CN106934659A - Highway engineering material cost difference method of adjustment and system - Google Patents

Highway engineering material cost difference method of adjustment and system Download PDF

Info

Publication number
CN106934659A
CN106934659A CN201710138043.XA CN201710138043A CN106934659A CN 106934659 A CN106934659 A CN 106934659A CN 201710138043 A CN201710138043 A CN 201710138043A CN 106934659 A CN106934659 A CN 106934659A
Authority
CN
China
Prior art keywords
difference
price
engineering
price index
cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710138043.XA
Other languages
Chinese (zh)
Inventor
董再更
谢萍
宋军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Sino Beijing Jingwei Engineering Technology Co Ltd
Beijing Zhong Jing Jing Ji Highway Cost Technology Co Ltd
Original Assignee
Changsha Sino Beijing Jingwei Engineering Technology Co Ltd
Beijing Zhong Jing Jing Ji Highway Cost Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Sino Beijing Jingwei Engineering Technology Co Ltd, Beijing Zhong Jing Jing Ji Highway Cost Technology Co Ltd filed Critical Changsha Sino Beijing Jingwei Engineering Technology Co Ltd
Priority to CN201710138043.XA priority Critical patent/CN106934659A/en
Publication of CN106934659A publication Critical patent/CN106934659A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination

Abstract

The present invention relates to highway engineering technical field, a kind of highway engineering material cost difference method of adjustment and system are disclosed, to form a science, the highway engineering material price tune difference system of comprehensive, system.The inventive method includes:It is determined that participating in the numerical value for adjusting the difference amount of money to calculate required parameter, the parameter includes the cost weight by calculating the poor material of each tune for obtaining in each engineering type, and by inquiring about or calculating price index of each tune for the obtaining difference material in different engineering types;Then divide engineering type the current material of each engineering type is calculated with current cost weight in corresponding engineering type of the metering amount of money, each material and the fluctuation of material price index and adjust the difference amount of money, then adjust the difference amount of money to collect each engineering type and obtain current total material and adjust the difference amount of money.The method disclosed in the present and system, simple and convenient, the final tune difference result of whole project is basically identical with the poor result of tune that current quantity of goods produced method is calculated.

