two the second guide rods, the first U-bracket has two first through hole passed through by the first guide rod, and the second U-bracket has two It is cased with individual the second through hole passed through by the second guide rod, each first guide rod on first compression spring, each second guide rod It is cased with second compression spring.
3. U-lag groover according to claim 1, it is characterised in that the installation base plate is further fixed on being located at and installed Suction section below substrate, the extruded parts is between the U-frame and the suction section, and the suction section is taken out including first Suction pipe and the second suction tube, it is perpendicular that first suction tube includes first level pipe, the first vertical tube, connection first level pipe and first There is the first blower fan, the bottom flare of first vertical tube in first bend pipe of pipe, the first level pipe;Described second Suction tube includes the second bend pipe of the second horizontal tube, the second vertical tube, the second horizontal tube of connection and the second vertical tube, second level There is the second blower fan, the bottom flare of second vertical tube in pipe.
4. U-lag groover according to claim 3, it is characterised in that the installation base plate include being hinged the One substrate and second substrate, the motor are fixed on the first substrate, and the U-frame, press section and suction section are fixed On second substrate;The first substrate side is fixed with the first fixed block with the first jack, the second substrate side It is fixed with the second fixed block with third through-hole, the third through-hole and is inserted with the first latch, the end of first latch With the first limited cap, first be enclosed on first latch is connected between first limited cap and the second fixed block and is drawn Stretch spring;The upper surface of the first substrate also has the second jack, and the second substrate has fourth hole, the four-way The second latch is inserted with hole, the second latch end has the second limited cap, between the second substrate and the second limited cap It is connected with the second extension spring being enclosed on the second latch;First and second substrate is at first state and the second state, In the first state, first latch inserts the first jack, and second latch is not inserted into the second jack, and first and second The angle for the angle that substrate is in is 180 degree;In second state, first latch is not inserted into the first jack, described Two latches insert the second jack, and the angle that first and second substrate is in is 0 degree.
5. U-lag groover according to claim 4, it is characterised in that first latch, the first fixed block, first Extension spring and the quantity of the second fixed block are two, and two the first fixed blocks are fixed on two relative sides of first substrate On;Second latch, the second jack, the quantity of fourth hole and the second extension spring are two.
6. U-lag groover according to claim 4, it is characterised in that the thickness of first and second substrate is equal, institute State in first state, the upper surface flush and lower surface of first and second substrate are flushed.
7. U-lag groover according to claim 1, it is characterised in that the side wall of first vertical tube has multiple One sucker, the side wall of second vertical tube has multiple second suckers.
8. U-lag groover according to claim 1, it is characterised in that the mobile vehicle is creeper truck.
CN201710214670.7A 2017-04-01 2017-04-01 A kind of U-lag groover Pending CN106968281A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710214670.7A CN106968281A (en) 2017-04-01 2017-04-01 A kind of U-lag groover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710214670.7A CN106968281A (en) 2017-04-01 2017-04-01 A kind of U-lag groover

Publications (1)

Publication Number Publication Date
CN106968281A true CN106968281A (en) 2017-07-21

Family

ID=59336163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710214670.7A Pending CN106968281A (en) 2017-04-01 2017-04-01 A kind of U-lag groover

Country Status (1)

Country Link
CN (1) CN106968281A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2521190A1 (en) * 1982-02-11 1983-08-12 Gosselin Claude Manually steered trench digger - has motor operated cutting blades and spoil evacuation by suction
EP0716190A1 (en) * 1994-12-09 1996-06-12 Wirth Maschinen- und Bohrgeräte-Fabrik GmbH Slotting mill
CN201131124Y (en) * 2007-12-12 2008-10-15 潘伟才 A furrowing machine with rotary colter
US20100095560A1 (en) * 2007-01-30 2010-04-22 Ihc Engineering Business Limited Trenching Machines And Methods
CN203066847U (en) * 2012-12-21 2013-07-17 杭州爱知工程车辆有限公司 Reversible step ladder
CN104164898A (en) * 2014-08-29 2014-11-26 湖北楚峰水电工程有限公司 U-shaped trench earthwork heading machine
CN204803948U (en) * 2015-06-17 2015-11-25 杭州汇达绿地有限公司 A groove wall compaction device for gardens ditching construction
CN204959844U (en) * 2015-09-24 2016-01-13 宋海章 Hang ditching machine with adjustable
CN206681052U (en) * 2017-04-01 2017-11-28 江苏科弘岩土工程有限公司 A kind of U-lag groover

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2521190A1 (en) * 1982-02-11 1983-08-12 Gosselin Claude Manually steered trench digger - has motor operated cutting blades and spoil evacuation by suction
EP0716190A1 (en) * 1994-12-09 1996-06-12 Wirth Maschinen- und Bohrgeräte-Fabrik GmbH Slotting mill
US20100095560A1 (en) * 2007-01-30 2010-04-22 Ihc Engineering Business Limited Trenching Machines And Methods
CN201131124Y (en) * 2007-12-12 2008-10-15 潘伟才 A furrowing machine with rotary colter
CN203066847U (en) * 2012-12-21 2013-07-17 杭州爱知工程车辆有限公司 Reversible step ladder
CN104164898A (en) * 2014-08-29 2014-11-26 湖北楚峰水电工程有限公司 U-shaped trench earthwork heading machine
CN204803948U (en) * 2015-06-17 2015-11-25 杭州汇达绿地有限公司 A groove wall compaction device for gardens ditching construction
CN204959844U (en) * 2015-09-24 2016-01-13 宋海章 Hang ditching machine with adjustable
CN206681052U (en) * 2017-04-01 2017-11-28 江苏科弘岩土工程有限公司 A kind of U-lag groover

Similar Documents

Publication Publication Date Title
CN113957912B (en) A slope empty bag department of subsides repair equipment for ground is administered
CN206681052U (en) A kind of U-lag groover
US20160177528A1 (en) Method and Apparatus for Ground Improvement Using Compacted Aggregate Columns
CN106968281A (en) A kind of U-lag groover
CN211571673U (en) Rolling machine for filling soil
KR101089235B1 (en) Flatting device for a sheet pile
CN112459064A (en) Full casing cast-in-situ bored pile casing correcting device and construction method
CN112962384A (en) Temporary road structure for constructional engineering and construction method thereof
CN103909566B (en) A kind of pipe pile mould cleaning device
CN115370298B (en) Highway construction drilling machine
CN116752539A (en) Compaction grouting device for road and bridge construction
CN109339083A (en) Utilize the open caisson construction method of twisting sucker head
KR101804541B1 (en) Apparatus for Punching the Support Flange for Concrete Pile Mold
CN214605210U (en) Ground fluting device for construction
CN111676780B (en) Template of slip form forming machine
CN211849384U (en) Anti-blocking vibration and impact device for foundation treatment
CN110952430B (en) Manufacturing device for filling mold and filling layer combination structure and use method
CN113520229B (en) Sand and soil garbage cleaning device for building construction
CN216074666U (en) Semi-soft pavement polymer grouting equipment
CN111527940A (en) Construction method for installing steel structure of plastic greenhouse
CN104552565A (en) Concrete water tank splicing module fast forming machine
KR101665089B1 (en) A draining device for weak ground
KR102293914B1 (en) Rock collection pipe well construction method
CN218540894U (en) Simple belt type ditch for mine
CN211446825U (en) Flood discharge gate structure

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170721

RJ01 Rejection of invention patent application after publication