CN106967858A - A kind of converter slag ladle movement system and technique - Google Patents

A kind of converter slag ladle movement system and technique Download PDF

Info

Publication number
CN106967858A
CN106967858A CN201710327820.5A CN201710327820A CN106967858A CN 106967858 A CN106967858 A CN 106967858A CN 201710327820 A CN201710327820 A CN 201710327820A CN 106967858 A CN106967858 A CN 106967858A
Authority
CN
China
Prior art keywords
slag ladle
track
slag
carriage
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710327820.5A
Other languages
Chinese (zh)
Inventor
崔荣峰
钱永辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huatian Engineering and Technology Corp MCC
Original Assignee
Huatian Engineering and Technology Corp MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huatian Engineering and Technology Corp MCC filed Critical Huatian Engineering and Technology Corp MCC
Priority to CN201710327820.5A priority Critical patent/CN106967858A/en
Publication of CN106967858A publication Critical patent/CN106967858A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B3/00General features in the manufacture of pig-iron
    • C21B3/04Recovery of by-products, e.g. slag
    • C21B3/06Treatment of liquid slag
    • C21B3/10Slag pots; Slag cars

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

The present invention discloses a kind of converter slag ladle movement system.Designed mainly for the direct motion transport of slag, including transport crane and the first track and the second track that are arranged between converter and slag car treatment region;The first slag ladle and carriage is provided with one end correspondence converter of first track, first track;The second slag ladle and carriage is provided with the second track correspondence slag treatment area, second track;The transhipment crane includes being provided with crane on the aerial conveyor above the first track and the second track, the aerial conveyor.The present invention realizes transhipment of the slag ladle on two slag cars, solves the interference between the slag car and factory building structures by the transhipment crane being arranged on above track, it is ensured that the direct motion transport of slag.

