CN106963016B - Heat sticking machine - Google Patents

Heat sticking machine Download PDF

Info

Publication number
CN106963016B
CN106963016B CN201611233372.4A CN201611233372A CN106963016B CN 106963016 B CN106963016 B CN 106963016B CN 201611233372 A CN201611233372 A CN 201611233372A CN 106963016 B CN106963016 B CN 106963016B
Authority
CN
China
Prior art keywords
roller
seat
fixed
pinch roller
synchronous pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611233372.4A
Other languages
Chinese (zh)
Other versions
CN106963016A (en
Inventor
陈中华
谢作中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Zhigu Electromechanical Technology Co Ltd
Original Assignee
Changzhou Zhigu Electromechanical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Zhigu Electromechanical Technology Co Ltd filed Critical Changzhou Zhigu Electromechanical Technology Co Ltd
Priority to CN201611233372.4A priority Critical patent/CN106963016B/en
Publication of CN106963016A publication Critical patent/CN106963016A/en
Priority to PCT/CN2017/113260 priority patent/WO2018121159A1/en
Application granted granted Critical
Publication of CN106963016B publication Critical patent/CN106963016B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A41WEARING APPAREL
    • A41HAPPLIANCES OR METHODS FOR MAKING CLOTHES, e.g. FOR DRESS-MAKING OR FOR TAILORING, NOT OTHERWISE PROVIDED FOR
    • A41H43/00Other methods, machines or appliances
    • A41H43/04Joining garment parts or blanks by gluing or welding ; Gluing presses

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

The invention discloses a kind of hot melt sticking machine, main points are:Including workbench, adjusting part, feed device, press-roller device, shear and hot air apparatus.Workbench bag including rack, first movement portal frame, front and rear walking mechanism, left and right walking mechanism and the second mounting suspension.First movement portal frame is arranged on by front and rear walking mechanism in rack, can be moved forward and backward.Second mounting suspension is arranged on by left and right walking mechanism on first movement portal frame, can be moved left and right.Feed device, press-roller device and hot air apparatus are rotatably arranged on by adjusting part on the second mounting suspension of workbench.Feed device is used to install corresponding hot melt adhesive film and recycles corresponding release paper.Press-roller device is used to overlay hot melt adhesive film in corresponding fabric.Shear is arranged on press-roller device, for cutting off hot melt adhesive film.Hot air apparatus is used to heat hot melt adhesive film.

Description

Heat sticking machine
Technical field
The present invention relates to a kind of clothes processing equipment fields, and in particular to a kind of that hot melt adhesive film is attached on garment material Heat sticking machine.
Background technology
Clothes are the product for being through at human body and playing protection and decorative effect sewed with fabric, also known as clothes.Most start to occur Clothes mainly for the purpose of hushing up a scandal, the development in elapsed time has turned to practicability, while also more focuses on the aesthetics of clothes. The quality because being known as fabric of influence aesthetics, color, floral designs, shape keeping property, drapability, elasticity, wrinkle resistance, clothes Style etc..
It is the stitch being fixed on filler and lining in face to sew with long stitches line.The line of sewing with long stitches of traditional down jackets can be broken to fabric generation Bad (having pin hole), tiny natural feather from the pin hole for sew with long stitches line it is possible that can leak out, so as to influence the aesthetics and quality of clothes.Clothes Seamless rubberizing technology is exactly to paste lining and face with hot melt adhesive film item to replace traditional line of sewing with long stitches, the clothes worked it out in this way from Outer viewing better appearance, generous while tiny eiderdown quilt are well fixed between lining and face.These techniques are big at present Majority carries out rubberizing by hand, and efficiency is too low.
Invention content
The object of the present invention is to provide a kind of simple in structure, rubberizing it is efficient be used for hot melt adhesive film item is attached to garment surface Hot melt sticking machine on material.
Realizing the basic technical scheme of the object of the invention is:A kind of hot melt sticking machine, is structurally characterized in that:Including work Platform, adjusting part, feed device, press-roller device, shear and hot air apparatus.Workbench bag including rack, first movement gantry Frame, front and rear walking mechanism, left and right walking mechanism and the second mounting suspension.First movement portal frame is set by front and rear walking mechanism In rack, it can be moved forward and backward.Second mounting suspension is arranged on by left and right walking mechanism on first movement portal frame, can left and right It is mobile.Feed device, press-roller device and hot air apparatus are rotatably arranged on by adjusting part on the second mounting suspension of workbench. Feed device is used to install corresponding hot melt adhesive film and recycles corresponding release paper.Press-roller device is used to overlay hot melt adhesive film On corresponding fabric.Shear is arranged on press-roller device, for cutting off hot melt adhesive film.Hot air apparatus is used to heat hot melt adhesive Film.
Technical solution based on above-mentioned basic technical scheme is:Workbench further includes absorptive table component.Absorptive table group Part includes airdraft plate, suspended hood and wind turbine.Airdraft plate is equipped with several wind inlets.Airdraft plate is closed to be fixed at suspended hood On, suspended hood is fixed in rack.Wind turbine is connected by corresponding air hose with suspended hood.
Technical solution based on above-mentioned corresponding technical solution is:The front and rear walking mechanism of workbench includes left side straight line Synchronous pulley, left side synchronous belt, right side the linear guide, right side preamble belt wheel, the right side behind guide rail, left side preamble belt wheel, left side Synchronous pulley, right side synchronous belt, driving motor, the first synchronous pulley of middle part, the second synchronous pulley of middle part, middle part synchronize behind side Band, the first drive shaft and front and rear detection limiting device.First drive shaft is along left and right to being rotatably arranged in rack.Left side straight line is led Rail is from its guide rail along front and rear on the left part for being fixed at rack.Preamble belt wheel in left side is turned by being tensioned mounting base accordingly It is dynamic to be arranged on the left part forepart of rack.The left end of first drive shaft is rotatably arranged on the left part of rack by corresponding mounting base On rear portion, synchronous pulley is fixed on the left end of the first drive shaft behind left side, and in the mounting base.Left side synchronous belt Synchronous pulley is set after left side preamble belt wheel and left side.Right side the linear guide is from its guide rail along front and rear to being fixed at On the right part of rack.Preamble belt wheel in right side is rotatably arranged on by being tensioned mounting base accordingly on the right part forepart of rack.The The right end of one drive shaft is rotatably arranged on by corresponding mounting base on the right part rear portion of rack, and synchronous pulley is fixed and set behind right side It puts on the right end of the first drive shaft, and in the mounting base.Right side synchronous belt is after right side preamble belt wheel and right side Synchronous pulley is set.Driving motor is fixed at by being tensioned mounting base accordingly in the middle part of the rear portion of rack, motor shaft Edge is controlled to setting.The first synchronous pulley of middle part is fixed on the motor shaft of driving motor.Pass through phase in the middle part of first drive shaft On the mounting base answered is rotatably arranged in the middle part of the rear portion of rack, the second synchronous pulley of middle part is fixed in the first drive shaft In portion, and in the mounting base.Middle part synchronous belt is set around the first synchronous pulley of middle part and the second synchronous pulley of middle part.The The left part of one mobile gantry frame is fixed on the sliding block of left side the linear guide.The left part of first movement portal frame passes through corresponding Synchronous clamping be fixedly connected with left side synchronous belt.The right part of first movement portal frame is fixed at the cunning of right side the linear guide On block.The right part of first movement portal frame is fixedly connected by corresponding synchronous clamping with right side synchronous belt.So as to by driving electricity Machine driving first movement portal frame is moved forward and backward along left side the linear guide and right side the linear guide.Front and rear detection limiting device is used for The front and back position residing for first movement portal frame is detected, limits the sagittal stroke of first movement portal frame.Left and right walking mechanism Including front side the linear guide, rear side the linear guide, third synchronous pulley, the 4th synchronous pulley, left and right synchronous belt, left and right driving electricity Machine and left and right detection limiting device.Front side the linear guide is from its guide rail along controlling to the upper of first movement portal frame is fixed at On on front side of portion.Rear side the linear guide is from its guide rail along left and right on being fixed on rear side of the top of first movement portal frame.The Four synchronous pulleys are rotatably arranged on by corresponding backstand on the right part of first movement portal frame.Left and right driving motor fixation is set It puts on the left part of first movement portal frame, motor shaft is along front and rear to setting.Third synchronous pulley is fixed at left and right and drives On the motor shaft of dynamic motor.Left and right synchronous belt is set around third synchronous pulley and the 4th synchronous pulley.Second mounting suspension is consolidated Surely it is arranged on the sliding block of front side the linear guide and rear side the linear guide.Second mounting suspension passes through corresponding synchronous clamping and a left side Right synchronous belt is fixedly connected.So as to the second mounting suspension be driven to be led along front side the linear guide and rear side straight line by left and right driving motor Rail side-to-side movement.Left and right detection limiting device for detecting the right position residing for the second mounting suspension, hang by the second installation of limitation Frame or so to stroke.
Technical solution based on above-mentioned corresponding technical solution is:Adjusting part includes regulation motor and rotation seat.It adjusts Section motor is fixed on the second mounting suspension of workbench.Rotation seat is rotatably arranged on the second mounting suspension, rotation Axis vertical is set, and rotation seat is driven along its pivot axis by regulation motor.It is equipped with above and below it in the middle part of rotation seat Center through hole.
Technical solution based on above-mentioned corresponding technical solution is:Feed device includes feeding mounting bracket, loading tray group Part, recovering tray component, rewinding driving device and tape tensioning device.Loading tray component includes left loading tray, right loading tray, first Wheel shaft, damping sleeve and damping sheet.First round axis is rotatably arranged on the top rear portion of mounting bracket.Left loading tray is fixed at On one wheel shaft right part.Right loading tray is detachably fixed by corresponding locking wheel and is arranged on the first wheel shaft, positioned at left loading tray Right side.Damping sleeve is fixed on the first wheel shaft.Damping sheet is fixed on feeding mounting bracket, and damping sheet elasticity is pushed down Damping sleeve.First wheel shaft left end is equipped with air admission hole, and right end is equipped with gas outlet, and air admission hole is connected with gas outlet.Gas outlet is located at Between left loading tray and right loading tray.First wheel shaft left end is additionally provided with air inlet duct, and air inlet duct is circumferentially disposed along the first wheel shaft The annular groove of outward opening.Air admission hole is connected with air inlet duct.The left and right sides of air inlet duct is equipped with seal groove, in seal groove Equipped with corresponding sealing ring.Recovering tray component includes left rewinding disk, right rewinding disk and the second wheel shaft.Second wheel shaft is rotatably arranged on On the top forepart of mounting bracket.Left rewinding disk is fixed on the second wheel shaft, and right rewinding disk is removable by corresponding locking wheel It unloads and is fixed on the second wheel shaft, positioned at the right side of left rewinding disk.Rewinding driving device includes rewinding motor, rewinding first together Walk belt wheel, the second synchronous pulley of rewinding and rewinding synchronous belt.Rewinding motor is fixed at peace by being tensioned mounting base accordingly It shelves.The first synchronous pulley of rewinding is fixed on the motor shaft of rewinding motor.The second synchronous pulley of rewinding is fixedly installed On left section of the second wheel shaft of recovering tray component.Rewinding synchronous belt surrounds the second synchronous belt of the first synchronous pulley of rewinding and rewinding Wheel setting.Tape tensioning device includes air bag seat, air bag, inlet suction port and bladder joint.Left dress is coaxially fixedly installed in air bag seat On charging tray, between left loading tray and right loading tray.Air bag seat right part periphery is equipped with baffle portion.Air bag seat is equipped with and first The mounting groove inside and outside it that the gas outlet of wheel shaft communicates.Air bag is arranged between the baffle portion of air bag seat and left loading tray, The air inlet of air bag by bladder joint with the gas outlet of the first wheel shaft is closed connects.Bladder joint is fixed at left loading tray On, corresponding portion is located in the mounting groove of air bag seat.Inlet suction port is equipped with intake interface, and inlet suction port is fixed at feeding On mounting bracket.The left end of first wheel shaft is rotatably arranged in inlet suction port.Inlet suction port is by being arranged on the sealing of the first wheel shaft The left end of corresponding sealing ring and the first wheel shaft in ring recess is tightly connected, the intake interface of inlet suction port and the first wheel shaft into Air drain communicates.
Technical solution based on above-mentioned corresponding technical solution is:Press-roller device include roller seat, roller, roller frame, First driving cylinder, guide-localization component, auxiliary feeding material component and speed detector.The rotation seat of roller seat and adjusting part It is fixedly connected.Roller is rotatably arranged on the forepart of roller frame.Roller frame is rotatably arranged on by its middle part on roller seat.First drives Cylinder of taking offence is hinged on by its cylinder body on roller seat.The cylinder rod of first driving cylinder and the rear end of roller frame are articulated and connected.By One driving cylinder lifts roller by roller frame.Guide-localization component includes the second leading truck, third guide locating frame and determines Position seat.Second leading truck is fixed on the forepart of roller seat.On the forepart of second guide locating frame fixed setting roller seat, Positioned at the lower section of the second leading truck.Positioning seat includes positioning plate and cover board.Positioning plate is fixed on the forepart of roller seat, position In the lower section of the second guide locating frame.Positioning plate is equipped with the forward locating slot of opening above and below it.The width of locating slot with The width of hot melt adhesive film is corresponding.Cover board is hinged on positioning plate, cover board is made to cover tightly on positioning plate by corresponding torsional spring.It is auxiliary Feeding material component is helped to include the first pinch roller, the second pinch roller, the first transmission gear, the second transmission gear, pinch roller driving motor, pinch roller the One synchronous pulley, the second synchronous pulley of pinch roller, pinch roller synchronous belt, the second pinch roller seat, pinch roller adjustment seat, pinch roller adjust cylinder, send Expect tracheae and pressure roller damping sheet.First pinch roller, the first transmission gear and the second synchronous pulley of pinch roller sequentially coaxially turn from left to right Dynamic to be arranged on roller seat, the first pinch roller, the first transmission gear and the second synchronous pulley of pinch roller rotate synchronously.Pinch roller driving motor It is fixed on roller seat by corresponding backstand.The first synchronous pulley of pinch roller is fixed at the electricity of pinch roller driving motor On arbor.Pinch roller synchronous belt is set around the first synchronous pulley of pinch roller and the second synchronous pulley of pinch roller.It is driven by pinch roller driving motor Dynamic first pinch roller and the rotation of the first transmission gear.Second pinch roller and the second transmission gear, which rotate coaxially, is arranged on the second pinch roller seat On, the second pinch roller and the second transmission gear rotate synchronously.Second transmission gear is meshed with the first transmission gear, the second driving cog The gear ratio of wheel and the first transmission gear is 1:1.Pinch roller adjustment seat is rotatably arranged on by its middle part on roller seat, the second pinch roller seat It is fixed on the lower end of pinch roller adjustment seat, pinch roller adjusts the upper end that cylinder is fixed at pinch roller adjustment seat by its cylinder body On.Compressed spring is equipped between the lower part of second pinch roller seat and roller seat.Feeding tracheae is fixed on roller seat, towards roller Lower front blow.Pressure roller damping sheet is resiliently arranged on roller seat, under the front upper of roller, pressure roller damping sheet Portion's elasticity pushes down the front upper corresponding site of roller, for preventing roller from dallying.The front side of pressure roller damping sheet, which is equipped with to be oriented to, determines Position slot.Speed detector includes the first U-shaped optoelectronic switch and the first detection plate.First U-shaped optoelectronic switch is fixed at pressure On roller seat.First detection plate is fixed on the motor shaft of pinch roller driving motor, passes through the first inspection by the first U-shaped optoelectronic switch Drafting board determines the rotating speed of pinch roller driving motor.
Technical solution based on above-mentioned corresponding technical solution is:Shear includes upper cutter, lower cutter, cutter and drives It takes offence cylinder, cutter backing plate and cutter air passage block.Cutter backing plate is fixed on roller seat, positioned at the second pinch roller and roller it Between.Cutter backing plate is equipped with the forward adhesive tape slot of opening above and below it.Upper cutter is fixed on cutter backing plate.On cut Knife is equipped with feeding stomata.Feeding stomata has 2, and 2 feeding stomatas are set gradually from top to bottom.Feeding stomata and adhesive tape slot phase Connection.The angle α of feeding stomata and horizontal plane is 30 degree to 70 degree.Lower cutter is rotatably arranged on roller seat, with upper cutter shape Into cutting mechanism.By the driving lower cutter rotation of cutter driving cylinder, lower cutter is made to carry out shearing hot melt adhesive film operation with upper cutter. Cutter air passage block is fixed on upper cutter, for connecting feeding stomata and corresponding feeder.
Technical solution based on above-mentioned corresponding technical solution is:Hot air apparatus includes hot wind gun platform, heat gun, connection Seat, heat gun adjustment seat, guide rod, directive wheel, regulating arm, first adjust cylinder, the second adjusting cylinder and third and adjust cylinder. Feeding mounting bracket is fixed at by its lower end on the top of hot wind gun platform.The rotation seat of hot wind gun platform and adjusting part, which is fixed, to be connected It connects.Heat gun, which is adjusted, to be fixed in heat gun adjustment seat, and short transverse, which does circular motion, makes the tuyere of its heat gun The distance between roller remains unchanged.Heat gun adjustment seat is slidably arranged on connecting seat, can be moved forward and backward.Second adjusts gas Cylinder is fixed at by its cylinder body on the left part of heat gun adjustment seat, and cylinder rod is fixedly connected with connecting seat.Third adjusts gas Cylinder is fixed at by its cylinder body on the right part of heat gun adjustment seat, and cylinder rod is fixedly connected with connecting seat.So as to pass through the Two adjusting cylinders and third, which adjust cylinder, is moved forward and backward heat gun adjustment seat.Guide rod is along controlling to heat gun is fixed at On seat, guide rod is arc-shaped.Directive wheel has 2, and 2 wheel designs are identical, are circumferentially with guide rod slot along it.2 Directive wheel is rotatably arranged on connecting seat successively from top to bottom, and guide rod is located in the guide rod slot of 2 directive wheels.Adjust gas Cylinder is fixed on hot wind gun platform, and one end and the connecting seat of regulating arm are rotatablely connected, and the other end of regulating arm is with adjusting cylinder Cylinder rod be hinged, the middle part of regulating arm is rotatablely connected with hot wind gun platform.So as to make connecting seat along guide rod by adjusting cylinder It swings.
The present invention has positive effect:(1)The configuration of the present invention is simple, feed device, press-roller device and hot air apparatus lead to It overregulates component to be rotatably arranged on workbench, can not only realize the patch hot melt adhesive film operation of 360 ° omni-directional, and can be real It now works continuously back and forth, greatly improves production efficiency.
(2)Feed device, press-roller device and the hot air apparatus of the present invention is rotatably arranged on workbench by adjusting part On second mounting suspension, walking mechanism and left and right walking mechanism can carry out the joint strip operation of curvilinear style before and after cooperation so that moulding It is more beautiful and various.Walking mechanism uses the linear guide, by toothed belt transmission, operates steadily.
(3)The present invention workbench be equipped with absorptive table component, can by fabric securely it is smooth be absorbed and fixed on airdraft plate, Help to improve the quality of rubberizing.
(4)The present invention is equipped with feed device, and feed device is also equipped with recovering tray component, can be equal by two sides while feeding The release paper recycling that wherein one side is taken off of hot melt adhesive film with release paper, further improves rubberizing quality and automation journey Degree.
(5)The present invention is equipped with feed device and is equipped with the first trigger switch, when the release paper on the second wheel shaft is more and more, Release paper can be tensioned to push down the first trigger switch upwards, make the rewinding of rewinding driving device electric after triggering the first trigger switch Machine stops operating, and is avoided that feeding excessively causes to accumulate, using reliable.
(6)The present invention's is equipped with tape tensioning device, facilitates and installs the coiled two sides hot melt adhesive film with release paper, energy Easily hot melt adhesive film is sleeved on tensioning apparatus, while also adapts to the hot melt adhesive film that round inner ring slightly deforms, after tensioning Fixation good reliability.
(7)The press-roller device of the present invention is equipped with limited post, and roller and airdraft plate distance can be prevented too near, avoid roller rubberizing When cloth is dragged can together.
(8)The press-roller device of the present invention is equipped with guide-localization component, can accurately position hot melt adhesive film, guide-localization group Part positioning seat is equipped with cover board, and installation adhesive tape is convenient, using reliable.
(9)The press-roller device of the present invention is equipped with auxiliary feeding material component, and auxiliary feeding material component is in use, pinch roller adjusts cylinder Cylinder rod stretches out the corresponding portion for withstanding roller seat so that the lower end of pinch roller adjustment seat is close to roller seat, so as to drive second Pinch roller seat is close to roller seat, even if also adhesive tape is pressed on the first pinch roller by the second pinch roller, while makes the second transmission gear and One transmission gear is in meshing state, conveys hot melt adhesive film down by the second pinch roller and the first pinch roller common rotation, send Material is stablized.When needing replacing hot melt adhesive film, the cylinder rod that pinch roller adjusts cylinder is retracted, and compressed spring will be under pinch roller adjustment seat Hold to far from roller seat direction jack up, so as to make the second pinch roller far from the first pinch roller, at this point, by the hot melt adhesive film after replacement from Second pinch roller reloads conveniently far from being passed through between the first pressure.
(10)The auxiliary feeding material component of the press-roller device of the present invention is equipped with feeding tracheae, and feeding tracheae is towards under the forepart of roller Side blows, for the hot melt adhesive film end after cutting to be blowed to roller, convenient for roller rubberizing.Pressure roller damping sheet is resiliently arranged in pressure On roller seat, positioned at the front upper of roller, the lower elastic of pressure roller damping sheet pushes down the front upper corresponding site of roller, is used for Prevent roller from dallying.The front side of pressure roller damping sheet is equipped with guide-localization slot, it is ensured that rubberizing is accurate.
(11)The press-roller device of the present invention is equipped with speed detector, and speed detector can determine that pinch roller driving motor Rotating speed can ensure that stable feeding, rubberizing even uniform.
(12)The present invention is equipped with shear, can cut off hot melt adhesive film, improve processing efficiency, further improves certainly Dynamicization degree.The cutter backing plate of shear is equipped with the forward adhesive tape slot of opening above and below it, can accurately positioning heat The position of melten gel film, it is ensured that rubberizing is accurate.Upper cutter is equipped with feeding stomata, and feeding stomata is connected with adhesive tape slot;Feeding gas The angle of hole and horizontal plane is 30 degree to 70 degree, is conducive to down convey the hot melt adhesive film end of cut-out.
(13)The heat gun of the hot air apparatus of the present invention, which is adjusted, to be fixed in heat gun adjustment seat, short transverse Doing circular motion remains unchanged the distance between the tuyere of its heat gun and roller, it is ensured that the hot wind blown on hot melt adhesive film is protected Hold consistent temperature.When preparing rubberizing operation, the cylinder rod of the second adjusting cylinder and third adjusting gas is retracted simultaneously so that hot wind Rifle adjustment seat moves backward, though also the tuyere of heat gun by hot melt adhesive film top to roller, hot melt adhesive film is enable to be bonded with roller, Ensure that rubberizing position is accurate, it is very big to improve product quality.
(14)The heat gun of the hot air apparatus of the present invention can make its tuyere swing disengaging roller by adjusting cylinder, prolong significantly The service life of roller is grown.
Description of the drawings
Fig. 1 is the structure diagram of the hot melt sticking machine of the present invention;
Fig. 2 is the left view schematic diagram of Fig. 1;
The right side that Fig. 3 is Fig. 1 regards schematic diagram;
Fig. 4 is the schematic rear view of Fig. 1;
Fig. 5 is the schematic top plan view of Fig. 1;
Schematic diagram when Fig. 6 is from the front upper right of Fig. 1;
Schematic diagram when Fig. 7 is from the left anterior-superior part of Fig. 1;
Schematic diagram when Fig. 8 is from the right front lower side of Fig. 1;
Fig. 9 is the structure diagram of the workbench in Fig. 6, is used to protect front and rear walking accordingly in rack wherein eliminating The baffle of mechanism and dust-proof corrugated cover;
Schematic diagram when Figure 10 is from the left anterior-superior part of Fig. 9;
Schematic diagram when Figure 11 is from the right back upper place of Fig. 9;
The enlarged structure schematic diagram of absorptive table component when Figure 12 is from the left front lower section of Fig. 1;
The enlarged structure schematic diagram of feed device when Figure 13 is from the left front lower section of Fig. 1;
The enlarged structure schematic diagram of feed device when Figure 14 is from the front upper right of Fig. 1, wherein eliminating loading tray The right loading tray of component and the right rewinding disk of recovering tray component;
First wheel shaft of the loading tray component of feed device and adhesive tape tensioning dress when Figure 15 is from the left front lower section of Fig. 1 It puts, the enlarged structure schematic diagram of air bag seat, air bag and bladder joint;
Figure 16 is the enlarged structure schematic diagram of the first wheel shaft of the loading tray component of feed device;
The enlarged structure schematic diagram of press-roller device and shear when Figure 17 is from the front upper right of Fig. 1;
The enlarged structure schematic diagram of press-roller device and shear when Figure 18 is from the right front lower side of Fig. 1;
The enlarged structure schematic diagram of press-roller device and shear when Figure 19 is from the right back lower place of Fig. 1;
The enlarged structure schematic diagram of press-roller device and shear when Figure 20 is from the left anterior-superior part of Fig. 1;
Enlarged structure schematic diagrams of the Figure 21 for the upper cutter of the shear in Fig. 1, cutter backing plate and cutter air passage block;
Figure 22 is the A-A schematic cross-sectional views in Figure 21;
The enlarged structure schematic diagram of hot air apparatus when Figure 23 is from the front upper right of Fig. 1;
The enlarged structure schematic diagram of hot air apparatus when Figure 24 is from the left anterior-superior part of Fig. 1;
The enlarged structure schematic diagram of hot air apparatus when Figure 25 is from the left back lower section of Fig. 1.
Label in above-mentioned attached drawing is as follows:
Workbench 1,
Rack 11,
First movement portal frame 12,
Front and rear walking mechanism 13, left side the linear guide 13-1, left side preamble belt wheel 13-2, synchronous pulley 13- behind left side 3, left side synchronous belt 13-4, right side the linear guide 13-5, right side preamble belt wheel 13-6, synchronous pulley 13-7 behind right side, right side Synchronous belt 13-8, driving motor 13-9, middle part the first synchronous pulley 13-10, middle part the second synchronous pulley 13-11, middle part synchronize Band 13-12, the first drive shaft 13-13,
Left and right walking mechanism 14, front side the linear guide 14-1, rear side the linear guide 14-2, third synchronous pulley 14-3, the Four synchronous pulley 14-4, left and right synchronous belt 14-5, left and right driving motor 14-6,
Second mounting suspension 15,
Absorptive table component 16, airdraft plate 16-1, suspended hood 16-2, wind turbine 16-3,
Dust-proof corrugated cover 17,
Adjusting part 2, regulation motor 21, rotation seat 22, center through hole 22-1,
Feed device 3,
Feeding mounting bracket 31,
Loading tray component 32, left loading tray 32-1, right loading tray 32-2, the first wheel shaft 32-3, air admission hole 32-31, outlet Mouth 32-32, air inlet duct 32-33, seal groove 32-34, damping sleeve 32-4, damping sheet 32-5,
Recovering tray component 33, left rewinding disk 33-1, right rewinding disk 33-2, the second wheel shaft 33-3,
Rewinding driving device 34, rewinding motor 34-1, rewinding the first synchronous pulley 34-2, the second synchronous pulley of rewinding 34- 3, rewinding synchronous belt 34-4,
Tape tensioning device, air bag seat 35-1, baffle portion 35-1a, mounting groove 35-1b, air bag 35-2, inlet suction port 35- 3, intake interface 35-31, bladder joint 35-4,
First guide locating frame 36, the first trigger switch 37,
Press-roller device 4, roller seat 41, roller 42, roller frame 43, the first driving cylinder 44, limited post 45,
Guide-localization component 46, the second leading truck 46-1, third guide locating frame 46-2, positioning seat 46-3, positioning plate 46- 31, locating slot 46-31a, cover board 46-32,
Assist feeding material component 47, the first pinch roller 47-1, the second pinch roller 47-2, the first transmission gear 47-3, the second driving cog Take turns 47-4, pinch roller driving motor 47-5, pinch roller the first synchronous pulley 47-6, pinch roller the second synchronous pulley 47-7, the second pinch roller seat 47-8, pinch roller adjustment seat 47-9, pinch roller adjust cylinder 47-10, feeding tracheae 47-11, pressure roller damping sheet 47-12, guide-localization Slot 47-12a,
Speed detector 48, the first U-shaped optoelectronic switch 48-1, the first detection plate 48-2,
Shear 5, upper cutter 51, feeding stomata 51-1, lower cutter 52, cutter driving cylinder 53, cutter backing plate 54, glue Trough of belt 54-1, cutter air passage block 55,
Hot air apparatus 6, hot wind gun platform 61, heat gun 62, connecting seat 63, heat gun adjustment seat 64, guide rod 65, directive wheel 66, guide rod slot 66-1, regulating arm 67 adjust cylinder 68, and second adjusts cylinder 69a, and third adjusts cylinder 69b.
Specific embodiment
The description in the orientation of the present invention is carried out according to orientation shown in FIG. 1 namely direction up and down shown in FIG. 1 is The direction up and down of description, a side of court of Fig. 1 institutes is front, and the side away from Fig. 1 is rear.
(Embodiment 1)
See Fig. 1 to Fig. 8, hot melt sticking machine of the invention includes workbench 1, adjusting part 2, feed device 3, press-roller device 4th, shear 5 and hot air apparatus 6.Feed device 3, press-roller device 4 and hot air apparatus 6 are rotatably arranged on by adjusting part 2 On workbench 1.
See Fig. 1 to Figure 12, workbench 1 includes rack 11, first movement portal frame 12, front and rear walking mechanism 13, left and right rows Walk mechanism 14, the second mounting suspension 15, absorptive table component 16.First movement portal frame 12 is arranged on by front and rear walking mechanism 13 In rack 11, it can be moved forward and backward.Second mounting suspension 15 is arranged on by left and right walking mechanism 14 on first movement portal frame 12, It can move left and right.
See Fig. 1 to Figure 12, front and rear walking mechanism 13 includes left side the linear guide 13-1, left side preamble belt wheel 13-2, a left side It is same behind synchronous pulley 13-3, left side synchronous belt 13-4, right side the linear guide 13-5, right side preamble belt wheel 13-6, right side behind side Walk belt wheel 13-7, right side synchronous belt 13-8, driving motor 13-9, middle part the first synchronous pulley 13-10, the second synchronous pulley of middle part 13-11, middle part synchronous belt 13-12, the first drive shaft 13-13 and front and rear detection limiting device.First drive shaft 13-13 edges left and right To being rotatably arranged in rack 11.Left side the linear guide 13-1 is from its guide rail along front and rear to the left part for being fixed at rack 11 On.Left side preamble belt wheel 13-2 is rotatably arranged on by being tensioned mounting base accordingly on the left part forepart of rack 11.First drives The left end of moving axis 13-13 is rotatably arranged on by corresponding mounting base on the left part rear portion of rack 11, synchronous pulley 13- behind left side 3 are fixed on the left end of the first drive shaft 13-13, and in the mounting base.Before left side synchronous belt 13-4 surrounds left side Synchronous pulley 13-3 is set behind synchronous pulley 13-2 and left side.Right side the linear guide 13-5 is from its guide rail along front and rear to fixed setting On the right part of rack 11.Right side preamble belt wheel 13-6 is rotatably arranged on the right part of rack 11 by being tensioned mounting base accordingly On forepart.The right end of first drive shaft 13-13 is rotatably arranged on by corresponding mounting base on the right part rear portion of rack 11, right side Synchronous pulley 13-7 is fixed on the right end of the first drive shaft 13-13 afterwards, and in the mounting base.Right side synchronous belt 13-8 synchronous pulley 13-7 after right side preamble belt wheel 13-6 and right side are set.Driving motor 13-9 by being tensioned accordingly On mounting base is fixed in the middle part of the rear portion of rack 11, motor shaft edge is controlled to setting.Middle part the first synchronous pulley 13-10 It is fixed on the motor shaft of driving motor 13-9.
Fig. 9 and Figure 11 are seen, after the middle part of the first drive shaft 13-13 is rotatably arranged on rack 11 by corresponding mounting base On in the middle part of portion, middle part the second synchronous pulley 13-11 is fixed on the middle part of the first drive shaft 13-13, and positioned at the installation In seat.Middle part synchronous belt 13-12 is set around middle part the first synchronous pulley 13-10 and middle part the second synchronous pulley 13-11.
See Fig. 9 to Figure 11, the left part of first movement portal frame 12 is fixed on the sliding block of left side the linear guide 13-1, The sliding block has 2.The left part of first movement portal frame 12 is fixed by corresponding synchronous clamping and left side synchronous belt 13-4 to be connected It connects.The right part of first movement portal frame 12 is fixed on the sliding block of right side the linear guide 13-5, and the sliding block has 2.The The right part of one mobile gantry frame 12 is fixedly connected by corresponding synchronous clamping with right side synchronous belt 13-8.So as to by driving motor 13-9 driving first movements portal frame 12 is moved forward and backward along left side the linear guide 13-1 and right side the linear guide 13-5.Front and rear detection Limiting device is used to detect the front and back position residing for first movement portal frame 12,12 sagittal row of limitation first movement portal frame Journey.
See Fig. 1 to Figure 12, left and right walking mechanism 14 includes front side the linear guide 14-1, rear side the linear guide 14-2, third Synchronous pulley 14-3, the 4th synchronous pulley 14-4, left and right synchronous belt 14-5, left and right driving motor 14-6 and left and right detection limiting dress It puts.Front side the linear guide 14-1 is from its guide rail along left and right on being fixed on front side of the top of first movement portal frame 12.Afterwards Side the linear guide 14-2 is from its guide rail along left and right on being fixed on rear side of the top of first movement portal frame 12.4th synchronizes Belt wheel 14-4 is rotatably arranged on by corresponding backstand on the right part of first movement portal frame 12.Left and right driving motor 14-6 consolidates Surely it is arranged on the left part of first movement portal frame 12, motor shaft is along front and rear to setting.Third synchronous pulley 14-3 fixations are set It puts on the motor shaft of left and right driving motor 14-6.Left and right synchronous belt 14-5 surrounds third synchronous pulley 14-3 and the 4th synchronous belt Take turns 14-4 settings.
See Fig. 1 to Figure 11, the second mounting suspension 15 is fixed at front side the linear guide 14-1 and rear side the linear guide 14- On 2 sliding block.Second mounting suspension 15 is fixedly connected by corresponding synchronous clamping with left and right synchronous belt 14-5.So as to by left and right Driving motor 14-6 drives the second mounting suspension 15 along front side the linear guide 14-1 and rear side the linear guide 14-2 side-to-side movements.It is left It is right detection limiting device for detect the second mounting suspension 15 residing for right position, limitation the second mounting suspension 15 or so to Stroke.Dust-proof corrugated cover 17 is equipped between second mounting suspension 15 and first movement portal frame 12, left and right walking mechanism 14 is covered Firmly.
See Fig. 1 to Figure 12, absorptive table component 16 includes airdraft plate 16-1, suspended hood 16-2 and wind turbine 16-3.Airdraft plate 16- 1 is equipped with several wind inlet 16-1a.Airdraft plate 16-1 is closed to be fixed on suspended hood 16-2, and suspended hood 16-2 fixations are set It puts in rack 11.Wind turbine 16-3 is connected by corresponding air hose with suspended hood 16-2.
See Fig. 1 to Fig. 8, adjusting part 2 includes regulation motor 21 and rotation seat 22.Regulation motor 21 is fixed at work On second mounting suspension 15 of platform 1.Rotation seat 22 is rotatably arranged on the second mounting suspension 15, the setting of pivot center vertical, Rotation seat 22 is driven along its pivot axis by regulation motor 21.22 middle part of rotation seat is equipped with the center through hole above and below it 22-1。
Fig. 1 to Fig. 8 and Figure 13 are seen to Figure 16, and feed device 3 includes feeding mounting bracket 31, loading tray component 32, recovering tray Component 33, rewinding driving device 34, tape tensioning device, the first guide locating frame 36 and the first trigger switch 37.Loading tray group Part 32 includes left loading tray 32-1, right loading tray 32-2, the first wheel shaft 32-3, damping sleeve 32-4 and damping sheet 32-5.The first round Axis 32-3 is rotatably arranged on the top rear portion of mounting bracket 31.Left loading tray 32-1 is fixed at the first wheel shaft 32-3 right parts On.Right loading tray 32-2 is detachably fixed by corresponding locking wheel to be arranged on the first wheel shaft 32-3, positioned at left loading tray 32- 1 right side.Damping sleeve 32-4 is fixed on the first wheel shaft 32-3.Damping sheet 32-5 is fixed at feeding mounting bracket 31 On, damping sheet 32-5 elasticity pushes down damping sleeve 32-4.First wheel shaft 32-3 left ends are equipped with air admission hole 32-31, and right end is equipped with outlet Mouthful 32-32, air admission hole 32-31 are connected with gas outlet 32-32.Gas outlet 32-32 is located at left loading tray 32-1 and right loading tray Between 32-2.First wheel shaft 32-3 left ends are additionally provided with air inlet duct 32-33, and air inlet duct 32-33 is circumferentially sets along the first wheel shaft 32-3 The annular groove for the outward opening put.Air admission hole 32-31 is connected with air inlet duct 32-33.The left and right sides of air inlet duct 32-33 is equipped with Corresponding sealing ring is equipped in seal groove 32-34, seal groove 32-34.
Fig. 1 is seen to Fig. 8, Figure 13 and Figure 14, and recovering tray component 33 includes left rewinding disk 33-1, right rewinding disk 33-2 and second Wheel shaft 33-3.Second wheel shaft 33-3 is rotatably arranged on the top forepart of mounting bracket 31.Left rewinding disk 33-1 is fixed at On great wheel arbor 33-3, right rewinding disk 33-2 is detachably fixed by corresponding locking wheel to be arranged on the second wheel shaft 33-3, is located at The right side of left rewinding disk 33-1.Rewinding driving device 34 includes rewinding motor 34-1, the first synchronous pulley of rewinding 34-2, rewinding the Two synchronous pulley 34-3 and rewinding synchronous belt 34-4.Rewinding motor 34-1 is fixed at installation by being tensioned mounting base accordingly On frame 31.The first synchronous pulley of rewinding 34-2 is fixed on the motor shaft of rewinding motor 34-1.The second synchronous pulley of rewinding 34-3 is fixed on left section of the second wheel shaft 33-3 of recovering tray component 33.Rewinding synchronous belt 34-4 is same around rewinding first Walk belt wheel 34-2 and the second synchronous pulley of rewinding 34-3 settings.
See Figure 13 to Figure 15, tape tensioning device connects including air bag seat 35-1, air bag 35-2, inlet suction port 35-3 and air bag Head 35-4.Air bag seat 35-1 is coaxially fixedly installed on left loading tray 32-1, positioned at left loading tray 32-1 and right loading tray 32-2 it Between.Air bag seat 35-1 right parts periphery is equipped with baffle portion 35-1a.Air bag seat 35-1 is equipped with the gas outlet with the first wheel shaft 32-3 The mounting groove 35-1b inside and outside it that 32-32 is communicated.Air bag 35-2 is arranged on baffle portion 35-1a and a left side of air bag seat 35-1 Between loading tray 32-1, the air inlet of air bag 35-2 is close by bladder joint 35-4 and the gas outlet 32-32 of the first wheel shaft 32-3 Close connection.Bladder joint 35-4 is fixed on left loading tray 32-1, and corresponding portion is located at the mounting groove 35- of air bag seat 35-1 In 1b.
See Fig. 2, Fig. 7 and Figure 13, inlet suction port 35-3 is equipped with intake interface 35-31, inlet suction port 35-3 fixed settings On feeding mounting bracket 31.The left end of first wheel shaft 32-3 is rotatably arranged in inlet suction port 35-3.Inlet suction port 35-3 passes through The left end sealing of corresponding sealing ring and the first wheel shaft 32-3 being arranged in the seal groove 32-34 of the first wheel shaft 32-3 connects It connects, the intake interface 35-31 of inlet suction port 35-3 is communicated with the air inlet duct 32-33 of the first wheel shaft 32-3.It in use, first will be coiled Hot melt adhesive film be sleeved on outside air bag seat 35-1.Intake interface 35-31 is connected with corresponding aerating and exhaust device, is filled by inflation/deflation It puts and is filled with gas in air bag 35-2 along the air inlet duct 32-33, air admission hole 32-31 and gas outlet 32-32 of the first wheel shaft 32-3, from And hot melt adhesive film is fixedly connected by air bag 35-2 tensioners in hot melt adhesive film with air bag seat 35-1.When needing replacing hot melt adhesive film When, the gas extraction in air bag 35-2 can be removed the hot melt adhesive film being finished by aerating and exhaust device.
First guide locating frame 36 is fixed on feeding mounting bracket 31.First trigger switch 37 is fixed at feeding On mounting bracket 31, one layer of release paper that when use strips down hot melt adhesive film on loading tray component under the first trigger switch 37 around It crosses and is then attached on the second wheel shaft 33-3 of recovering tray component 33, when the release paper on the second wheel shaft 33-3 is more and more, Release paper can be tensioned to push down the first trigger switch 37 upwards, make rewinding driving device 34 after triggering the first trigger switch 37 Rewinding motor 34-1 stops operating.
Fig. 1 to Fig. 8 and Figure 17 are seen to Figure 20, and press-roller device 4 includes roller seat 41, roller 42, roller frame 43, first and drives Cylinder 44, limited post 45, guide-localization component 46, auxiliary feeding material component 47 and speed detector 48.Roller seat 41 is with adjusting The rotation seat 22 of component 2 is fixedly connected.Roller 42 is rotatably arranged on the forepart of roller frame 43.Roller frame 43 is rotated by its middle part It is arranged on roller seat 41.First driving cylinder 44 is hinged on by its cylinder body on roller seat 41.The cylinder of first driving cylinder 44 The rear end of bar and roller frame 43 is articulated and connected.Roller 42 is lifted by the first driving cylinder 44 by roller frame 43.Limited post 45 It is fixed on roller seat 41, on the upside of the rear portion of roller frame 43, for limiting between roller 42 and airdraft plate 16-1 Distance prevents roller 42 and airdraft plate 16-1 distances too near, avoids cloth being dragged can together during 42 rubberizing of roller.
Fig. 1 to Fig. 8 and Figure 17 are seen to Figure 20, and guide-localization component 46 includes the second leading truck 46-1, third guide-localization Frame 46-2 and positioning seat 46-3.Second leading truck 46-1 is fixed on the forepart of roller seat 41.Second guide locating frame 46- On the forepart of 2 fixed setting roller seats 41, positioned at the lower section of the second leading truck 46-1.Positioning seat 46-3 includes positioning plate 46-31 With cover board 46-32.Positioning plate 46-31 is fixed on the forepart of roller seat 41, under the second guide locating frame 46-2 Side.Positioning plate 46-31 is equipped with the forward locating slot 46-31a of opening above and below it.The width and hot melt of locating slot 46-31 The width of glued membrane is corresponding.Cover board 46-32 is hinged on positioning plate 46-31, covers tightly cover board 46-32 by corresponding torsional spring On positioning plate 46-31.
Fig. 1 to Fig. 8 and Figure 17 are seen to Figure 20, and auxiliary feeding material component 47 includes the first pinch roller 47-1, the second pinch roller 47-2, the One transmission gear 47-3, the second transmission gear 47-4, pinch roller driving motor 47-5, the first synchronous pulley of pinch roller 47-6, pinch roller Two synchronous pulley 47-7, pinch roller synchronous belt, the second pinch roller seat 47-8, pinch roller adjustment seat 47-9, pinch roller adjust cylinder 47-10, send Expect tracheae 47-11 and pressure roller damping sheet 47-12.The second synchronous pulley of first pinch roller 47-1, the first transmission gear 47-3 and pinch roller 47-7 is sequentially coaxially rotatably arranged on roller seat 41 from left to right, the first pinch roller 47-1, the first transmission gear 47-3 and pinch roller Second synchronous pulley 47-7 is rotated synchronously.Pinch roller driving motor 47-5 is fixed at roller seat 41 by corresponding backstand On.The first synchronous pulley of pinch roller 47-6 is fixed on the motor shaft of pinch roller driving motor 47-5.Pinch roller synchronous belt is around pressure Take turns the first synchronous pulley 47-6 and the second synchronous pulley of pinch roller 47-7 settings.First pinch roller is driven by pinch roller driving motor 47-5 47-1 and the first transmission gear 47-3 rotations.Second pinch roller 47-2 and the second transmission gear 47-4 are rotated coaxially and are arranged on the second pressure On wheel seat 47-8, the second pinch roller 47-2 and the second transmission gear 47-4 are rotated synchronously.The transmissions of second transmission gear 47-4 and first Gear 47-3 is meshed, and the gear ratio of the second transmission gear 47-4 and the first transmission gear 47-3 are 1:1.Pinch roller adjustment seat 47-9 It being rotatably arranged on roller seat 41 by its middle part, the second pinch roller seat 47-8 is fixed on the lower end of pinch roller adjustment seat 47-9, Pinch roller adjusts cylinder 47-10 and is fixed at by its cylinder body on the upper end of pinch roller adjustment seat 47-9.Under second pinch roller seat 47-8 Compressed spring is equipped between portion and roller seat 41.In use, roller seat 41 is withstood in the cylinder rod stretching that pinch roller adjusts cylinder 47-10 Corresponding portion so that the lower end of pinch roller adjustment seat 47-9 is close to roller seat 41, so as to drive the second pinch roller seat 47-8 close Roller seat 41 even if also adhesive tape is pressed on the first pinch roller 47-1 by the second pinch roller 47-2, while makes the second transmission gear 47-4 Meshing state is in the first transmission gear 47-3, by the second pinch roller 47-2 and the first pinch roller 47-1 common rotations by hot melt adhesive film It is conveyed down.When needing replacing hot melt adhesive film, the cylinder rod that pinch roller adjusts cylinder 47-10 is retracted, and compressed spring will press The lower end for taking turns adjustment seat 47-9 is jacked up to the direction far from roller seat 41, so as to make the second pinch roller 47-2 far from the first pinch roller 47- 1, at this point, by the hot melt adhesive film after replacement from the second pinch roller 47-2 far from being passed through between the first pinch roller 47-1.Feeding tracheae 47-11 It is fixed on roller seat 41, the lower front towards roller 42 is blown, for the hot melt adhesive film end after cutting to be blowed to roller Wheel 42, convenient for 42 rubberizing of roller.Pressure roller damping sheet 47-12 is resiliently arranged on roller seat 41, positioned at the front upper of roller 42, The lower elastic of pressure roller damping sheet 47-12 pushes down the front upper corresponding site of roller 42, for preventing roller 42 from dallying.Pressure roller The front side of damping sheet 47-12 is equipped with guide-localization slot 47-12a.
See Figure 19, speed detector 48 includes the first U-shaped optoelectronic switch 48-1 and the first detection plate 48-2.First is U-shaped Optoelectronic switch 48-1 is fixed on roller seat 41.First detection plate 48-2 is fixed at the electricity of pinch roller driving motor 47-5 On arbor, the rotating speed of pinch roller driving motor 47-5 is determined by the first detection plate 48-2 by the first U-shaped optoelectronic switch 48-1.
See Fig. 1 to Fig. 8 and Figure 17 to Figure 22, shear 5 include upper cutter 51, lower cutter 52, cutter driving cylinder 53, Cutter backing plate 54 and cutter air passage block 55.Cutter backing plate 54 is fixed on roller seat 41, positioned at the second pinch roller 47-2 and roller Between wheel 42.Cutter backing plate 54 is equipped with the forward adhesive tape slot 54-1 of opening above and below it.Upper cutter 51 is fixed at On cutter backing plate 54.Upper cutter 51 is equipped with feeding stomata 51-1.Feeding stomata 51-1 has 2, and 2 feeding stomata 51-1 are from upper It is set gradually under.Feeding stomata 51-1 is connected with adhesive tape slot 54-1.The angle α of feeding stomata 51-1 and horizontal plane is 30 degree To 70 degree, the present embodiment is 45 degree.Lower cutter 52 is rotatably arranged on roller seat 41, and cutting mechanism is formed with upper cutter 51.By Cutter driving cylinder 53 drives lower cutter 52 to rotate, and lower cutter 52 is made to carry out shearing hot melt adhesive film operation with upper cutter 51.Cutter Air passage block 55 is fixed on upper cutter 51, for connecting feeding stomata 51-1 and corresponding feeder.
Fig. 1 to Fig. 8 and Figure 23 are seen to Figure 25, and hot air apparatus 6 includes hot wind gun platform 61, heat gun 62, connecting seat 63, hot wind Rifle adjustment seat 64, guide rod 65, directive wheel 66, regulating arm 67, first adjust cylinder 68, second and adjust cylinder 69a and third tune Displacements of cylinders 69b.Feeding mounting bracket 31 is fixed at by its lower end on the top of hot wind gun platform 61.Roller seat 41 is fixed at On the rear side of hot wind gun platform 61.Hot wind gun platform 61 is fixedly connected with the rotation seat 22 of adjusting part 2.Heat gun 62 is adjustable to be fixed It is arranged in heat gun adjustment seat 64, short transverse, which does circular motion, to be made between the tuyere 62-1 of its heat gun 62 and roller 42 Distance remain unchanged.Heat gun adjustment seat 64 is slidably arranged on connecting seat 63, can be moved forward and backward.Second adjusts cylinder 69a It is fixed at by its cylinder body on the left part of heat gun adjustment seat 64, cylinder rod is fixedly connected with connecting seat 63.Third is adjusted Cylinder 69b is fixed at by its cylinder body on the right part of heat gun adjustment seat 64, and cylinder rod is fixedly connected with connecting seat 63.From And adjusting cylinder 69b by the second adjusting cylinder 69a and third is moved forward and backward heat gun adjustment seat 64.Guide rod 65 along left and right To being fixed on hot wind gun platform 61, guide rod 65 is arc-shaped.Directive wheel 66 has 2, and 2 66 structures of directive wheel are identical, Guide rod slot 66-1 is circumferentially with along it.2 directive wheels 66 are rotatably arranged on connecting seat 63 successively from top to bottom, and are oriented to Bar 65 is located in the guide rod slot 66-1 of 2 directive wheels 65.It adjusts cylinder 68 to be fixed on hot wind gun platform 61, regulating arm 67 One end be rotatablely connected with connecting seat 63, the other end of regulating arm 67 and adjust the cylinder rod of cylinder 68 and be hinged, regulating arm 67 Middle part is rotatablely connected with hot wind gun platform 61.So as to connecting seat 63 be made to swing along guide rod 64 by adjusting cylinder 68.
When the hot melt sticking machine of the present invention uses:Fabric tiling to be rubberized is first fixed on to the air draught of absorptive table component 16 On plate 16-1.Then the coiled two sides hot melt adhesive film with release paper is mounted on tape tensioning device.Again hot melt adhesive One layer of release paper positioned at front side of film detaches, and this layer of release paper from the first trigger switch 37 time is bypassed and is then attached to back It closes on the second wheel shaft 33-3 of component 33.Hot melt adhesive film is sequentially passed through to the first guide locating frame 36 from top to bottom, is oriented to and determines Second leading truck 46-1 of hyte part 46, third guide locating frame 46-2, positioning seat 46-3 positioning plate 46-31 locating slot Between 46-31a, the first pinch roller 47-1 and the second pinch roller 47-2, the adhesive tape slot 54-1 of the cutter backing plate 54 of shear 5 and pressure roller resistance 42 forepart corresponding position of roller is reached after the guide-localization slot 47-12a of Buddhist nun's plate 47-12.Then make hot wind by adjusting cylinder 68 The tuyere 62-1 of rifle 62 is rocked to 42 front corresponding position of roller, starts heat gun 62, when the tuyere 62-1 outlet air of heat gun 62 After temperature reaches rated value, prepare to start rubberizing operation.When starting rubberizing, second adjusts cylinder 69a and third adjusting cylinder 69b Cylinder rod retract simultaneously so that heat gun adjustment seat 64 moves backward, even if also the tuyere 62-1 of heat gun 62 is by hot melt adhesive Film top enables hot melt adhesive film to be bonded with roller 42, roller 42 pushes simultaneously, treats that hot melt adhesive film is attached to face by roller 42 to roller 42 After on material, the cylinder rod that the second adjusting cylinder 69a and third adjust cylinder 69b stretches out simultaneously so that heat gun adjustment seat 64 to Preceding movement, even if also the tuyere 62-1 of heat gun 62 is maintained a certain distance with roller 42, by front and rear walking mechanism 13 or/and a left side Right walking mechanism 14 drives feed device 3, press-roller device 4, shear 5 and hot air apparatus 6 to be synchronized with the movement, and roller 42 will heat Glued membrane is attached on fabric.After completing a rubberizing operation, hot melt adhesive film is cut off by shear 5, roller 42 is lifted up, so It afterwards swings by adjusting cylinder 68 the tuyere 62-1 of heat gun 62 and is detached from 42 front corresponding position of roller, then by front and rear walking Mechanism 13 or/and left and right walking mechanism 14 drive feed device 3, press-roller device 4, shear 5 and hot air apparatus 6 to move to down Behind one rubberizing position, repeat above-mentioned action and carry out rubberizing operation again.
Above example is used for illustrative purposes only rather than limitation of the present invention, the technology people in relation to technical field Member without departing from the spirit and scope of the present invention, can also make various transformation and variation, during concrete application It can also be accordingly transformed according to the inspiration of above-described embodiment, therefore all equivalent technical solutions should be included into this hair Within bright scope of patent protection.

Claims (8)

1. a kind of hot melt sticking machine, it is characterised in that:Including workbench(1), adjusting part(2), feed device(3), pressure roller dress It puts(4), shear(5)And hot air apparatus(6);Workbench(1)Including rack(11), first movement portal frame(12), it is front and rear Walking mechanism(13), left and right walking mechanism(14)With the second mounting suspension(15);First movement portal frame(12)Pass through front and rear row Walk mechanism(13)It is arranged on rack(11)On, it can be moved forward and backward;Second mounting suspension(15)Pass through left and right walking mechanism(14)If It puts in first movement portal frame(12)On, it can move left and right;Feed device(3), press-roller device(4)And hot air apparatus(6)Pass through Adjusting part(2)It is rotatably arranged on workbench(1)The second mounting suspension(15)On;Feed device(3)It is corresponding for installing Hot melt adhesive film and the corresponding release paper of recycling;Press-roller device(4)For overlaying hot melt adhesive film in corresponding fabric;Pressure roller fills It puts(4)Including roller seat(41), roller(42)With guide-localization component(46);Roller(42)It is rotatably arranged on roller seat(41) On;Guide-localization component(46)Including positioning seat(46-3);Positioning seat(46-3)Including positioning plate(46-31)And cover board(46- 32);Positioning plate(46-31)It is fixed at roller seat(41)Forepart on, positioned at roller(42)Top;Positioning plate(46- 31)Equipped with the forward locating slot of opening above and below it(46-31a);Locating slot(46-31)Width and hot melt adhesive film width It spends corresponding;Cover board(46-32)It is hinged on positioning plate(46-31)On;Shear(5)It is arranged on press-roller device(4)On, it is used for Cut off hot melt adhesive film;Hot air apparatus(6)For heating hot melt adhesive film.
2. hot melt sticking machine according to claim 1, it is characterised in that:Workbench(1)Further include absorptive table component(16); Absorptive table component(16)Including airdraft plate(16-1), suspended hood(16-2)And wind turbine(16-3);Airdraft plate(16-1)If equipped with Dry wind inlet(16-1a);Airdraft plate(16-1)It is closed to be fixed at suspended hood(16-2)On, suspended hood(16-2)Fixed setting In rack(11)On;Wind turbine(16-3)Pass through corresponding air hose and suspended hood(16-2)It is connected.
3. hot melt sticking machine according to claim 1, it is characterised in that:Workbench(1)Front and rear walking mechanism(13)Packet Include left side the linear guide(13-1), left side preamble belt wheel(13-2), synchronous pulley behind left side(13-3), left side synchronous belt(13- 4), right side the linear guide(13-5), right side preamble belt wheel(13-6), synchronous pulley behind right side(13-7), right side synchronous belt (13-8), driving motor(13-9), the first synchronous pulley of middle part(13-10), the second synchronous pulley of middle part(13-11), middle part it is same Walk band(13-12), the first drive shaft(13-13)With front and rear detection limiting device;First drive shaft(13-13)Edge is controlled to rotation It is arranged on rack(11)On;Left side the linear guide(13-1)From its guide rail along front and rear to being fixed at rack(11)Left part On;Left side preamble belt wheel(13-2)Rack is rotatably arranged on by being tensioned mounting base accordingly(11)Left part forepart on;The One drive shaft(13-13)Left end rack is rotatably arranged on by corresponding mounting base(11)Left part rear portion on, it is same behind left side Walk belt wheel(13-3)It is fixed at the first drive shaft(13-13)Left end on, and in the mounting base;Left side synchronous belt (13-4)Around left side preamble belt wheel(13-2)With synchronous pulley behind left side(13-3)Setting;Right side the linear guide(13-5)By Its guide rail is along front and rear to being fixed at rack(11)Right part on;Right side preamble belt wheel(13-6)By being tensioned peace accordingly Dress seat is rotatably arranged on rack(11)Right part forepart on;First drive shaft(13-13)Right end pass through corresponding mounting base turn It is dynamic to be arranged on rack(11)Right part rear portion on, synchronous pulley behind right side(13-7)It is fixed at the first drive shaft(13-13) Right end on, and in the mounting base;Right side synchronous belt(13-8)Around right side preamble belt wheel(13-6)With it is same behind right side Walk belt wheel(13-7)Setting;Driving motor(13-9)Rack is fixed at by being tensioned mounting base accordingly(11)Rear portion in In portion, motor shaft edge is controlled to setting;The first synchronous pulley of middle part(13-10)It is fixed on driving motor(13-9)Motor shaft On;First drive shaft(13-13)Middle part rack is rotatably arranged on by corresponding mounting base(11)Rear portion in the middle part of on, middle part Second synchronous pulley(13-11)It is fixed at the first drive shaft(13-13)Middle part on, and in the mounting base;Middle part Synchronous belt(13-12)Around the first synchronous pulley of middle part(13-10)With the second synchronous pulley of middle part(13-11)Setting;First moves Driven portal frame(12)Left part be fixed at left side the linear guide(13-1)Sliding block on;First movement portal frame(12)A left side Portion passes through corresponding synchronous clamping and left side synchronous belt(13-4)It is fixedly connected;First movement portal frame(12)Right part fixation set It puts in right side the linear guide(13-5)Sliding block on;First movement portal frame(12)Right part pass through corresponding synchronous clamping with it is right Side synchronous belt(13-8)It is fixedly connected;So as to by driving motor(13-9)Drive first movement portal frame(12)It is led along left side straight line Rail(13-1)With right side the linear guide(13-5)It moves forward and backward;Front and rear detection limiting device is used to detect first movement portal frame (12)Residing front and back position limits first movement portal frame(12)Sagittal stroke;Left and right walking mechanism(14)Including preceding Side the linear guide(14-1), rear side the linear guide(14-2), third synchronous pulley(14-3), the 4th synchronous pulley(14-4), it is left Right synchronous belt(14-5), left and right driving motor(14-6)Limiting device is detected with left and right;Front side the linear guide(14-1)It is led by it Rail is along controlling to first movement portal frame is fixed at(12)Top on front side of on;Rear side the linear guide(14-2)By its guide rail Along controlling to first movement portal frame is fixed at(12)Top on rear side of on;4th synchronous pulley(14-4)By corresponding Backstand is rotatably arranged on first movement portal frame(12)Right part on;Left and right driving motor(14-6)It is fixed at the first shifting Driven portal frame(12)Left part on, motor shaft is along front and rear to setting;Third synchronous pulley(14-3)Left and right is fixed to drive Dynamic motor(14-6)Motor shaft on;Left and right synchronous belt(14-5)Around third synchronous pulley(14-3)With the 4th synchronous pulley (14-4)Setting;Second mounting suspension(15)It is fixed at front side the linear guide(14-1)With rear side the linear guide(14-2)'s On sliding block;Second mounting suspension(15)Pass through corresponding synchronous clamping and left and right synchronous belt(14-5)It is fixedly connected;So as to by a left side Right driving motor(14-6)Drive the second mounting suspension(15)Along front side the linear guide(14-1)With rear side the linear guide(14-2) Side-to-side movement;Left and right detection limiting device is for the second mounting suspension of detection(15)Residing right position, the second installation of limitation Hanger(15)Left and right to stroke.
4. the hot melt sticking machine according to one of claims 1 to 3, it is characterised in that:Adjusting part(2)Including regulation motor (21)And rotation seat(22);Regulation motor(21)It is fixed at workbench(1)The second mounting suspension(15)On;Rotation seat (22)It is rotatably arranged on the second mounting suspension(15)On, pivot center vertical setting, by regulation motor(21)Drive rotation seat (22)Along its pivot axis;Rotation seat(22)Middle part is equipped with the center through hole above and below it(22-1).
5. hot melt sticking machine according to claim 4, it is characterised in that:Feed device(3)Including feeding mounting bracket(31)、 Loading tray component(32), recovering tray component(33), rewinding driving device(34)And tape tensioning device;Loading tray component(32)Packet Include left loading tray(32-1), right loading tray(32-2), the first wheel shaft(32-3), damping sleeve(32-4)And damping sheet(32-5);The One wheel shaft(32-3)It is rotatably arranged on mounting bracket(31)Top rear portion on;Left loading tray(32-1)It is fixed at the first wheel shaft (32-3)On right part;Right loading tray(32-2)It is detachably fixed by corresponding locking wheel and is arranged on the first wheel shaft(32-3)On, Positioned at left loading tray(32-1)Right side;Damping sleeve(32-4)It is fixed at the first wheel shaft(32-3)On;Damping sheet(32-5) It is fixed at feeding mounting bracket(31)On, damping sheet(32-5)Elasticity pushes down damping sleeve(32-4);First wheel shaft(32-3)It is left End is equipped with air admission hole(32-31), right end is equipped with gas outlet(32-32), air admission hole(32-31)With gas outlet(32-32)It is connected; Gas outlet(32-32)Positioned at left loading tray(32-1)With right loading tray(32-2)Between;First wheel shaft(32-3)Left end is additionally provided with Air inlet duct(32-33), air inlet duct(32-33)For along the first wheel shaft(32-3)The annular groove of circumferentially disposed outward opening;Air inlet Hole(32-31)With air inlet duct(32-33)It is connected;Air inlet duct(32-33)The left and right sides be equipped with seal groove(32-34), it is close Seal slot(32-34)In be equipped with corresponding sealing ring;Recovering tray component(33)Including left rewinding disk(33-1), right rewinding disk(33- 2)With the second wheel shaft(33-3);Second wheel shaft(33-3)It is rotatably arranged on mounting bracket(31)Top forepart on;Left rewinding disk (33-1)It is fixed at the second wheel shaft(33-3)On, right rewinding disk(33-2)Setting is detachably fixed by corresponding locking wheel In the second wheel shaft(33-3)On, positioned at left rewinding disk(33-1)Right side;Rewinding driving device(34)Including rewinding motor(34- 1), the first synchronous pulley of rewinding(34-2), the second synchronous pulley of rewinding(34-3)With rewinding synchronous belt(34-4);Rewinding motor (34-1)Mounting bracket is fixed at by being tensioned mounting base accordingly(31)On;The first synchronous pulley of rewinding(34-2)Fixation is set It puts in rewinding motor(34-1)Motor shaft on;The second synchronous pulley of rewinding(34-3)It is fixed at recovering tray component(33)'s Second wheel shaft(33-3)Left section on;Rewinding synchronous belt(34-4)Around the first synchronous pulley of rewinding(34-2)It is same with rewinding second Walk belt wheel(34-3)Setting;Tape tensioning device includes air bag seat(35-1), air bag(35-2), inlet suction port(35-3)And air bag Connector(35-4);Air bag seat(35-1)Left loading tray is coaxially fixedly installed(32-1)On, positioned at left loading tray(32-1)With right dress Charging tray(32-2)Between;Air bag seat(35-1)Right part periphery is equipped with baffle portion(35-1a);Air bag seat(35-1)It is equipped with and first Wheel shaft(32-3)Gas outlet(32-32)The mounting groove inside and outside it communicated(35-1b);Air bag(35-2)It is arranged on air bag Seat(35-1)Baffle portion(35-1a)With left loading tray(32-1)Between, air bag(35-2)Air inlet pass through bladder joint (35-4)With the first wheel shaft(32-3)Gas outlet(32-32)Closed connection;Bladder joint(35-4)It is fixed at left charging Disk(32-1)On, corresponding portion is located at air bag seat(35-1)Mounting groove(35-1b)In;Inlet suction port(35-3)It is equipped with air inlet Interface(35-31), inlet suction port(35-3)It is fixed at feeding mounting bracket(31)On;First wheel shaft(32-3)Left end rotation It is arranged on inlet suction port(35-3)In;Inlet suction port(35-3)By being arranged on the first wheel shaft(32-3)Seal groove(32- 34)In corresponding sealing ring and the first wheel shaft(32-3)Left end be tightly connected, inlet suction port(35-3)Intake interface (35-31)With the first wheel shaft(32-3)Air inlet duct(32-33)It communicates.
6. hot melt sticking machine according to claim 4, it is characterised in that:Press-roller device(4)Further include roller frame(43), One driving cylinder(44), auxiliary feeding material component(47)And speed detector(48);Roller seat(41)With adjusting part(2)Turn Dynamic seat(22)It is fixedly connected;Roller(42)It is rotatably arranged on roller frame(43)Forepart on;Roller frame(43)It is rotated by its middle part It is arranged on roller seat(41)On;First driving cylinder(44)Roller seat is hinged on by its cylinder body(41)On;First driving cylinder (44)Cylinder rod and roller frame(43)Rear end articulated connection;By the first driving cylinder(44)Pass through roller frame(43)Make roller (42)Lifting;Guide-localization component(46)Further include the second leading truck(46-1)With third guide locating frame(46-2);Second leads To frame(46-1)It is fixed at roller seat(41)Forepart on;Second guide locating frame(46-2)Roller seat is fixedly installed(41) Forepart on, positioned at the second leading truck(46-1)Lower section;Positioning seat(46-3)Positioned at the second guide locating frame(46-2)Under Side;Cover board is made by corresponding torsional spring(46-32)It covers tightly in positioning plate(46-31)On;Assist feeding material component(47)Including first Pinch roller(47-1), the second pinch roller(47-2), the first transmission gear(47-3), the second transmission gear(47-4), pinch roller driving motor (47-5), the first synchronous pulley of pinch roller(47-6), the second synchronous pulley of pinch roller(47-7), pinch roller synchronous belt, the second pinch roller seat (47-8), pinch roller adjustment seat(47-9), pinch roller adjust cylinder(47-10), feeding tracheae(47-11)With pressure roller damping sheet(47- 12);First pinch roller(47-1), the first transmission gear(47-3)With the second synchronous pulley of pinch roller(47-7)From left to right sequentially coaxially It is rotatably arranged on roller seat(41)On, the first pinch roller(47-1), the first transmission gear(47-3)With the second synchronous pulley of pinch roller (47-7)It rotates synchronously;Pinch roller driving motor(47-5)Roller seat is fixed at by corresponding backstand(41)On;Pinch roller First synchronous pulley(47-6)It is fixed at pinch roller driving motor(47-5)Motor shaft on;Pinch roller synchronous belt is around pinch roller the One synchronous pulley(47-6)With the second synchronous pulley of pinch roller(47-7)Setting;By pinch roller driving motor(47-5)Drive the first pinch roller (47-1)With the first transmission gear(47-3)Rotation;Second pinch roller(47-2)With the second transmission gear(47-4)Rotate coaxially setting In the second pinch roller seat(47-8)On, the second pinch roller(47-2)With the second transmission gear(47-4)It rotates synchronously;Second transmission gear (47-4)With the first transmission gear(47-3)It is meshed, the second transmission gear(47-4)With the first transmission gear(47-3)The number of teeth Than being 1:1;Pinch roller adjustment seat(47-9)Roller seat is rotatably arranged on by its middle part(41)On, the second pinch roller seat(47-8)Fixation is set It puts in pinch roller adjustment seat(47-9)Lower end on, pinch roller adjust cylinder(47-10)Pinch roller adjustment seat is fixed at by its cylinder body (47-9)Upper end on;Second pinch roller seat(47-8)Lower part and roller seat(41)Between be equipped with compressed spring;Feeding tracheae (47-11)It is fixed at roller seat(41)On, towards roller(42)Lower front blow;Pressure roller damping sheet(47-12)Elasticity It is arranged on roller seat(41)On, positioned at roller(42)Front upper, pressure roller damping sheet(47-12)Lower elastic push down roller (42)Front upper corresponding site, for preventing roller(42)Idle running;Pressure roller damping sheet(47-12)Front side be equipped be oriented to it is fixed Position slot(47-12a);Speed detector(48)Including the first U-shaped optoelectronic switch(48-1)With the first detection plate(48-2);First U-shaped optoelectronic switch(48-1)It is fixed at roller seat(41)On;First detection plate(48-2)It is fixed at pinch roller driving electricity Machine(47-5)Motor shaft on, by the first U-shaped optoelectronic switch(48-1)Pass through the first detection plate(48-2)Determine pinch roller driving electricity Machine(47-5)Rotating speed.
7. hot melt sticking machine according to claim 6, it is characterised in that:Shear(5)Including upper cutter(51), incision Knife(52), cutter driving cylinder(53), cutter backing plate(54)With cutter air passage block(55);Cutter backing plate(54)It is fixed at pressure Roller seat(41)On, positioned at the second pinch roller(47-2)With roller(42)Between;Cutter backing plate(54)It is equipped with opening above and below it The forward adhesive tape slot of mouth(54-1);Upper cutter(51)It is fixed at cutter backing plate(54)On;Upper cutter(51)It is equipped with feeding Stomata(51-1);Feeding stomata(51-1)There are 2,2 feeding stomatas(51-1)It sets gradually from top to bottom;Feeding stomata(51- 1)With adhesive tape slot(54-1)It is connected;Feeding stomata(51-1)Angle α with horizontal plane is 30 degree to 70 degree;Lower cutter(52)Turn It is dynamic to be arranged on roller seat(41)On, with upper cutter(51)Form cutting mechanism;By cutter driving cylinder(53)Drive lower cutter (52)Rotation, makes lower cutter(52)With upper cutter(51)Carry out shearing hot melt adhesive film operation;Cutter air passage block(55)Fixed setting In upper cutter(51)On, for connecting feeding stomata(51-1)With corresponding feeder.
8. hot melt sticking machine according to claim 5, it is characterised in that:Hot air apparatus(6)Including hot wind gun platform(61), heat Air pressure gun(62), connecting seat(63), heat gun adjustment seat(64), guide rod(65), directive wheel(66), regulating arm(67), first adjust Displacements of cylinders(68), second adjust cylinder(69a)Cylinder is adjusted with third(69b);Feeding mounting bracket(31)It is fixed and set by its lower end It puts in hot wind gun platform(61)Top on;Hot wind gun platform(61)With adjusting part(2)Rotation seat(22)It is fixedly connected;Heat gun (62)It is adjustable to be fixed at heat gun adjustment seat(64)On, short transverse, which does circular motion, makes its heat gun(62)Wind Mouth(62-1)With roller(42)The distance between remain unchanged;Heat gun adjustment seat(64)It is slidably arranged in connecting seat(63)On, It can be moved forward and backward;Second adjusts cylinder(69a)Heat gun adjustment seat is fixed at by its cylinder body(64)Left part on, cylinder Bar and connecting seat(63)It is fixedly connected;Third adjusts cylinder(69b)Heat gun adjustment seat is fixed at by its cylinder body(64)'s On right part, cylinder rod and connecting seat(63)It is fixedly connected;So as to adjust cylinder by second(69a)Cylinder is adjusted with third (69b)Make heat gun adjustment seat(64)It is moved forward and backward;Guide rod(65)Along controlling to hot wind gun platform is fixed at(61)On, it leads To bar(65)It is arc-shaped;Directive wheel(66)There are 2,2 directive wheels(66)Structure is identical, is circumferentially with guide rod slot along it (66-1);2 directive wheels(66)It is rotatably arranged on connecting seat successively from top to bottom(63)On, and guide rod(65)It is led positioned at 2 To wheel(65)Guide rod slot(66-1)In;Adjust cylinder(68)It is fixed at hot wind gun platform(61)On, regulating arm(67)'s One end and connecting seat(63)Rotation connection, regulating arm(67)The other end with adjust cylinder(68)Cylinder rod be hinged, regulating arm (67)Middle part and hot wind gun platform(61)Rotation connection;So as to by adjusting cylinder(68)Make connecting seat(63)Along guide rod(64) It swings.
CN201611233372.4A 2016-12-28 2016-12-28 Heat sticking machine Active CN106963016B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201611233372.4A CN106963016B (en) 2016-12-28 2016-12-28 Heat sticking machine
PCT/CN2017/113260 WO2018121159A1 (en) 2016-12-28 2017-11-28 Hot-melt tape affixing machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611233372.4A CN106963016B (en) 2016-12-28 2016-12-28 Heat sticking machine

Publications (2)

Publication Number Publication Date
CN106963016A CN106963016A (en) 2017-07-21
CN106963016B true CN106963016B (en) 2018-06-19

Family

ID=59334542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611233372.4A Active CN106963016B (en) 2016-12-28 2016-12-28 Heat sticking machine

Country Status (2)

Country Link
CN (1) CN106963016B (en)
WO (1) WO2018121159A1 (en)

Families Citing this family (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106963016B (en) * 2016-12-28 2018-06-19 常州智谷机电科技有限公司 Heat sticking machine
CN107467763A (en) * 2017-08-28 2017-12-15 阮积康 One kind paving glue machine
CN107647514A (en) * 2017-09-21 2018-02-02 阮积康 One kind paving scalds machine
CN107891653A (en) * 2017-12-13 2018-04-10 东莞市元达精工智能装备有限公司 Clothes TPU hot melt film adhesive press fit devices
CN109250563B (en) * 2018-09-11 2024-02-13 广东联塑安防科技有限公司 Automatic installation device of fireproof strip of fireproof door
CN109177188A (en) * 2018-09-14 2019-01-11 葛宝发 A kind of automatic pressing device of chromatic steel sandwich plate sealing strip
CN109301033A (en) * 2018-10-10 2019-02-01 苏州鑫本智能科技有限公司 Hot melt adhesive reflective membrane attaching device
CN108936926B (en) * 2018-10-12 2024-01-26 常州智谷机电科技有限公司 Strip sticking machine
CN108936925B (en) * 2018-10-12 2024-01-26 常州智谷机电科技有限公司 Feeding device of strip sticking machine
CN108970923B (en) * 2018-10-25 2023-11-28 山东长兴木业机械有限公司 Full-automatic rubber coating production line
CN109455566A (en) * 2018-12-14 2019-03-12 合肥宝亿自动化科技有限公司 A kind of automatic adhesive sticking machine head
CN109455565A (en) * 2018-12-14 2019-03-12 合肥宝亿自动化科技有限公司 A kind of automatic adhesive sticking machine
CN109473728A (en) * 2018-12-14 2019-03-15 无锡先导智能装备股份有限公司 Adhesive tape rubberizing mechanism and sticking method
CN110306301A (en) * 2018-12-17 2019-10-08 常州智谷机电科技有限公司 Full-automatic cold rolls over sack filling machine
CN109778449A (en) * 2019-01-21 2019-05-21 苏州大喆智能科技有限公司 Production platform is adjusted in a kind of two-side synchronous work feed overseam, tangent line automatically
CN109703166A (en) * 2019-02-02 2019-05-03 苏州市合昌电器有限公司 A kind of lagging device for elevator Crashworthy plate
CN110070952B (en) * 2019-04-01 2024-01-12 丹东华日理学电气有限公司 Multichannel small-pipe-diameter digital real-time imaging detection device
CN110507027B (en) * 2019-09-09 2021-04-30 浙江乔治白服饰股份有限公司 Glue pressing device
CN110744824A (en) * 2019-09-29 2020-02-04 武汉振佳宇恒机电设备有限公司 Device for pasting 3M adhesive tape on automobile trim
CN110815327B (en) * 2019-10-11 2023-12-29 镇江现代包装有限公司 Be applied to cutting machine of food packaging film
CN111020955B (en) * 2019-12-27 2022-03-08 界首市永顺服饰有限公司 Pressing and leveling mechanism for inner fabric of suit and using method of pressing and leveling mechanism
CN111101363A (en) * 2019-12-31 2020-05-05 强信机械科技(莱州)有限公司 Pocket lining cloth cutting device
CN111649042B (en) * 2020-06-05 2021-07-13 苏州维格纳信息科技有限公司 Adhesive film attaching device capable of avoiding peeling of covering belt
CN112213323A (en) * 2020-09-28 2021-01-12 海宁明润纺织有限公司 Efficient inspection equipment for fabric
CN112493596B (en) * 2020-11-09 2022-11-18 浙江国富服饰有限公司 Processing technology and processing equipment of down jacket without down leakage
CN113498903A (en) * 2021-06-21 2021-10-15 厦门铭潮工贸有限公司 Wainscot hot press for tailoring
CN113561501B (en) * 2021-06-30 2023-06-30 江苏远华轻化装备有限公司 Heat dissipation cleaning device for hot melting compounding machine
CN114600653B (en) * 2022-03-31 2023-02-21 贵州大学 Auxiliary device for grafting rootstock to germ of camellia oleifera bud seedling and using method of auxiliary device
CN114801212B (en) * 2022-04-29 2023-04-07 浙江朝晖过滤技术股份有限公司 Automatic butt joint machine for automobile filter element and use method thereof
CN114872102A (en) * 2022-06-06 2022-08-09 无锡沃格自动化科技股份有限公司 Automatic slitting device and rubberizing method for adhesive tape
CN115192318B (en) * 2022-07-19 2023-07-14 晋江市顺昌机械制造有限公司 Annular waist transfer device on intelligent paper diaper production line
CN115195136A (en) * 2022-09-16 2022-10-18 河南新飞电器集团有限公司 A automatic weld special plane for hot-blast butt fusion production of cloth
CN115503033A (en) * 2022-10-24 2022-12-23 太仓恩力成密封件有限公司 Rubber sealing strip cutting mechanism with adjustable blade spacing and working method thereof
CN116002174A (en) * 2023-01-03 2023-04-25 深圳市博硕科技股份有限公司 Automatic laminating machine for double faced adhesive tape of plastic sheet injection molding part

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2679822B1 (en) * 1991-07-30 1995-07-21 Protechnic Sa PROCESS FOR MANUFACTURING A HEAT-STICKING PRODUCT, DEVICE FOR CARRYING OUT THIS PROCESS AND PRODUCT THUS OBTAINED.
CN201021482Y (en) * 2007-02-05 2008-02-13 京华超音波股份有限公司 Thermal smelting glue bar jointer
CN201128836Y (en) * 2007-10-12 2008-10-08 江苏闳业机械有限公司 Hot fusing splicing machine
JP5468276B2 (en) * 2009-03-06 2014-04-09 Juki株式会社 Bonding equipment
CN101700144A (en) * 2009-10-29 2010-05-05 广东溢达纺织有限公司 Sutureless connected structure and processing method thereof
CN203435764U (en) * 2013-07-03 2014-02-19 东莞市新发源自动化科技有限公司 Seamless ultrasonic multi-function bonding machine
CN103355802B (en) * 2013-07-30 2014-07-30 苏州美山子制衣有限公司 Automatic spot hot press machine
CN103598692B (en) * 2013-12-04 2015-08-12 肖华清 Cut out all-in-one
CN205062396U (en) * 2015-09-10 2016-03-02 天津宝盈电脑机械有限公司 Full -automatic ultrasonic wave bonder
CN205020333U (en) * 2015-09-21 2016-02-10 张铁猛 Automatic dispensing machine
CN205321329U (en) * 2015-12-30 2016-06-22 浙江曼克斯机械有限公司 No trace underwear rubberizing bonder
CN106963016B (en) * 2016-12-28 2018-06-19 常州智谷机电科技有限公司 Heat sticking machine
CN206462476U (en) * 2016-12-28 2017-09-05 常州智谷机电科技有限公司 One kind hot melt sticking machine

Also Published As

Publication number Publication date
WO2018121159A1 (en) 2018-07-05
CN106963016A (en) 2017-07-21

Similar Documents

Publication Publication Date Title
CN106963016B (en) Heat sticking machine
CN106963017B (en) Press-roller device
CN106087284B (en) Rubber band sewing machine
CN105839299A (en) Patch pocket sewing machine
CN206462476U (en) One kind hot melt sticking machine
CN206453316U (en) A kind of press-roller device
CN205974983U (en) Automatic shirt sleeve fork machine
CN110065261A (en) A kind of shopping bag bag body process units and method heating edge sealing
CN212077304U (en) Automatic sewing machine with movable sewing machine head
CN207775507U (en) Tug device after a kind of motor-driven belt-type
CN206245113U (en) Automatic cutting machines vacuum chamber structure
CN210712026U (en) Automatic seam lower hem device
CN208855906U (en) Socket type is adjustable packing case bottom automatic moulding machine
CN203866510U (en) Full-automatic woven bag joint cutter
CN206591253U (en) A kind of shirt sleeve gram husband lockstitch button holder
CN105525455B (en) A kind of material cutting mechanism of the seamless installation equipment of slide fastener
CN206052322U (en) Elastic seaming machine
CN206916390U (en) A kind of full-automatic gas pouch sewing device
CN213596569U (en) Sewing machine
CN205368691U (en) Automatic draw limit and make up device
CN209194159U (en) A kind of sewing machine
CN206467417U (en) A kind of feed device of full-automatic many panel sewing devices
CN205456550U (en) Laminating mechanism of seamless erection equipment of zip fastener
CN206462474U (en) A kind of workbench
CN209251827U (en) A kind of brassiere back hook automatic cutting suture cloth turning machine

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Hot-melting strip pasting machine

Effective date of registration: 20190401

Granted publication date: 20180619

Pledgee: Bank of China Limited Changzhou Tianning Branch

Pledgor: CHANGZHOU ZHIGU ELECTROMECHANICAL TECHNOLOGY CO., LTD.

Registration number: 2019320000161

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20200331

Granted publication date: 20180619

Pledgee: Bank of China Limited Changzhou Tianning Branch

Pledgor: CHANGZHOU ZHIGU ELECTRICAL AND MECHANICAL TECHNOLOGY Co.,Ltd.

Registration number: 2019320000161

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Hot-melting strip pasting machine

Effective date of registration: 20200413

Granted publication date: 20180619

Pledgee: Bank of China Limited Changzhou Tianning Branch

Pledgor: CHANGZHOU ZHIGU ELECTRICAL AND MECHANICAL TECHNOLOGY Co.,Ltd.

Registration number: Y2020980001410

PE01 Entry into force of the registration of the contract for pledge of patent right