Description

Highway engineering material cost difference method of adjustment and system
Technical field
The present invention relates to highway engineering technical field, more particularly to a kind of highway engineering material cost difference method of adjustment and it is System.
Background technology
At present, highway engineering takes quantity of goods produced method to carry out material and adjusts poor mostly, i.e., made by the bill of quantities budget of reply Valency data file calculates the unit materials consumption of each metering specific item, consumption of materials=specific item metered amounts × unit material Material consumption, adjusts the difference amount of money=consumption of materials × material cost difference × difference coefficient, and it is calculated such as formula 1.
Material adjusts the difference amount of money=∑ (specific item metered amounts × unit materials consumption × material cost difference) × difference coefficient (formula 1).
Existing quantity of goods produced method adjusts poor " calculating consumption of materials according to the inventory documents of estimate " regulation of price difference, is deposited in end item There are unit price and quantity in bill of quantities, and the specific item is miss out in inventory documents of estimate, existing cannot carry out material consumption The situation of calculating, causes part specific item to carry out real material and adjusts poor, and is related to specific item too many in highway engineering, also has Following defects:
(1) censorship difficulty is big
Because bill of quantities specific item is more, administrative department is needed to each specific item construction unit material consumption using quantity of goods produced method Amount and current material cost difference are examined, because data are not directly perceived, lack macro-indicators reference frame, administrative department's censorship Amount is big, and the cycle is long, and efficiency is low.
(2) it is unfavorable for the development of negative tune difference work
Currently, material adjust difference basic data from contractor submit to data, when price differential be on the occasion of when, contractor is carried The enthusiasm of friendship data is very high;When price differential is negative value, contractor submits being short of power for data to, causes negative tune difference work to be difficult to Carry out.
(3) it is unfavorable for that entirety is carried out to capital projects funds raises arrangement
The difference amount of money is adjusted with property afterwards based on the material that quantity of goods produced method is calculated, it is impossible to grasp the whole province's construction project material in advance Difference macro-data is adjusted, and carries out capital collection arrangement accordingly, the passivity for causing fund planning to manage.
(4) it is unfavorable for the risk management and control of material cost
It is management and control of the owner to investment risk, contractor to material cost risk that material adjusts the essence of difference management, in face of valency Lattice wave is dynamic frequently to need constantly lifting level of risk management to tackle with violent material market, owner and contractor, current material Material adjusts the price differential of the consumption of difference administration base quantity of goods produced and material unit price, and the guiding to lifting risk management ability is not enough.
The content of the invention
Present invention aim at disclosing a kind of highway engineering material cost difference method of adjustment and system, with formed a science, Comprehensively, the highway engineering material price of system adjusts difference system.
To achieve the above object, the invention discloses a kind of highway engineering material cost difference method of adjustment, including:
It is determined that participating in the numerical value for adjusting the difference amount of money to calculate required parameter, the parameter is included by calculating the poor material of each tune for obtaining Expect the cost weight in each engineering type, and by the poor material of each tune inquired about or calculating is obtained in different engineering types Price index;
According to computing formulaCarry out price index and adjust poor;Wherein, A is Material is current to adjust the difference amount of money;MjtTo deduct the current metering amount of money for being not involved in adjusting difference in j engineering types;IjitIt is current j Engineerings I material prices index in type;Iji0It is i material price indexes in initial stage j engineering type;QjiFor i materials are made in j engineering types Valency weight;α is difference coefficient, and m is engineering type number;N is tune difference material classification number.
To realize the object of the invention, the invention also discloses a kind of highway engineering material cost difference adjustment system, including:
Parameter acquisition module, the numerical value for determining parameter needed for following tune difference amount of money computing modules, the parameter includes By calculating cost weight of each tune for the obtaining difference material in each engineering type, and by inquiring about or calculating each tune for obtaining Price index of the difference material in different engineering types;
Difference amount of money computing module is adjusted, for according to computing formulaCarry out It is poor that price index is adjusted;Wherein, A is the current tune difference amount of money of material;MjtTo deduct the current metering for being not involved in adjusting difference in j engineering types The amount of money;IjitIt is i material price indexes in current j engineering types;Iji0It is i material price indexes in initial stage j engineering type;QjiFor The cost weight of i materials in j engineering types;α is difference coefficient, and m is engineering type number;N is tune difference material classification number.
Optionally, based on above-mentioned highway engineering material cost difference method of adjustment and system, above-mentioned tune difference material includes individual material Material and compound material, accordingly, above-mentioned material price index is divided into individual material price index kpWith compound material price index Ip, the computing formula of individual material price index is:
Wherein, kpRepresent individual material price index, p0Represent base period material price for estimation, p1Represent and calculate Phase material price for estimation;
The computing formula of compound material price index is:
Wherein, IpRepresent the price index of compound material, ptiRepresent compound material corresponding to the calculating phase The budgetary price of middle i materials, p0iRepresent the budgetary price of i materials in compound material corresponding to the base period, qiRepresent i in compound material The composition of material.
Further, in view of material price is related to region, for trans-regional highway engineering, each material calculates the price of phase Index is weighted average computation according to circuit distribution situation, and specific formula for calculation is:
Wherein, R is weighted average material price index, RiIt is i areas material price index, LiBe circuit by i ground the head of district Degree, L is total line length.
To sum up, the invention has the advantages that:
Adjustment Method of Material Price Difference disclosed in this invention and system, according to the cost weight and price index ripple of material Move the calculating tune difference amount of money for coming science, comprehensive, system, simple and fast, the final tune difference result of whole project and current quantity of goods produced The price differential result that method is calculated is basically identical, can quickly reflect that highway engineering material adjusts difference scale, and be easy to optimization material to adjust Difference management process, solves functional management department and adjusts difference that dependence when adjusting difference to contractor's reported data is born in managing.
Below with reference to accompanying drawings, the present invention is further detailed explanation.
Brief description of the drawings
The accompanying drawing for constituting the part of the application is used for providing a further understanding of the present invention, schematic reality of the invention Apply example and its illustrate, for explaining the present invention, not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is highway engineering material cost difference method of adjustment flow chart disclosed in the embodiment of the present invention.
Specific embodiment
Because the material category that highway engineering is related to is various, different materials differ to the influence degree of construction costs, because This, it is considered to engineering material is sorted out according to material classification, and finds out the material classification to construction costs with material impact To set up the main material classification price index of highway engineering.
Additionally, highway engineering is installed and applied comprising subgrade engineering, pavement engineering, science of bridge building, Tunnel Engineering, friendship, it is different Material category required for engineering differs greatly, should take into full account material with than universal law, according to engineering system in practice Meter custom carries out the division of works category, to ensure the reasonability of material index.
To form a science, Hunan Province's highway engineering material cost difference adjustment system of comprehensive, system, below in conjunction with accompanying drawing Embodiments of the invention are described in detail, but the multitude of different ways that the present invention can be defined by the claims and cover Implement.
Embodiment 1
Embodiment discloses a kind of highway engineering material cost difference method of adjustment, as shown in figure 1, including:
Step S1, the numerical value for determining parameter needed for participation tune difference amount of money calculating, relevant parameter calculate acquisition including passing through Each cost weight for adjusting difference material in each engineering type, and by inquiring about or calculating each tune for obtaining difference material in different works Price index in journey type.Wherein, inquired about in the price index that the preferred Industry regulatory bodies of material price index are periodically announced Obtain.
Cost weight with current the metering amount of money, each material in corresponding engineering type of step S2, point engineering type and The material price index fluctuation material tune difference amount of money current to calculate each engineering type, then adjusts the difference amount of money to converge each engineering type Current total material must be arrived and adjust the difference amount of money.
In the step, the specific formula for calculation for carrying out price index tune difference is:
In above-mentioned formula:A is that material is current adjusts the difference amount of money;MjtTo deduct the current meter for being not involved in adjusting difference in j engineering types The amount amount of money;IjitIt is i material price indexes in current j engineering types;Iji0It is i material price indexes in initial stage j engineering type;Qji It is the cost weight of i materials in j engineering types;α is difference coefficient, and m is engineering type number;N is tune difference material classification number (reference Aftermentioned table 1, the composition and its composition of the material classification corresponding to different engineering types have differences).
Optionally, in the present embodiment, cost weight of the above-mentioned each material in each engineering type can by it is following either one Formula is calculated:
Mode one, calculated (for example by inventory estimated cost data file:Circular can divide Engineering Type is weighted to the cost weight of each bid section and averagely obtains, so as to draw each material under same project difference engineering type The cost weighted value of differentiation), in view of contract price is competitive result, there is some difference with inventory budget, by contract price Determine that a correction factor entangles to the material construction weight based on inventory budget with the difference historical data of inventory budget Treatment partially;Or
Mode two, the cost weight that material is calculated based on bid contrul valency cost data file.
In the present embodiment, each engineering type is in representative materials with reference to table 1 below.
Table 1:
As shown in Table 1, generally, compound material includes:5 major classes such as steel, cement, broken (gravel) stone, pitch, piece (block) stone Material.Individual material is including diesel oil, medium coarse sand, barbed wire, welded mesh isolated gate etc..It is corresponding, above-mentioned tune difference material Including individual material and compound material, (material that compound material is made up of the material of polytype, specification, such as cement include 32.5 class g cements, 42.5 class g cements, 52.5 class g cements), accordingly, above-mentioned material price index is divided into individual material price index kpWith compound material price index Ip, the computing formula of individual material price index is:
Wherein, kpRepresent individual material price index, p0Represent base period material price for estimation, p1Represent and calculate Phase material price for estimation;
The computing formula of compound material price index is:
Wherein, IpRepresent the price index of compound material, ptiRepresent compound material corresponding to the calculating phase The budgetary price of middle i materials, p0iRepresent the budgetary price of i materials in compound material corresponding to the base period, qiRepresent i in compound material The composition of material.What deserves to be explained is, qiDescribed in " i materials " be to I in above-mentioned formula (1)ji0、QjiPart is described " i materials " respectively segments the further division of model (for example:Such as table 2 below, steel are divided into plain bar, Ribbed Bar ... etc. Ten several concrete models), wherein, the related composition of each subdivision model can refer to table 2 below in the compound material of part.
Table 2:
In the present embodiment, material cost difference adjustment can be by month, or quarterly;Corresponding price index is also corresponding Calculated or inquired about by monthly or season.Additionally, to distinguish above-mentioned base period, initial stage and current concept, being illustrated below:
Phase base is the comparing period of material price, is fixed, such as the base period has been scheduled in January, 2016, its price index It is 1, project goes into operation in June, 2016, the project initial stage is in June, 2016;Project carried out material cost difference adjustment at 2 months 2017, It is then current to refer to 2 months 2017.
Situations such as considering various regions produce, traffic, Economic Development Status differs greatly, and usual subregion carries out material guidelines valency Issue.In highway material price index system construction, also Ge Zhou cities highway engineering material should be respectively worked out according to each region Price index.Therefore, in the present embodiment, further, in view of material price is related to region, for trans-regional highway engineering, The price index that each material calculates the phase is weighted average computation according to circuit distribution situation, and specific formula for calculation is:
Wherein, R is weighted average material price index, RiIt is i areas material price index, LiBe circuit by i ground the head of district Degree, L is total line length.
In the present embodiment, the selection of difference coefficient adjusts the difference amount of money to have direct and material impact to material.Difference coefficient sets Meter can in fixed proportion (such as 60%) or step ratio (such as Party A undertakes 30% within price index poor ± 10%, ± 10% 80%) above section Party A undertake.Or be:Difference coefficient takes 0.3 in material price index fluctuation certain amplitude, more than this The difference coefficient of amplitude takes 0.8.What deserves to be explained is:In the present embodiment, difference coefficient does not differentiate between specific engineering type;But this Art personnel are under corresponding enlightenment of the invention, it is easy to expect for different engineering types carry out differentiation tune it is poor Coefficient evaluation, this kind of deformation is all considered as the equivalent to institute's protection scheme of the present invention.
To sum up, the adjustment Method of Material Price Difference disclosed in the present embodiment, according to the cost weight and price index of material Fluctuation comes the calculating tune difference amount of money of science, comprehensive, system, simple and fast, the final tune difference result of whole project and current material object The price differential result that amount method is calculated is basically identical, can quickly reflect that highway engineering material adjusts difference scale, and be easy to optimize material Difference management process is adjusted, functional management department is solved and is adjusted difference that dependence when adjusting difference to contractor's reported data is born in managing.
Embodiment 2
Corresponding with above method embodiment, the present embodiment discloses a kind of highway engineering material cost difference adjustment system, bag Include:
Parameter acquisition module, the numerical value for determining parameter needed for following tune difference amount of money computing modules, relevant parameter includes By calculating cost weight of each tune for the obtaining difference material in each engineering type, and by inquiring about or calculating each tune for obtaining Price index of the difference material in different engineering types;
Difference amount of money computing module is adjusted, for according to computing formulaCarry out It is poor that price index is adjusted;Wherein, A is the current tune difference amount of money of material;MjtTo deduct the current metering for being not involved in adjusting difference in j engineering types The amount of money;IjitIt is i material price indexes in current j engineering types;Iji0It is i material price indexes in initial stage j engineering type;QjiFor The cost weight of i materials in j engineering types;α is difference coefficient, and m is engineering type number;N is tune difference material classification number.
Optionally, in the present embodiment, cost weight of each material in each engineering type is calculated by following either types Draw:
Mode one, calculated by inventory estimated cost data file, in view of contract price is competitive result, with inventory There is some difference for budget, determines a correction factor to based on clear by contract price and the difference historical data of inventory budget The material construction weight of single budget carries out correction treatment;Or
Mode two, the cost weight that material is calculated based on bid contrul valency cost data file.
In the present embodiment, above-mentioned tune difference material includes individual material and compound material, and corresponding material price index is divided into Individual material price index kpWith compound material price index Ip, the computing formula of individual material price index is:
Wherein, kpRepresent individual material price index, p0Represent base period material price for estimation, p1Represent and calculate Phase material price for estimation;
The computing formula of compound material price index is:
Wherein, IpRepresent the price index of compound material, ptiRepresent compound material corresponding to the calculating phase The budgetary price of middle i materials, p0iRepresent the budgetary price of i materials in compound material corresponding to the base period, qiRepresent i in compound material The composition of material.
Further, in view of material price is related to region, for trans-regional highway engineering, each material is calculated the present embodiment The price index of phase is weighted average computation according to circuit distribution situation, and specific formula for calculation is:
Wherein, R is weighted average material price index, RiIt is i areas material price index, LiBe circuit by i ground the head of district Degree, L is total line length.
Similarly, the material cost difference disclosed in the present embodiment adjusts difference system, according to the cost weight and price index of material Fluctuation comes the calculating tune difference amount of money of science, comprehensive, system, simple and fast, the final tune difference result of whole project and current material object The price differential result that amount method is calculated is basically identical, can quickly reflect that highway engineering material adjusts difference scale, and be easy to optimize material Difference management process is adjusted, functional management department is solved and is adjusted difference that dependence when adjusting difference to contractor's reported data is born in managing.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (8)

1. a kind of highway engineering material cost difference method of adjustment, it is characterised in that including:
It is determined that participating in the numerical value for adjusting the difference amount of money to calculate required parameter, the parameter includes existing by calculating the poor material of each tune for obtaining Cost weight in each engineering type, and by inquiring about or calculating valency of each tune for the obtaining difference material in different engineering types Grid index;
According to computing formulaCarry out price index and adjust poor;Wherein, A for material work as Phase adjusts the difference amount of money;MjtTo deduct the current metering amount of money for being not involved in adjusting difference in j engineering types;IjitIt is i in current j engineering types Material price index;Iji0It is i material price indexes in initial stage j engineering type;QjiIt is the cost power of i materials in j engineering types Weight;α is difference coefficient, and m is engineering type number;N is tune difference material classification number.
2. highway engineering material cost difference method of adjustment according to claim 1, it is characterised in that each material is in each Engineering Cost weight in type is calculated by following either types:
Mode one, calculated by inventory estimated cost data file, in view of contract price is competitive result, with inventory budget There is some difference, determines a correction factor to pre- based on inventory by contract price and the difference historical data of inventory budget The material construction weight of calculation carries out correction treatment;Or
Mode two, the cost weight that material is calculated based on bid contrul valency cost data file.
3. highway engineering material cost difference method of adjustment according to claim 1 and 2, it is characterised in that the tune difference material Including individual material and compound material, the material price index is divided into individual material price index kpRefer to compound material price Number Ip, the computing formula of individual material price index is:
Wherein, kpRepresent individual material price index, p0Represent base period material price for estimation, p1Represent calculating phase material Material budgetary price;
The computing formula of the compound material price index is:
Wherein, IpRepresent the price index of compound material, ptiRepresent i materials in compound material corresponding to the calculating phase The budgetary price of material, p0iRepresent the budgetary price of i materials in compound material corresponding to the base period, qiRepresent i materials in compound material Composition.
4. highway engineering material price index according to claim 3 adjusts difference method, it is characterised in that in view of material price Related to region, for trans-regional highway engineering, the price index that each material calculates the phase is weighted according to circuit distribution situation Average computation, specific formula for calculation is:
R = ΣR i × L i L ;
Wherein, R is weighted average material price index, RiIt is i areas material price index, LiBe circuit by i ground section length, L It is total line length.
5. a kind of highway engineering material cost difference adjusts system, it is characterised in that including:
Parameter acquisition module, the numerical value for determining parameter needed for following tune difference amount of money computing modules, the parameter includes inquiry Or calculate price index of each material in different engineering types for obtaining and by calculating each tune for obtaining difference material each Cost weight in engineering type;
Difference amount of money computing module is adjusted, for according to computing formulaPrice is carried out to refer to It is poor that number is adjusted;Wherein, A is the current tune difference amount of money of material;MjtTo deduct the current metering amount of money for being not involved in adjusting difference in j engineering types; IjitIt is i material price indexes in current j engineering types;Iji0It is i material price indexes in initial stage j engineering type;QjiIt is j engineerings The cost weight of i materials in type;α is difference coefficient, and m is engineering type number;N is tune difference material classification number.
6. highway engineering material cost difference according to claim 5 adjusts system, it is characterised in that each material is in each Engineering Cost weight in type is calculated by following either types:
Mode one, calculated by inventory estimated cost data file, in view of contract price is competitive result, with inventory budget There is some difference, determines a correction factor to pre- based on inventory by contract price and the difference historical data of inventory budget The material construction weight of calculation carries out correction treatment;Or
Mode two, the cost weight that material is calculated based on bid contrul valency cost data file.
7. the highway engineering material cost difference according to claim 5 or 6 adjusts system, it is characterised in that the tune difference material Including individual material and compound material, the material price index is divided into individual material price index kpRefer to compound material price Number Ip, the computing formula of individual material price index is:
Wherein, kpRepresent individual material price index, p0Represent base period material price for estimation, p1Represent calculating phase material Material budgetary price;
The computing formula of the compound material price index is:
Wherein, IpRepresent the price index of compound material, ptiRepresent i materials in compound material corresponding to the calculating phase The budgetary price of material, p0iRepresent the budgetary price of i materials in compound material corresponding to the base period, qiRepresent i materials in compound material Composition.
8. highway engineering material price index according to claim 7 adjusts difference system, it is characterised in that in view of material price Related to region, for trans-regional highway engineering, the price index that each material calculates the phase is weighted according to circuit distribution situation Average computation, specific formula for calculation is:
R = Σ R i × L i L ;
Wherein, R is weighted average material price index, RiIt is i areas material price index, LiBe circuit by i ground section length, L It is total line length.
CN201710138043.XA 2017-03-09 2017-03-09 Highway engineering material cost difference method of adjustment and system Pending CN106934659A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710138043.XA CN106934659A (en) 2017-03-09 2017-03-09 Highway engineering material cost difference method of adjustment and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710138043.XA CN106934659A (en) 2017-03-09 2017-03-09 Highway engineering material cost difference method of adjustment and system

Publications (1)

Publication Number Publication Date
CN106934659A true CN106934659A (en) 2017-07-07

Family

ID=59433029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710138043.XA Pending CN106934659A (en) 2017-03-09 2017-03-09 Highway engineering material cost difference method of adjustment and system

Country Status (1)

Country Link
CN (1) CN106934659A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111028013A (en) * 2019-12-11 2020-04-17 广州地铁集团有限公司 Method for evaluating construction cost of proposed construction of rail transit station
CN111598731A (en) * 2020-03-27 2020-08-28 广联达科技股份有限公司 Intelligent adjustment system and method for man-machine price difference in engineering settlement
CN112767040A (en) * 2021-01-26 2021-05-07 广联达科技股份有限公司 Method and device for generating project pricing file, computer equipment and storage medium
CN116911776A (en) * 2023-06-29 2023-10-20 广东中洲国信建设管理咨询有限公司 Engineering budget error item control method, system, equipment and storage medium

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111028013A (en) * 2019-12-11 2020-04-17 广州地铁集团有限公司 Method for evaluating construction cost of proposed construction of rail transit station
CN111598731A (en) * 2020-03-27 2020-08-28 广联达科技股份有限公司 Intelligent adjustment system and method for man-machine price difference in engineering settlement
CN112767040A (en) * 2021-01-26 2021-05-07 广联达科技股份有限公司 Method and device for generating project pricing file, computer equipment and storage medium
CN116911776A (en) * 2023-06-29 2023-10-20 广东中洲国信建设管理咨询有限公司 Engineering budget error item control method, system, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN106934659A (en) Highway engineering material cost difference method of adjustment and system
Cass et al. Calculation of greenhouse gas emissions for highway construction operations by using a hybrid life-cycle assessment approach: case study for pavement operations
CN107977717A (en) A kind of grid maintenance project cost difference automatic adjusting method
Easter Inadequate management and declining infrastructure: the critical recurring cost problem facing irrigation in Asia
US20090177515A1 (en) System and method for prioritizing the transformation activities to optimize the resulting infrastructure improvements
Vermillion et al. Results of management turnover in two irrigation districts in Colombia
Hamdar et al. Life-Cycle Evaluation of Pavements: A Critical Review.
JP4003827B2 (en) Road surface property estimation method and system using traffic detector
Chou et al. Quantity-based approach to preliminary cost estimates for highway projects
Zhai et al. Using parametric modeling to estimate highway construction contract time
Fraumeni Productive highway capital stock measures
Pakalapati Data usage optimization for cost estimating in asphalt paving projects using a cost indexing system
Westfield Methodology of evaluating economic regulation
Winanri et al. Comparison Analysis Between Traditional and Long Segment Contracts on National Road Preservation Activities in Indonesia.
CN117350757A (en) BIM-based highway construction cost rapid measurement method and system
CN110020753A (en) A kind of optimization of sewage network working sources and Project Schedule Risk Analysis method
Ashuri et al. Best practices for budget-based design
Rathore et al. Development of whole life cost model for road tunnels
Yadav et al. Cost escalation in construction: An alternative approach
Chen Analysis and Simulation Demonstration of Pricing Rules for Construction Projects
Mallick et al. USGA Water Pricing Projection Tool
Vidalis Relation between cost, quality, and risk in portland cement concrete pavement construction
Williams The Framework of a Multi-Level Database of Highway Construction Performance Times
Min et al. Evaluating the comparative efficiency of eleven states’ highway expenditures
Van et al. Price management in construction investment in Vietnam: Current situation and proposed solutions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170707