Description

A kind of converter slag ladle movement system and technique
Technical field
The present invention relates to a kind of converter slag ladle movement system and technique, belong to process for making and metallurgical solid waste field.
Background technology
Iron and steel enterprise is the basic industry of national economy, under the fast-developing situation of national economy, and output of steel is in recent years not Disconnected to improve, China's crude steel output statistics of 2015 reaches 8.04 hundred million tons.Slag as process for making flow derivative, with The raising of output of steel, slag yield is also continuously increased.Counted according to update, China's slag is accumulative at present to store up nearly 1,000,000,000 tons, Data display steel slag utilization rate is very low, and the target apart from iron and steel enterprise's solid waste " zero-emission " is still remote.
(such as slag treatment is on supply line across factory building columns) can not be realized and slag tap for various reasons in slag treatment workshop The smooth of line passes through, and the slag line direct motion that goes out to steelshop causes certain difficulty, for this technology arrangement situation, has Producer, which takes, embraces tank car to realize, but the investment of armful tank car and maintenance cost are very high, also needs increase workshop to work accordingly Staffing, it is very uneconomical.
The content of the invention
Transported in view of the above-mentioned problems, the present invention provides a kind of converter for the direct motion transport that can realize slag of coming out of the stove with slag ladle System.
To reach above-mentioned purpose, a kind of converter slag ladle movement system of the invention, including transhipment crane and being arranged on The first track and the second track between converter and slag car treatment region;
The first slag ladle and carriage is provided with one end correspondence converter of first track, first track;
The second slag ladle and carriage is provided with the second track correspondence slag treatment area, second track;
The transhipment crane is included on the aerial conveyor above the first track and the second track, the aerial conveyor It is provided with for by slag ladle, a slag ladle and carriage to be hung to the crane of another slag ladle and carriage therefrom.
Further, one end first car stop of first track away from converter, first car stop is used to make first Slag ladle and carriage is rested on below aerial conveyor.
Further, the described one end of second track away from slag treatment area is provided with the second car stop, second car stop For making the second slag ladle and carriage rest on below aerial conveyor.
Further, the travel switch for controlling crane to rest in precalculated position, institute are provided with the aerial conveyor Travel switch is stated to electrically connect with crane drive device.
Further, the side wall of slag ladle is provided with the distance between some hangers, two neighboring hanger along along same axis It is identical;The crane is provided with to be adapted with the one-to-one suspension hook of hanger, the suspension hook with the hanger.
The present invention is had bad luck slag ladle by transporting crane on two slag ladles and carriages, realizes the spatial displacement of slag ladle, from And realize the direct motion transport of slag.
Transported in view of the above-mentioned problems, the present invention provides a kind of converter for the direct motion transport that can realize slag of coming out of the stove with slag ladle Technique.
To reach the first rail is arranged with parallel on above-mentioned purpose, a kind of converter of the invention slag ladle transhipment technique, ground The first slag for transporting slag ladle is provided with road and the second track, the first track correspondence converter, first track Tank car;The second slag ladle and carriage for transporting slag ladle is provided with the second track correspondence slag treatment area, second track; The transhipment for slag ladle to be hung to the second slag ladle and carriage from the first slag ladle and carriage is provided with above first track and the second track Crane, the technique includes:Slag ladle and carriage along rail running to transhipment crane lower section;Transhipment crane hangs the slag ladle on slag ladle and carriage Extremely arrive another slag ladle and carriage.
Converter of the present invention slag ladle transhipment technique, is had bad luck slag ladle by transporting crane on two slag ladles and carriages, The spatial displacement of slag ladle is realized, so as to realize the direct motion transport of slag.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the sectional view in Fig. 1 along A-A.
Embodiment
With reference to Figure of description, the present invention will be further described.
Embodiment 1
A kind of converter slag ladle movement system of the present invention, including transport crane and be arranged on converter and slag car processing The first track 2 and the second track 9 between area;
The first slag ladle and carriage 4 is provided with one end correspondence converter 1 of first track 2, first track;
The second slag ladle and carriage 8 is provided with the second track correspondence slag treatment area, second track;
The transhipment crane is included on the aerial conveyor above the first track and the second track, the aerial conveyor It is provided with for by slag ladle 3, a slag ladle and carriage to be hung to the crane 6 of another slag ladle and carriage therefrom.
Specific first slag ladle and carriage, the second slag ladle and carriage are the electronic slag car, and the scope of the speed of service is 20~30m/ min.The model of first track and the second track is QU120.It is described transhipment crane rise a liter weight be:Q=70t (11m3Slag ladle), the lifting velocity interval of suspension hook is:10~40m/min;Cart travel speed scope is 10~80/min.
Embodiment 2
As the concrete scheme of embodiment 1, one end first car stop 5 of first track away from converter, the first car stop is used for The first slag ladle and carriage is set to rest on below aerial conveyor.By setting car stop slag ladle and carriage can be made to be parked in pre-determined bit in the present embodiment Put, provide convenient for the transhipment of slag ladle.
Embodiment 3
As the concrete scheme of embodiment 1, the one end of the second track away from slag treatment area is provided with the second car stop 7, institute Stating the second car stop 7 is used to make the second slag ladle and carriage rest on below aerial conveyor.By setting car stop to make slag in the present embodiment Tank car is parked in precalculated position, provides convenient for the transhipment of slag ladle.
Embodiment 4
As the concrete scheme of embodiment 1, it is provided with the aerial conveyor for controlling crane to rest in precalculated position Travel switch, the travel switch electrically connects with crane drive device.Can be with by the travel switch of setting in the present embodiment Crane is accurately rested on specified location, be that the lifting transhipment of slag ladle is brought convenience.
Embodiment 5
As the concrete scheme of embodiment 1, the side wall of slag ladle is provided with some hangers along along same axis, two neighboring to hang The distance between ear is identical;The crane is provided with to be adapted with the one-to-one suspension hook of hanger, the suspension hook with the hanger. In the present embodiment by set some suspension hooks ensure that slag ladle sling transhipment during do not turn on one's side, it is ensured that slag ladle it is steady Transhipment.
Embodiment 6
The first track and the second track, institute are arranged with parallel on a kind of converter slag ladle transhipment technique of the present invention, ground State the first slag ladle and carriage being provided with the first track correspondence converter, first track for transporting slag ladle;Second rail The second slag ladle and carriage for transporting slag ladle is provided with road correspondence slag treatment area, second track;First track with The transhipment crane for slag ladle to be hung to the second slag ladle and carriage from the first slag ladle and carriage, the technique bag are provided with above second track Include:Slag ladle and carriage along rail running to transhipment crane lower section;Transporting crane, a slag ladle and carriage is hung to another slag therefrom by slag ladle Tank car.
The present invention the course of work be:First slag ladle and carriage 4 is in place, and converter 1 is slagged tap, and the first slag ladle and carriage 4 is along the first track 2 The underface of operation transhipment crane, crane 6 hangs slag ladle 3 and is hung on the second slag ladle and carriage 8, and the second slag ladle and carriage 8 is transported to slag treatment Across crane 10 hangs away slag ladle, and slag ladle is handled, and crane 10 is hung back is hung to the second slag ladle and carriage by empty slag ladle 8, and the second slag ladle and carriage is back to Transport below crane, crane 6 hangs sky slag ladle to the first slag ladle and carriage.
The present invention is transported by can be achieved with the coming out of the stove direct motion of slag of the double car transhipment techniques of slag ladle, with the low, technique of investment Simply, process, operating cost are relatively low, process intensification, rationally, it is very worth to be subject in the currently related project of upgrading and rebuilding Promotion and application.
More than, only presently preferred embodiments of the present invention, but protection scope of the present invention is not limited thereto, and it is any to be familiar with sheet Those skilled in the art the invention discloses technical scope in, the change or replacement that can be readily occurred in should all be covered Within protection scope of the present invention.Therefore, the protection domain that protection scope of the present invention should be defined by claim is defined.

