CN106948634A - The operation managing and control system of the tower-type space garage of parallelization Transport Vehicle - Google Patents

The operation managing and control system of the tower-type space garage of parallelization Transport Vehicle Download PDF

Info

Publication number
CN106948634A
CN106948634A CN201710338125.9A CN201710338125A CN106948634A CN 106948634 A CN106948634 A CN 106948634A CN 201710338125 A CN201710338125 A CN 201710338125A CN 106948634 A CN106948634 A CN 106948634A
Authority
CN
China
Prior art keywords
parking
tower
server
scheduling system
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710338125.9A
Other languages
Chinese (zh)
Inventor
汤辉
朱迅
查金水
王晨晨
胡劲松
朱志远
钱庆
吴影生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Bowei United Control Technology Co.,Ltd.
Original Assignee
CETC 38 Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CETC 38 Research Institute filed Critical CETC 38 Research Institute
Priority to CN201710338125.9A priority Critical patent/CN106948634A/en
Publication of CN106948634A publication Critical patent/CN106948634A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • E04H6/08Garages for many vehicles
    • E04H6/12Garages for many vehicles with mechanical means for shifting or lifting vehicles
    • E04H6/18Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions
    • E04H6/28Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions characterised by use of turntables or rotary rings for horizontal transport
    • E04H6/282Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions characterised by use of turntables or rotary rings for horizontal transport turntables, rotary elevators or the like on which the cars are not permanently parked
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • E04H6/42Devices or arrangements peculiar to garages, not covered elsewhere, e.g. securing devices, safety devices, monitoring and operating schemes; centering devices
    • E04H6/422Automatically operated car-parks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of operation managing and control system of the tower-type space garage of parallelization Transport Vehicle, apply in tower-type space garage, including task scheduling system, video monitoring system, mobile internet service system, parking charge management system, each subsystem carries out information transfer by the way of LAN, and other three subsystems carry out information exchange by dispatching system;Task scheduling system includes scheduling system server, display and layer controller, and scheduling system server also dispatches the POS and lift at caching parking stall;Video monitoring system includes video monitoring server, display and some cameras;Mobile internet service system includes mobile terminal, mobile internet service device;Parking fee management system includes parking charge server, display and camera, lifts bar machine, card sender, the POS, display screen.The present invention has advantages below:Using the handling capacity of the multi-storied garage of present invention operation managing and control system is big, bicycle access speed is fast, reliability and security is high.

Description

The operation managing and control system of the tower-type space garage of parallelization Transport Vehicle
Technical field
The present invention relates to the operation managing and control system in garage parking, more particularly to a kind of parking systems.
Background technology
With increasing sharply for China's car ownership, parking difficulty, random, improvement difficulty of stopping have become puzzlement Chinese city The main bugbear of development, especially under the overall background of economic new normality, traditional parking Industry Model has been difficult to meet new ring Industry development demand under border.2010, state lived the portion of building, the Ministry of Public Security and the Committee of Development and Reform and combines what is issued《Urban parking facilities are advised Draw the instruction built and managed》Point out:In current China's urban economy social development process, city parking imbalance between supply and demand Become increasingly conspicuous, particularly under China's urban land resource highly in short supply and car owning amount rapid growth background, due to parking Facility total amount wretched insufficiency, unreasonable allocation, utilization ratio be low and parking management is not in place and result in serious parking difficulty, friendship The problems such as logical congestion, life of urban resident quality is had a strong impact on, urban sustainable development is constrained.
Mechanical stereo garage is one kind of parking apparatus, one of category special equipment product, convenient with vehicle access, is System economical operation, easy to maintenance, the features such as floor space is few is currently to tackle one kind that vehicle is more and the area that stops is less to solve Certainly scheme.
Early in nineteen twenty, the U.S. has built up First mechanical three-dimensional parking device in the world, after the fifties, the U.S. and The multi-storied garage of a variety of patterns, the later stage sixties, with developing rapidly for World Auto Industry, city automobile are built up in West Europe successively Owning amount sharp increase, the appearance of especially a large amount of private cars, makes the big city of U.S., day, Ou Deng industrially developed country equal Different degrees of parking difficulty problem is occurred in that, especially in intown shopping centre, depth of building is intensive, it is impossible to vacate big Parking lot is built on amount land for building, and now the small three-dimensional parking apparatus of floor space is just really developed popularization.
Current parking systems mainly have lifting cross sliding type (PSH), simple lifting class (PJS), vertical lifting (PCS), Tunnel stacking class (PXD), planar movement class (PPY), horizontal cyclic class (PSX), vertical circulation class (PCX), multilayer circulation class (PDX), the big type of automobile elvator (PQS) etc. 9, according to ASSOCIATE STATISTICS, more than in nine kinds of parking apparatus types, 80% city Market share all concentrates on the relatively low lifting cross sliding type of technical merit (PSH), and only less enterprise possesses high-rise vertical lift type (tower storehouse) qualification.
Current parking systems is distinguished according to its operation principle, and its classification and code name see the table below 1:
The garage parking classification of table 1 and code name
A mechanical type three-dimensional parking garage is built, the total arrangement in garage and the bicycle parking energy in garage parking are must take into consideration in design Power, it is The more the better that people are often desirable to bicycle parking quantity in a storehouse, when actually designing a garage parking, it is ensured that garage it is smooth and Safely run also particularly significant.
Since maximum entered and (gone out) time and just refer to providing an instruction for entering car (or going out car) in mechanical carport, will Car docks to the most unfavorable combination (or taking out vehicle from most unfavorable combination) of the mechanical carport, until the garage parking is carried out It is next enter car (or going out car) instruction untill needed for time.Bicycle maximum enter and (go out) time should according to its use environment, area, Purposes and the particular/special requirement of user carry out reasonable selection, and the time is entered and (gone out) to the bicycle maximum that different types of mechanical carport is chosen The phenomenon of Transport Vehicle queuing can should be occurred without with different but basic requirement.
Parking systems market access at this stage stable development period, particularly public resource be supporting and unit uses by oneself User's rapid development, by the exploration of decades, parking systems product standard system is more perfect, but still has The problem of Transport Vehicle overlong time in peak period on and off duty.
The content of the invention
The technical problems to be solved by the invention are the provision of that a kind of handling capacity in guarantee garage is big, bicycle access speed Hurry up, the operation management and control system of the tower-type space garage for the parallelization Transport Vehicle that Transport Vehicle experience effect is good, reliability and security is high System.
The present invention is to solve above-mentioned technical problem by the following technical programs:A kind of tower type three-dimensional of parallelization Transport Vehicle The operation managing and control system in garage, is applied in tower-type space garage, and the tower-type space garage includes steel structures coating, parking and removed Fortune system, the steel structures coating includes at least one tower-type space garage steel construction, each tower-type space garage steel construction bag If including dried layer parking tier, tower-type space garage steel construction is divided into inner ring, outer ring, and outer ring parking, the parking handling system includes It is connected between floor truck, rotatable disc and lift, two neighboring tower-type space garage steel construction by lift, two Tower-type space garage steel construction shares a lift, and every layer of inner ring center of tower-type space garage steel construction places one Rotatable disc and a floor truck, around rotatable disc, the radial multiple parking stalls of setting, floor truck exists vehicle Moved between parking stall and rotatable disc, each layer in outer ring of tower-type space garage steel construction reserves at least two positions and is used as liter The operative position of ladder is dropped, each parking tier is connected by lift, first layer stops pick-up position, the second layer and above conduct as caching Parking stall is stored, the caching of first layer stops caching parking stall and storage parking stall that pick-up position includes being staggered;
Whole operation managing and control system it is main by task scheduling system, video monitoring system, mobile internet service system, stop Four subsystem compositions of car far management system, each subsystem carries out information transfer, other three by the way of LAN Subsystem carries out information exchange by dispatching system;
Wherein task scheduling system includes scheduling system server, is connected to the display of scheduling system server, and Every layer of layer controller, is interconnected between scheduling system server and layer controller by the form of network, scheduling system clothes Business device also dispatches the POS and lift at caching parking stall;
The video monitoring system includes video monitoring server, display and several cameras, video monitoring clothes It is connected between business device and several cameras by network connection, display on video monitoring server;
The mobile internet service system includes mobile terminal, mobile internet service device, the mobile Internet clothes Pass through network connection between business device and mobile terminal;
The parking fee management system includes parking charge server, display and camera, lifts bar machine, IC-card hair fastener Machine, the POS, LED display, display are connected on parking charge server, camera, act bar machine, IC-card card sender, brush Card machine, LED display are connected on parking charge server by interchanger, camera herein, act bar machine, IC-card hair fastener Machine, the POS, LED display are installed in the gateway of multi-storied garage;
Video monitoring server, mobile internet service device, parking charge server are all connected to task scheduling system Interchanger.
As the technical scheme of optimization, at least one exchange is also associated between scheduling system server and layer controller Machine.
As the technical scheme of optimization, layer controller uses PLC.
As the technical scheme of optimization, layer controller control object specifically includes floor truck, rotatable disc, into slow The vehicle interceptor in device of arguing for the sake of arguing, the shutter door of caching parking stall import and export, caching parking stall before bicycle parking position, and vehicle guidance are aobvious Display screen curtain.
As the technical scheme of optimization, the unit of the layer controller detection of multi-storied garage first layer includes being arranged on caching car Position in vehicle parameter sensor, lift sensors in place, rotating disk sensors in place, shutter door sensors in place, feel line Circle, dolly path sensor, agv controller, wheel controller, device of arguing for the sake of arguing, vehicle interceptor, LED guiding screen, other layers The unit of layer controller detection includes lift sensors in place, rotating disk sensors in place, dolly path sensor, dolly control Device, wheel controller.
As the technical scheme of optimization, interchanger is additionally provided between video monitoring server and several cameras.
As the technical scheme of optimization, fire wall is provided between the mobile internet service device and mobile terminal.
As the technical scheme of optimization, parking charge management system and task scheduling system interactive information include:
1) information of vehicles:Parking charge management system recognizes the number-plate number by high definition Number Reorganization camera, is stored to IC In card, car owner takes IC-card by IC-card card sender, is swiped the card to the POS cached at parking stall, and task scheduling system, which passes through, to be read The IC card information of the POS at caching parking stall is dispatched buses;
2) vehicle guidance information:Task scheduling system gives parking charge management system information pushing, draws to new vehicle of marching into the arena Lead which parking mouth is stopped;
3) paying information:After appearance vehicle is by brush IC-card, parking charge server is carried out to scheduling system server Whether inquiry user is paid dues by mobile terminal, and whether scheduling system server is handed over for one to parking charge server The feedback taken.
As the technical scheme of optimization, the interactive information between task scheduling system and video monitoring system includes:
1) current vehicle position information:Task scheduling system is fed back when the position of advance storehouse vehicle is believed to video monitoring system Breath;
2) parking final image information:After vehicle stops onto parking stall, video monitoring system is fed back to task scheduling system One final parking image.
As the technical scheme of optimization, the interactive information bag between task scheduling system and mobile internet service system Include:
1) vehicle collection reservation information:User initiates vehicle collection reservation application by mobile terminal to task scheduling system, and task is adjusted Degree system feeds back whether vehicle collection reservation succeeds by mobile Internet on the mobile terminal of user;
2) paying information:User inquires about down time by mobile Internet to task scheduling system, carries out on-line payment, Mobile Internet to task scheduling system send pay dues whether successful information;
3) remaining parking space information:Task scheduling system reports and submits residue from trend mobile internet service device at regular intervals Parking space information;
4) parking end-state image information:Task scheduling system automatically reports and submits the parking bit image of vehicle finally to shifting Dynamic Internet Server.
The present invention has advantages below compared with prior art:
Using the handling capacity of the multi-storied garage of the operation managing and control system of the tower-type space garage of parallelization Transport Vehicle of the present invention Greatly:Current serial access is changed to the technical scheme that Transport Vehicle can be parallel, the problem of peak period concentrates on and off duty is solved, Increase the handling capacity in current garage.
Deposited using the bicycle of the multi-storied garage of the operation managing and control system of the tower-type space garage of parallelization Transport Vehicle of the present invention Take speed fast:Speed is further improved, many lifts optimize access vehicle speed.
Using the reliability of the multi-storied garage of the operation managing and control system of the tower-type space garage of parallelization Transport Vehicle of the present invention With it is safe:Transport Vehicle process is divided into lifting and two action executings of plane, sets the redundant measures such as system backup to improve and sets Standby reliability and security.
Brief description of the drawings
Fig. 1 is the single layer structure schematic diagram for the tower-type space garage that multiple port, many lifts realize parallelization Transport Vehicle;
Fig. 2 is the Transport Vehicle process signal for the tower-type space garage that multiple port, many lifts realize parallelization Transport Vehicle Figure.
Fig. 3 is the schematic layout pattern that first layer caching stops pick-up position in the embodiment of the present invention;
Fig. 4 is the whole Organization Chart of operation managing and control system;
Fig. 5 is task scheduling system external interface schematic diagram;
Fig. 6 is the Organization Chart of task scheduling system.
Embodiment
Embodiments of the invention are elaborated below, the present embodiment is carried out lower premised on technical solution of the present invention Implement, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to following implementations Example.
As shown in figure 1, the present embodiment multiple port, many lifts realize that the tower-type space garage of parallelization Transport Vehicle includes Steel structures coating, parking handling system.
The steel structures coating includes at least one tower-type space garage steel construction 1, each tower-type space garage steel construction 1 If including dried layer parking tier, first layer stops pick-up position as caching, and the second layer and the above are used as storage parking stall.And tower type three-dimensional car 1 point of storehouse steel construction is inner ring, outer ring, outer ring parking.
The parking handling system includes floor truck, rotatable disc 2 and lift 3, two neighboring tower type three-dimensional car It is connected between the steel construction of storehouse by lift, two tower-type space garage steel constructions share a lift.Tower-type space garage A rotatable disc 2 and a floor truck (not shown) are placed in the inner ring center of every layer of steel construction 1, around rotatable Disk 2, radial to set multiple parking stalls 12, each layer in outer ring of tower-type space garage steel construction 1 is reserved at least two positions and made For the operative position of lift 3, each parking tier is connected by lift 3, whole system flexibly configurable lift 3 as needed Quantity, increase vehicle access efficiency.System uses Redundancy Design, improves overall operation reliability.
Floor truck is placed between the outer ring of rotatable disc 2 and tower-type space garage steel construction 1, will pass through lift 3 cars elevated are transported on rotatable disc 2, and the floor truck can use existing various floor trucks.
Specifically, the special lift of the lift 3 using parking garage systems, lift 3 and steel construction using bolt or Anchor ear connected mode is fixed.
The rotatable disc 2 provides floor truck and functional interface and the cabling such as powered, control, monitoring.
Refer to shown in Fig. 2, the multiple port, many lifts realize the parking of the tower-type space garage of parallelization Transport Vehicle Flow comprises the steps:
Step 1:Vehicle is driveed to parking lot doorway;
Step 2:Parking lot doorway carry out video capture, judge vehicle can admission, if can admission, clearance, meanwhile, Information of vehicles is preserved to computer, otherwise, points out vehicle to leave;
Step 3:Vehicle reaches garage parking in front of the door;
Step 4:Garage door is opened, it is preferred that garage door is waited to stop before being provided with automatic identification equipment, automatic identification garage , when recognize need before garage stopped when, garage door is automatically opened up;
Step 5:Driver opens vehicle into garage parking, at this point it is possible to the installation detecting device in garage parking, detection parking Personnel and/or information of vehicles, if parking personnel and/or information of vehicles can not be matched with the information deposited in computer, are carried Show and leave;
Step 6:Driver's parking is finished, optimization, and the vehicle-state detecting system installed in garage parking is real according to monitoring When remind whether driver stops in place and whether vehicle weight transfinites, after driver's parking is got off, according to infrared right Penetrate and remind parking user whether to shut car door with video identification and whether have important legacy etc., after confirmation is errorless, driver Need to be confirmed on the human-computer interaction interface in garage parking, such as swipe the card and confirm or confirmed by screen taps, leave parking Storehouse, garage parking external door is closed, and vehicle enters floor truck, and vehicle is dragged on rotatable disc 2 by floor truck, rotatable disc 2 rotation specified angles, the center line of rotatable disc 2 aligns with the central axis of lift;
Step 7:In floor truck trailer to lift, floor truck leaves lift, and vehicle is promoted to by lift Specify parking tier;
Step 8:Vehicle, which is reached, specifies after parking tier, and the parking tier floor truck enters lift, and vehicle is dragged into the layer Rotatable disc 2 on, rotatable disc 2 rotates specified angle to specified parking stall, the center line of rotatable disc 2 and specified car The central axis alignment of position;
Step 9:Vehicle is dragged to specified parking stall by floor truck, and then floor truck leaves, bicycle parking success, it is preferred that this When can be uploaded to computer with collection vehicle information, system one bicycle parking information of formation.
The multiple port, many lifts realize that the pick-up flow of the tower-type space garage of parallelization Transport Vehicle includes following steps Suddenly:
Step 100:Driver's vehicle collection reservation outside garage parking, optimization, it can be picked up the car by brush parking card, then system is known Other parking card correspondence vehicle and parking space information, triggering, which is picked up the car, orders;
Step 102:The rotatable disc 2 at parking tier center rotates specified angle to treating pick-up parking stall, rotatable disc 2 Center line with treating that the central axis of pick-up parking stall aligns;
Step 103:Floor truck, which enters, treats pick-up parking stall, vehicle is dragged on rotatable disc 2, rotatable disc 2 revolves Turn specified angle, center line aligns with the central axis of lift;
Step 104:In floor truck trailer to lift, floor truck leaves lift, and lift delivers to vehicle Stall;
Step 105:The floor truck of Stall enters lift, and vehicle is dragged on rotatable disc 2, rotatable disc 2 Specified angle is rotated, center line aligns with the central axis of pick-up position;
Step 106:Vehicle is dragged to pick-up position by floor truck, and floor truck leaves;
Step 107:Garage external door is opened, and driver picks up the car into garage;
Step 108:Driver is opened to EXIT, and after collection vehicle information, vehicle leaves parking lot.
Refer to shown in Fig. 3, be that the caching of first layer stops pick-up position schematic diagram, the caching of this layer, which stops pick-up position, to be included staggeredly The caching parking stall 42 and storage parking stall 44 of setting, the storage parking stall 44 is used as normal storage parking stall, and driver's entrance stops It is that car is stopped into caching parking stall 42 or car bicycle parking position 42 of postponing is taken out when garage stops or picked up the car.The caching parking stall The first half in 42 sections is trapezoidal, and the latter half in section is rectangle, and the width at the most narrow place of caching parking stall 42 can Ensure that the vacant width in both sides is more than 1.5m after the door opening on vehicle both sides, optimization, the width for caching the most narrow place of parking stall 42 is 2.5m, the floor height of first layer is 3m.The setting of parking stall is cached, the sense of depression of client can be eliminated, the good experience of parking is improved Degree.As the case of a reality, the caching of originally first layer, which stops pick-up position, can set 14 parking stalls, optimize by the parking stall Design, the caching of the first layer, which stops pick-up position, can set 12 parking stalls, wherein caching parking stall 42 and storage parking stall 44 each 6, Greatly improve the good experience degree of parking.
Multiple port, many lifts realize that the tower-type space garage of parallelization Transport Vehicle also includes operation managing and control system, please Refering to shown in Fig. 4, to run the whole Organization Chart of managing and control system, whole operation managing and control system it is main by task scheduling system, regard Frequency monitoring system, mobile internet service system, four subsystem compositions of parking charge management system.Each subsystem uses office The mode of domain net interconnected between information transfer, four subsystems by interchanger.
It is task scheduling system external interface schematic diagram simultaneously refering to Fig. 5, four subsystems are carried out using standard ethernet Interface, other three subsystems carry out information exchange by dispatching system.That is video monitoring server, mobile internet service Device, parking charge server are all connected to the interchanger of task scheduling system, so as to realize task scheduling system, video monitoring system System, mobile internet service system, the interconnection of parking charge management system.
Parking charge management system and task scheduling system interactive information include:
1) information of vehicles:Parking charge management system recognizes the number-plate number by high definition Number Reorganization camera, is stored to IC In card, car owner takes IC-card by IC-card card sender, is swiped the card to the POS cached at parking stall, and task scheduling system, which passes through, to be read The IC card information of the POS at caching parking stall is dispatched buses;
2) vehicle guidance information:Task scheduling system gives parking charge management system information pushing, draws to new vehicle of marching into the arena Lead which parking mouth is stopped;
3) paying information:After appearance vehicle is by brush IC-card, parking charge server is carried out to scheduling system server Whether inquiry user is paid dues by mobile terminal, and whether scheduling system server is handed over for one to parking charge server The feedback taken;
Interactive information between task scheduling system and video monitoring system includes:
1) current vehicle position information:Task scheduling system is fed back when the position of advance storehouse vehicle is believed to video monitoring system Breath;
2) parking final image information:After vehicle stops onto parking stall, video monitoring system is fed back to task scheduling system One final parking image;
Interactive information between task scheduling system and mobile internet service system includes:
1) vehicle collection reservation information:User initiates vehicle collection reservation application by mobile terminal to task scheduling system, and task is adjusted Degree system feeds back whether vehicle collection reservation succeeds by mobile Internet on the mobile terminal of user;
2) paying information:User inquires about down time by mobile Internet to task scheduling system, carries out on-line payment, Mobile Internet to task scheduling system send pay dues whether successful information;
3) remaining parking space information:Task scheduling system reports and submits residue from trend mobile internet service device at regular intervals Parking space information;
4) parking end-state image information:Task scheduling system automatically reports and submits the parking bit image of vehicle finally to shifting Dynamic Internet Server.
The premise of the quantity of each module in Fig. 4 and Fig. 5 is:Multi-storied garage includes two tower-type space garage steel constructions, And two tower-type space garage steel constructions share a lift, i.e. total of three lift, each tower-type space garage steel knot Structure tool is of five storeys, and the caching of wherein first layer, which stops the caching parking stall 42 of pick-up position and storage parking stall 44, respectively 6.Certainly, if bag Multi-storied garage includes more than two tower-type space garage steel constructions, then quantity is according to depending on the need for specific, and each tower Depending on the number of plies that multi-storied garage steel construction has and each layer of parking stall number are also according to actual size.
Further referring to Fig. 6, wherein task scheduling system includes scheduling system server, is connected to scheduling system service The display of device, and every layer of layer controller, the form for passing through network between scheduling system server and layer controller are carried out Interconnection, optimization, it is also associated with least one interchanger between scheduling system server and layer controller.Layer controller is used PLC, supports network communicating function.In addition to layer controller, scheduling system server also needs to swiping the card at scheduling caching parking stall Machine (totally 12) and lift (totally 3).
Layer controller control object specifically includes floor truck, rotatable disc, into the device of arguing for the sake of arguing before caching parking stall, slow The shutter door of bicycle parking position import and export, the vehicle interceptor cached in parking stall, and vehicle guidance display screen, layer controller need The unit of detection is specifically included installed in the vehicle parameter sensor (infrared emission), lift sensors in place cached in parking stall (proximity switch), rotating disk sensors in place (travel switch), shutter door sensors in place (travel switch), ground induction coil, carrying Dolly is to lift sensors in place (infrared emission), carrier homing sensor (travel switch).Specifically, multi-storied garage The unit of one layer of layer controller detection includes being arranged on the vehicle parameter sensor (36) cached in parking stall, lift in place Sensor (3), rotating disk sensors in place (28), shutter door sensors in place (24), ground induction coil (12), small bus or train route Footpath sensor (36), agv controller (2), wheel controller (2), device of arguing for the sake of arguing (12), vehicle interceptor (12), LED guiding screens (12), the unit of the layer controller detection of other layers includes lift sensors in place (3), rotating disk in place Sensor (28), dolly path sensor (36), agv controller (2), wheel controller (2).It is specific each Depending on the installation site of sensor is according to corresponding parameter is easily detected, certainly, specific each sensor and controller etc. Quantity depending on specifically used.
In order to solve conventional garage pick up the car it is slow the problem of, task scheduling system need based on operational research make rational planning for elevator System, turntable subsystem, the operating path of floor truck subsystem and time, it can maximize and save whole Transport Vehicle process Time.
Top layer scheduling system server is mainly responsible for Transport Vehicle task scheduling, Transport Vehicle path planning, level controller Task control, vehicle information database management etc. work.The instruction that bottom level controller receives scheduling system server is completed Corresponding units task, and return the status information of current each unit in real time and give scheduling system server.
The video monitoring system includes video monitoring server, display and several cameras, video monitoring clothes It is connected between business device and several cameras by network connection, display on video monitoring server, optimization, video prison Interchanger is additionally provided between control server and several cameras.
The mobile internet service system includes mobile terminal, mobile internet service device, the mobile Internet clothes It is engaged between device and mobile terminal by network connection, optimization, set between the mobile internet service device and mobile terminal There is fire wall.
The parking fee management system includes parking charge server, display and camera, lifts bar machine, IC-card hair fastener Machine, the POS, LED display.Display is connected on parking charge server, camera, act bar machine, IC-card card sender, brush Card machine, LED display are connected on parking charge server by interchanger, camera herein, act bar machine, IC-card hair fastener Machine, the POS, LED display are installed in the gateway of multi-storied garage.
Presently preferred embodiments of the present invention is the foregoing is only, is not intended to limit the invention, all essences in the present invention Any modification, equivalent and improvement made within refreshing and principle etc., should be included within the scope of the present invention.

Claims (10)

1. a kind of operation managing and control system of the tower-type space garage of parallelization Transport Vehicle, it is characterised in that:Apply in tower type three-dimensional In garage, the tower-type space garage includes steel structures coating, parking handling system, and the steel structures coating includes at least one Tower-type space garage steel construction, if each tower-type space garage steel construction includes dried layer parking tier, tower-type space garage steel construction It is divided into inner ring, outer ring, outer ring parking, the parking handling system includes floor truck, rotatable disc and lift, adjacent two It is connected between individual tower-type space garage steel construction by lift, two tower-type space garage steel constructions share a lift, A rotatable disc and a floor truck are placed in the inner ring center of every layer of tower-type space garage steel construction, around can turn Dynamic disk, the radial multiple parking stalls of setting, floor truck moves vehicle between parking stall and rotatable disc, tower vertical Each layer in outer ring of body garage steel construction reserves operative position of at least two positions as lift, by lift by each parking tier It is connected, first layer stops pick-up position as caching, and the second layer and the above are as storage parking stall, and the caching of first layer, which stops pick-up position, to be included The caching parking stall and storage parking stall being staggered,
Whole operation managing and control system is main to be counted by task scheduling system, video monitoring system, mobile internet service system, parking Take four subsystem compositions of management system, each subsystem carries out information transfer, other three subsystems by the way of LAN System carries out information exchange by dispatching system;
Wherein task scheduling system includes scheduling system server, is connected to the display of scheduling system server, and every layer Layer controller, scheduling system server and layer controller between be interconnected by the form of network, dispatch system server The POS and lift also at scheduling caching parking stall;
The video monitoring system includes video monitoring server, display and several cameras, video monitoring server By network connection between several cameras, display is connected on video monitoring server;
The mobile internet service system includes mobile terminal, mobile internet service device, the mobile internet service device Pass through network connection between mobile terminal;
The parking fee management system include parking charge server, display and camera, lift bar machine, IC-card card sender, The POS, LED display, display are connected on parking charge server, camera, lifted bar machine, IC-card card sender, are swiped the card Machine, LED display are connected on parking charge server by interchanger, camera herein, lift bar machine, IC-card card sender, The POS, LED display are installed in the gateway of multi-storied garage;
Video monitoring server, mobile internet service device, parking charge server are all connected to the exchange of task scheduling system Machine.
2. the operation managing and control system of the tower-type space garage of parallelization Transport Vehicle according to claim 1, it is characterised in that At least one interchanger is also associated between scheduling system server and layer controller.
3. the operation managing and control system of the tower-type space garage of parallelization Transport Vehicle according to claim 1, it is characterised in that Layer controller uses PLC.
4. the operation managing and control system of the tower-type space garage of parallelization Transport Vehicle according to claim 1, it is characterised in that Layer controller control object specifically includes floor truck, rotatable disc, entered into the device of arguing for the sake of arguing before caching parking stall, caching parking stall The shutter door of outlet, the vehicle interceptor cached in parking stall, and vehicle guidance display screen.
5. the operation managing and control system of the tower-type space garage of parallelization Transport Vehicle according to claim 4, it is characterised in that The unit of the layer controller detection of multi-storied garage first layer includes vehicle parameter sensor, the lift being arranged in caching parking stall Sensors in place, rotating disk sensors in place, shutter door sensors in place, ground induction coil, dolly path sensor, dolly control Device, wheel controller, device of arguing for the sake of arguing, vehicle interceptor, LED guiding screens, the unit of the layer controller detection of other layers include lifting Terraced sensors in place, rotating disk sensors in place, dolly path sensor, agv controller, wheel controller.
6. the operation managing and control system of the tower-type space garage of parallelization Transport Vehicle according to claim 1, it is characterised in that Interchanger is additionally provided between video monitoring server and several cameras.
7. the operation managing and control system of the tower-type space garage of parallelization Transport Vehicle according to claim 1, it is characterised in that Fire wall is provided between the mobile internet service device and mobile terminal.
8. the operation managing and control system of the tower-type space garage of parallelization Transport Vehicle according to claim 1, it is characterised in that Parking charge management system and task scheduling system interactive information include:
1) information of vehicles:Parking charge management system recognizes the number-plate number by high definition Number Reorganization camera, is stored in IC-card, Car owner takes IC-card by IC-card card sender, is swiped the card to the POS cached at parking stall, and task scheduling system, which passes through to read, to be cached The IC card information of the POS at parking stall is dispatched buses;
2) vehicle guidance information:Task scheduling system gives parking charge management system information pushing, is directed to new vehicle of marching into the arena Which parking mouth is stopped;
3) paying information:After appearance vehicle is by brush IC-card, parking charge server is inquired about to scheduling system server Whether user is paid dues by mobile terminal, what whether scheduling system server paid dues to parking charge server one Feedback.
9. the operation managing and control system of the tower-type space garage of parallelization Transport Vehicle according to claim 1, it is characterised in that Interactive information between task scheduling system and video monitoring system includes:
1) current vehicle position information:Task scheduling system feeds back the positional information when advance storehouse vehicle to video monitoring system;
2) parking final image information:After vehicle stops onto parking stall, video monitoring system feeds back one to task scheduling system Final parking image.
10. the operation managing and control system of the tower-type space garage of parallelization Transport Vehicle according to claim 1, its feature exists In the interactive information between task scheduling system and mobile internet service system includes:
1) vehicle collection reservation information:User initiates vehicle collection reservation application, task scheduling system by mobile terminal to task scheduling system System feeds back whether vehicle collection reservation succeeds by mobile Internet on the mobile terminal of user;
2) paying information:User inquires about down time by mobile Internet to task scheduling system, carries out on-line payment, mobile Internet to task scheduling system send pay dues whether successful information;
3) remaining parking space information:Task scheduling system reports and submits remaining parking stall from trend mobile internet service device at regular intervals Information;
4) parking end-state image information:Task scheduling system is automatic to report and submit the parking bit image of vehicle finally to mobile mutual Networked server.
CN201710338125.9A 2017-05-15 2017-05-15 The operation managing and control system of the tower-type space garage of parallelization Transport Vehicle Pending CN106948634A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710338125.9A CN106948634A (en) 2017-05-15 2017-05-15 The operation managing and control system of the tower-type space garage of parallelization Transport Vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710338125.9A CN106948634A (en) 2017-05-15 2017-05-15 The operation managing and control system of the tower-type space garage of parallelization Transport Vehicle

Publications (1)

Publication Number Publication Date
CN106948634A true CN106948634A (en) 2017-07-14

Family

ID=59479602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710338125.9A Pending CN106948634A (en) 2017-05-15 2017-05-15 The operation managing and control system of the tower-type space garage of parallelization Transport Vehicle

Country Status (1)

Country Link
CN (1) CN106948634A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107293154A (en) * 2017-07-26 2017-10-24 合肥巨步机械科技有限公司 A kind of stopping guide system for multi-storied garage
CN108153200A (en) * 2017-12-29 2018-06-12 贵州航天南海科技有限责任公司 A kind of stereo garage control method of three-layer neural network path planning
CN108222612A (en) * 2017-12-15 2018-06-29 广西云高智能停车设备有限公司 Mechanical Three-dimensional Garage Intelligent unattended control method on duty
CN110159025A (en) * 2018-08-27 2019-08-23 中国国际海运集装箱(集团)股份有限公司 The control method and system of stereo garage, stereo garage, medium and electronic equipment
CN110155583A (en) * 2018-07-05 2019-08-23 中国国际海运集装箱(集团)股份有限公司 Control method, device, medium and the electronic equipment of stereo garage

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1731453A (en) * 2005-07-22 2006-02-08 深圳市来吉智能科技有限公司 Method and system for intelligent loading/unloading lot guiding and charging management of three-dimensional carbarn
CN101461271A (en) * 2005-10-14 2009-06-17 开利网络有限责任公司 System and method for real-time management of mobile resources
CN103592926A (en) * 2013-11-25 2014-02-19 无锡普智联科高新技术有限公司 Intelligent control system and method based on combination of mechanical three-dimensional parking lot and AGV
US20150138001A1 (en) * 2013-11-18 2015-05-21 ImageMaker Development Inc. Automated parking space management system with dynamically updatable display device
CN104835352A (en) * 2015-06-05 2015-08-12 湖南泰安智能立体车库设备有限公司 Method and system improving mechanical type stereo garage stock handling capacity
CN106088744A (en) * 2016-07-12 2016-11-09 中国电子科技集团公司第三十八研究所 Multiple port, many elevators realize the tower-type space garage of parallelization Transport Vehicle
CN206737524U (en) * 2017-05-15 2017-12-12 中国电子科技集团公司第三十八研究所 The operation managing and control system of the tower-type space garage of parallelization Transport Vehicle

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1731453A (en) * 2005-07-22 2006-02-08 深圳市来吉智能科技有限公司 Method and system for intelligent loading/unloading lot guiding and charging management of three-dimensional carbarn
CN101461271A (en) * 2005-10-14 2009-06-17 开利网络有限责任公司 System and method for real-time management of mobile resources
US20150138001A1 (en) * 2013-11-18 2015-05-21 ImageMaker Development Inc. Automated parking space management system with dynamically updatable display device
CN103592926A (en) * 2013-11-25 2014-02-19 无锡普智联科高新技术有限公司 Intelligent control system and method based on combination of mechanical three-dimensional parking lot and AGV
CN104835352A (en) * 2015-06-05 2015-08-12 湖南泰安智能立体车库设备有限公司 Method and system improving mechanical type stereo garage stock handling capacity
CN106088744A (en) * 2016-07-12 2016-11-09 中国电子科技集团公司第三十八研究所 Multiple port, many elevators realize the tower-type space garage of parallelization Transport Vehicle
CN206737524U (en) * 2017-05-15 2017-12-12 中国电子科技集团公司第三十八研究所 The operation managing and control system of the tower-type space garage of parallelization Transport Vehicle

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107293154A (en) * 2017-07-26 2017-10-24 合肥巨步机械科技有限公司 A kind of stopping guide system for multi-storied garage
CN108222612A (en) * 2017-12-15 2018-06-29 广西云高智能停车设备有限公司 Mechanical Three-dimensional Garage Intelligent unattended control method on duty
CN108222612B (en) * 2017-12-15 2020-03-10 广西云高智能停车设备有限公司 Intelligent unattended control method for mechanical stereo garage
CN108153200A (en) * 2017-12-29 2018-06-12 贵州航天南海科技有限责任公司 A kind of stereo garage control method of three-layer neural network path planning
CN110155583A (en) * 2018-07-05 2019-08-23 中国国际海运集装箱(集团)股份有限公司 Control method, device, medium and the electronic equipment of stereo garage
CN110155583B (en) * 2018-07-05 2020-06-30 中国国际海运集装箱(集团)股份有限公司 Control method and device of stereo garage, medium and electronic equipment
CN110159025A (en) * 2018-08-27 2019-08-23 中国国际海运集装箱(集团)股份有限公司 The control method and system of stereo garage, stereo garage, medium and electronic equipment
CN110159025B (en) * 2018-08-27 2024-02-06 中集物联科技有限公司 Control method and system of stereo garage, medium and electronic equipment

Similar Documents

Publication Publication Date Title
CN106088744B (en) Multiple port, more elevators realize the tower-type space garage of parallelization Transport Vehicle
CN107178237B (en) Multi-machine multi-path parallel vehicle access scheduling system
CN106948634A (en) The operation managing and control system of the tower-type space garage of parallelization Transport Vehicle
CN107591023A (en) A kind of intelligent machine multi-storied garage total management system and its management method
CN106401240B (en) The design method of the parking stall quantity arrangement of parking systems
CN206785050U (en) A kind of vertical transport circular stereo garage
CN107958611A (en) A kind of intelligent interconnection shutdown system based on image recognition indoor positioning
CN104652894B (en) Control method for stopping of the horizontal shifting without fixed driving passage shutdown system and based on the system
CN103514641B (en) A kind of Intelligent parking lot management system and management method
CN107239843A (en) The method for running of shared parking stall integration system based on mobile Internet
CN107610247A (en) Parking management method and cloud server
CN106930585A (en) Pick up platform, jacking system and utilize its high efficiency smart module type stereo garage
CN107993478A (en) Berth service and management system and method based on vehicle detection
CN202976509U (en) RFID Internet-of-things parking lot management system
CN103646293A (en) Reservation transaction system and method for idle parking space
CN107134169A (en) Multi-storied garage intelligent guides parking apparatus and its storage warehouse-out method
CN102622781A (en) Large cluster mechanical three-dimensional garage guiding system and guiding method
CN2789861Y (en) Intelligent parking fees collecting managment apparatus
CN107100398A (en) The safety monitoring system of multimachine multipath multi-storied garage
CN103680191A (en) RFID ITO (Internet of Things) parking lot management system
CN103225435B (en) A kind of Novel round stereo garage with rotary trolley and many exchange areas
CN106677580A (en) Intelligent stereo parking garage
CN206737524U (en) The operation managing and control system of the tower-type space garage of parallelization Transport Vehicle
CN203201206U (en) Multilayer multi-circle aligning moving parking disc automatic car getting garage and intelligent controlling device
CN107082095A (en) Patrol is hired a car robot

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200428

Address after: 230000 Fifth Floor of 101 Building, 88 Pihe Road, Shushan District, Hefei City, Anhui Province

Applicant after: Anhui Bowei United Control Technology Co.,Ltd.

Address before: 199 No. 230000 Anhui city of Hefei province high tech Development Zone Hefei road camphor

Applicant before: 38th Research Institute, China Electronics Technology Group Corp.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20170714