CN106967448A CN201710223920.3A CN201710223920A CN106967448A CN 106967448 A CN106967448 A CN 106967448A CN 201710223920 A CN201710223920 A CN 201710223920A CN 106967448 A CN106967448 A CN 106967448A
Authority
CN
China
Prior art keywords
coke
dry quenching
furnace
temperature
baker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710223920.3A
Other languages
Chinese (zh)
Other versions
CN106967448B (en
Inventor
李德勇
刘立军
向海飞
张汉卿
张智勇
高立东
陈昕
靳迎武
高锋林
王洪顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anyang Iron and Steel Co Ltd
Original Assignee
Anyang Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anyang Iron and Steel Co Ltd filed Critical Anyang Iron and Steel Co Ltd
Priority to CN201710223920.3A priority Critical patent/CN106967448B/en
Publication of CN106967448A publication Critical patent/CN106967448A/en
Application granted granted Critical
Publication of CN106967448B publication Critical patent/CN106967448B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B39/00Cooling or quenching coke
    • C10B39/02Dry cooling outside the oven

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Coke Industry (AREA)

Abstract

The present invention relates to Dry Quenching Technology field, and in particular to the furnace drying method after a kind of resistance to material large area replacing of dry quenching system, comprises the following steps:Warm air is dried, with coke dry quenching furnace inlet temperature T2For main management temperature, the temperature T for section that coke dry quenching furnace is prestored5100 DEG C ~ 120 DEG C are raised to by normal temperature;Dry coke quenching coal gas baker burner is installed, importing air by adjusting disposable dust remover emergency diffusion valve helps coke-stove gas to burn baker, is prestored a section temperature T with the coke dry quenching furnace5For main management temperature, 500 DEG C ~ 600 DEG C are risen to;Use N2Gas displacement is carried out to coke dry quenching furnace, control combustible gas component content throws red burnt baker into coke dry quenching furnace, the most at last coke dry quenching boiler inlet temperature T within safe range6It is increased to 800 DEG C ~ 960 DEG C, the coke dry quenching furnace prestores a section temperature T5It is increased to 800 DEG C ~ 1050 DEG C.Coal gas baker and red burnt baker are combined by the present invention, both ensure stove quality, and the shortening baker duration is realized again.