Claims (6)

1. a kind of converter slag ladle movement system, it is characterised in that including transporting crane and being arranged on converter and the slag car The first track and the second track between treatment region;
The first slag ladle and carriage is provided with one end correspondence converter of first track, first track;
The second slag ladle and carriage is provided with the second track correspondence slag treatment area, second track;
The transhipment crane includes setting on the aerial conveyor above the first track and the second track, the aerial conveyor Have for by slag ladle, a slag ladle and carriage to be hung to the crane of another slag ladle and carriage therefrom.
2. a kind of converter slag ladle movement system according to claim 1, it is characterised in that first track is remote The car stop of one end first of converter, first car stop is used to make the first slag ladle and carriage rest on below aerial conveyor.
3. a kind of converter slag ladle movement system according to claim 1, it is characterised in that second track is remote The one end in slag treatment area is provided with the second car stop, and second car stop is used to make the second slag ladle and carriage rest under aerial conveyor Side.
4. a kind of converter slag ladle movement system according to claim 1, it is characterised in that set on the aerial conveyor The travel switch for controlling crane to rest in precalculated position is equipped with, the travel switch is electrically connected with crane drive device.
5. a kind of converter slag ladle movement system according to claim 1, it is characterised in that the side wall of slag ladle is along same It is provided with some hangers on axis, the distance between two neighboring hanger is identical;The crane is provided with to be corresponded with hanger Suspension hook, the suspension hook is adapted with the hanger.
6. it is arranged with the first track and the second track, first rail on a kind of converter slag ladle transhipment technique, ground in parallel The first slag ladle and carriage for transporting slag ladle is provided with road correspondence converter, first track;The second track correspondence stove The second slag ladle and carriage for transporting slag ladle is provided with Slag treatment area, second track;First track and the second track Top be provided with transhipment crane for slag ladle to be hung to the second slag ladle and carriage from the first slag ladle and carriage, it is characterised in that the work Skill includes:Slag ladle and carriage along rail running to transhipment crane lower section;Transporting crane, a slag ladle and carriage is hung to separately therefrom by slag ladle One slag ladle and carriage.
CN201710327820.5A 2017-05-10 2017-05-10 A kind of converter slag ladle movement system and technique Pending CN106967858A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710327820.5A CN106967858A (en) 2017-05-10 2017-05-10 A kind of converter slag ladle movement system and technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710327820.5A CN106967858A (en) 2017-05-10 2017-05-10 A kind of converter slag ladle movement system and technique

Publications (1)

Publication Number Publication Date
CN106967858A true CN106967858A (en) 2017-07-21

Family

ID=59330756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710327820.5A Pending CN106967858A (en) 2017-05-10 2017-05-10 A kind of converter slag ladle movement system and technique

Country Status (1)

Country Link
CN (1) CN106967858A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107806767A (en) * 2017-10-10 2018-03-16 铜陵有色金属集团股份有限公司金冠铜业分公司 Treatment of slag and its movement system
CN108686617A (en) * 2018-05-07 2018-10-23 湖南城市学院 A kind of CO absorption2Carbon material preparation and method of modifying

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1344131A (en) * 1970-03-17 1974-01-16 Voest Ag Railway and a vehicle for transporting a metallurgical vessel along a railway
CN204545403U (en) * 2015-04-20 2015-08-12 中冶华天南京工程技术有限公司 Realize the system of the hot-metal ladle and carriage translation of " a tank system "
CN204690024U (en) * 2015-06-26 2015-10-07 中冶京诚工程技术有限公司 A kind of logistics transportation system of smelting iron and steel industry
CN106282449A (en) * 2016-10-28 2017-01-04 中冶华天南京工程技术有限公司 It is applicable to the slag ladle rotating technics method and system of slag processing
CN206721232U (en) * 2017-05-10 2017-12-08 中冶华天工程技术有限公司 A kind of converter slag ladle movement system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1344131A (en) * 1970-03-17 1974-01-16 Voest Ag Railway and a vehicle for transporting a metallurgical vessel along a railway
CN204545403U (en) * 2015-04-20 2015-08-12 中冶华天南京工程技术有限公司 Realize the system of the hot-metal ladle and carriage translation of " a tank system "
CN204690024U (en) * 2015-06-26 2015-10-07 中冶京诚工程技术有限公司 A kind of logistics transportation system of smelting iron and steel industry
CN106282449A (en) * 2016-10-28 2017-01-04 中冶华天南京工程技术有限公司 It is applicable to the slag ladle rotating technics method and system of slag processing
CN206721232U (en) * 2017-05-10 2017-12-08 中冶华天工程技术有限公司 A kind of converter slag ladle movement system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨玻等: "重钢铁钢界面"一罐制"技术的研究与应用", 2012年全国炼钢—连铸生产技术会, pages 117 - 122 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107806767A (en) * 2017-10-10 2018-03-16 铜陵有色金属集团股份有限公司金冠铜业分公司 Treatment of slag and its movement system
CN107806767B (en) * 2017-10-10 2020-03-17 铜陵有色金属集团股份有限公司 Slag treatment method and transfer system thereof
CN108686617A (en) * 2018-05-07 2018-10-23 湖南城市学院 A kind of CO absorption2Carbon material preparation and method of modifying

Similar Documents

Publication Publication Date Title
CN103433474A (en) Two-way conveying system for blast furnace molten iron conveying process of conveying ladle to bottom without stopping
CN204690024U (en) A kind of logistics transportation system of smelting iron and steel industry
CN105238891A (en) Direct connection type process for iron making and steel making interface
CN106967858A (en) A kind of converter slag ladle movement system and technique
CN211360636U (en) Steel ladle hot repairing device
CN104210958B (en) A kind of method of vehicle-mounted lifting RH steel ladle and device
CN204057752U (en) The outer vacuum refining vehicle frame lifting mode trolley device of a kind of RH stove
CN203998195U (en) The raw material of resistance to material promotes screening blanking transport systems
CN206721232U (en) A kind of converter slag ladle movement system
CN103572006A (en) Compact RH (Ruhrstahl and Hereaeus) refining process layout and production flow
CN207914574U (en) anode plate conveying device
CN206997726U (en) Strand is heat-fed system
CN207857342U (en) A kind of lime powder retracting device
CN205062091U (en) Braised sediment processing system of heat
CN202279833U (en) Simple converter flue transition carriage
CN210305738U (en) Steel ladle transferring device with heat preservation mechanism
CN201437154U (en) Molten iron conveying system
CN206721233U (en) A kind of converter slag car translation system
CN105689695B (en) A kind of steel ladle covering/uncovering device for being provided with incline track
CN211191999U (en) L type steel ladle car and ladle storage device
EP3315615A1 (en) Manipulator for a ladle
CN211645307U (en) Device for adding scrap steel into molten iron tank on molten iron transportation line
CN101979674B (en) Argon blowing process system
CN207418152U (en) It is a kind of interior across the roller conveying device at lifting dead angle for solving workshop
CN203373386U (en) RH vacuum refining device capable of lifting vacuum chamber

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination