CN106939704B - Brick mix structure punches wall fast repairing method after shake - Google Patents

Brick mix structure punches wall fast repairing method after shake Download PDF

Info

Publication number
CN106939704B
CN106939704B CN201710193443.0A CN201710193443A CN106939704B CN 106939704 B CN106939704 B CN 106939704B CN 201710193443 A CN201710193443 A CN 201710193443A CN 106939704 B CN106939704 B CN 106939704B
Authority
CN
China
Prior art keywords
wall
reinforced mesh
mortar
mix structure
shake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710193443.0A
Other languages
Chinese (zh)
Other versions
CN106939704A (en
Inventor
信任
姚继涛
马鹏飞
谷慧
黄斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201710193443.0A priority Critical patent/CN106939704B/en
Publication of CN106939704A publication Critical patent/CN106939704A/en
Application granted granted Critical
Publication of CN106939704B publication Critical patent/CN106939704B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0222Replacing or adding wall ties
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0244Increasing or restoring the load-bearing capacity of building construction elements of beams at places of holes, e.g. drilled in them

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The present invention discloses brick mix structure after a kind of shake and punches wall fast repairing method, it include: the wall hole damaged component up and down that punches after removing shake, reserve horse tooth trough and rake-out, it is implanted into corner end reinforcing bar, bottom layer of the reinforcing steel mesh sheet is laid with sufficiently to overlap with bottom layer of the reinforcing steel, utilize the frictional force and cohesive force between the two of mortar and reinforced mesh hole edge, form whole stress base, it builds in brick block and simultaneously bends reinforced mesh by skin brick along wall diagonal line step type mortar joint, when building to wall cover layer ends, reinforced mesh is sufficiently overlapped with the reinforcing bar being implanted into wall, maintenance to the stipulated time can come into operation after completing building wall work.The present invention is while realizing effective anti-seismic performance, hence it is evident that accelerates speed of application, reduces reinforcement cost, simplifies technical solution.The present invention has operability and generalization, can bring significant economic and social profit.