Description

A kind of furnace drying method after the resistance to material large area replacing of dry quenching system
Technical field
The present invention relates to Dry Quenching Technology field, and in particular to the baker after a kind of resistance to material large area replacing of dry quenching system Method.
Background technology
Dry quenching system is gradually heating to that red burnt temperature can be filled from cold conditions, and this process is referred to as dry coke quenching baker.It is dry Quenching system terminates in brickwork engineering or annual overhaul terminates, main equipment is debugged after finishing, and formally fills red Jiao in dry coke quenching and goes into operation it Before, to carry out the baker operation of dry quenching system.
Dry coke quenching baker is divided to the temperature-rising method that masonry is dried and system heats up two stages, is taken after warm air drying terminates There are two kinds:Coal gas baker temperature-rising method and the red burnt temperature-rising method of throwing.Generally for newly-built dry coke quenching baker, to ensure the matter that goes into operation Amount, using coal gas baker temperature-rising method, i.e., sets dry coke quenching coal gas baker burner and a secondary air register in coke dry quenching furnace baker hole, Logical coke-stove gas makes its generation heat that burnt in coke dry quenching furnace, and most the coke dry quenching furnace section masonry temperature that prestores rises to 800 DEG C at last.The liter Warm method operating process is complicated, and labor intensity is big, and the whole temperature-rise period used time is longer.And for the annual overhaul of small area resistance to material repairing Heating is using the method for throwing red burnt heating afterwards, that is, it is that thermal source rises to coke dry quenching furnace masonry temperature to put into red Jiao Li with red heat coke 800℃.Although the temperature-rising method can realize being rapidly heated for whole dry quenching system, the temperature-rising method is only applicable to do The resistance to material of quenching system repairs little annual overhaul.
At present when the resistance to material large area of dry quenching system is changed and repaired, typically by the baker of newly-started coke dry quenching furnace Method carries out baker, and the method for throwing red burnt heating is optimized patent ZL201110431864.5, with realize stove quality, The target that duration neglects neither, which disclose a kind of temperature-rising method of coke dry quenching furnace, and this method is included to built-in cold Jiao of coke dry quenching furnace Cover after central blast cap, red Jiao put into coke dry quenching furnace, make red Jiao cover before cold Jiao, then throw red before cold Jiao is allowed to cover Jiao, then leads to inert gas from bottom, and warm air drying is carried out using red burnt heat, and inert gas is from the sky between two adjacent brackets Between discharged through ring-shaped flue and peephole, the coke cooled is discharged from coke dry quenching furnace bottom, is repeated repeatedly, is realized coke dry quenching furnace Heating, temperature when most coke dry quenching furnace temperature rises to normal production at last.
The above method has the following disadvantages:1st, red Jiao inevitably contacts with furnace wall, direct when masonry temperature is relatively low Red Jiao is thrown, the masonry of red burnt areas adjacent can acutely heat up, the overall stove quality of influence.2nd, ring-shaped flue and peephole are prestoring Section lower section, the inert gas for absorbing red burnt heat is discharged from the space between two adjacent brackets through ring-shaped flue and peephole, nothing Method ensures that section masonry that prestores uniformly heats up.
The content of the invention
Furnace drying method after being changed the invention provides a kind of resistance to material large area of dry quenching system, by coal gas baker and red Jiao Baker is combined, and both ensures stove quality, is realized again and is shortened the baker duration.
In order to achieve the above object, the technical solution adopted in the present invention is as follows:
Furnace drying method after a kind of resistance to material large area replacing of dry quenching system, it is characterised in that comprise the following steps:
Step one:Warm air is dried, with coke dry quenching furnace inlet temperature T2For main management temperature, the temperature for section that coke dry quenching furnace is prestored T5100 DEG C~120 DEG C are raised to by normal temperature;
Step 2:3~5 dry coke quenching coal gas baker burners are installed, opened by adjusting disposable dust remover emergency diffusion valve Degree imports air and helps coke-stove gas to burn baker, is prestored a section temperature T with the coke dry quenching furnace5For main management temperature, risen to 500 DEG C~600 DEG C;
Step 3:Dry coke quenching coal gas baker burner is quickly removed, the disposable dust remover is closed urgent in closing baker hole Diffusion valve, uses N2Gas displacement is carried out to coke dry quenching furnace, until O in coke dry quenching furnace2Content reaches less than 5%, is thrown into the coke dry quenching furnace Red burnt baker, with coke dry quenching boiler inlet temperature T6For main management temperature, prestored a section temperature T with the coke dry quenching furnace5For auxiliary tube Manage temperature, the at last most coke dry quenching boiler inlet temperature T6It is increased to 800 DEG C~960 DEG C, the coke dry quenching furnace prestores a section temperature T5 It is increased to 800 DEG C~1050 DEG C.
Further, the baker hole in the step 3 be the length of side retained after people's bore portion is sealed be 300mm~ 400mm square hole.
Further, the dry coke quenching coal gas baker burner includes supervisor, and the supervisor two ends are respectively perpendicular setting Front end and end, the front end be provided with flange, the end be provided with nozzle.
Further, the internal diameter of the dry coke quenching coal gas baker burner is 50mm.
Further, the nozzle of the dry coke quenching coal gas baker burner is positioned on the central coke of coke dry quenching furnace by baker hole Side is fixed, and the front end of the dry coke quenching coal gas baker burner is connected with coke-stove gas supervisor by flange.
Further, section temperature T that coke dry quenching furnace prestores in the step one5100 DEG C~120 DEG C of method is raised to by normal temperature It is as follows:
A, to built-in cold Jiao of the coke dry quenching furnace so that cold Jiao covers central blast cap;
B, by air from the disposable dust remover emergency diffusion valve import boiler, the boiler using low-pressure steam to air Heated, air is heated up with 10 DEG C/h~15 DEG C/h speed, be heated to 160-170 DEG C of holding;
C, the hot-air come out from the boiler blasted into the coke dry quenching furnace, the coke dry quenching furnace is dried, dried Coke dry quenching furnace described in journey prestore section Stress control in 30-60Pa, until coke dry quenching furnace prestore a section masonry temperature reach 100 DEG C~ 24h is kept after 120 DEG C.
Further, the boiler is heated using low-pressure steam to air, and the air is according to 10 DEG C/h~15 DEG C/h Speed heated up.
Further, air is imported in the step 2 helps the method for coke-stove gas burning baker as follows:
Dry coke quenching coal gas baker burner end nozzle is installed on above the central coke of coke dry quenching furnace by baker hole and fixed, Start circulating fan, run with minimum speed, open disposable dust remover emergency diffusion valve, it is ensured that sufficient air imports coke dry quenching furnace It is interior;
To each section of progress N of dry coke quenching coal gas baker burner2The fight flow control valve that slowly turns on the gas-fire, point are put after displacement By gas flow governor valve control coke gas flow and circulating fan rotating speed and disposable dust remover emergency diffusion are adjusted after combustion Valve opening control air imbibed quantity, coke dry quenching furnace masonry is heated up with 4 DEG C/h~5 DEG C/h, up to furnace temperature rise to 500 DEG C~ 600℃。
Further, coke dry quenching boiler inlet temperature T in the step 36Prestored a section temperature T with the coke dry quenching furnace5Heating Speed is respectively according to T6≤30℃/h、T5≤ 15 DEG C/h is heated up.
Having the beneficial effect that produced by the present invention:
The coke dry quenching furnace bottom of the present invention is set to less baker hole, it is not necessary to retains a secondary air register, but utilizes and adjust Whole disposable dust remover emergency diffusion aperture controls air import volume, can be kept away after coal gas baker terminates with quick closure baker hole Exempt from a large amount of cold airs and entered coke dry quenching furnace, prevent the resistance to material of coke dry quenching furnace from significantly cooling.And hot waste gas passes through pre- during baker Deposit section and section masonry heat exchange that prestores after discharged from the bleeding valve on top, be effectively guaranteed coke dry quenching furnace and prestore the equal of section masonry Even heating.
The present invention replaces original internal diameter is larger to do using 3~5 internal diameter 50mm dry coke quenching coal gas baker burner Quenching coal gas baker burner, crane need not be used with dismounting operation by installing, it is easy to installing/dismounting, after coal gas baker terminates It can take out quick-detach soon, it is to avoid the take-down time is long, the resistance to material cooling of coke dry quenching furnace is excessive.
The resistance to material of dry coke quenching is warming up to 500 DEG C~600 DEG C by the present invention using coal gas baker, it is therefore prevented that straight under low-temperature condition Connect and throw the problem of local masonry heating that red Jiao brings is too fast, but red Jiao is thrown when coke dry quenching furnace masonry temperature is higher and is dried Stove, both ensures stove quality, and the baker duration is shortened again.
Brief description of the drawings
Fig. 1 is warm air drying steps flow chart of the invention;
Fig. 2 is coal gas baker flow chart of steps of the invention;
Fig. 3 is red burnt baker flow chart of steps of the invention;
Fig. 4 is the structural representation of the dry coke quenching coal gas baker burner of the present invention;
Coke-stove gas supervisors and the interface diagram of dry coke quenching coal gas baker burner of the Fig. 5 for the present invention.
In figure:1- coke-stove gas supervisor, 2- gas flows regulating valve, 3- flanges, 4- nozzles, 5- supervisor.
Embodiment
Carry out the specific description present invention with specific embodiment below in conjunction with the accompanying drawings, but protection scope of the present invention is not limited In this.
Embodiment 1
As shown in Fig. 1~5, the furnace drying method after a kind of resistance to material large area replacing of dry quenching system comprises the following steps:
Step one:Warm air is dried, with coke dry quenching furnace inlet temperature T2For main management temperature, coke dry quenching furnace is prestored a section temperature T5 120 DEG C are raised to by normal temperature, following content is specifically included:
A, to built-in cold Jiao of coke dry quenching furnace so that cold Jiao covers central blast cap.
B, seal part manhole, retain a length of side and be used as baker hole for 400mm square hole.
C, air from disposable dust remover emergency diffusion valve imported into boiler, boiler added using low-pressure steam to air Heat, makes air be heated up with 10 DEG C/h speed, is heated to 165 DEG C of holdings.
D, the hot-air come out from boiler blasted into coke dry quenching furnace, coke dry quenching furnace is dried, prestore section in drying course Stress control is in 50-60Pa, until coke dry quenching furnace prestores after a section masonry temperature reaches 120 DEG C and keeps 24h.By Stress control 50~ 60Pa is able to ensure that a part of hot-air passes through the coke dry quenching furnace section that prestores and section masonry that prestores is heated, it is ensured that coke dry quenching furnace is pre- The uniform heating of section refractory material is deposited, the service life of refractory material is extended.
The air discharged from coke dry quenching furnace is delivered to after ground station for dust removal carries out dust removal process by environment dust collect plant and is discharged into Air, it is to avoid pollute to air.
Step 2:Make and dry coke quenching coal gas baker burner is installed, opened by adjusting disposable dust remover emergency diffusion valve Degree imports air and helps coke-stove gas to burn baker, is prestored a section temperature T with coke dry quenching furnace5For main management temperature, 600 are risen to DEG C, it is specific as follows:
E, 5 internal diameter 50mm front ends of making are flanged, the end nozzle dry coke quenching coal gas baker combustion vertical with gas piping Burner.The dry coke quenching coal gas baker burner includes supervisor 5, and 5 two ends of supervisor are respectively perpendicular the front end and end of setting, The front end is provided with flange 3, and the end is provided with nozzle 4, by baker hole by dry coke quenching coal gas baker burner end nozzle 4 It is positioned over above the central coke of coke dry quenching furnace and fixes, front end is connected with coke-stove gas supervisor 1 by flange 3.The dry coke quenching coal gas dries Burner makes simple, and installation need not use crane with dismounting operation, facilitate installing/dismounting, when coal gas baker terminates After can quickly remove, it is to avoid the take-down time is long, and the resistance to material cooling of coke dry quenching furnace is excessive.
F, startup circulating fan, are run with minimum speed, open disposable dust remover emergency diffusion valve, it is ensured that sufficient air Import in coke dry quenching furnace.
G, to each section of dry coke quenching coal gas baker burner progress N2Lighted a fire after displacement and the flow tune that slowly turns on the gas-fire Valve 2 is saved, by the flow of gas flow governor valve control coke-stove gas and the rotating speed of circulating fan is adjusted after lighting and once removes Dirt device emergency diffusion valve opening controls air imbibed quantity, coke dry quenching furnace masonry is heated up with 5 DEG C/h, until the furnace temperature of coke dry quenching furnace Rise to 600 DEG C.Waste gas after burning, is partly diffused from furnace roof, and being delivered to ground station for dust removal through environment dust collect plant carries out dedusting Be discharged into air after processing, another part after disposable dust remover dust removal process with air mixing preheated air, then by this part gas Body feeding boiler heating, this portion gas come out from boiler is blasted dry after secondary filter dust removal process by circulating fan Putting out stove helps coke-stove gas to burn.
Step 3:Dry coke quenching coal gas baker burner is quickly removed, disposable dust remover emergency diffusion is closed in closing baker hole Valve, uses N2To coke dry quenching furnace carry out gas displacement, to oxygen content≤5% it is qualified after, red burnt baker is thrown into coke dry quenching furnace, is put out with dry Burnt boiler inlet temperature T6For main management temperature, prestored a section temperature T with coke dry quenching furnace5For Added Management temperature, red heat coke is utilized For thermal source, N2For heat transfer carrier, at last most coke dry quenching boiler inlet temperature T6It is increased to 960 DEG C, coke dry quenching furnace prestores a section temperature T5 It is increased to 1050 DEG C.The high temperature N come out from coke dry quenching furnace2Boiler is sent into after disposable dust remover dedusting and carries out heat exchange reduction temperature Spend, then coke dry quenching furnace is blasted by circulating fan after secondary filter dedusting and recycle.
Thrown into coke dry quenching furnace during red burnt baker, open the N of coke dry quenching furnace entrance2It is filled with valve continuous logical into coke dry quenching furnace Enter nitrogen, CO contents are in 0~6%, H in control cycle gas composition2Content is red burnt from dry within 0~2% safe range Furnace roof loading is put out, with coke dry quenching boiler inlet temperature T6For main management temperature, prestored a section temperature T with coke dry quenching furnace5For Added Management Temperature, control coke dry quenching boiler inlet temperature T6With 30 DEG C/h, coke dry quenching furnace prestores a section temperature T5Heated up with 15 DEG C/h.
Embodiment 2
As shown in Fig. 1~5, the furnace drying method after a kind of resistance to material large area replacing of dry quenching system comprises the following steps:
Step one:Warm air is dried, with coke dry quenching furnace inlet temperature T2For main management temperature, coke dry quenching furnace is prestored a section temperature T5 115 DEG C are raised to by normal temperature, following content is specifically included:
A, to built-in cold Jiao of coke dry quenching furnace so that cold Jiao covers central blast cap.
B, seal part manhole, retain a length of side and be used as baker hole for 400mm square hole.
C, air from disposable dust remover emergency diffusion valve imported into boiler, boiler added using low-pressure steam to air Heat, makes air be heated up with 12 DEG C/h speed, is heated to 160 DEG C of holdings.
D, the hot-air come out from boiler blasted into coke dry quenching furnace, coke dry quenching furnace is dried, prestore section in drying course Stress control is in 50-60Pa, until coke dry quenching furnace prestores after a section masonry temperature reaches 115 DEG C and keeps 24h.By Stress control 50~ 60Pa is able to ensure that a part of hot-air passes through the coke dry quenching furnace section that prestores and section masonry that prestores is heated, it is ensured that coke dry quenching furnace is pre- The uniform heating of section refractory material is deposited, the service life of refractory material is extended.
The air discharged from coke dry quenching furnace is delivered to after ground station for dust removal carries out dust removal process by environment dust collect plant and is discharged into Air, it is to avoid pollute to air.
Step 2:Make and dry coke quenching coal gas baker burner is installed, opened by adjusting disposable dust remover emergency diffusion valve Degree imports air and helps coke-stove gas to burn baker, is prestored a section temperature T with coke dry quenching furnace5For main management temperature, 600 are risen to DEG C, it is specific as follows:
E, 5 internal diameter 50mm front ends of making are flanged, the end nozzle dry coke quenching coal gas baker combustion vertical with gas piping Burner, the dry coke quenching coal gas baker burner includes supervisor 5, and 5 two ends of supervisor are respectively perpendicular the front end and end of setting, The front end is provided with flange 3, and the end is provided with nozzle 4, by baker hole by dry coke quenching coal gas baker burner end nozzle 4 It is positioned over above the central coke of coke dry quenching furnace and fixes, front end is connected with coke-stove gas supervisor 1 by flange 3.The dry coke quenching coal gas dries Burner makes simple, and installation need not use crane with dismounting operation, facilitate installing/dismounting, when coal gas baker terminates After can quickly remove, it is to avoid the take-down time is long, and the resistance to material cooling of coke dry quenching furnace is excessive.
F, startup circulating fan, are run with minimum speed, open disposable dust remover emergency diffusion valve, it is ensured that sufficient air Import in coke dry quenching furnace.
G, to each section of dry coke quenching coal gas baker burner progress N2Lighted a fire after displacement and the flow tune that slowly turns on the gas-fire Valve 2 is saved, by the flow of gas flow governor valve control coke-stove gas and the rotating speed of circulating fan is adjusted after lighting and once removes Dirt device emergency diffusion valve opening controls air imbibed quantity, coke dry quenching furnace masonry is heated up with 5 DEG C/h, until the furnace temperature of coke dry quenching furnace Rise to 600 DEG C.Waste gas after burning, partly diffuses from furnace roof and is delivered to through environment dust collect plant at ground station for dust removal progress dedusting Be discharged into air after reason, another part after disposable dust remover dust removal process with air mixing preheated air, then by this portion gas Boiler heating is sent into, this portion gas come out from boiler blasts dry put out after secondary filter dust removal process by circulating fan Stove helps coke-stove gas to burn.
Step 3:Dry coke quenching coal gas baker burner is quickly removed, disposable dust remover emergency diffusion is closed in closing baker hole Valve, uses N2To coke dry quenching furnace carry out gas displacement, to oxygen content≤5% it is qualified after, red burnt baker is thrown into coke dry quenching furnace, is put out with dry Burnt boiler inlet temperature T6For main management temperature, prestored a section temperature T with coke dry quenching furnace5For Added Management temperature, red heat coke is utilized For thermal source, N2For heat transfer carrier, at last most coke dry quenching boiler inlet temperature T6It is increased to 950 DEG C, coke dry quenching furnace prestores a section temperature T5 It is increased to 1000 DEG C.The high temperature N come out from coke dry quenching furnace2Boiler is sent into after disposable dust remover dedusting and carries out heat exchange reduction temperature Spend, then coke dry quenching furnace is blasted by circulating fan after secondary filter dedusting and recycle.
Thrown into coke dry quenching furnace during red burnt baker, open the N of coke dry quenching furnace entrance2It is filled with valve continuous logical into coke dry quenching furnace Enter nitrogen, CO contents are in 0~6%, H in control cycle gas composition2Content is red burnt from dry within 0~2% safe range Furnace roof loading is put out, with coke dry quenching boiler inlet temperature T6For main management temperature, prestored a section temperature T with coke dry quenching furnace5For Added Management Temperature, control coke dry quenching boiler inlet temperature T6With 30 DEG C/h, coke dry quenching furnace prestores a section temperature T5Heated up with 15 DEG C/h.
Embodiment 3
As shown in Fig. 1~5, the furnace drying method after a kind of resistance to material large area replacing of dry quenching system comprises the following steps:
Step one:Warm air is dried, with coke dry quenching furnace inlet temperature T2For main management temperature, coke dry quenching furnace is prestored a section temperature T5 110 DEG C are raised to by normal temperature, following content is specifically included:
A, to built-in cold Jiao of coke dry quenching furnace so that cold Jiao covers central blast cap.
B, seal part manhole, retain a length of side and be used as baker hole for 300mm square hole.
C, air from disposable dust remover emergency diffusion valve imported into boiler, boiler added using low-pressure steam to air Heat, makes air be heated up with 12 DEG C/h speed, is heated to 170 DEG C of holdings.
D, the hot-air come out from boiler blasted into coke dry quenching furnace, coke dry quenching furnace is dried, prestore section in drying course Stress control is in 40-50Pa, until coke dry quenching furnace prestores after a section masonry temperature reaches 110 DEG C and keeps 24h.By Stress control 40~ 50Pa is able to ensure that a part of hot-air passes through the coke dry quenching furnace section that prestores and section masonry that prestores is heated, it is ensured that coke dry quenching furnace is pre- The uniform heating of section refractory material is deposited, the service life of refractory material is extended.
The air discharged from coke dry quenching furnace is delivered to after ground station for dust removal carries out dust removal process by environment dust collect plant and is discharged into Air, it is to avoid pollute to air.
Step 2:Make and dry coke quenching coal gas baker burner is installed, opened by adjusting disposable dust remover emergency diffusion valve Degree imports air and helps coke-stove gas to burn baker, is prestored a section temperature T with coke dry quenching furnace5For main management temperature, 550 are risen to DEG C, it is specific as follows:
E, 4 internal diameter 50mm front ends of making are flanged, the end nozzle dry coke quenching coal gas baker combustion vertical with gas piping Burner, the dry coke quenching coal gas baker burner includes supervisor 5, and 5 two ends of supervisor are respectively perpendicular the front end and end of setting, The front end is provided with flange 3, and the end is provided with nozzle 4, by baker hole by dry coke quenching coal gas baker burner end nozzle 4 It is positioned over above the central coke of coke dry quenching furnace and fixes, front end is connected with coke-stove gas supervisor 1 by flange 3.The dry coke quenching coal gas dries Burner makes simple, and installation need not use crane with dismounting operation, facilitate installing/dismounting, when coal gas baker terminates After can quickly remove, it is to avoid the take-down time is long, and the resistance to material cooling of coke dry quenching furnace is excessive.
F, startup circulating fan, are run with minimum speed, open disposable dust remover emergency diffusion valve, it is ensured that sufficient air Import in coke dry quenching furnace.
G, to each section of dry coke quenching coal gas baker burner progress N2Lighted a fire after displacement and the flow tune that slowly turns on the gas-fire Valve 2 is saved, by the flow of gas flow governor valve control coke-stove gas and the rotating speed of circulating fan is adjusted after lighting and once removes Dirt device emergency diffusion valve opening controls air imbibed quantity, coke dry quenching furnace masonry is heated up with 5 DEG C/h, until the furnace temperature of coke dry quenching furnace Rise to 550 DEG C.Waste gas after burning, partly diffuses from furnace roof and is delivered to through environment dust collect plant at ground station for dust removal progress dedusting Be discharged into air after reason, another part after disposable dust remover dust removal process with air mixing preheated air, then by this portion gas Boiler heating is sent into, this portion gas come out from boiler blasts dry put out after secondary filter dust removal process by circulating fan Stove helps coke-stove gas to burn.
Step 3:Dry coke quenching coal gas baker burner is quickly removed, disposable dust remover emergency diffusion is closed in closing baker hole Valve, uses N2To coke dry quenching furnace carry out gas displacement, to oxygen content≤5% it is qualified after, red burnt baker is thrown into coke dry quenching furnace, is put out with dry Burnt boiler inlet temperature T6For main management temperature, prestored a section temperature T with coke dry quenching furnace5For Added Management temperature, red heat coke is utilized For thermal source, N2For heat transfer carrier, at last most coke dry quenching boiler inlet temperature T6It is increased to 920 DEG C, coke dry quenching furnace prestores a section temperature T5 It is increased to 960 DEG C.The high temperature N come out from coke dry quenching furnace2Boiler is sent into after disposable dust remover dedusting and carries out heat exchange reduction temperature, Coke dry quenching furnace is blasted by circulating fan after secondary filter dedusting again to recycle.
Thrown into coke dry quenching furnace during red burnt baker, open the N of coke dry quenching furnace entrance2It is filled with valve continuous logical into coke dry quenching furnace Enter nitrogen, CO contents are in 0~6%, H in control cycle gas composition2Content is red burnt from dry within 0~2% safe range Furnace roof loading is put out, with coke dry quenching boiler inlet temperature T6For main management temperature, prestored a section temperature T with coke dry quenching furnace5For Added Management Temperature, control coke dry quenching boiler inlet temperature T6With 30 DEG C/h, coke dry quenching furnace prestores a section temperature T5Heated up with 15 DEG C/h.
Embodiment 4
As shown in Fig. 1~5, the furnace drying method after a kind of resistance to material large area replacing of dry quenching system comprises the following steps:
Step one:Warm air is dried, with coke dry quenching furnace inlet temperature T2For main management temperature, coke dry quenching furnace is prestored a section temperature T5 105 DEG C are raised to by normal temperature, following content is specifically included:
A, to built-in cold Jiao of coke dry quenching furnace so that cold Jiao covers central blast cap.
B, seal part manhole, retain a length of side and be used as baker hole for 300mm square hole.
C, air from disposable dust remover emergency diffusion valve imported into boiler, boiler added using low-pressure steam to air Heat, makes air be heated up with 13 DEG C/h speed, is heated to 168 DEG C of holdings.
D, the hot-air come out from boiler blasted into coke dry quenching furnace, coke dry quenching furnace is dried, prestore section in drying course Stress control is in 40-50Pa, until coke dry quenching furnace prestores after a section masonry temperature reaches 105 DEG C and keeps 24h.By Stress control 40~ 50Pa is able to ensure that a part of hot-air passes through the coke dry quenching furnace section that prestores and section masonry that prestores is heated, it is ensured that coke dry quenching furnace is pre- The uniform heating of section refractory material is deposited, the service life of refractory material is extended.
The air discharged from coke dry quenching furnace is delivered to after ground station for dust removal carries out dust removal process by environment dust collect plant and is discharged into Air, it is to avoid pollute to air.
Step 2:Make and dry coke quenching coal gas baker burner is installed, opened by adjusting disposable dust remover emergency diffusion valve Degree imports air and helps coke-stove gas to burn baker, is prestored a section temperature T with coke dry quenching furnace5For main management temperature, 500 are risen to DEG C, it is specific as follows:
E, 4 internal diameter 50mm front ends of making are flanged, the end nozzle dry coke quenching coal gas baker combustion vertical with gas piping Burner, the dry coke quenching coal gas baker burner includes supervisor 5, and 5 two ends of supervisor are respectively perpendicular the front end and end of setting, The front end is provided with flange 3, and the end is provided with nozzle 4, by baker hole by dry coke quenching coal gas baker burner end nozzle 4 It is positioned over above the central coke of coke dry quenching furnace and fixes, front end is connected with coke-stove gas supervisor 1 by flange 3.The dry coke quenching coal gas dries Burner makes simple, and installation need not use crane with dismounting operation, facilitate installing/dismounting, when coal gas baker terminates After can quickly remove, it is to avoid the take-down time is long, and the resistance to material cooling of coke dry quenching furnace is excessive.
F, startup circulating fan, are run with minimum speed, open disposable dust remover emergency diffusion valve, it is ensured that sufficient air Import in coke dry quenching furnace.
G, to each section of dry coke quenching coal gas baker burner progress N2Lighted a fire after displacement and the flow tune that slowly turns on the gas-fire Valve 2 is saved, by the flow of gas flow governor valve control coke-stove gas and the rotating speed of circulating fan is adjusted after lighting and once removes Dirt device emergency diffusion valve opening controls air imbibed quantity, coke dry quenching furnace masonry is heated up with 5 DEG C/h, until the furnace temperature of coke dry quenching furnace Rise to 500 DEG C.Waste gas after burning, partly diffuses from furnace roof and is delivered to through environment dust collect plant at ground station for dust removal progress dedusting Be discharged into air after reason, another part after disposable dust remover dust removal process with air mixing preheated air, then by this portion gas Boiler heating is sent into, this portion gas come out from boiler blasts dry put out after secondary filter dust removal process by circulating fan Stove.
Step 3:Dry coke quenching coal gas baker burner is quickly removed, disposable dust remover emergency diffusion is closed in closing baker hole Valve, uses N2To coke dry quenching furnace carry out gas displacement, to oxygen content≤5% it is qualified after, red burnt baker is thrown into coke dry quenching furnace, is put out with dry Burnt boiler inlet temperature T6For main management temperature, prestored a section temperature T with coke dry quenching furnace5For Added Management temperature, red heat coke is utilized For thermal source, N2For heat transfer carrier, at last most coke dry quenching boiler inlet temperature T6It is increased to 900 DEG C, coke dry quenching furnace prestores a section temperature T5 It is increased to 950 DEG C.The high temperature N come out from coke dry quenching furnace2Boiler is sent into after disposable dust remover dedusting and carries out heat exchange reduction temperature, Coke dry quenching furnace is blasted by circulating fan after secondary filter dedusting again to recycle.
Thrown into coke dry quenching furnace during red burnt baker, open the N of coke dry quenching furnace entrance2It is filled with valve continuous logical into coke dry quenching furnace Enter nitrogen, CO contents are in 0~6%, H in control cycle gas composition2Content is red burnt from dry within 0~2% safe range Furnace roof loading is put out, with coke dry quenching boiler inlet temperature T6For main management temperature, prestored a section temperature T with coke dry quenching furnace5For Added Management Temperature, control coke dry quenching boiler inlet temperature T6With 30 DEG C/h, coke dry quenching furnace prestores a section temperature T5Heated up with 15 DEG C/h.
Embodiment 5
As shown in Fig. 1~5, the furnace drying method after a kind of resistance to material large area replacing of dry quenching system comprises the following steps:
Step one:Warm air is dried, with coke dry quenching furnace inlet temperature T2For main management temperature, coke dry quenching furnace is prestored a section temperature T5 100 DEG C are raised to by normal temperature, following content is specifically included:
A, to built-in cold Jiao of coke dry quenching furnace so that cold Jiao covers central blast cap.
B, seal part manhole, retain a length of side and be used as baker hole for 300mm square hole.
C, air from disposable dust remover emergency diffusion valve imported into boiler, boiler added using low-pressure steam to air Heat, makes air be heated up with 15 DEG C/h speed, is heated to 162 DEG C of holdings.
D, the hot-air come out from boiler blasted into coke dry quenching furnace, coke dry quenching furnace is dried, prestore section in drying course Stress control is in 30-40Pa, until coke dry quenching furnace prestores after a section masonry temperature reaches 100 DEG C and keeps 24h.By Stress control 30~ 40Pa is able to ensure that a part of hot-air passes through the coke dry quenching furnace section that prestores and section masonry that prestores is heated, it is ensured that coke dry quenching furnace is pre- The uniform heating of section refractory material is deposited, the service life of refractory material is extended.
The air discharged from coke dry quenching furnace is delivered to after ground station for dust removal carries out dust removal process by environment dust collect plant and is discharged into Air, it is to avoid pollute to air.
Step 2:Make and dry coke quenching coal gas baker burner is installed, opened by adjusting disposable dust remover emergency diffusion valve Degree imports air and helps coke-stove gas to burn baker, is prestored a section temperature T with coke dry quenching furnace5For main management temperature, 500 are risen to DEG C, it is specific as follows:
E, 3 internal diameter 50mm front ends of making are flanged, the end nozzle dry coke quenching coal gas baker combustion vertical with gas piping Burner, the dry coke quenching coal gas baker burner includes supervisor 5, and 5 two ends of supervisor are respectively perpendicular the front end and end of setting, The front end is provided with flange 3, and the end is provided with nozzle 4, by baker hole by dry coke quenching coal gas baker burner end nozzle 4 It is positioned over above the central coke of coke dry quenching furnace and fixes, front end is connected with coke-stove gas supervisor 1 by flange 3.The dry coke quenching coal gas dries Burner makes simple, and installation need not use crane with dismounting operation, facilitate installing/dismounting, when coal gas baker terminates After can quickly remove, it is to avoid the take-down time is long, and the resistance to material cooling of coke dry quenching furnace is excessive.
F, startup circulating fan, are run with minimum speed, open disposable dust remover emergency diffusion valve, it is ensured that sufficient air Import in coke dry quenching furnace.
G, to each section of dry coke quenching coal gas baker burner progress N2Lighted a fire after displacement and the flow tune that slowly turns on the gas-fire Valve 2 is saved, by the flow of gas flow governor valve control coke-stove gas and the rotating speed of circulating fan is adjusted after lighting and once removes Dirt device emergency diffusion valve opening controls air imbibed quantity, coke dry quenching furnace masonry is heated up with 5 DEG C/h, until the furnace temperature of coke dry quenching furnace Rise to 500 DEG C.Waste gas after burning, partly diffuses from furnace roof and is delivered to through environment dust collect plant at ground station for dust removal progress dedusting Be discharged into air after reason, another part after disposable dust remover dust removal process with air mixing preheated air, then by this portion gas Boiler heating is sent into, this portion gas come out from boiler blasts dry put out after secondary filter dust removal process by circulating fan Stove.
Step 3:Dry coke quenching coal gas baker burner is quickly removed, disposable dust remover emergency diffusion is closed in closing baker hole Valve, uses N2To coke dry quenching furnace carry out gas displacement, to oxygen content≤5% it is qualified after, red burnt baker is thrown into coke dry quenching furnace, is put out with dry Burnt boiler inlet temperature T6For main management temperature, prestored a section temperature T with coke dry quenching furnace5For Added Management temperature, red heat coke is utilized For thermal source, N2For heat transfer carrier, at last most coke dry quenching boiler inlet temperature T6It is increased to 880 DEG C, coke dry quenching furnace prestores a section temperature T5 It is increased to 920 DEG C.The high temperature N come out from coke dry quenching furnace2Boiler is sent into after disposable dust remover dedusting and carries out heat exchange reduction temperature, Coke dry quenching furnace is blasted by circulating fan after secondary filter dedusting again to recycle.
Thrown into coke dry quenching furnace during red burnt baker, open the N of coke dry quenching furnace entrance2It is filled with valve continuous logical into coke dry quenching furnace Enter nitrogen, CO contents are in 0~6%, H in control cycle gas composition2Content is red burnt from dry within 0~2% safe range Furnace roof loading is put out, with coke dry quenching boiler inlet temperature T6For main management temperature, prestored a section temperature T with coke dry quenching furnace5For Added Management Temperature, control coke dry quenching boiler inlet temperature T6With 30 DEG C/h, coke dry quenching furnace prestores a section temperature T5Heated up with 15 DEG C/h.
Embodiment 6
The present embodiment and the difference of embodiment 1 are:
1st, in the process g of the step 2, coke dry quenching furnace masonry is the speed heating with 4.8 DEG C/h, until furnace temperature rises to 580 ℃;
2nd, in step 3, coke dry quenching boiler inlet temperature T6860 DEG C are warming up to 25 DEG C/h speed, and coke dry quenching furnace prestores section Temperature T5900 DEG C are warming up to 14 DEG C/h speed.
Embodiment 7
The present embodiment and the difference of embodiment 1 are:
1st, in the process g of the step 2, coke dry quenching furnace masonry is the speed heating with 4.5 DEG C/h, until furnace temperature rises to 560 ℃;
2nd, in step 3, coke dry quenching boiler inlet temperature T6840 DEG C are warming up to 25 DEG C/h speed, and coke dry quenching furnace prestores section Temperature T5880 DEG C are warming up to 13 DEG C/h speed.
Embodiment 8
The present embodiment and the difference of embodiment 1 are:
1st, in the process g of the step 2, coke dry quenching furnace masonry is the speed heating with 4.2 DEG C/h, until furnace temperature rises to 530 ℃;
2nd, in step 3, coke dry quenching boiler inlet temperature T6820 DEG C are warming up to 22 DEG C/h speed, and coke dry quenching furnace prestores section Temperature T5840 DEG C are warming up to 12 DEG C/h speed.
Embodiment 9
The present embodiment and the difference of embodiment one are:
1st, in the process g of the step 2, coke dry quenching furnace masonry is the speed heating with 4 DEG C/h, until furnace temperature rises to 540 ℃;
2nd, in step 3, coke dry quenching boiler inlet temperature T6800 DEG C are warming up to 20 DEG C/h speed, and coke dry quenching furnace prestores section Temperature T5800 DEG C are warming up to 10 DEG C/h speed.
It is noted that above-described embodiment is to the illustrative and not limiting of technical solution of the present invention, art is general The equivalent substitution of logical technical staff or the other modifications made according to prior art, as long as not exceeding technical solution of the present invention Thinking and scope, should be included within interest field of the presently claimed invention.

Claims (9)

1. the furnace drying method after a kind of resistance to material large area replacing of dry quenching system, it is characterised in that comprise the following steps:
Step one:Warm air is dried, with coke dry quenching furnace inlet temperature T2For main management temperature, the temperature T for section that coke dry quenching furnace is prestored5By Normal temperature is raised to 100 DEG C ~ 120 DEG C;
Step 2:The dry coke quenching coal gas baker burner of installation 3 ~ 5, is led by adjusting disposable dust remover emergency diffusion valve opening Entering air helps coke-stove gas to burn baker, is prestored a section temperature T with the coke dry quenching furnace5For main management temperature, 500 DEG C are risen to ~600℃;
Step 3:Dry coke quenching coal gas baker burner is quickly removed, closing baker hole is closed the disposable dust remover and promptly put Valve is dissipated, N is used2Gas displacement is carried out to coke dry quenching furnace, until O2Content reaches less than 5%, and red burnt baker is thrown into the coke dry quenching furnace, with Coke dry quenching boiler inlet temperature T6For main management temperature, prestored a section temperature T with the coke dry quenching furnace5For Added Management temperature, finally By the coke dry quenching boiler inlet temperature T6It is increased to 800 DEG C ~ 960 DEG C, the coke dry quenching furnace prestores a section temperature T5Be increased to 800 DEG C ~ 1050℃。
2. the furnace drying method after the resistance to material large area replacing of a kind of dry quenching system according to claim 1, it is characterised in that Dry coke quenching coal gas baker burner in the step 2 includes supervisor, and supervisor two ends are respectively perpendicular the front end and end of setting End, the front end is provided with flange, and the end is provided with nozzle.
3. the furnace drying method after the resistance to material large area replacing of a kind of dry quenching system according to claim 1 or 2, its feature exists In the internal diameter of the dry coke quenching coal gas baker burner is 50mm.
4. the furnace drying method after the resistance to material large area replacing of a kind of dry quenching system according to claim 2, it is characterised in that The nozzle of the dry coke quenching coal gas baker burner is positioned over above the central coke of coke dry quenching furnace by the baker hole and fixed, described The front end of dry coke quenching coal gas baker burner is connected with coke-stove gas supervisor by flange.
5. the furnace drying method after the resistance to material large area replacing of a kind of dry quenching system according to claim 1, it is characterised in that Baker hole in the step 3 is the square hole that the length of side retained after people's bore portion is sealed is 300 mm ~ 400mm.
6. the furnace drying method after the resistance to material large area replacing of a kind of dry quenching system according to claim 1, it is characterised in that A section temperature T that coke dry quenching furnace prestores in the step one5The method for being raised to 100 DEG C ~ 120 DEG C by normal temperature is as follows:
A, to built-in cold Jiao of the coke dry quenching furnace so that cold Jiao covers central blast cap;
B, by air from the disposable dust remover emergency diffusion valve import boiler, the boiler using low-pressure steam to air progress Heating, is heated to 160-170 DEG C of holding;
C, the hot-air come out from the boiler blasted into the coke dry quenching furnace, the coke dry quenching furnace is dried, in drying course The coke dry quenching furnace prestore section Stress control in 30-60Pa, until the coke dry quenching furnace section masonry temperature that prestores is reached after 100 DEG C ~ 120 DEG C Keep 24h.
7. the furnace drying method after the resistance to material large area replacing of a kind of dry quenching system according to claim 6, it is characterised in that The boiler is heated using low-pressure steam to air, and the air is heated up according to 10 DEG C/h ~ 15 DEG C/h speed.
8. the furnace drying method after the resistance to material large area replacing of a kind of dry quenching system according to claim 1, it is characterised in that Air is imported in the step 2 helps the method for coke-stove gas burning baker as follows:
Start circulating fan, run with minimum speed, open the disposable dust remover emergency diffusion valve, it is ensured that sufficient air is led Enter in the coke dry quenching furnace;
To described each section of progress N of dry coke quenching coal gas baker burner2Lighted a fire and the flow control valve that turns on the gas-fire, controlled after displacement Coke gas flow processed simultaneously adjusts the circulating fan rotating speed control air imbibed quantity, makes coke dry quenching furnace masonry with 4 DEG C/h ~ 5 DEG C/h Heated up, until furnace temperature rises to 500 DEG C ~ 600 DEG C.
9. the furnace drying method after the resistance to material large area replacing of a kind of dry quenching system according to claim 1, it is characterised in that Coke dry quenching boiler inlet temperature T in the step 36Prestored a section temperature T with the coke dry quenching furnace5Programming rate respectively according to T6≤ 30℃/h、T5≤ 15 DEG C/h is heated up.
CN201710223920.3A 2017-04-07 2017-04-07 Oven drying method for dry quenching system after large-area replacement of refractory Active CN106967448B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710223920.3A CN106967448B (en) 2017-04-07 2017-04-07 Oven drying method for dry quenching system after large-area replacement of refractory

