CN106952173A - Oil well down tube, rod tube reason and application process - Google Patents
Oil well down tube, rod tube reason and application process Download PDFInfo
- Publication number
- CN106952173A CN106952173A CN201710144797.6A CN201710144797A CN106952173A CN 106952173 A CN106952173 A CN 106952173A CN 201710144797 A CN201710144797 A CN 201710144797A CN 106952173 A CN106952173 A CN 106952173A
- Authority
- CN
- China
- Prior art keywords
- tube rod
- data
- well
- tube
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims description 9
- 239000003129 oil well Substances 0.000 title claims description 8
- 230000008569 process Effects 0.000 title claims description 7
- 238000004458 analytical method Methods 0.000 claims abstract description 17
- 238000012545 processing Methods 0.000 claims abstract description 7
- 238000004519 manufacturing process Methods 0.000 claims abstract description 6
- 238000007726 management method Methods 0.000 claims description 27
- 239000000463 material Substances 0.000 claims description 14
- 238000011084 recovery Methods 0.000 claims description 9
- 230000008439 repair process Effects 0.000 claims description 7
- 238000003860 storage Methods 0.000 claims description 6
- 230000001186 cumulative effect Effects 0.000 claims description 4
- 238000012423 maintenance Methods 0.000 claims description 4
- 238000007405 data analysis Methods 0.000 abstract description 4
- 238000005457 optimization Methods 0.000 abstract description 4
- 241001269238 Data Species 0.000 abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 7
- 238000005516 engineering process Methods 0.000 description 3
- 238000013480 data collection Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 238000012552 review Methods 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000013481 data capture Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 238000007619 statistical method Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Forestry; Mining
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Marine Sciences & Fisheries (AREA)
- Mining & Mineral Resources (AREA)
- Agronomy & Crop Science (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Animal Husbandry (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A kind of oil field well pipe, the management application system of bar, by using the identification code for reading the unique identities in tube rod, by the real-time status of tube rod and data message typing background data base, database is handled data on backstage, the data after tube rod information and processing are called to realize the foundation and analysis of digital archive by background data base, and analysis result is provided, digitlization pit shaft can be set up for daily production with reference to used form and other analyze datas by being formed, it is that each tube rod and downhole tool set up digital archive, pass through big data analysis optimization resource, the shared allotment resource in internet, realize the lifecycle management of downhole tool.The present invention compared with prior art, reduces error rate, alleviates the labor intensity of personnel, shorten the working time, improve operating efficiency.
Description
First, technical field
The present invention relates to oil production equipment, and in particular to oil field well pipe, the management method of bar and application this management method generation
Big data application.
2nd, background technology
In the normal work of oilfield, the oil-water well run daily has tens thousand of mouths, and not only quantity is huge for oil field well pipe, bar
Greatly, and intermediate links are more, repair process is reclaimed numerous and diverse.Oil pipe, sucker rod, downhole tool are connect well head and oil reservoir logical
Road.The important component produced as oil-water well, its managerial skills direct relation oil-water well be excused from a college course phase length and operation into
This height.
But the data capture management of current oil pipe bar, mainly by manual entry, note account, the method workload is big, efficiency
Low, the data of online operation are not complete or discontinuous, and not enough, information can not be shared transparency.And not to every mouthful of well oil pipe bar,
The network data acquisition of the failure causes such as the disconnected de-, eccentric wear of the burn into of downhole tool, leakage and description, enter without being formed big
Failure analysis on the basis of data to oil pipe bar and downhole tool, the foundation requirement based on digitlization oil field to digital pit shaft.
Such as, equally it is tube rod using 1 year, because residing oil well condition differs, its failure degree can be different,
And tube rod fully relies on labor management, not enough, the data of online operation are also imperfect, do not share for fine degree.Every mouthful of profit
The data collection and analysis of the failure causes such as the disconnected de-, eccentric wear of well casing bar burn into is also not implemented, and quality problems occur can not be whole, accurate
Really review;Meanwhile, every tube rod, each downhole tool are not set up completely from going into operation to scrapping with the database associated yet, it is impossible to
The data that extension oil-water well is excused from a college course the phase, optimization tube rod instrument is used are provided and support that directive function is not protruded.
3rd, the content of the invention
The present invention is conceived to the digital pit shaft of foundation there is provided one kind regarding to the issue above, is that each tube rod and downhole tool are set up
Digital archive, by big data analysis optimization resource, the shared allotment resource in internet, realize oil field well manage, bar it is complete
A kind of oil well down tube, rod tube reason and the application process of life cycle management application system.
The purpose of the present invention is achieved through the following technical solutions:
A kind of oil field well pipe, the management application system of bar, are characterized in utilize the mark of the unique identities read in tube rod
Code, automatically by the real-time status of tube rod and tube rod data message typing background data base, database is at backstage is to data progress
Reason, the data-base content that administrative staff are shown by backstage calls the data after tube rod data message and processing to realize number
The foundation and analysis of word archives, and analysis result is provided, formed for daily production with reference to used form and other analyses
Data result.
Described oil field well use is managed, the management application system of bar, and the real-time status of the tube rod described in its feature is:In pipe
Bar is put in storage, provided, going into the well, reclaiming, repairing, scrapping entire life cycle in use, and the real-time status of wherein tube rod includes
Video or picture and the underground residing for tube rod depth.
The oil well down tube, rod tube reason and application process, it is characterized in that described tube rod data message includes:Tube rod
Coding, manufacturer, tube rod specification, classification, material, length, days of going into operation, affiliated directorial area, oil field, pound sign, operation team, record
The angle of incidence;
Described entry time includes entry time, Time Of Release, time of going into the well, recovery time, repair time, failure time.
Described oil field well pipe, the management application system of bar, it is characterised in that described data-base content includes number
According to maintenance, service inquiry, tube rod workflow management;Wherein data maintenance includes Back ground Information, material information, historical information, business
Inquiry includes materiel warehouse-in, material granting, material recycle, material is gone into the well, material is to be repaired, inventory disposal, tube rod workflow management
Including dispensing flow path, recovery process, repair flow, equivalent life cycle management.
Described oil field well pipe, the management application system of bar, it is characterised in that the data after described processing include:
Tube rod using number of days, the frequency, provide sequence number, sequence number of going into the well, cumulative length of going into the well, cumulative depth, provide record sheet, same day oil pipe
Granting registration account, recovery record sheet, same day oil pipe reclaim registration account, teams and groups' form, individual well oil pipe and manage card, are in charge of reason
Provide retrieval management table in area.
Described oil field well use is managed, the management application system of bar, and described analysis result is:To every mouthful of well oil pipe bar,
The statistical analysis and formation carried out after the network data acquisitions of failure cause such as the disconnected de-, eccentric wear of the burn into of downhole tool, leakage is respectively
The description of figure is planted, and then forms the failure analysis on the basis of big data to oil pipe bar and downhole tool.
Using the present invention, by reading the mark in tube rod, the unique mark identity information of the tube rod is obtained, so as to obtain
The various application datas of the tube rod, such as manufacturer, tube rod specification, classification, material, length, go into operation days and directorial area, down tube
Barcode scanning identification is carried out while post operation, it is possible to obtain the exact length data of each tube rod, and automatically generate individual well rice
Number, under the support of these normal datas, it is established that digitlization pit shaft;Error rate is reduced, the labor intensity of personnel is alleviated,
The working time is shortened, is preserved in real time, in addition, also following remarkable advantage:
1st, DBAS can implement the foundation and analysis of above-mentioned digital archive by counting multi-group data, and provide
Analysis result, administrative staff only need to call data from network, you can meet daily production with reference to used form and other
Analyze the demand of chart.
2nd, managerial and technical staff is without the scene of running, and the tube rod data that can be just uploaded by analyzing handheld terminal are shone with scene
Piece, is held a consultation, is analyzed, decision-making, improves operating efficiency.
3rd, the data collection and analysis of the failure causes such as the disconnected de-, eccentric wear of every mouthful of oil-water well tube rod burn into is realized, quality occurs
Problem can realize whole process, accurately review;Simultaneously, it is established that every tube rod, each downhole tool it is complete from going into operation to scrapping and
The data base administration system of association passes through letter there is provided the data support that extension oil-water well is excused from a college course the phase, optimization tube rod instrument is used
Breath identification, can also realize tube rod point unit, divider lattice, point time limit automatic sorting.
4th, illustrate
Without accompanying drawing
5th, embodiment
Storage:Each tube rod is encoded by preparing the knowledge decoding apparatus automatic input of group and carries out storage processing, makes each
New tube rod is all under " stock " state, and information Real-Time Sharing, each relevant unit can see real-time tube rod with the very first time
State.
Provide:Employee knows decoding apparatus with handheld terminal, according to pound sign, carries out information gathering to providing tube rod coding one by one,
And according to well logging pound sign input database, in database record provide the directorial area of tube rod, oil field, pound sign, operation team, coding,
The data such as Time Of Release.
Go into the well:After tube rod is come on well, employee knows decoding apparatus with handheld terminal, and tube rod of going into the well is encoded into row information one by one
Collection, and the position of each tube rod is recorded automatically, add up into the tube rod length of well, the tube rod of the well is automatically generated after storage to be made
Use tubing string figure, it is established that digitlization pit shaft.Then, every tube rod coding information is reached into Life cycle pipe using data network
Information system is managed, is realized to a certain tube rod position and the real-time query of information.
Reclaim:Enter after one pump detection period of well, in removal process, tube rod parameter is acquired according to pound sign.Data
Record reclaims the data such as directorial area, oil field, pound sign, operation team, coding, the recovery time of tube rod in storehouse.
Repair:Tube rod after recovery is through over cleaning, in each repair line progress repairing again one by one, with identifying system to compiling
Code identification, to repairing qualified tube rod, progress survey is long again, and new information is re-typed into database.To underproof pipe
Bar, reaches that scraps rank scraps coding information typing tube rod storehouse, processing is scrapped in progress.
By being adopted to the storage of every tube rod, granting, recovery, reparation up to scrapping the data of " Life cycle " information
Collection, the information of all collections will as dynamic, systematization, living data, be that the diagnostic analysis of oil field block and individual well is carried
Supported for data, be technology decision-making and the offer foundation of administrative decision.
Management and technical staff rely on big data, cloud computing, can analyze in real time in transverse direction each oil field, the tube rod of block,
Downhole tool behaviour in service, failure cause, optimizing pipe string combination, technology measure;It will be seen that every mouth well, every on longitudinal direction
One depth, the tube rod service condition of each layer of position, targetedly optimize cost input, extension oil-water well is excused from a college course the phase.
There is a big lifting to the materials quality and construction quality of oil well, mainly accomplished that the quality analysis to tube rod has
Specific data, quality tracing has foundation.The use of tube rod has data supporting, and service life is greatly prolonged, and average oil well is excused from a college course
Phase can bring up to 800 days.
Operation field tube rod and the quantitative of downhole tool use information, locating and tracking are realized, is conducive to oil field, area
The information and flaw detection, pressure testing etc. such as block, the eccentric wear of individual well tube rod and downhole tool, corrosion and fatigue, fouling, product quality detect number
According to organically blending, the adaptability to oil field, block tube rod and downhole tool carries out quantitative, qualitative evaluation, design personnel couple
Job design optimizes preferred with product.
In summary, system and method for the invention can be greatly improved the managerial skills and operating efficiency of tube rod, be oil
The production management work of well provides data supporting.Meanwhile, tube rod fine-grained management is to accord with the change of sinopec ' four ' build and think
Road, realizes and checks resources, the effective means for the constructive direction rationally planned as a whole, cut payroll to improve efficiency.
Particular embodiments described above, has been carried out further in detail to the purpose of the present invention, technical scheme and beneficial effect
Describe in detail bright, it should be understood that the foregoing is only the present invention specific embodiment, be not intended to limit the invention, it is all
Within the spirit and principles in the present invention, any modifications, equivalent substitutions and improvements done etc. should be included in the protection of the present invention
Within the scope of.
Claims (6)
1. a kind of oil field well pipe, the management application system of bar, are characterized in utilize the mark of the unique identities read in tube rod
Code, automatically by the real-time status of tube rod and tube rod data message typing background data base, database is at backstage is to data progress
Reason, the data-base content that administrative staff are shown by backstage calls the data after tube rod data message and processing to realize number
The foundation and analysis of word archives, and analysis result is provided, formed for daily production with reference to used form and other analyses
Data result.
2. oil field well according to claim 1 pipe, the management application system of bar, tube rod described in its feature it is real-time
State is:The reality for being put in storage in use, provide, going into the well, reclaim, repairing, scrap entire life cycle, wherein tube rod in tube rod
When the video that includes of state or picture and the underground residing for tube rod depth.
3. oil well down tube, rod tube are managed and application process according to claim 1, it is characterized in that described tube rod data message
Including:The coding of tube rod, manufacturer, tube rod specification, classification, material, length, frequency of usage, go into operation days, affiliated management
Area, oil field, pound sign, operation team, entry time;
Described entry time includes entry time, Time Of Release, time of going into the well, recovery time, repair time, failure time.
4. oil field well according to claim 1 pipe, the management application system of bar, it is characterised in that described database
Content includes data maintenance, service inquiry, tube rod workflow management;Wherein data maintenance includes Back ground Information, material information, history
Information, service inquiry includes materiel warehouse-in, material granting, material recycle, material is gone into the well, material is to be repaired, inventory disposal, tube rod
Workflow management includes dispensing flow path, recovery process, repairs flow, whole-life cycle fee.
5. oil field well according to claim 1 pipe, the management application system of bar, it is characterised in that after described processing
Data include:Tube rod using number of days, the frequency, provide sequence number, sequence number of going into the well, cumulative length of going into the well, cumulative depth, provide record
Table, same day oil pipe granting registration account, recovery record sheet, same day oil pipe reclaim registration account, teams and groups' form, the management of individual well oil pipe
Card, point directorial area provide retrieval management table.
6. oil field well use according to claim 1 is managed, the management application system of bar, described analysis result is:To every
The statistics carried out after the network data acquisition of failure cause such as mouth well oil pipe bar, the disconnected de-, eccentric wear of burn into, the leakage of downhole tool
The description of various figures is analyzed and formed, and then forms the failure point on the basis of big data to oil pipe bar and downhole tool
Analysis.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710144797.6A CN106952173A (en) | 2017-03-13 | 2017-03-13 | Oil well down tube, rod tube reason and application process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710144797.6A CN106952173A (en) | 2017-03-13 | 2017-03-13 | Oil well down tube, rod tube reason and application process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106952173A true CN106952173A (en) | 2017-07-14 |
Family
ID=59467544
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710144797.6A Pending CN106952173A (en) | 2017-03-13 | 2017-03-13 | Oil well down tube, rod tube reason and application process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106952173A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107355217A (en) * | 2017-07-20 | 2017-11-17 | 陕西优润安石油科技有限公司 | The data information acquisition processing method of oil pipe in a kind of each well of oil gas field |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102073929A (en) * | 2010-12-30 | 2011-05-25 | 檀朝东 | System and method for managing information of underground tube roofbolt on basis of radio frequency technology |
US8004414B2 (en) * | 2008-03-14 | 2011-08-23 | International Business Machines Corporation | Use of RFIDs to measure flow-rates of materials flowing through piping |
CN106022411A (en) * | 2016-06-02 | 2016-10-12 | 青岛中瑞泰软控技术有限公司 | Oil gas drilling and production pipe rod tracking system |
-
2017
- 2017-03-13 CN CN201710144797.6A patent/CN106952173A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8004414B2 (en) * | 2008-03-14 | 2011-08-23 | International Business Machines Corporation | Use of RFIDs to measure flow-rates of materials flowing through piping |
CN102073929A (en) * | 2010-12-30 | 2011-05-25 | 檀朝东 | System and method for managing information of underground tube roofbolt on basis of radio frequency technology |
CN106022411A (en) * | 2016-06-02 | 2016-10-12 | 青岛中瑞泰软控技术有限公司 | Oil gas drilling and production pipe rod tracking system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107355217A (en) * | 2017-07-20 | 2017-11-17 | 陕西优润安石油科技有限公司 | The data information acquisition processing method of oil pipe in a kind of each well of oil gas field |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102509181B (en) | Computer network system for enterprise purchasing management | |
CN107146020B (en) | Photovoltaic power plant engineering project informatization management system | |
CN102436624B (en) | A kind of based on the power marketing live traffic treatment scheme of handheld terminal and the method for specification | |
CN102708149A (en) | Data quality management method and system | |
CN111767247A (en) | File specification and synchronous forming control platform for real-time supervision of engineering data | |
CN101501590B (en) | Apparatus and method to estimate the value of a work process and determine gaps in current and desired states | |
CN103955754A (en) | Mold workshop scheduling method based on real-time production data collection | |
CN105160038A (en) | Data analysis method and system based on audit database | |
US20200210954A1 (en) | Heterogeneous Data Management Methodology and System | |
CN104899143A (en) | Software peer review system realizing device for providing DM (Data Mining) | |
CN105069542A (en) | Responsibility cost budget drafting method and system | |
CN101996364A (en) | Method for modifying labor time standard and labor time standard management system | |
CN112529131A (en) | Equipment full production cycle management system based on three-dimensional visualization for power plant | |
CN106982251A (en) | Project field work data reporting method and system are reconnoitred based on mobile device | |
CN112819407A (en) | Intelligent inventory checking system and method based on component coding and information acquisition technology | |
CN108960758A (en) | Architectural engineering process control management system | |
CN106952173A (en) | Oil well down tube, rod tube reason and application process | |
CN103020023A (en) | Automatic storing and reading method for electronic document data of technical supervision system in electric power industry | |
CN116307566B (en) | Dynamic design system for large-scale building construction project construction organization scheme | |
CN107093018A (en) | Communication engineering project information method for visualizing and device based on health model | |
CN105550264A (en) | User journal collecting and processing system and method | |
CN115660305A (en) | Traffic infrastructure is built and is managed support integration data management platform | |
CN115545630A (en) | Machine learning model establishment method for improving turnover rate of large-scale equipment | |
Leksic | Lean model for construction project effectiveness measurement | |
Kotelnikov et al. | Evaluation of the effectiveness of innovative solutions in the construction of oil and gas wells |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170714 |