Description

Brick mix structure punches wall fast repairing method after shake
Technical field
The invention belongs to building structure calamity post-reinforcing recovery technique field, in particular to a kind of impaired brick mix structure punches wall The restorative procedure of body.
Background technique
Brick mix structure is as important architecture structure form, and ownership is very big in China's town building, but this class formation The earthquake fortification level of their location is usually lower, and brick mix structure easily destroys in earthquake.The reinforcing of brick mix structure after shake It is of great significance with the recovery of function is used, restorative procedure is mainly reinforcing wall surface to improve wall after calamity at this stage Seismic Bearing Capacity shows as increasing considerably the rigidity of structure in the form of " hard anti-", structure in earthquake is caused to absorb more Brisance.Differentiation is not added frequently with integral reinforcing mode, to structural damage mode in such reinforcement means, to the destruction sequence of component It is not required, the not reasonable economy of reinforcement means also has security risk.
Different degrees of destruction can occur in earthquake for the wall that punches in brick mix structure.And what common repair methods were faced The disadvantage is that: construction speed is slow, and reinforcement amount is big, with a certain amount of wet construction, and does not account for two secondary earthquakes and is brought Influence, damaged part often still destroys in lower secondary earthquake, can not embody structure ductility and destroy and multiple defence line Reinforcing theory.Based on this problem, the punch reinforcement and repair method of wall of brick mix structure has much room for improvement, and realizes rapid, simple and direct, warp Ji effectively reinforces target.
Summary of the invention
It punches wall fast repairing method the purpose of the present invention is to provide brick mix structure after a kind of shake, it is above-mentioned existing to overcome There is the shortcomings that conventional method.The present invention is based on reinforced mesh holistic resistant behavior is good, property is worked together with mortar and brick block The significant principle of energy, after removing the impaired wall in brick mix structure hole or more, reasonable Arrangement steel mesh while building new structural member Piece is reliably connected inside wall, and with neighboring walls formation.Normal construction is not influenced, exceptional space is not take up, does not change knot Structure functional characteristic is remarkably improved the anti-seismic performance for the wall that punches;Period of the invention is short, the scale of construction is small, cheap.
In order to realize above-mentioned purpose, the present invention adopts the following technical scheme:
Brick mix structure punches wall fast repairing method after shake, comprising the following steps:
Step 1: will shake back wall hole impaired wall up and down, from cracking by skin remove damaged building block, two sides are torn open Except horse tooth trough until adjacent vertical wall edge, is retained, bottom is removed to this layer of collar tie beam, forms the former hole removed;
Step 2: the impurity on block surfaces and this layer of collar tie beam surface at cleaning horse tooth trough;In two sides horse tooth trough mouth mortar joint Place from top to bottom leads to height every the double drilling of skin brick, is from top to bottom implanted into reinforcing bar along drill hole;
Step 3: after being laid with bedding mortar on collar tie beam, two sides reinforced mesh being horizontally placed on bedding mortar, End and the bar splicing being exposed at other than horse tooth trough;It starts simultaneously at and lays bricks, place first piece of building block of the left and right sides in steel mesh On piece, make mortar even adhesion building block using the hole of reinforced mesh, then along the vertical mortar joint of building block 90 degree be folded up steel Muscle mesh sheet;Then the reinforced mesh side after bending continues to lay bricks;It so repeats to make reinforced mesh bending stepped and bury In mortar between building block;The reinforcing bar being exposed at other than horse tooth trough is fully embedded in mortar by intermediate each skin when building;
Step 4: building to two panels reinforced mesh intersection, by two panels reinforced mesh where the building block of this skin vertical mortar joint Place is welded, and is reversely bent two reinforced mesh later, is continued to build by skin bending reinforcing steel bar mesh sheet by step 3 method;
Step 5: it builds to by reinforced mesh and being previously implanted other than mortar joint close at the former hole wall height removed Reinforcing bar reliably overlaps, then builds last skin building block, makes to build highly consistent with original wall body absolute altitude.
Further, further comprising the steps of: step 6: mending slurry cementation of fissures maintenance, and progress surface is smeared after reaching prescribed strength Ash, the brick mix structure wall that punches quickly is repaired after completing shake.
Further, after clearing up impurity in step 2, block surfaces of polishing and collar tie beam surface can be with masonry sand Starch reliable bond.
Further, drilling depth is 150mm in step 2.
Further, reinforcing bar length in corner is 200mm;Remaining each middle layer reinforcing bar length is 250mm.
Further, the lap of splice of reinforced mesh and reinforcing bar is 50mm.
Further, in step 3 and step 4, the strength grade of masonry mortar and brick setting is higher by 1 than former building materials Grade.
Further, in step 3 and step 4, masonry way uses stretcher masonry method.
Further, after the completion of step 5, in the hole that original is removed in the masonry that is formed, reinforced mesh is in X-type and buries Enter in mortar joint;The end of reinforced mesh is overlapped with corresponding embedded bar.
Further, reinforced mesh with a thickness of 4mm.
Punch wall hole damaged component up and down after present invention dismounting shake, reserves horse tooth trough and rake-out, is implanted into corner End reinforcing bar is laid with bottom layer of the reinforcing steel mesh sheet and sufficiently overlaps with bottom layer of the reinforcing steel, utilizes rubbing for mortar and reinforced mesh hole edge Power and cohesive force between the two are wiped, whole stress base is formed, is built in brick block while by reinforced mesh along wall diagonal line Stepped mortar joint is bent by skin brick, when building to wall cover layer ends, by reinforced mesh and the steel being implanted into wall Muscle sufficiently overlaps, and maintenance to the stipulated time can come into operation after completing building wall work.
Needed reinforcing bar length is 200mm, diameter 4mm at the horse tooth trough mortar joint of corner, and being implanted into length in mortar joint is 150mm, 50mm is reserved to be used as with reinforced mesh overlap joint.The specification for laying reinforced mesh is b*t=240mm*4mm, and b is width, and t is Thickness;The hole of uniformly distributed 5*5mm on reinforced mesh.The strength grade of masonry mortar and brick setting requires to be higher by than former building materials 1 grade.Masonry way uses stretcher masonry method.
Compared with the existing technology, the invention has the following advantages:
The present invention as a kind of brick mix structure punch wall shake after repairing and reinforcement technology, be different from structure wall surface into The method that row is reinforced enhances the shock resistance and ductility of component while not increasing wall stiffness.By reinforced mesh and brick Reinforced mesh is layed in brick setting by masonry cooperative characteristic during wall reparation is built according to construction technology Portion, and be reliably connected with neighboring walls formation, form the antidetonation system of multiple defence line.While realizing effective anti-seismic performance, Speed of application obviously is accelerated, reinforcement cost is reduced, simplifies technical solution.The present invention has operability and generalization, Significant economic and social profit can be brought.
Detailed description of the invention
Fig. 1 is the impaired wall elevation that punches after present invention shake;
Fig. 2 is elevation after the impaired wall that punches of the present invention is removed;
Fig. 3 is that present invention implantation reinforced mesh builds back wall elevation (by taking a hole as an example);
Fig. 4 is building process schematic diagram;
Fig. 5 is that two reinforced mesh intersections build detail drawing;
Fig. 6 is reinforced mesh floor projection detail drawing;
In figure: 1 impaired wall;2 two sides neighboring walls;3 horse tooth troughs;4 collar tie beams;The 5 former holes removed;6 reinforced mesh;7 Reinforcing bar;Layer building block where 8 reinforced mesh intersections;9 windows.
Specific embodiment
Brick mix structure punches wall fast repairing method after a kind of shake of the present invention, comprising the following steps:
Step 1: refering to Figure 1, by the way of traditional artificial operation, shake back wall hole is damaged wall up and down Body 1, from cracking by skin remove damaged building block, utilize hammer and the sub- work compound of clink, remove to adjacent vertical wall Until edge, retain horse tooth trough 3, forms the former hole 5 (please referring to shown in Fig. 2) removed.From light to heavy according to wall damage Sequence is successively removed, and the wall after dismounting is with can carry out aftermentioned reinforcement and repair step;
Step 2: please referring to shown in Fig. 3, clears up the impurity on block surfaces and this layer of 4 surface of collar tie beam at horse tooth trough 3, beats Mill block surfaces and this layer of 4 surface of collar tie beam allow it to and masonry mortar reliable bond;At the horse tooth trough mouth mortar joint of two sides From top to bottom leading to height every the double drilling of skin brick, hole depth 150mm is from top to bottom implanted into reinforcing bar 7 along drill hole, wherein Reinforcing bar 7 length in corner is 200mm to guarantee to form reliable overlap joint with reinforced mesh 6, remaining each 7 length of middle layer reinforcing bar is 250mm, and be embedded in horizontal mortar joint during subsequent building wall, form preferable drawknot effect;
Step 3: please referring to shown in Fig. 4, and after being laid with bedding mortar on collar tie beam 4, reinforced mesh 6 level in two sides is set On bedding mortar, end is overlapped with the reinforcing bar 7 being exposed at other than horse tooth trough 3, lap of splice 50mm;Start simultaneously at block Brick places first piece of building block of the left and right sides on reinforced mesh 6, makes mortar even adhesion building block using its mesh sheet hole, Then along the vertical mortar joint of building block 90 degree be folded up reinforced mesh 6;Then 6 side of reinforced mesh after bending continues to lay bricks; In such mortar for repeatedly making 6 bending stepped of reinforced mesh and being embedded between building block;Intermediate each skin will be exposed at horse when building Reinforcing bar 7 other than tooth raft 3 is fully embedded in mortar;
Step 4: please referring to shown in Fig. 5, builds to 6 intersection of two panels reinforced mesh, by reinforced mesh 6 in the building block of this skin It is welded at the vertical mortar joint in place, two reinforced mesh 6 is reversely bent later, by step 3 method by skin bending reinforcing steel bar mesh sheet 6 continue to build;
Step 5: by reinforced mesh 6 and the reinforcing bar being previously implanted other than mortar joint at masonry to 5 wall height of close former hole 7 reliable overlap joints and lap of splice 50mm, then last skin building block is built, guarantee to build at this time highly consistent with original wall body absolute altitude;
Step 6: slurry cementation of fissures maintenance is mended, surface plastering is carried out after reaching prescribed strength, can come into operation after the completion.

Claims (10)

1. brick mix structure punches wall fast repairing method after shake, which comprises the following steps:
Step 1: will shake back wall hole up and down impaired wall (1), from cracking by skin remove damaged building block, two sides are torn open Except retaining horse tooth trough (3) until adjacent vertical wall edge, bottom is removed to this layer of collar tie beam (4), forms the former hole removed (5);
Step 2: the impurity on block surfaces and this layer of collar tie beam (4) surface at cleaning horse tooth trough (3);The horse tooth trough mouth ash in two sides From top to bottom lead to height at seam every the double drilling of skin brick, reinforcing bar (7) are from top to bottom implanted into along drill hole;
Step 3: after being laid with bedding mortar on collar tie beam (4), two sides reinforced mesh (6) being horizontally placed on bedding mortar, Its end is overlapped with the reinforcing bar (7) being exposed at other than horse tooth trough (3);It starts simultaneously at and lays bricks, place first piece of building block of the left and right sides On reinforced mesh (6), make mortar even adhesion building block using the hole of reinforced mesh (6), then along the vertical mortar joint of building block 90 degree are folded up reinforced mesh (6);Then the reinforced mesh after bending (6) side continues to lay bricks;It so repeats to make reinforcing bar Mesh sheet (6) bending stepped is simultaneously embedded in the mortar between building block;Intermediate each skin will be exposed at other than horse tooth trough (3) when building Reinforcing bar (7) is fully embedded in mortar;
Step 4: building to two panels reinforced mesh (6) intersection, and two panels reinforced mesh (6) is vertical grey where the building block of this skin It is welded at seam, reversely bends two reinforced mesh (6) later, continued by step 3 method by skin bending reinforcing steel bar mesh sheet (6) It builds;
Step 5: it builds to by reinforced mesh (6) and being previously implanted other than mortar joint close at former hole (5) wall height removed Reinforcing bar (7) reliably overlap, then build last skin building block, make to build height consistent with original wall body absolute altitude.
2. brick mix structure punches wall fast repairing method after shake according to claim 1, which is characterized in that further include with Lower step:
Step 6: mending slurry cementation of fissures maintenance, reach and carry out surface plastering after prescribed strength, and it is fast to complete the wall that punches of brick mix structure after shake Speed is repaired.
3. brick mix structure punches wall fast repairing method after shake according to claim 1, which is characterized in that in step 2 After clearing up impurity, block surfaces of polishing and collar tie beam (4) surface can be with masonry mortar reliable bonds.
4. brick mix structure punches wall fast repairing method after shake according to claim 1, which is characterized in that in step 2 Drilling depth is 150mm.
5. brick mix structure punches wall fast repairing method after shake according to claim 4, which is characterized in that corner reinforcing bar Length is 200mm;Remaining each middle layer reinforcing bar length is 250mm.
6. brick mix structure punches wall fast repairing method after shake according to claim 4, which is characterized in that reinforced mesh It (6) is 50mm with the lap of splice of reinforcing bar (7).
7. brick mix structure punches wall fast repairing method after shake according to claim 1, which is characterized in that step 3 and In step 4, the strength grade of masonry mortar and brick setting is higher by 1 grade than former building materials.
8. brick mix structure punches wall fast repairing method after shake according to claim 1, which is characterized in that step 3 and In step 4, masonry way uses stretcher masonry method.
9. brick mix structure punches wall fast repairing method after shake according to claim 1, which is characterized in that step 5 is complete Cheng Hou, in the hole (5) that original is removed in the masonry of formation, reinforced mesh (6) is in X-type and is embedded in mortar joint;Reinforced mesh (6) End and corresponding embedded bar (7) overlap.
10. brick mix structure punches wall fast repairing method after shake according to claim 1, which is characterized in that steel mesh Piece (6) with a thickness of 4mm.
CN201710193443.0A 2017-03-28 2017-03-28 Brick mix structure punches wall fast repairing method after shake Expired - Fee Related CN106939704B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710193443.0A CN106939704B (en) 2017-03-28 2017-03-28 Brick mix structure punches wall fast repairing method after shake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710193443.0A CN106939704B (en) 2017-03-28 2017-03-28 Brick mix structure punches wall fast repairing method after shake

Publications (2)

Publication Number Publication Date
CN106939704A CN106939704A (en) 2017-07-11
CN106939704B true CN106939704B (en) 2019-01-04

Family

ID=59463027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710193443.0A Expired - Fee Related CN106939704B (en) 2017-03-28 2017-03-28 Brick mix structure punches wall fast repairing method after shake

Country Status (1)

Country Link
CN (1) CN106939704B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700700A (en) * 2017-11-01 2018-02-16 西安建筑科技大学 A kind of prestressed building blocks wall between windows and reinforcement means
CN108265996B (en) * 2017-12-28 2020-08-04 浙江核力建筑特种技术有限公司 Masonry structure wall-breaking hole-opening pre-jacking recovery construction method
CN113158279B (en) * 2020-01-23 2022-10-25 久瓴(江苏)数字智能科技有限公司 Brick wall model generation method and device, computer equipment and storage medium

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100787818B1 (en) * 2006-08-05 2007-12-21 김기태 The outer wall repair method of brick building using ceramics coat
KR101187668B1 (en) * 2011-11-15 2012-10-04 한가람건설 주식회사 Repair method of brisk wall
CN202509792U (en) * 2012-03-31 2012-10-31 西安工业大学 Cement mortar surface layer reinforcing mesh for reinforcing brick-concrete structural wall
CN104179363B (en) * 2014-07-24 2016-05-04 北京筑福国际工程技术有限责任公司 A kind of brick-concrete composite buildings door-window opening ruggedized construction and reinforcement means
KR101513066B1 (en) * 2014-08-29 2015-04-17 이장희 Method for reinforcing masonry wall
CN205822823U (en) * 2016-06-23 2016-12-21 周献祥 A kind of Hollow Block Masonry Structure Anti-seismic ruggedized construction

Also Published As

Publication number Publication date
CN106939704A (en) 2017-07-11

Similar Documents

Publication Publication Date Title
CN106939704B (en) Brick mix structure punches wall fast repairing method after shake
CN206189647U (en) Novel infilled wall brickwork drawknot muscle structure
CN103334422A (en) Assembled embedded type prefabricated hollow underground continuous wall and construction method thereof
CN106401069A (en) Damage repairing assembly type combined column with self-reset function
CN104947684B (en) Construction method based on assembled recyclable process soil nailing wall support
CN103556749A (en) Suspension type flexible connection for precast concrete infilled wall
CN101368447B (en) Old wall renovation and construction method
CN106545019B (en) Support-replacing system and construction method for stage differential style Underground Construction
CN204060020U (en) A kind of Reinforced Concrete Reinforcement structure
TWI494486B (en) Combined steel sheet pile, diaphragm wall, and method of reutilizing combined steel sheet pile
CN106760851A (en) The construction method of the newly-increased Seismic Isolation of Isolation Layer of existing brick mix structure
CN104746890B (en) Method for strengthening dense-rib hollow brick floor slab
CN102251582B (en) Barrier-free decoration structure of high and low incorporated buildings and construction method thereof
CN111794555B (en) Method for repairing multi-story historical building
CN105040855B (en) Prefabricated shear wall welded end plate and horizontal section steel combined connection apparatus
CN103711132A (en) Cylindrical reinforcing steel bar connecting method and connecting structure in reverse building method
CN103397661B (en) The construction technology of combined exterior wall structure under shaped steel-concrete ground
CN103243722A (en) Construction method of novel inner support of foundation trench
CN106368443A (en) Coinciding conversion antitorque structure for reinforcement and reconstruction of existing structure and construction method
CN1156633C (en) Steel-frame building structure
JP6295029B2 (en) Pile embedding method
CN207228451U (en) A kind of lower edge muscle single deck tape-recorder buckles connector
CN105672681B (en) One kind realizes load bearing wall support and change method using combining structure
CN206015720U (en) A kind of prefabricated ground-connecting-wall with limiting card groove plate joint
CN205444484U (en) Wall lacing wire subassembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20170711

Assignee: Xi'an Construction Technology University Engineering Co.,Ltd.

Assignor: XIAN University OF ARCHITECTURE AND TECHNOLOG

Contract record no.: X2020980010019

Denomination of invention: Fast repair method of wall with opening in brick concrete structure after earthquake

Granted publication date: 20190104

License type: Common License

Record date: 20201229

EC01 Cancellation of recordation of patent licensing contract
EC01 Cancellation of recordation of patent licensing contract

Assignee: Xi'an Construction Technology University Engineering Co.,Ltd.

Assignor: XIAN University OF ARCHITECTURE AND TECHNOLOG

Contract record no.: X2020980010019

Date of cancellation: 20220506

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190104