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710223920.3A CN106967448B (en) 2017-04-07 2017-04-07 Oven drying method for dry quenching system after large-area replacement of refractory

Publications (2)

Publication Number Publication Date
CN106967448A true CN106967448A (en) 2017-07-21
CN106967448B CN106967448B (en) 2020-06-12

Family

ID=59337296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710223920.3A Active CN106967448B (en) 2017-04-07 2017-04-07 Oven drying method for dry quenching system after large-area replacement of refractory

Country Status (1)

Country Link
CN (1) CN106967448B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108624339A (en) * 2018-05-11 2018-10-09 鞍钢股份有限公司 Winter dry quenching furnace annual repair heat preservation method
CN108709413A (en) * 2018-05-24 2018-10-26 山东钢铁集团日照有限公司 A method of dry coke quenching warm air is carried out using combustion gas furnace and dries baker
CN110452717A (en) * 2019-08-05 2019-11-15 中冶焦耐(大连)工程技术有限公司 A kind of method and system for distributing comprehensive treatment coking tail gas rationally
CN113736494A (en) * 2020-05-29 2021-12-03 宝山钢铁股份有限公司 Coke oven gas collecting pipe voltage stabilization adjusting method
CN114736697A (en) * 2022-04-13 2022-07-12 山东四化环保节能工程有限公司 Heating method of dry quenching furnace

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58127778A (en) * 1982-01-25 1983-07-29 Ishikawajima Harima Heavy Ind Co Ltd Drying and heating of dry quenching equipment for coke
CN101747913A (en) * 2009-12-31 2010-06-23 山西太钢不锈钢股份有限公司 Method for baking dry quenching furnace
CN102304369A (en) * 2011-08-12 2012-01-04 重庆钢铁(集团)有限责任公司 Oven-drying working process for coke dry quenching system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58127778A (en) * 1982-01-25 1983-07-29 Ishikawajima Harima Heavy Ind Co Ltd Drying and heating of dry quenching equipment for coke
CN101747913A (en) * 2009-12-31 2010-06-23 山西太钢不锈钢股份有限公司 Method for baking dry quenching furnace
CN102304369A (en) * 2011-08-12 2012-01-04 重庆钢铁(集团)有限责任公司 Oven-drying working process for coke dry quenching system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
潘立慧 等: "《干熄焦技术》", 28 February 2005 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108624339A (en) * 2018-05-11 2018-10-09 鞍钢股份有限公司 Winter dry quenching furnace annual repair heat preservation method
CN108624339B (en) * 2018-05-11 2020-09-29 鞍钢股份有限公司 Winter dry quenching furnace annual repair heat preservation method
CN108709413A (en) * 2018-05-24 2018-10-26 山东钢铁集团日照有限公司 A method of dry coke quenching warm air is carried out using combustion gas furnace and dries baker
CN108709413B (en) * 2018-05-24 2020-06-30 山东钢铁集团日照有限公司 Method for dry quenching coke warm air drying oven by adopting flue gas oven
CN110452717A (en) * 2019-08-05 2019-11-15 中冶焦耐(大连)工程技术有限公司 A kind of method and system for distributing comprehensive treatment coking tail gas rationally
CN110452717B (en) * 2019-08-05 2024-03-19 中冶焦耐(大连)工程技术有限公司 Method and system for comprehensively treating coking tail gas by optimizing configuration
CN113736494A (en) * 2020-05-29 2021-12-03 宝山钢铁股份有限公司 Coke oven gas collecting pipe voltage stabilization adjusting method
CN114736697A (en) * 2022-04-13 2022-07-12 山东四化环保节能工程有限公司 Heating method of dry quenching furnace

Also Published As

Publication number Publication date
CN106967448B (en) 2020-06-12

Similar Documents

Publication Publication Date Title
CN106967448A (en) A kind of furnace drying method after the resistance to material large area replacing of dry quenching system
CN107109237A (en) Improved combustion characteristic for coking operation
CN108709413B (en) Method for dry quenching coke warm air drying oven by adopting flue gas oven
CN106867549A (en) A kind of coke dry quenching boiler do not stop production realize maintenance method
CN107419052A (en) The furnace drying method after fire proof material of furnace lining is changed in 120t converters
CN101353579B (en) 7.63m coke oven negative pressure in-furnace furnace drying method
CN109489030A (en) A kind of tobacco modulation biomass particle burning machine
CN109055713A (en) A kind of double-regenerative heating furnace board briquette and method for controlling furnace temperature
CN108531675A (en) A kind of blast furnace top ignition method
CN108707713A (en) A kind of hot-blast stove attemperator and method
CN105674278A (en) Garbage combustion furnace high in combustion efficiency
CN102559214A (en) Method for raising temperature in coke dry quenching furnace
CN106379866B (en) A kind of fluidized bed furnace for pyrite-based sulphuric acid ignition method of energy-saving and environmental protection
CN108278854A (en) A kind of diesel oil furnace drying method
CN104001853B (en) Heating device for casting used sand hot method regeneration technology and heating mode of heating device
CN109882869A (en) A kind of sulfur furnace furnace drying method
CN215049884U (en) Coke oven negative pressure oven drying equipment adopting positive pressure oven drying technology
CN201382423Y (en) Black smoke treating device for precision casting mold shell roasting furnace
CN208495252U (en) A kind of carbon black fuel oil gun rapid purging device
CN103913056B (en) Alloy baking method
CN203454183U (en) Burner assembly for converter waste heat recovery boiler
US2805143A (en) Method and apparatus for heating metal
CN110467932A (en) A method of for coke dry quenching boiler fast cooling
CN106855352B (en) A kind of furnace drying method of chimney
CN210267258U (en) Exhaust gas ignition device

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant