CN201437154U - Molten iron conveying system - Google Patents

Molten iron conveying system Download PDF

Info

Publication number
CN201437154U
CN201437154U CN2009201503163U CN200920150316U CN201437154U CN 201437154 U CN201437154 U CN 201437154U CN 2009201503163 U CN2009201503163 U CN 2009201503163U CN 200920150316 U CN200920150316 U CN 200920150316U CN 201437154 U CN201437154 U CN 201437154U
Authority
CN
China
Prior art keywords
molten iron
supply line
crane
ironworks
steelshop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009201503163U
Other languages
Chinese (zh)
Inventor
王卫海
师磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beris Engineering and Research Corp
Original Assignee
Beris Engineering and Research Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beris Engineering and Research Corp filed Critical Beris Engineering and Research Corp
Priority to CN2009201503163U priority Critical patent/CN201437154U/en
Application granted granted Critical
Publication of CN201437154U publication Critical patent/CN201437154U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)

Abstract

The utility model provides a molten iron conveying system which comprises a steelshop molten iron hoist conveying line and an ironworks delivery molten iron hoist conveying line, the steelshop molten iron hoist conveying line is connected with the ironworks delivery molten iron hoist conveying line through a transition connection molten iron hoist conveying line, the ironworks delivery molten iron hoist conveying line is arranged between two ironworks, and the molten iron is conveyed to the steelshop through the hoists. By adopting the molten iron conveying system, the continuation of the molten iron conveying is improved, the transport period is reduced to the most extent, the transport time is reduced and the molten iron temperature drop is effectively reduced; the molten iron conveying system is applicable to joint ironworks with capacity of 0.5-4 million tons.

Description

Molten iron transportation system
Technical field
The utility model relates to molten iron transportation system of iron and steel enterprise, relates to the novel molten iron transportation system of the locomotive of having cancelled the transportation molten iron and railway particularly.
Background technology
The mode of integrated iron and steel works' molten iron transportation mainly is with hot-metal ladle and carriage or torpedo tank car molten iron to be transported into steelshop from blast furnace casting factory by railway in the world wide at present, this mode not only needs to dispose a large amount of locomotives and transportation railway line, floor space is big, investment is high, service cycle is long, hot metal temperature drop is big in transportation, and safeguard and the expense height of locomotive, railway cause the raising of cost.
The utility model content
The utility model provides a kind of novel molten iron transportation system that is applicable to iron and steel enterprise, and molten iron transportation continuity is strong, and can shorten the transhipment cycle to greatest extent, reduces the transhipment time, effectively reduces hot metal temperature drop.
To achieve these goals, the utility model provides a kind of molten iron transportation system, comprise steelshop molten iron crane supply line, also comprise ironworks molten iron crane supply line, described steelshop molten iron crane supply line connects molten iron crane supply line by transition and is connected in the described ironworks molten iron crane supply line that goes out, describedly go out ironworks molten iron crane supply line and be arranged on two and go out between the ironworks, molten iron is transported to steelshop from going out the ironworks by crane.
Preferably, described steelshop molten iron crane supply line apart from the distance on ground greater than 14 meters.
Preferably, described transition connects the length of molten iron crane supply line less than 200 meters.
Preferably, described steelshop molten iron crane supply line, described transition connect molten iron crane supply line and described to go out ironworks molten iron crane supply line be the double track supply line, and by the reinforced crane transportation molten iron of striding.
Preferably, the described molten iron container that goes out ironworks output is arranged along described reinforced traffic direction of striding crane, and is arranged on below in the described double track that goes out ironworks molten iron crane supply line.
Further, below described transition connection molten iron crane supply line, also can be provided with pig machine.
Further, below described transition connection molten iron crane supply line, also can be provided with the desulfurization station.
Further, below described transition connection molten iron crane supply line, also be provided with the molten iron container and repair the storehouse.
The molten iron transportation system that provides by the utility model, blast furnace casting factory and steelshop are adjoined layout, set out ironworks molten iron crane supply line, and steelshop molten iron crane supply line is connected molten iron crane supply line by transition be connected in out ironworks molten iron crane supply line, reinforced the striding of blast furnace casting factory and converter united two into one, the steelshop molten iron crane supply line that is provided with continuously by the crane edge behind the blast furnace casting, transition connects molten iron crane supply line and goes out ironworks molten iron crane supply line and directly the molten iron container of splendid attire molten iron is transported to steelshop, molten iron is blended into converter or directly carries out molten iron preliminary treatment etc., like this, not only help improving the molten iron charging temperature, energy-saving and cost-reducing, and owing to cancelled railway, it is compact that integrated iron and steel works are arranged, floor space is little, investment significantly reduces, and tangible economic benefit and social benefit are arranged.This means of transportation is suitable for 50~4,000,000 tons of integrated iron and steel works.
Description of drawings
Fig. 1 is the planar structure schematic diagram of molten iron one embodiment of transportation system of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in detail.
Fig. 1 is the planar structure schematic diagram of an embodiment of molten iron of the present utility model transportation system.Steelshop molten iron crane supply line 8 (all illustrating) are not prolonged, connect molten iron crane supply line 4 by transition steelshop molten iron crane supply line 8 is connected in out ironworks molten iron crane supply line 1, go out ironworks molten iron crane supply line 1 and be arranged on two and go out between the ironworks 9, molten iron is transported directly to steelshop and processes from going out the ironworks by crane.In a preferred embodiment, steelshop molten iron crane supply line greater than 14 meters, is beneficial to the handling of molten iron apart from the distance on ground.In another preferred embodiment, described transition connects the length of molten iron crane supply line less than 200 meters, so that the molten iron transportation reduces hot metal temperature drop.
As shown in the figure, steelshop molten iron crane supply line 8, transition connect molten iron crane supply line 4 and go out ironworks molten iron crane supply line 1 and be the double track supply line, and by the reinforced crane 7 transportation molten iron of striding.Make the orientation of molten iron container 2 of splendid attire molten iron identical with the traffic direction of crane 7 by the layout that adjusts the ironworks iron runner, and make molten iron container 2 be arranged in out the interior below of double track of ironworks molten iron crane supply line 1, particular location can be advisable so that crane can be sling the molten iron container according to the relative dimensions adjustment of crane rail distance and molten iron container.
Further, also can transition connect molten iron crane supply line 4 below be provided with pig machine 5, thereby can utilize the hoist engine of tumbling when excessively striding crane as cast iron.
Further, also can transition connect molten iron crane supply line 4 below be provided with desulfurization station 6, handle molten iron is carried out desulfurization.
Further, below transition connection molten iron crane supply line 4, also be provided with the molten iron container and repair storehouse 3, the molten iron container is keeped in repair with convenient.
The distinguishing feature of Iron Melt Transport System of the present utility model is:
(1) integrated iron and steel works' characteristics of compact layout takes up an area few;
(2) locomotive of cancellation transportation molten iron and this section transportation railway line;
(3) Molten Iron Transportation Distance Shortened is saved haulage time, reduces hot metal temperature drop and molten iron and has bad luck loss;
(4) replace blast furnace hot-metal bottle with the converter hot-metal bottle, therefore, cancelled blast furnace iron flask car, hot-metal bottle and iron flask and repaired library facilities;
(5) pig machine is arranged in steel-making and excessively strides side, can utilize the hoist engine of tumbling when excessively striding crane as cast iron.
(6) molten iron handling hoist lifting hook has specific (special) requirements, need to satisfy simultaneously blast furnace casting and converter is converted the iron requirement.

Claims (8)

1. molten iron transportation system, comprise steelshop molten iron crane supply line, it is characterized in that, also comprise ironworks molten iron crane supply line, described steelshop molten iron crane supply line connects molten iron crane supply line by transition and is connected in the described ironworks molten iron crane supply line that goes out, describedly go out ironworks molten iron crane supply line and be arranged on two and go out between the ironworks, molten iron is transported to steelshop from going out the ironworks by crane.
2. molten iron as claimed in claim 1 transportation system is characterized in that, described steelshop molten iron crane supply line apart from the distance on ground greater than 14 meters.
3. molten iron as claimed in claim 1 or 2 transportation system is characterized in that, described transition connects the length of molten iron crane supply line less than 200 meters.
4. molten iron as claimed in claim 1 transportation system, it is characterized in that, described steelshop molten iron crane supply line, described transition connect molten iron crane supply line and described to go out ironworks molten iron crane supply line be the double track supply line, and by the reinforced crane transportation molten iron of striding.
5. molten iron as claimed in claim 4 transportation system is characterized in that, the described molten iron container that goes out ironworks output is arranged along described reinforced traffic direction of striding crane, and is arranged on below in the described double track that goes out ironworks molten iron crane supply line.
6. molten iron as claimed in claim 5 transportation system is characterized in that, described transition connect molten iron crane supply line below be provided with pig machine.
7. as claim 5 or 6 described molten iron transportation systems, it is characterized in that, described transition connect molten iron crane supply line below be provided with the desulfurization station.
8. molten iron as claimed in claim 7 transportation system is characterized in that, described transition connect molten iron crane supply line below also be provided with the molten iron container and repair the storehouse.
CN2009201503163U 2009-04-30 2009-04-30 Molten iron conveying system Expired - Lifetime CN201437154U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201503163U CN201437154U (en) 2009-04-30 2009-04-30 Molten iron conveying system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201503163U CN201437154U (en) 2009-04-30 2009-04-30 Molten iron conveying system

Publications (1)

Publication Number Publication Date
CN201437154U true CN201437154U (en) 2010-04-14

Family

ID=42399135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201503163U Expired - Lifetime CN201437154U (en) 2009-04-30 2009-04-30 Molten iron conveying system

Country Status (1)

Country Link
CN (1) CN201437154U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103357859A (en) * 2012-03-26 2013-10-23 中国一拖集团有限公司 Front casting ladle transfer device for double induction furnaces
CN103924015A (en) * 2013-01-13 2014-07-16 山东省冶金设计院股份有限公司 Equipment combination and method for achieving iron and steel zero interface
CN104785767A (en) * 2015-04-20 2015-07-22 中冶华天南京工程技术有限公司 Hot metal ladle car horizontal movement method and system achieving one-ladle system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103357859A (en) * 2012-03-26 2013-10-23 中国一拖集团有限公司 Front casting ladle transfer device for double induction furnaces
CN103357859B (en) * 2012-03-26 2015-08-05 中国一拖集团有限公司 A kind of stokehold casting ladle transporter for double-induction stove
CN103924015A (en) * 2013-01-13 2014-07-16 山东省冶金设计院股份有限公司 Equipment combination and method for achieving iron and steel zero interface
CN104785767A (en) * 2015-04-20 2015-07-22 中冶华天南京工程技术有限公司 Hot metal ladle car horizontal movement method and system achieving one-ladle system

Similar Documents

Publication Publication Date Title
CN101249558B (en) One tank to end technique for iron-smelting to steel-smelting
CN105238891A (en) Direct connection type process for iron making and steel making interface
CN103924014B (en) The company's iron for shortening molten iron molten steel interface distance connects steel method and its equipment combination
CN103433474A (en) Two-way conveying system for blast furnace molten iron conveying process of conveying ladle to bottom without stopping
CN101280347A (en) Blast furnace-converter interface 'compact one tank mode' process
CN105170965B (en) Molten iron transport system
CN201437154U (en) Molten iron conveying system
CN101249560B (en) Iron melt transfer system
CN211645307U (en) Device for adding scrap steel into molten iron tank on molten iron transportation line
CN112059163A (en) Molten iron transportation system of iron-making-steel interface
CN112846161B (en) Ultra-low clearance vehicle-mounted cover-opening machine above torpedo tank opening
CN213476034U (en) Steelmaking workshop process arrangement structure with horizontal continuous charging electric furnace
CN103343632B (en) Compact Iron Melt Transport System
CN101892346B (en) Layout structure in converter steelmaking bidirectional steel supply system and method for arranging steel ladles and slag ladles
CN216729541U (en) Multipurpose straddle carrier transportation arrangement system
CN114934141A (en) Smelting system
CN210702525U (en) Connection system for railway transportation of molten iron to steelmaking workshop
CN210789218U (en) Flexible connecting device in middle of one-pot bottom molten iron transportation process
CN203751325U (en) Molten iron transportation system
CN106967858A (en) A kind of converter slag ladle movement system and technique
CN103924015B (en) Realize equipment combination and the method at the interface of steel zero
CN201751052U (en) Steel pot roll-over vehicle
CN203361705U (en) Compact type molten iron transportation system
CN220056905U (en) Blast furnace casting house
CN216445406U (en) Automatic heating and preheating system for scrap steel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20100414

CX01 Expiry of patent term