CN106948823A - 车站风道与暗挖区间联合施作的施工方法 - Google Patents
车站风道与暗挖区间联合施作的施工方法 Download PDFInfo
- Publication number
- CN106948823A CN106948823A CN201710154541.3A CN201710154541A CN106948823A CN 106948823 A CN106948823 A CN 106948823A CN 201710154541 A CN201710154541 A CN 201710154541A CN 106948823 A CN106948823 A CN 106948823A
- Authority
- CN
- China
- Prior art keywords
- layer
- pilot tunnel
- construction
- shaft
- air channel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 48
- 238000009412 basement excavation Methods 0.000 title claims description 23
- 230000007123 defense Effects 0.000 claims abstract description 5
- 238000004873 anchoring Methods 0.000 claims description 12
- 239000002689 soil Substances 0.000 claims description 12
- 238000000034 method Methods 0.000 claims description 11
- 238000005065 mining Methods 0.000 claims description 11
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 230000001360 synchronised effect Effects 0.000 claims description 4
- 239000007788 liquid Substances 0.000 claims description 3
- 238000007363 ring formation reaction Methods 0.000 claims description 3
- 238000005728 strengthening Methods 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 2
- 230000005641 tunneling Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/14—Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F1/00—Ventilation of mines or tunnels; Distribution of ventilating currents
- E21F1/003—Ventilation of traffic tunnels
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明公开了一种车站风道与暗挖区间联合施作的施工方法,至少包括如下步骤:步骤一,施工新风井竖井;步骤二,施工竖井与风道连接段结构;步骤三,施工车站风道结构,该风道结构位于车站区间正线上方;步骤四,施工新风竖井二衬结构,待新风井二衬结构完成后完成风道人防段结构;步骤五,施工排风井竖井;步骤六,施工排风井与风道连接段结构。本发明克服了受施工场地的限制,降低了施工风险,节约了工期。
Description
技术领域
本发明涉及隧道挖掘领域,特别涉及一种车站风道与暗挖区间联合施作的施工方法。
背景技术
随着我国城市经济的快速持续发展,城市道路交通条件日趋紧张,地下交通车站运输逐渐成为大运量快速公共交通系统的主要交通要道。目前,对于地下车站通常采用明挖法或者暗挖法。但是,由于明挖法施工占地面积较大,而周围商业、居民等楼宇密集,交通繁忙,加之密集的地下管线及地下构筑物的制约,使得明挖法的应用受到一定的限制。
地铁施工中一般包括车站主体的施工以及风道结构的施工,一般的车站风道结构或者采用独立与地铁车站的结构,或者在地铁车站末端与车站主体联合施做横向风道结构,但此种方式受施工场地的限制,车站外侧无法施工场地,需要提供一种新的风道设置方式以及施工方法。
发明内容
本发明在于提供一种车站风道与暗挖区间联合施作的施工方法,其克服了受施工场地的限制。
本发明采用如下技术方案,一种车站风道与暗挖区间联合施作的施工方法,至少包括如下步骤:
步骤一,施工新风井竖井;
步骤二,施工竖井与风道连接段结构;
步骤三,施工车站风道结构,该风道结构位于车站区间正线上方;
步骤四,施工新风竖井二衬结构,待新风井二衬结构完成后完成风道人防段结构;
步骤五,施工排风井竖井;
步骤六,施工排风井与风道连接段结构。
通过采用上述技术方案,采用在区间正线上方设置风道的方法克服了施工场地受限制,无足够场地进行风道施工的问题,同时风道和区间结构二者结合的施工方式,可以在区间暗挖完成的同时同步进行风道河区间施工,从而节约了工期,也无独立风道施工场地的问题。
作为优选,施工新风井竖井的步骤包括:
第一步,竖井开挖至上施工通道拱顶前,竖井井壁三榀格栅以及临时横撑加密,沿通道供顶外周水平打设两排超前小导管注浆加固底层;
第二步,竖井开挖至临时仰拱位置,临时封底后凿除上层通道上台阶码头门范围内初支井壁,同步密封架设通道格栅钢架,横通道第一榀格栅架设在井壁平面内与被割断的竖井格栅以及竖向连接筋焊接成一体,然后进行通道开挖,施作初期支护;
第三步,第一层横通道开挖后,在保证上下导洞开间距大于等于6m的前提下,按第一步方法进行第二层横通道的施工,然后继续竖井开挖至第二层横通道底板下榀钢架处,临时封底;
第四步,按照第二步~第三步步序依次开挖竖井施工各层导洞。
作为优选,施工风道结构步骤包括,
第一步,在开挖前对第一层导洞土体进行加固,采用开挖第一层左部导洞土体,施作初期支护并架设临时支撑,采用锁脚锚杆加固墙角;
第二步,开挖第二层左部导洞,施作初期支护并架设临时支撑,并采用锁脚锚杆加固墙角;
第三步,加固地层,开挖第一层右部导洞以及第二层右部导洞土体,施作初期支护并架设临时支撑,采用锁脚锚杆加固墙角;
第四步,开挖第三层左部导以及第三层右部导洞,施作初期支护并架设临时支撑,并采用锁脚锚杆加固墙角;
第五步,开挖第四层左部导洞以及第四层右部导洞,施作初期支护封闭初期支护;
第六步,初期支护背后注浆,自下而上的顺序施作防水层,施作底板,侧墙二次衬砌,预留钢筋,防水板接头,并逐段换撑临时支撑直至并最顶层施作顶板防水层以及顶板二次衬砌,结构封闭成环进行二次衬砌背后注浆。
作为优选,所述第一步、第二步、第三步、第四步以及第五步的导洞的开挖均采用台阶法。
作为优选,每个导洞分上、下2个台阶开挖,邻近导洞之间纵向错开10~15m,每个台阶纵向步距为3~5m,且每个台阶均预留核心土。
本发明与现有技术相比具有:1、可以在区间暗挖完成的同时,同步进行风道和区间施工,从很大程度上节约了工期,也无独立风道施工场地的问题。
附图说明
图1为本发明车站风道与暗挖区间的结构示意图;
图2为用于体现导洞的结构示意图;
图3为用于体现导洞的断面图。
图中:1、新风井竖井;2、竖井与风道连接段结构;3、风道结构;4、新风竖井二衬结构;41、风道人防段结构;5、排风井竖井;6、排风井与风道连接段结构;71、第一层导洞;71a、第一层左部导洞;71b、第一层右部导洞;72、第二层导洞;72a、第二层左部导洞;72b、第二层右部导洞;73、第三层导洞;73a、第三层左部导洞;73b、第三层右部导洞;74、第四层导洞;74a、第四层左部导洞;74b、第四层右部导洞;75、第五层导洞。
具体实施方式
以下结合附图对本发明作进一步详细说明。
参见图1所示,一种车站风道与暗挖区间联合施作的施工方法,包括如下步骤:
步骤一,施工新风井竖井1;
步骤二,施工竖井与风道连接段结构2;
步骤三,施工车站风道结构3,该风道结构位于车站区间正线上方;
步骤四,施工新风竖井二衬结构4,待新风井二衬结构4完成后完成风道人防段结构41;
步骤五,施工排风井竖井5;
步骤六,施工排风井与风道连接段结构6。
其中,参见图2对施工新风井竖井1的步骤进行说明,在开挖前根据断面尺寸将断面分成四层八部。
第一步,竖井开挖至上施工通道拱顶前,竖井井壁三榀格栅以及临时横撑加密,沿通道供顶外周水平打设两排超前小导管注浆加固底层;
第二步,竖井开挖至临时仰拱位置,临时封底后凿除上层通道上台阶码头门范围内初支井壁,同步密封架设通道格栅钢架,横通道第一榀格栅架设在井壁平面内与被割断的竖井格栅以及竖向连接筋焊接成一体,然后进行通道开挖,施作初期支护;
第三步,第一层横通道开挖后,在保证上下导洞开间距大于等于6m的前提下,按第一步方法进行第二层横通道的施工,然后继续竖井开挖至第二层横通道底板下榀钢架处,临时封底;
第四步,按照第二步~第三步步序依次开挖竖井施工各层导洞。
参见图3对导洞土体开挖做具体说明,导洞的开挖均采用台阶法,每个导洞分上、下2个台阶开挖,邻近导洞之间纵向错开10~15m,每个台阶纵向步距为3~5m,且每个台阶均预留核心土。
第一步,在开挖前对第一层导洞71土体进行加固,采用开挖第一层左部导洞71a土体,施作初期支护并架设临时支撑,采用锁脚锚杆加固墙角;
第二步,开挖第二层左部导洞72a,施作初期支护并架设临时支撑,并采用锁脚锚杆加固墙角;
第三步,加固地层,开挖第一层右部导洞71b以及第二层右部导洞72b土体,施作初期支护并架设临时支撑,采用锁脚锚杆加固墙角;
第四步,开挖第三层左部导洞73a以及第三层右部导洞73b,施作初期支护并架设临时支撑,并采用锁脚锚杆加固墙角;
第五步,开挖第四层左部导洞74a以及第四层右部导洞74b,施作初期支护封闭初期支护;
第六步,自下而上的顺序施作防水层,施作底板,侧墙二次衬砌,预留钢筋,防水板接头,并逐段换撑临时支撑直至并最顶层施作顶板防水层以及顶板二次衬砌,结构封闭成环进行二次衬砌背后注浆。
具体实施例仅仅是对本发明的解释,其并不是对本发明的限制,本领域技术人员在阅读完本说明书后可以根据需要对本实施例做出没有创造性贡献的修改,但只要在本发明的权利要求范围内都受到专利法的保护。
Claims (5)
1.一种车站风道与暗挖区间联合施作的施工方法,其特征在于,至少包括如下步骤:
步骤一,施工新风井竖井(1);
步骤二,施工竖井与风道连接段结构(2);
步骤三,施工车站风道结构(3),该风道结构(3)位于车站区间正线上方;
步骤四,施工新风竖井二衬结构(4),待新风井二衬结构(4)完成后完成风道人防段结构(41);
步骤五,施工排风井竖井(5);
步骤六,施工排风井与风道连接段结构(6)。
2.根据权利要求1所述的车站风道与暗挖区间联合施作的施工方法,其特征在于,施工新风井竖井(1)的步骤包括:
第一步,竖井开挖至上施工通道拱顶前,竖井井壁三榀格栅以及临时横撑加密,沿通道供顶外周水平打设两排超前小导管注浆加固底层;
第二步,竖井开挖至临时仰拱位置,临时封底后凿除上层通道上台阶码头门范围内初支井壁,同步密封架设通道格栅钢架,横通道第一榀格栅架设在井壁平面内与被割断的竖井格栅以及竖向连接筋焊接成一体,然后进行通道开挖,施作初期支护;
第三步,第一层横通道开挖后,在保证上下导洞开间距大于等于6m的前提下,按第一步方法进行第二层横通道的施工,然后继续竖井开挖至第二层横通道底板下榀钢架处,临时封底;
第四步,按照第二步~第三步步序依次开挖竖井施工各层导洞。
3.根据权利要求1所述的车站风道与暗挖区间联合施作的施工方法,其特征在于:施工风道结构(3)步骤包括,
第一步,在开挖前对第一层导洞(71)土体进行加固,采用开挖第一层左部导洞(71a)土体,施作初期支护并架设临时支撑,采用锁脚锚杆加固墙角;
第二步,开挖第二层左部导洞(72a),施作初期支护并架设临时支撑,并采用锁脚锚杆加固墙角;
第三步,加固地层,开挖第一层右部导洞(71b)以及第二层右部导洞(72b)土体,施作初期支护并架设临时支撑,采用锁脚锚杆加固墙角;
第四步,开挖第三层左部导洞(73a)以及第三层右部导洞(73b),施作初期支护并架设临时支撑,并采用锁脚锚杆加固墙角;
第五步,开挖第四层左部导洞(74a)以及第四层右部导洞(74b),施作初期支护封闭初期支护;
第六步,初期支护背后注浆,自下而上的顺序施作防水层,施作底板,侧墙二次衬砌,预留钢筋,防水板接头,并逐段换撑临时支撑直至并最顶层施作顶板防水层以及顶板二次衬砌,结构封闭成环进行二次衬砌背后注浆。
4.根据权利要求3所述的车站风道与暗挖区间联合施作的施工方法,其特征在于:所述第一步、第二步、第三步、第四步以及第五步的导洞的开挖均采用台阶法。
5.根据权利要求3所述的车站风道与暗挖区间联合施作的施工方法,其特征在于:每个导洞分上、下2个台阶开挖,邻近导洞之间纵向错开10~15m,每个台阶纵向步距为3~5m,且每个台阶均预留核心土。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710154541.3A CN106948823A (zh) | 2017-03-15 | 2017-03-15 | 车站风道与暗挖区间联合施作的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710154541.3A CN106948823A (zh) | 2017-03-15 | 2017-03-15 | 车站风道与暗挖区间联合施作的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106948823A true CN106948823A (zh) | 2017-07-14 |
Family
ID=59472189
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710154541.3A Pending CN106948823A (zh) | 2017-03-15 | 2017-03-15 | 车站风道与暗挖区间联合施作的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106948823A (zh) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108222945A (zh) * | 2017-11-30 | 2018-06-29 | 中铁四局集团有限公司 | 利用主、辅分层坑道开挖特大断面地铁暗挖车站的施工方法 |
CN108331591A (zh) * | 2018-01-24 | 2018-07-27 | 中铁四局集团有限公司 | 一种隧道开挖施工辅助结构体系 |
CN108361036A (zh) * | 2018-03-14 | 2018-08-03 | 北京市政路桥股份有限公司 | 一种地铁车站附属结构外挂的施工方法 |
CN108412500A (zh) * | 2018-02-08 | 2018-08-17 | 中铁二院工程集团有限责任公司 | 山地城市地铁暗挖车站通风构造及其施工方法 |
CN108843338A (zh) * | 2018-06-27 | 2018-11-20 | 北京市政路桥股份有限公司 | 一种竖井施工通道转换大断面隧道的一体开挖施工法 |
CN110439574A (zh) * | 2019-07-16 | 2019-11-12 | 中铁隧道集团二处有限公司 | 用于盾构侧向平移始发与出渣运料的隧道结构及施工方法 |
CN110566212A (zh) * | 2019-09-19 | 2019-12-13 | 中铁六局集团石家庄铁路建设有限公司 | 一种先隧后井暗挖风道施工方法 |
CN112145183A (zh) * | 2020-09-02 | 2020-12-29 | 中铁五局集团第四工程有限责任公司 | 一种浅埋软弱围岩陡坡隧道仰挖的施工方法 |
CN112282809A (zh) * | 2020-10-27 | 2021-01-29 | 聊城大学 | 一种建筑物多层地下结构支护施工方法及支护装置 |
CN115182737A (zh) * | 2022-07-04 | 2022-10-14 | 北京城建设计发展集团股份有限公司 | 深埋地铁车站竖向正交顶出式风道结构及施工方法 |
CN115387385A (zh) * | 2022-10-08 | 2022-11-25 | 中建八局轨道交通建设有限公司 | 一种地下空间工程竖向增层施工方法 |
CN116658167A (zh) * | 2023-08-01 | 2023-08-29 | 中铁九局集团第四工程有限公司 | 一种设置中央竖井修建地铁大断面渡线隧道的施工方法 |
CN116816396A (zh) * | 2023-08-31 | 2023-09-29 | 中国铁路设计集团有限公司 | 地铁暗挖车站结合横通道设置轨顶排热风道结构及方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060083740A (ko) * | 2005-01-18 | 2006-07-21 | 주식회사 하이콘엔지니어링 | 앵커 지보를 이용한 피암터널 시공방법 |
CN2931792Y (zh) * | 2006-08-09 | 2007-08-08 | 上海市城市建设设计研究院 | 一种地铁车站活塞风井系统 |
CN102953739A (zh) * | 2012-10-26 | 2013-03-06 | 中铁二十二局集团第六工程有限公司 | 一种暗挖地铁车站的双向开洞方法 |
CN103276749A (zh) * | 2013-05-29 | 2013-09-04 | 中国人民解放军总参谋部工程兵第四设计研究院 | 城市轨道交通工程人民防空系统 |
CN103452561A (zh) * | 2013-08-20 | 2013-12-18 | 中铁二局股份有限公司 | 一种地铁暗挖车站多层横向通道竖向进洞施工方法、以及东、西两侧施工方法 |
CN105298501A (zh) * | 2015-11-11 | 2016-02-03 | 上海市城市建设设计研究总院 | 暗挖车站附属风道结构施工方法 |
-
2017
- 2017-03-15 CN CN201710154541.3A patent/CN106948823A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060083740A (ko) * | 2005-01-18 | 2006-07-21 | 주식회사 하이콘엔지니어링 | 앵커 지보를 이용한 피암터널 시공방법 |
CN2931792Y (zh) * | 2006-08-09 | 2007-08-08 | 上海市城市建设设计研究院 | 一种地铁车站活塞风井系统 |
CN102953739A (zh) * | 2012-10-26 | 2013-03-06 | 中铁二十二局集团第六工程有限公司 | 一种暗挖地铁车站的双向开洞方法 |
CN103276749A (zh) * | 2013-05-29 | 2013-09-04 | 中国人民解放军总参谋部工程兵第四设计研究院 | 城市轨道交通工程人民防空系统 |
CN103452561A (zh) * | 2013-08-20 | 2013-12-18 | 中铁二局股份有限公司 | 一种地铁暗挖车站多层横向通道竖向进洞施工方法、以及东、西两侧施工方法 |
CN105298501A (zh) * | 2015-11-11 | 2016-02-03 | 上海市城市建设设计研究总院 | 暗挖车站附属风道结构施工方法 |
Non-Patent Citations (1)
Title |
---|
童利红等: "《暗挖地铁车站通风系统的布置与风道的设计研究》", 《隧道建设》 * |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108222945B (zh) * | 2017-11-30 | 2020-03-27 | 中铁四局集团有限公司 | 利用主、辅分层坑道开挖特大断面地铁暗挖车站的施工方法 |
CN108222945A (zh) * | 2017-11-30 | 2018-06-29 | 中铁四局集团有限公司 | 利用主、辅分层坑道开挖特大断面地铁暗挖车站的施工方法 |
CN108331591A (zh) * | 2018-01-24 | 2018-07-27 | 中铁四局集团有限公司 | 一种隧道开挖施工辅助结构体系 |
CN108412500A (zh) * | 2018-02-08 | 2018-08-17 | 中铁二院工程集团有限责任公司 | 山地城市地铁暗挖车站通风构造及其施工方法 |
CN108361036A (zh) * | 2018-03-14 | 2018-08-03 | 北京市政路桥股份有限公司 | 一种地铁车站附属结构外挂的施工方法 |
CN108843338A (zh) * | 2018-06-27 | 2018-11-20 | 北京市政路桥股份有限公司 | 一种竖井施工通道转换大断面隧道的一体开挖施工法 |
CN110439574A (zh) * | 2019-07-16 | 2019-11-12 | 中铁隧道集团二处有限公司 | 用于盾构侧向平移始发与出渣运料的隧道结构及施工方法 |
CN110566212B (zh) * | 2019-09-19 | 2021-08-06 | 中铁六局集团石家庄铁路建设有限公司 | 一种先隧后井暗挖风道施工方法 |
CN110566212A (zh) * | 2019-09-19 | 2019-12-13 | 中铁六局集团石家庄铁路建设有限公司 | 一种先隧后井暗挖风道施工方法 |
CN112145183A (zh) * | 2020-09-02 | 2020-12-29 | 中铁五局集团第四工程有限责任公司 | 一种浅埋软弱围岩陡坡隧道仰挖的施工方法 |
CN112282809A (zh) * | 2020-10-27 | 2021-01-29 | 聊城大学 | 一种建筑物多层地下结构支护施工方法及支护装置 |
CN115182737A (zh) * | 2022-07-04 | 2022-10-14 | 北京城建设计发展集团股份有限公司 | 深埋地铁车站竖向正交顶出式风道结构及施工方法 |
JP7394252B1 (ja) | 2022-07-04 | 2023-12-07 | 北京城建設計▲発▼展集団股▲ふん▼有限公司 | 大深度地下鉄駅における縦方向に直交する突き出し型風道構造及び施工方法 |
JP2024007536A (ja) * | 2022-07-04 | 2024-01-18 | 北京城建設計▲発▼展集団股▲ふん▼有限公司 | 大深度地下鉄駅における縦方向に直交する突き出し型風道構造及び施工方法 |
US12025008B2 (en) | 2022-07-04 | 2024-07-02 | Beijing Urban Construction Design & Development Group Co., Limited | Vertical orthogonal top exhausting air duct structure of deeply-buried subway station and construction method therefor |
CN115387385A (zh) * | 2022-10-08 | 2022-11-25 | 中建八局轨道交通建设有限公司 | 一种地下空间工程竖向增层施工方法 |
CN116658167A (zh) * | 2023-08-01 | 2023-08-29 | 中铁九局集团第四工程有限公司 | 一种设置中央竖井修建地铁大断面渡线隧道的施工方法 |
CN116658167B (zh) * | 2023-08-01 | 2023-10-27 | 中铁九局集团第四工程有限公司 | 一种设置中央竖井修建地铁大断面渡线隧道的施工方法 |
CN116816396A (zh) * | 2023-08-31 | 2023-09-29 | 中国铁路设计集团有限公司 | 地铁暗挖车站结合横通道设置轨顶排热风道结构及方法 |
CN116816396B (zh) * | 2023-08-31 | 2023-12-05 | 中国铁路设计集团有限公司 | 地铁暗挖车站结合横通道设置轨顶排热风道结构及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106948823A (zh) | 车站风道与暗挖区间联合施作的施工方法 | |
CN106337686B (zh) | 岩质地层暗挖三层地铁车站伞盖结构及施工方法 | |
CN105041349B (zh) | 一种在地铁区间盾构隧道基础上扩挖车站的暗挖施工方法 | |
CN106703828B (zh) | 采用预制装配式衬砌结合pba建造地铁车站的施工方法 | |
CN101440708B (zh) | Pba浅埋暗挖近距离大断面三洞分离岛式结构施工方法 | |
CN102758632B (zh) | 岩质地层双初支分层法修建大型地下结构的方法 | |
CN104879144B (zh) | 软土地区以阵列顶管建设地下空间的暗挖施工方法 | |
JP7394252B1 (ja) | 大深度地下鉄駅における縦方向に直交する突き出し型風道構造及び施工方法 | |
CN108868778A (zh) | 一种大型地下结构非开挖修建方法 | |
CN104763433A (zh) | 上软下硬地层大跨地铁车站暗挖施工方法 | |
CN106703814A (zh) | 暗挖地铁车站洞桩施工方法 | |
CN106567717A (zh) | 一种利用地铁出入口兼作施工斜通道结构及施工方法 | |
CN104632235A (zh) | 一种用桩拱墙支撑扩挖大直径盾构隧道建地铁车站的方法 | |
CN102287194B (zh) | 一种多跨平拱隧道的施工方法 | |
CN103775110A (zh) | 软土地区多层地下空间的暗挖施工方法 | |
CN105201516A (zh) | 一种地铁车站主体结构及其四联拱pba暗挖施工方法 | |
CN105587320B (zh) | 富水砂卵石地层异型深竖井结构体系及其施工方法 | |
CN102748040A (zh) | 地铁大跨度车站主体结构及其柱拱法施工方法 | |
CN204457792U (zh) | 一种用多导洞法扩挖大直径盾构隧道而建造的地铁车站 | |
CN104653188B (zh) | 一种在暗挖风道内设置大直径盾构接收和始发井的方法 | |
CN107288642A (zh) | Pba施工工艺 | |
CN207033463U (zh) | 海域中部矿山盾构交接隧道叠合型接头结构 | |
CN109958445A (zh) | 用于超浅埋大型地下空间的棚架施工法 | |
CN102943488A (zh) | 软土地区大面积绿化下非开挖实施地下空间的施工方法 | |
CN109056810A (zh) | 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170714 |