CN106968267A - One kind combination strength stem and construction method - Google Patents

One kind combination strength stem and construction method Download PDF

Info

Publication number
CN106968267A
CN106968267A CN201710190381.8A CN201710190381A CN106968267A CN 106968267 A CN106968267 A CN 106968267A CN 201710190381 A CN201710190381 A CN 201710190381A CN 106968267 A CN106968267 A CN 106968267A
Authority
CN
China
Prior art keywords
steel pipe
steel
stem
pipe column
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710190381.8A
Other languages
Chinese (zh)
Other versions
CN106968267B (en
Inventor
吴金兴
吴晓斌
吴晓峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN FUTIAN JIANAN CONSTRUCTION GROUP Co Ltd
Original Assignee
SHENZHEN FUTIAN JIANAN CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN FUTIAN JIANAN CONSTRUCTION GROUP Co Ltd filed Critical SHENZHEN FUTIAN JIANAN CONSTRUCTION GROUP Co Ltd
Priority to CN201710190381.8A priority Critical patent/CN106968267B/en
Publication of CN106968267A publication Critical patent/CN106968267A/en
Application granted granted Critical
Publication of CN106968267B publication Critical patent/CN106968267B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/36Columns; Pillars; Struts of materials not covered by groups E04C3/32 or E04C3/34; of a combination of two or more materials
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

Strength stem is combined the present invention relates to one kind, mainly including pile foundation, cushion cap, steel pipe column, steel pipe stem and shaped steel stem;Pre-buried build-in steel pipe in pile foundation;Build-in steel pipe is connected with steel pipe column locating support in cushion cap;Steel pipe column is installed on steel pipe column locating support top in cushion cap;Steel pipe column top joint steel pipe stem;Steel pipe stem top connecting-type steel core post.By the invention belongs to structural steelwork field, for the construction method of steel pipe column, steel pipe stem, shaped steel stem in high-rise, super-high building structure, effectively reduction engineering cost, accelerates speed of application, applied to can obtain preferable technical economic benefit in Practical Project.

Description

One kind combination strength stem and construction method
Technical field
The present invention relates to one kind combination strength stem and construction method, belong to structural steelwork field, it is adaptable to high-rise, superelevation Steel pipe column, steel pipe stem, the construction of shaped steel stem in layer building structure.
Background technology
With continuing to develop for China's building trade, newly-built architectural style is increasingly diversified, and steel construction is widely used In large public building, in order to meet Architectural Design Requirements so that structure type entered by letter it is numerous, structural section also from unicity to Complicated sex reversal, the exposed complete bright permeable structures form of main structure body uses more and more, processing, installation so to steel construction Propose requirements at the higher level.
Steel construction is managed with the advantages such as its short time limit, easy construction, energy-saving and environmental protection, antidetonation, industrialization production and recycling economy Read and used by more and more building.Architecture structure form is from traditional reinforced concrete structure gradually to steel construction and reinforcing bar The structure type transformation that concrete structure is combined.Especially in some high-rise, high-rise buildings, steel construction already takes up work The principal status of public economy of journey structure.Many need such as use function, structural safety performance, appearance and modeling in order to realize building Ask, when traditional H types, steel beam with box shape steel member can not meet these requirements, the form of steel construction also to diversified development, Some compound section steel members are gradually available in some large-scale engineerings.
The content of the invention
The problem of it is an object of the invention to be constructed for combination strength stem, there is provided one kind combination strength stem and construction party Method, meets the demand of structure construction.
In order to realize above-mentioned technical purpose, present invention employs following technical scheme:
One kind combination strength stem, it is characterised in that mainly include pile foundation 1, cushion cap 9, steel pipe column 12, steel pipe stem 29 and type Steel core post 35;Pre-buried build-in steel pipe 6 in pile foundation 1;Build-in steel pipe 6 is connected with steel pipe column locating support 10 in cushion cap 9;In cushion cap 9 The top of steel pipe column locating support 10 is installed by steel pipe column 12;The top joint steel pipe stem 29 of steel pipe column 12;The top of steel pipe stem 29 connects Direct type steel core post 35.
The bottom of build-in steel pipe 6 sets steel plate 3, and steel plate 3 is welded with steel reinforcement cage reinforcement 2;Set on build-in steel pipe 6 Peg 5 is welded with pile foundation cage bar 4;The top of pile foundation 1 cuts and is provided with PVC disrance sleeves 20 outside the build-in steel pipe 6 of position;Pile foundation 1 Top sets bed course 7;The jacking junction steel plate 19 that the top of build-in steel pipe 6 is set can with the setting of the bottom of steel pipe column locating support 10 Mode positioning support 18 is welded to connect;The top of steel pipe column locating support 10 sets monoblock type junction steel plate 15;Monoblock type junction steel plate Positioning bloom 14 is set on 15;The middle part of steel pipe column locating support 10 sets support to fix ring flat-plate 16;On steel pipe column locating support 10 Sealing steel loop 8 is set.
The steel pipe column 12 is positioned by positioning bloom 14;The bottom of steel pipe column 12 sets steel pipe column to connect ring flat-plate 11; Steel pipe column 12 connects ring flat-plate 11 and monoblock type junction steel plate 15 by the joint steel pipe post of steel pipe column connecting bolt 13;Steel pipe column is connected Ring flat-plate 11 and monoblock type junction steel plate 15 are welded to connect.
The bottom of steel pipe column 12 opens up notch;The locator card 24 set on internal lining pipe 21 passes through notch;Steel pipe column 12 it Between connect through internal lining pipe 21, locator card 24, arc backplate 25, bolt 23 carry out bolt-weld joint;When steel pipe column 12 is installed, use Locating steel frame 27 and jack 26 carry out auxiliary positioning installation.
It is attached between the steel pipe column 12 and steel pipe stem 29 by connecting fin 30;Pass through between connection fin 30 Inner core tube 28 is attached;Steel pipe stem 29 and the lower frame portion of inner core tube 28 set connection ring flat-plate 31 inside core pipe.
The steel pipe stem 29 sets reinforcing bar fixing steel plate 42 with girder connection coupling part;Welded on reinforcing bar fixing steel plate 42 Straight screw sleeve 39;Beam main tendon 43 is connected by straight screw sleeve 39 with reinforcing bar fixing steel plate 42;Reinforcing bar fixing steel plate 42 passes through Positioning screw 41 is positioned;Reinforcing bar fixing steel plate 42 is welded and fixed with steel pipe stem 29 and tooth form backplate 40;Reinforcing bar is determined Hole 45 of vibrating is set on the steel plate 42 of position;Steel pipe stem 29 is provided with tooth form backplate 40 with girder connection junction;Tooth form backplate 40 it Between be attached by inner core tube 28.
It is welded to connect between the steel pipe stem 29 and shaped steel stem 35;The shaped steel connection peg set on shaped steel stem 35 34 weld with steel pipe core column tie-bar 33.
The steel pipe stem 29 is provided with post cage bar 32, post spiral bar 36 and steel pipe stem dowel 37.
The shaped steel stem 35 is provided with shaped steel, post cage bar 32, post spiral bar 36 and shaped steel stem stirrup 38.
The construction method of combinations thereof strength stem, it is characterised in that comprise the following steps:
Step 1: build-in steel pipe 6, steel pipe column locating support 10, the column jecket of steel pipe column 12, steel pipe stem 29, shaped steel stem 35 And connection fin 30 is processed:Build-in steel pipe 6 uses the steel pipe manufacturings of φ 300, two ends welding steel, middle weld stud 5;Steel pipe column Locating support 10, using the steel pipe manufacturings of φ 80, the adjustable positioning support 18 of lower weld, the adjustable positioning lower weld jacking of support 18 Junction steel plate 19, the upper weld monoblock type junction steel plate 15 of steel pipe column locating support 10, the middle part of steel pipe column locating support 10 is set Support fixes welding sealing steel loop 8 on ring flat-plate 16, steel pipe column locating support 10;The making of the column jecket of steel pipe column 12, plate rolling tube The method that welding uses Lincoln weld;Steel pipe stem 29 is rolled using steel plate and is welded;Shaped steel stem 35 is added using segmentation Work, is its floor height per segment length, is welded into " right-angled intersection double H-type " section Steel Column;
Step 2: pile foundation construction:The pre-buried build-in steel pipe 6 in the steel reinforcement cage installation process of pile foundation 1, the bottom steel of build-in steel pipe 6 Plate is welded with steel reinforcement cage reinforcement 2;The peg 5 of build-in steel pipe 6 is welded with pile foundation cage bar 4;The top of pile foundation 1 cuts position The build-in steel pipe 6 put installs PVC disrance sleeves 20;Then pile foundation filling concrete is carried out;
Step 3: steel pipe column locating support 10 is installed and cushion cap 9 is constructed:The top of pile foundation 1 carries out pile crown and cut, and then constructs Bed course 7, the top of build-in steel pipe 6 carries out welded and installed with the bottom of steel pipe column locating support 10 by jacking junction steel plate 19, then Carry out reinforcing bar colligation, model sheetinstallat and concreting;
Step 4: the installation of steel pipe column 12:First section steel pipe column 12 is positioned by positioning bloom 14, and steel pipe column 12 passes through The joint steel pipe post of bolt 13 connects ring flat-plate 11 and monoblock type junction steel plate 15, and ring flat-plate 11 and monoblock type connection are connected to steel pipe column Steel plate 15 is welded;Positioned between steel pipe column 12 by internal lining pipe 21 and locator card 24, pass through bolt 23 and arc protective Plate 25 is attached, and steel pipe column 12 and the link position of arc backplate 25 are welded;
Step 5: steel pipe column 12 and steel pipe core connection:Steel pipe column 12 and steel pipe stem 29 are attached with connection fin 30; Steel pipe column 12 is in termination along slot at axis cutting 4, and the top of steel pipe column 12 is located on flooring 1 meter, and connection fin 30 is inserted In the slot of steel pipe column 12, the slot of steel pipe column 12 carries out reinforcing bar colligation, punching block to this section of post with being connected the full weld of fin 30, then and installed And concreting;
Step 6: at levels beam-column node steel pipe stem 29 connection:Reinforcing bar fixing steel plate 42 passes through positioning screw 41 Positioned, beam main tendon 43 is attached by straight screw sleeve 39 with reinforcing bar fixing steel plate 42, reinforcing bar fixing steel plate 42 and steel Tube core post 29 and tooth form backplate 40 are welded and fixed, and reinforcing bar colligation, punching block are then carried out to the section installs and concreting, Vibrated in concreting process by the hole 45 of vibrating on reinforcing bar fixing steel plate 42;
Step 7: the connection of steel pipe stem 29 and shaped steel stem 35:In the junction of steel pipe stem 29 and shaped steel stem 35, The termination of steel pipe stem 29 along axis cutting 4 at slot, during installation toward slot insert shaped steel and with shape steel web full weld, then it is right The section carries out reinforcing bar colligation, punching block and installed and concreting.
The invention has the characteristics that and beneficial effect:
(1) steel pipe, steel pipe core, H profile steel core combination cylinder accomplish that stress can according to three's stress and the relation of steel quantity consumption OK, economical rationality;
(2) component such as steel pipe column column jecket, steel pipe core, fin core is carried out batch production and made, it is ensured that dimension precision requirement, just In in-site installation, duration and civilized construction are saved;
(3) connected between steel pipe column and the connection of steel pipe core stiffened column, every section of steel pipe core stiffened column using connection fin core Connection construction technique, it is ensured that stiffened column quality of connection.
Brief description of the drawings
Fig. 1 is pile foundation and cushion cap and steel pipe column attachment structure figure;
Fig. 2 is reducing steel pipe column attachment structure figure;
Fig. 3 is isometrical steel pipe column attachment structure figure;
Fig. 4 is erection of steel pipe column positioning schematic diagram;
Fig. 5 is steel pipe column and steel pipe core attachment structure figure;
Fig. 6 is steel pipe stem lintel node connection plan;
Fig. 7 is steel pipe stem lintel node connection profile;
Fig. 8 is that steel pipe stem is connected plan with shaped steel stem;
Fig. 9 is that steel pipe stem is connected sectional view with shaped steel stem;
Figure 10 is steel pipe core column structure figure;
Figure 11 is shaped steel core column structure figure;
In figure:1- pile foundations;2- steel reinforcement cage reinforcements;3- steel plates;4- pile foundation cage bars;5- pegs;6- build-in steel pipes;7- pads Layer;8- sealing steel loops;9- cushion caps;10- steel pipe column locating supports;11- steel pipe columns connect ring flat-plate;12- steel pipe columns;13- steel pipe columns Connecting bolt;14- positions bloom;15- monoblock type junction steel plates;16- supports fix ring flat-plate;17- concrete;18- is adjustable fixed Position support;19- jacking junction steel plates;20-PVC disrance sleeves;21- internal lining pipes;22- reducing steel pipe columns;23- bolts;24- is positioned Card;25- arc backplates;26- jack;27- locating steel frames;28- inner core tubes;29- steel pipe stems;30- connection fins;31- cores Connection ring flat-plate inside pipe;32- post cage bars;33- steel pipe core column tie-bars;34- shaped steel connects peg;35- shaped steel stems;36- post spiral shells Revolve muscle;37- steel pipe stem dowels;38- shaped steel column tie-bars;39- straight screw sleeves;40- tooth form backplates;41- positioning screws; 42- reinforcing bar fixing steel plates;43- beam main tendons;44- beam stirrups;45- vibrates hole.
Embodiment
The construction technical requirement such as reinforcing bar colligation, the interior, concreting of template branch is repeated no more in embodiment of the present invention, weight Point illustrates embodiments of the present invention, the present invention is described in further detail below in conjunction with the accompanying drawings and by embodiment, this is said It is bright to be not limited to following examples.
Fig. 1 is pile foundation and cushion cap and steel pipe column attachment structure figure, and Fig. 2 is reducing steel pipe column attachment structure figure, and Fig. 3 is isometrical Steel pipe column attachment structure figure, Fig. 4 is erection of steel pipe column positioning schematic diagram, and Fig. 5 is steel pipe column and steel pipe core attachment structure figure, Fig. 6 Steel pipe stem lintel node connection plan, Fig. 7 is steel pipe stem lintel node connection profile, Fig. 8 be steel pipe stem with Shaped steel stem connects plan, and Fig. 9 is that steel pipe stem is connected sectional view with shaped steel stem, and Figure 10 is steel pipe core column structure figure, figure 11 be shaped steel core column structure figure.
Combination strength stem as shown in Figure 1 mainly includes pile foundation 1, cushion cap 9, steel pipe column 12, steel pipe stem 29 and shaped steel core Post 35;Pre-buried build-in steel pipe 6 in pile foundation 1;Build-in steel pipe 6 is connected with steel pipe column locating support 10 in cushion cap 9;Steel pipe in cushion cap 9 The top of post locating support 10 is installed by steel pipe column 12;The top joint steel pipe stem 29 of steel pipe column 12;The top connecting-type of steel pipe stem 29 Steel core post 35.
Build-in steel pipe 6 is embedded with pile foundation 1, the bottom of build-in steel pipe 6 is provided with steel plate 3, steel plate 3 and steel reinforcement cage reinforcement 2 Welding.The peg 5 set on build-in steel pipe 6 is welded with pile foundation cage bar 4;The top of pile foundation 1 cuts the outer setting of build-in steel pipe 6 of position There are PVC disrance sleeves 20;The top of pile foundation 1 sets bed course 7;Jacking junction steel plate 19 and steel pipe column that the top of build-in steel pipe 6 is set The adjustable positioning support 18 that the bottom of locating support 10 is set is welded;The top of steel pipe column locating support 10 sets monoblock type junction steel plate 15;Positioning bloom 14 is set on monoblock type junction steel plate 15;The middle part of steel pipe column locating support 10 sets support to fix ring flat-plate 16;Steel Sealing steel loop 8 is set on tubing string locating support 10.Steel pipe column 12 is positioned by positioning bloom 14;The bottom of steel pipe column 12 is set Steel pipe column connects ring flat-plate 11;Steel pipe column 12 connects ring flat-plate 11 by the joint steel pipe post of steel pipe column connecting bolt 13 and monoblock type is connected Steel plate 15;Steel pipe column connects ring flat-plate 11 and monoblock type junction steel plate 15 is welded to connect.
As shown in figs. 2 to 4, the bottom of steel pipe column 12 opens up notch;The locator card 24 set on internal lining pipe 21 passes through notch;Steel Internal lining pipe 21, locator card 24, arc backplate 25, bolt 23 are connected through between tubing string 12 and carries out bolt-weld joint;Steel pipe column 12 is pacified During dress, auxiliary positioning installation is carried out using locating steel frame 27 and jack 26.
As shown in figure 5, being attached between steel pipe column 12 and steel pipe stem 29 by connecting fin 30;Connect fin 30 it Between be attached by inner core tube 28;Steel pipe stem 29 and the lower frame portion of inner core tube 28 set connection ring flat-plate inside core pipe 31。
As shown in figs. 6-7, steel pipe stem 29 sets reinforcing bar fixing steel plate 42 with girder connection coupling part;Reinforcing bar positions steel Straight screw sleeve 39 is welded on plate 42;Beam main tendon 43 is connected by straight screw sleeve 39 with reinforcing bar fixing steel plate 42;Reinforcing bar is positioned Steel plate 42 is positioned by positioning screw 41;Reinforcing bar fixing steel plate 42 carries out welding solid with steel pipe stem 29 and tooth form backplate 40 It is fixed;Hole 45 of vibrating is set on reinforcing bar fixing steel plate 42;Steel pipe stem 29 is provided with tooth form backplate 40 with girder connection junction;Tooth form It is attached between backplate 40 by inner core tube 28.
Lead to as shown in Fig. 8~9, between steel pipe stem 29 and shaped steel stem 35 and be welded to connect;Set on shaped steel stem 35 Shaped steel connects peg 34 and carries out welding positioning with steel pipe core column tie-bar 33.
As shown in Figure 10, steel pipe stem 29 is provided with steel pipe stem 29, post cage bar 32, post spiral bar 36, steel pipe stem and connected Connect muscle 37.
As shown in figure 11, steel core post is provided with shaped steel, post cage bar 32, post spiral bar 36, shaped steel stem stirrup 38.
The main construction course for combining the construction of strength stem is as follows:
Step 1: build-in steel pipe 6, steel pipe column locating support 10, the column jecket of steel pipe column 12, steel pipe stem 29, shaped steel stem 35 And connection fin 30 is processed:Build-in steel pipe 6 makes, and build-in steel pipe 6 uses the steel pipe manufacturings of φ 300, two ends welding steel, centre weldering Connect peg 5;Steel pipe column locating support 10, using the steel pipe manufacturings of φ 80, the adjustable positioning support 18 of steel pipe lower weld is adjustable fixed The position lower weld jacking junction steel plate 19 of support 18, the upper weld monoblock type junction steel plate 15 of steel pipe column locating support 10, steel pipe column The middle part of locating support 10 sets support to fix welding sealing steel loop 8 on ring flat-plate 16, steel pipe column locating support 10;The column jecket of steel pipe column 12 Making, plate rolling tube welding using Lincoln weld method, electric current, voltage and speed of welding should be joined by technique during welding Number and related guidelines, all weld seams all should meet the requirement of first-order weld, and 100% ultrasonic examination inspection is carried out in accordance with regulations Look into;The making of steel pipe stem 29, steel pipe core is rolled using Q235B steel plates and is welded;The making of shaped steel stem 35;Shaped steel stem 35 segmental machinings, are its floor height per segment length, wherein one H type are cut into two shaped steel, and use CO2Gas shield It is welded into " right-angled intersection double H-type " section Steel Column;The making of fin 30 is connected, fin core is radially welded in seamless steel pipe footpath 4 steel plates are connect, steel plate thickness, length press design requirement.Fin core be used for levels post steel pipe column 12 and steel pipe stem 29 it Between connection and for the connection between steel pipe stem 29, width stretches out 10mm on the outside of the pipe of steel pipe column 12, meets welding requirements, in The heart, which is stayed, connects mouth under the soldering and sealing core pipe of ring flat-plate 31 inside the core pipe in φ 100mm holes.
Step 2: pile foundation construction:The pre-buried build-in steel pipe 6 in the steel reinforcement cage installation process of pile foundation 1, the bottom steel of build-in steel pipe 6 Plate is welded with steel reinforcement cage reinforcement 2;The peg 5 of build-in steel pipe 6 is welded with pile foundation cage bar 4;The top of pile foundation 1 cuts position The build-in steel pipe 6 put installs PVC disrance sleeves 20;Then pile foundation filling concrete is carried out.
Step 3: steel pipe column locating support 10 is installed and cushion cap 9 is constructed:The top of pile foundation 1 carries out pile crown and cut, and then constructs Bed course 7, the top of build-in steel pipe 6 carries out welded and installed with the bottom of steel pipe column locating support 10 by jacking junction steel plate 19, then Carry out reinforcing bar colligation, model sheetinstallat and concreting.
Step 4: the installation of steel pipe column 12:First section steel pipe column 12 is positioned by positioning bloom 14, and steel pipe column 12 passes through The joint steel pipe post of bolt 13 connects ring flat-plate 11 and monoblock type junction steel plate 15, and ring flat-plate 11 and monoblock type connection are connected to steel pipe column Steel plate 15 is welded;Positioned between steel pipe column 12 by internal lining pipe 21 and locator card 24, pass through bolt 23 and arc protective Plate 25 is attached, and steel pipe column 12 and the link position of arc backplate 25 are welded.
Step 5: steel pipe column 12 and steel pipe core connection:Steel pipe column 12 and steel pipe stem 29 are attached with connection fin 30. Steel pipe column 12 is in termination along slot at axis cutting 4, and a length of design length of slot, the top of steel pipe column 12 is located on flooring 1 meter, The steel pipe stem 29 of the produced connection core of fin 30 in prior two ends is inserted in the slot of steel pipe column 12, the slot of steel pipe column 12 and company The full weld of fin 30 is connect, and ensures the three same circularity of pipe, reinforcing bar colligation, punching block installation and concrete are then carried out to this section of post and is poured Build.
Step 6: at levels beam-column node steel pipe stem 29 connection:Reinforcing bar fixing steel plate 42 passes through positioning screw 41 Positioned, beam main tendon 43 is attached by straight screw sleeve 39 with reinforcing bar fixing steel plate 42, reinforcing bar fixing steel plate 42 and steel Tube core post 29 and tooth form backplate 40 are welded and fixed, and reinforcing bar colligation, punching block are then carried out to the section installs and concreting, Vibrated in concreting process by the hole 45 of vibrating on reinforcing bar fixing steel plate 42.
Step 7: the connection of steel pipe stem 29 and shaped steel stem 35:In the junction of steel pipe stem 29 and shaped steel stem 35, In the termination of steel pipe stem 29 slot, a height of design height of slot at 4 are cut along axis.Toward slot insertion shaped steel and and type during installation Steel web full weld, then carries out reinforcing bar colligation, punching block to the section and installs and concreting.

Claims (10)

1. one kind combination strength stem, it is characterised in that mainly including pile foundation (1), cushion cap (9), steel pipe column (12), steel pipe stem And shaped steel stem (35) (29);Pre-buried build-in steel pipe (6) in pile foundation (1);Build-in steel pipe (6) is positioned with steel pipe column in cushion cap (9) Support (10) is connected;Steel pipe column (12) is installed on steel pipe column locating support (10) top in cushion cap (9);Steel pipe column (12) top is connected Steel pipe stem (29);Steel pipe stem (29) top connecting-type steel core post (35).
2. strength stem is combined as claimed in claim 1, it is characterised in that build-in steel pipe (6) bottom sets steel plate (3), steel Plate (3) is welded with steel reinforcement cage reinforcement (2);The peg (5) set on build-in steel pipe (6) is welded with pile foundation cage bar (4);Pile foundation (1) top cuts and is provided with PVC disrance sleeves (20) outside the build-in steel pipe (6) of position;Pile foundation (1) top sets bed course (7);It is embedding The adjustable positioning support that the jacking junction steel plate (19) that steel pipe Gu (6) top is set is set with steel pipe column locating support (10) bottom (18) it is welded to connect;Steel pipe column locating support (10) top sets monoblock type junction steel plate (15);Monoblock type junction steel plate (15) It is upper that positioning bloom (14) is set;Support is set to fix ring flat-plate (16) in the middle part of steel pipe column locating support (10);Steel pipe column locating support (10) sealing steel loop (8) is set on.
3. strength stem is combined as claimed in claim 1, it is characterised in that the steel pipe column (12) is entered by positioning bloom (14) Row positioning;Steel pipe column (12) bottom sets steel pipe column to connect ring flat-plate (11);Steel pipe column (12) passes through steel pipe column connecting bolt (13) Joint steel pipe post connection ring flat-plate (11) and monoblock type junction steel plate (15);Steel pipe column connection ring flat-plate (11) and monoblock type junction steel plate (15) it is welded to connect.
4. strength stem is combined as claimed in claim 1, it is characterised in that steel pipe column (12) bottom opens up notch;Internal lining pipe (21) locator card (24) set on passes through notch;Internal lining pipe (21), locator card (24), arc are connected through between steel pipe column (12) Shape backplate (25), bolt (23) carry out bolt-weld joint.
5. strength stem is combined as claimed in claim 1, it is characterised in that between the steel pipe column (12) and steel pipe stem (29) It is attached by connecting fin (30);It is attached between connection fin (30) by inner core tube (28);Steel pipe stem (29) Connection ring flat-plate (31) inside core pipe is set with inner core tube (28) lower frame portion.
6. strength stem is combined as claimed in claim 1, it is characterised in that steel pipe stem (29) is set with girder connection coupling part Reinforcing bar fixing steel plate (42);Straight screw sleeve (39) is welded on reinforcing bar fixing steel plate (42);Beam main tendon (43) passes through straight thread set Cylinder (39) is connected with reinforcing bar fixing steel plate (42);Reinforcing bar fixing steel plate (42) is positioned by positioning screw (41);Reinforcing bar is determined Position steel plate (42) is welded and fixed with steel pipe stem (29) and tooth form backplate (40);Set and vibrate on reinforcing bar fixing steel plate (42) Hole (45);Steel pipe stem (29) is provided with tooth form backplate (40) with girder connection junction;Tooth form backplate passes through inner core between (40) Pipe (28) is attached.
7. combination strength stem as claimed in claim 1, it is characterised in that the steel pipe stem (29) and shaped steel stem (35) it Between be welded to connect;The shaped steel connection peg (34) set on shaped steel stem (35) is welded with steel pipe core column tie-bar (33).
8. structure as claimed in claim 1, it is characterised in that the steel pipe stem (29) sets post cage bar (32), post spiral bar And steel pipe stem dowel (37) (36).
9. structure as claimed in claim 1, it is characterised in that the shaped steel stem (35) be provided with shaped steel, post cage bar (32), Post spiral bar (36) and shaped steel stem stirrup (38).
10. a kind of construction method for combining strength stem, it is characterised in that comprise the following steps:
Step 1: build-in steel pipe (6), steel pipe column locating support (10), steel pipe column (12) column jecket, steel pipe stem (29), shaped steel core Post (35) and connection fin (30) processing:Build-in steel pipe (6) uses the steel pipe manufacturings of φ 300, two ends welding steel, middle weld stud Follow closely (5);Steel pipe column locating support (10), using the steel pipe manufacturings of φ 80, the adjustable positioning support (18) of lower weld, adjustable positioning Support (18) lower weld jacking junction steel plate (19), steel pipe column locating support (10) upper weld monoblock type junction steel plate (15), Set support to fix in the middle part of steel pipe column locating support (10) and sealing steel loop is welded on ring flat-plate (16), steel pipe column locating support (10) (8);The making of steel pipe column (12) column jecket, the method welded using Lincoln weld of plate rolling tube;Steel pipe stem (29) is used Steel plate, which is rolled, to be welded;Shaped steel stem (35) uses segmental machining, is its floor height per segment length, is welded into " the double H of right-angled intersection Type " section Steel Column;
Step 2: pile foundation construction:The pre-buried build-in steel pipe (6) in pile foundation (1) steel reinforcement cage installation process, build-in steel pipe (6) bottom Steel plate is welded with steel reinforcement cage reinforcement (2);The peg (5) of build-in steel pipe (6) is welded with pile foundation cage bar (4);Pile foundation (1) top cuts build-in steel pipe (6) the installation PVC disrance sleeves (20) of position;Then pile foundation filling concrete is carried out;
Step 3: steel pipe column locating support (10) is installed and cushion cap (9) construction:Pile foundation (1) top carries out pile crown and cut, Ran Houshi Welded with steel pipe column locating support (10) bottom by jacking junction steel plate (19) on work bed course (7), build-in steel pipe (6) top Install, then carry out reinforcing bar colligation, model sheetinstallat and concreting;
Step 4: the installation of steel pipe column (12):First section steel pipe column (12) is positioned by positioning bloom (14), steel pipe column (12) Ring flat-plate (11) and monoblock type junction steel plate (15) are connected by bolt (13) joint steel pipe post, and ring flat-plate (11) is connected to steel pipe column Welded with monoblock type junction steel plate (15);Determined between steel pipe column (12) by internal lining pipe (21) and locator card (24) Position, is attached, and steel pipe column (12) and arc backplate (25) link position are entered by bolt (23) and arc backplate (25) Row welding;
Step 5: steel pipe column (12) and steel pipe core connection:Steel pipe column (12) and steel pipe stem (29) are carried out with connection fin (30) Connection;Steel pipe column (12) is in termination along slot at axis cutting 4, and the top of steel pipe column (12) is located on flooring 1 meter, will connect wing In piece (30) insertion steel pipe column (12) slot, steel pipe column (12) slot is then carried out with being connected fin (30) full weld to this section of post Reinforcing bar colligation, punching block are installed and concreting;
Step 6: at levels beam-column node steel pipe stem (29) connection:Reinforcing bar fixing steel plate (42) passes through positioning screw (41) positioned, beam main tendon (43) is attached by straight screw sleeve (39) with reinforcing bar fixing steel plate (42), reinforcing bar positioning Steel plate (42) is welded and fixed with steel pipe stem (29) and tooth form backplate (40), then carries out reinforcing bar colligation, punching block to the section Install and concreting, vibrated in concreting process by the hole of vibrating (45) on reinforcing bar fixing steel plate (42);
Step 7: the connection of steel pipe stem (29) and shaped steel stem (35):In the company of steel pipe stem (29) and shaped steel stem (35) Place is met, in steel pipe stem (29) termination along slot at axis cutting 4, shaped steel is inserted and full with shape steel web toward slot during installation Weldering, then carries out reinforcing bar colligation, punching block to the section and installs and concreting.
CN201710190381.8A 2017-03-28 2017-03-28 Combined stiffening core column and construction method Active CN106968267B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710190381.8A CN106968267B (en) 2017-03-28 2017-03-28 Combined stiffening core column and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710190381.8A CN106968267B (en) 2017-03-28 2017-03-28 Combined stiffening core column and construction method

Publications (2)

Publication Number Publication Date
CN106968267A true CN106968267A (en) 2017-07-21
CN106968267B CN106968267B (en) 2023-04-28

Family

ID=59336929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710190381.8A Active CN106968267B (en) 2017-03-28 2017-03-28 Combined stiffening core column and construction method

Country Status (1)

Country Link
CN (1) CN106968267B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208823A (en) * 2018-11-12 2019-01-15 安徽工程大学 It is a kind of can quick assembling built-in steel-case formula steel core concrete column and its production technology

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130076072A (en) * 2011-12-28 2013-07-08 주식회사 포스코 Steel socket and apparatus connecting steel pile steel column using the same
CN103276899A (en) * 2013-06-05 2013-09-04 中国建筑第八工程局有限公司 Construction method of steel bars surrounding steel column base
CN103967129A (en) * 2014-05-23 2014-08-06 东北石油大学 Combination column and combination beam frame with internally-arranged pipe high-strength concrete core columns and construction method thereof
CN103967128A (en) * 2014-05-23 2014-08-06 东北石油大学 Combination column and combination beam frame with internally-arranged high-strength concrete core columns and construction method thereof
CN205153131U (en) * 2015-10-14 2016-04-13 中铁五局集团路桥工程有限责任公司 Shaped steel concrete combination column structure at overhead station of urban rail transit
CN206768843U (en) * 2017-03-28 2017-12-19 深圳市福田建安建设集团有限公司 One kind combination strength stem

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130076072A (en) * 2011-12-28 2013-07-08 주식회사 포스코 Steel socket and apparatus connecting steel pile steel column using the same
CN103276899A (en) * 2013-06-05 2013-09-04 中国建筑第八工程局有限公司 Construction method of steel bars surrounding steel column base
CN103967129A (en) * 2014-05-23 2014-08-06 东北石油大学 Combination column and combination beam frame with internally-arranged pipe high-strength concrete core columns and construction method thereof
CN103967128A (en) * 2014-05-23 2014-08-06 东北石油大学 Combination column and combination beam frame with internally-arranged high-strength concrete core columns and construction method thereof
CN205153131U (en) * 2015-10-14 2016-04-13 中铁五局集团路桥工程有限责任公司 Shaped steel concrete combination column structure at overhead station of urban rail transit
CN206768843U (en) * 2017-03-28 2017-12-19 深圳市福田建安建设集团有限公司 One kind combination strength stem

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208823A (en) * 2018-11-12 2019-01-15 安徽工程大学 It is a kind of can quick assembling built-in steel-case formula steel core concrete column and its production technology
CN109208823B (en) * 2018-11-12 2024-03-08 安徽工程大学 Quick-assembly built-in steel box type concrete filled steel tube column and production process thereof

Also Published As

Publication number Publication date
CN106968267B (en) 2023-04-28

Similar Documents

Publication Publication Date Title
CN105625570B (en) A kind of prefabricated beam column attachment means and preparation method thereof
CN106988483A (en) A kind of assembled steel reinforced Concrete U Vierendeel girder and its construction method
CN104775516B (en) Field connecting method among prefabricated reinforced concrete columns
WO2018214477A1 (en) Prefabricated dual-steel-tube concrete shear wall, and assembly method therefor
CN205777098U (en) A kind of detachable assembling type concrete-filled circular steel tube column
CN201339250Y (en) Stiffness structure framework beam preformed steel reinforcement framework structure
CN107288218A (en) A kind of assembled steel tendon concrete frame structure bean column node and preparation method thereof
CN109372129A (en) The novel full assembly concrete frame joint of one kind and its construction method
CN105908864A (en) Interface crack preventing structure for filling brickwork and framework shear wall and construction method
CN101936170A (en) Cavern arch mould spraying concrete construction structure and process
CN107938837A (en) A kind of steel core concrete column and beam main tendon connecting node and construction method
CN106320704A (en) Steel reinforced concrete structure formwork sleeve threaded rod pulling construction method
CN208669320U (en) The anti-horizontal ovalizing deflection shield tunnel ruggedized construction of pre-embedded steel slab
CN206917087U (en) A kind of prefabricated assembling type reinforced concrete framework open tubular column and its making mould
CN107355008B (en) Prefabricated connection structure and method for newly added concrete filled steel tubular column and existing structure
CN107366353B (en) A kind of assembled steel reinforced concrete frame column with variable cross-sections and its construction method
CN206157913U (en) Assembled square steel tube concrete post and girder steel connected node
CN106760502A (en) Shear wall end cylinder construction method
CN102619286B (en) Connecting joint of steel pipe concrete column and profile steel concrete beam
CN207685996U (en) A kind of steel core concrete column and beam main tendon connecting node
CN206768843U (en) One kind combination strength stem
CN206768852U (en) Combine strength stem suspension column supporting construction
CN206844316U (en) A kind of assembled steel reinforced concrete column with well and post splicing node
CN206752693U (en) A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node
CN107217790A (en) A kind of prefabricated assembling type reinforced concrete framework open tubular column and its construction method

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant