CN106930762A - 一种采场充填体边帮加固方法 - Google Patents

一种采场充填体边帮加固方法 Download PDF

Info

Publication number
CN106930762A
CN106930762A CN201710163433.2A CN201710163433A CN106930762A CN 106930762 A CN106930762 A CN 106930762A CN 201710163433 A CN201710163433 A CN 201710163433A CN 106930762 A CN106930762 A CN 106930762A
Authority
CN
China
Prior art keywords
stope
mesh sheet
bamboo
obturation
mesh
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710163433.2A
Other languages
English (en)
Inventor
焦鹏
曹维勤
张文如
刘乾勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING YINMAO LEAD-ZINC MINE Co Ltd
Original Assignee
NANJING YINMAO LEAD-ZINC MINE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING YINMAO LEAD-ZINC MINE Co Ltd filed Critical NANJING YINMAO LEAD-ZINC MINE Co Ltd
Priority to CN201710163433.2A priority Critical patent/CN106930762A/zh
Publication of CN106930762A publication Critical patent/CN106930762A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/02Supporting means, e.g. shuttering, for filling-up materials
    • E21F15/04Stowing mats; Goaf wire netting; Partition walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Revetment (AREA)

Abstract

本发提供一种改善充填体边帮区域的抗拉、抗剪切强度,增加充填体整体的稳定性,减少充填体边帮垮落导致矿石贫化、溜井堵塞的情况发生,提高二步骤进路或矿柱的回采率,降低二步骤进路和矿柱回采时的安全风险的采场充填体边帮加固方法。该方法是,在采场回采结束后,清理采场顶板及边帮浮石,然后沿采场边帮竖直挂设钢筋网片或竹网片,使其紧贴岩帮,相邻各钢筋网片或竹网片之间用铅丝捆扎,然后用铁丝将各块钢筋网片或竹网片系于环绕采场的铁丝上,当采场横向跨度较小时,可直接将左两侧相对的右两块钢筋网片或竹网片用铁丝连接;当采场充填高度超过2米时,可随采场充填体升高而逐层架设,架设方式同上。

Description

一种采场充填体边帮加固方法
技术领域
本发明涉及金属矿山地下开采及充填技术,尤其是进路式充填采矿法。
背景技术
在部分矿石价值及品位较高的矿体上,采用充填采矿法可提升矿石的回采率。长期以来国内矿山及科研机构围绕提高充填体强度的目标,试验了提高充填浓度、提高灰砂比、添加高水固化材料、改进胶结材料等多种方式,均取得了一定的效果。充填体抗压强度的提升有利于保持围岩的稳定性,增加矿柱的回采率。但无论采用何种方式,充填体的抗拉强度和抗剪切强度均没有显著提高,在矿柱回采时揭露的充填体边帮常因近距离爆破振动或自身强度较低而发生垮塌混入矿石,不但容易造成矿石贫化,而且使得矿石和充填料混合体在溜矿井中极易固结造成井筒堵塞。因此部分矿山在实际的二步骤进路或矿柱回采作业中不完全揭露充填体,而保留一层薄矿壁以维持充填体边帮的稳定,这就造成了二步骤进路或矿柱回采的损失,当进路或分层回采高度较大时,这种损失尤为明显。另一方面,留设的薄矿壁受地应力的影响,更容易垮帮,给采矿作业带来安全隐患。
发明内容
本发明的目的是提供一种改善充填体边帮区域的抗拉、抗剪切强度,增加充填体整体的稳定性,减少充填体边帮垮落导致矿石贫化、溜井堵塞的情况发生,提高二步骤进路或矿柱的回采率,降低二步骤进路和矿柱回采时的安全风险的采场充填体边帮加固方法。
本发明的技术方案如下:
在采场回采结束后,清理采场顶板及边帮浮石,然后沿采场边帮竖直挂设钢筋网片或竹网片,使其紧贴岩帮,相邻各钢筋网片或竹网片之间用铅丝捆扎,然后用铁丝将各块钢筋网片或竹网片系于环绕采场的铁丝上,当采场横向跨度较小时,可直接将左两侧相对的右两块钢筋网片或竹网片用铁丝连接;当采场充填高度超过2米时,可随采场充填体升高而逐层架设,架设方式同上。
当二步骤进路或矿柱回采时,可直接爆破矿岩,揭露钢筋网片或竹网片。出矿完毕后可剪断连接钢筋网片或竹网片的铁丝,回收钢筋网片或竹网片再次循环使用。但回收时其钢筋网片或竹网片以内的充填体暴露高度不应超过3米,超过此高度时必须随充填作业逐层回收钢筋网片或竹网片,每层回收时充填体暴露高度不超过2米。
回收钢筋网片或竹网片前应对充填体进行含水率和塌落度检测,当检测结果表明揭露的充填体含水率小于25%,且塌落度小于10cm时方可进行钢筋网片或竹网片的回收作业。
施工所用的钢筋网片或竹网片孔网参数不大于100mm×100mm,钢筋网片中的钢筋直径不小于4mm,连接各网片的铁丝直径不小于4mm。
本发明有益效果:
本发明参考钢筋混凝土的力学特征,通过在充填体的边帮位置加筋,使钢筋网片或竹网片和充填料的共同作用,形成一种钢筋网或竹片网环绕充填体的结构,在充填体本身具有一定抗压强度的同时,改善充填体边帮区域的抗拉、抗剪切强度,增加充填体整体的稳定性,减少充填体边帮垮落导致矿石贫化、溜井堵塞的情况发生,提高二步骤进路或矿柱的回采率,降低二步骤进路和矿柱回采时的安全风险。通过在充填体边帮区域加入钢筋网片或竹网片加固充填体边帮,保持二步骤进路或矿柱回采过程中所揭露充填体边帮的完整性和稳定性,避免充填体受爆破振动或因其自立强度不高而发生垮塌,进而造成矿石贫化或溜井堵塞,亦可避免另行留设保护矿壁,提高二步骤进路或矿柱的回采率,消除因地压活动导致薄矿壁发生片帮的危险,改善采矿作业的安全环境。
附图说明
图1为采场充填体边帮加固结构的俯视图(图2的俯视图)。
图2为采场充填体边帮加固结构的主视图。
图3是另一种采场充填体边帮加固结构俯视图。
具体实施方式
本发明提出的一种采场充填体边帮加固方法施工方案如下:
(1)在井下采场回采结束并将矿石出清后,安装照明设备,清理采场顶板及边帮浮石,对不稳固区域及时进行支护作业,防止在后续作业中发生冒顶片帮。
(2)完成支护作业后沿采场边帮竖直挂设钢筋网片或竹网片,使其紧贴岩帮,各钢筋网片或竹网片之间用铅丝捆扎,然后用铁丝将各块钢筋网片或竹网片系于环绕采场的铁丝上(参见图1、2),当采场横向跨度较小时,可直接将左右两块钢筋网片或竹网片用铁丝连接(参见图3,参考图2),当采场充填高度超过2米时,可随采场充填体升高而逐层架设,架设方式同上。施工所用的钢筋网孔网参数不大于100mm×100mm(竹网片孔网参数相同),钢筋直径不小于4mm,连接各网片的铁丝直径不小于4mm。
(3)二步骤进路或矿柱回采时可直接爆破矿岩,不留矿壁,直接揭露钢筋网片或竹网片。采场矿石出清后可剪断连接钢筋网片或竹网片的铁丝,回收钢筋网片或竹网片再次循环使用。作二次回收利用时其钢筋网片或竹网片以内的充填体暴露高度不应超过3米,超过此高度时必须随充填作业逐层回收钢筋网片或竹网片,每层回收时充填体暴露高度不超过2米,防止充填体暴露高度过大时局部充填体发生垮塌。
(4)二步骤进路或矿柱回采结束、回收钢筋网片或竹网片前,应对充填体进行含水率和塌落度取样检测,当检测结果表明揭露的充填体含水率小于25%,且塌落度小于10cm时方可进行钢筋网片或竹网片的回收作业。
本申请公开了一种应用于采场分层充填或分段充填时充填体边帮的加固方式。在采场回采结束并支护后,沿采场边帮竖直挂设钢筋网片或竹网片,使其紧贴岩帮,各钢筋网片或竹网片之间用铅丝捆扎,然后用铁丝将各块钢筋网片或竹网片系于环绕采场的铁丝上,以此加固充填体边帮的稳固性,减少二步骤进路或矿柱回采时充填体边帮垮落造成的矿石贫化和溜井堵塞;亦可避免留设保护矿壁,提高二步骤进路或矿柱的回采率,消除薄矿壁片帮的安全风险,对于矿石价值较高、品位较好的矿体回收利用具有积极意义,操作简单、成本低廉、利于推广。

Claims (5)

1.一种采场充填体边帮加固方法,其特征在于:
井下采场充填作业前沿采场边帮(1)竖直挂设钢筋网片或竹网片(2);然后用铁丝(6)将各块钢筋网片或竹网片(2)系于环绕采场的铁丝(3)上,或者直接将左右两侧相对钢筋网片或竹网片(2)用铁丝(6)连接。
2.如权利要求1所述的采场充填体边帮加固方法,其特征在于:当采场充填高度超过2米时,可随采场充填体升高而逐层架设钢筋网片或竹网片(2)。
3.如权利要求2所述的采场充填体边帮加固方法,其特征在于:
待二步骤进路或矿柱(5)回采结束后,剪断铁丝(6)将钢筋网片或竹网片(2)回收,但回收时其充填体(4)暴露高度不应超过3米;超过此高度时必须随充填作业逐层回收钢筋网片或竹网片(2),每层回收时充填体(4)暴露高度不超过2米。
4.如权利要求3所述的采场充填体边帮加固方法,其特征在于:
回收钢筋网片或竹网片(2)的前提条件是:揭露的充填体(4)含水率小于25%,且塌落度小于10cm。
5.如权利要求1所述的采场充填体边帮加固方法,其特征在于:
钢筋网片或竹网片(2)孔网参数不大于100mm×100mm,钢筋网片中的钢筋直径不小于4mm,铁丝(6)直径不小于4mm。
CN201710163433.2A 2017-03-19 2017-03-19 一种采场充填体边帮加固方法 Pending CN106930762A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710163433.2A CN106930762A (zh) 2017-03-19 2017-03-19 一种采场充填体边帮加固方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710163433.2A CN106930762A (zh) 2017-03-19 2017-03-19 一种采场充填体边帮加固方法

Publications (1)

Publication Number Publication Date
CN106930762A true CN106930762A (zh) 2017-07-07

Family

ID=59433165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710163433.2A Pending CN106930762A (zh) 2017-03-19 2017-03-19 一种采场充填体边帮加固方法

Country Status (1)

Country Link
CN (1) CN106930762A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109519191A (zh) * 2018-10-19 2019-03-26 太原理工大学 一种防止综采工作面回撤阶段调节巷过度变形的方法
CN109611095A (zh) * 2019-01-17 2019-04-12 福州大学 三台阶七步形成凹凸无筋镶嵌结构的充填采矿方法
CN112761639A (zh) * 2021-01-22 2021-05-07 江西理工大学 一种控制高阶段采场充填体稳定的方法
CN113585336A (zh) * 2021-08-16 2021-11-02 中铁十五局集团第二工程有限公司 软弱地基环境中下沉式混凝土拌合站的快速施工方法
CN113738439A (zh) * 2021-10-11 2021-12-03 金川镍钴研究设计院有限责任公司 一种下向水平分层充填采矿法进路回填废石的方法
CN114215558A (zh) * 2021-11-30 2022-03-22 西北矿冶研究院 一种尾矿库近淹民采巷道的封堵方法
CN115324580A (zh) * 2022-07-06 2022-11-11 山东黄金矿业(莱州)有限公司三山岛金矿 上向进路充填采矿中防止矿石贫化的方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806225A (zh) * 2010-03-31 2010-08-18 上海大屯能源股份有限公司 煤仓漏斗修复加固工艺
CN103147792A (zh) * 2012-02-22 2013-06-12 贾巍 进路式采煤充填法
CN103603676A (zh) * 2013-11-21 2014-02-26 长沙矿山研究院有限责任公司 一种电耙巷道支护方法
CN103775086A (zh) * 2013-12-27 2014-05-07 马钢(集团)控股有限公司 一种进路式空场嗣后充填采矿方法
CN103953373A (zh) * 2014-05-08 2014-07-30 张新怀 巷道顶板高冒区临时支护装置
CN205422813U (zh) * 2016-03-07 2016-08-03 马钢(集团)控股有限公司 一种可拆卸式充填挡墙

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806225A (zh) * 2010-03-31 2010-08-18 上海大屯能源股份有限公司 煤仓漏斗修复加固工艺
CN103147792A (zh) * 2012-02-22 2013-06-12 贾巍 进路式采煤充填法
CN103603676A (zh) * 2013-11-21 2014-02-26 长沙矿山研究院有限责任公司 一种电耙巷道支护方法
CN103775086A (zh) * 2013-12-27 2014-05-07 马钢(集团)控股有限公司 一种进路式空场嗣后充填采矿方法
CN103953373A (zh) * 2014-05-08 2014-07-30 张新怀 巷道顶板高冒区临时支护装置
CN205422813U (zh) * 2016-03-07 2016-08-03 马钢(集团)控股有限公司 一种可拆卸式充填挡墙

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
姚香: "《岩金地下开采采场支护技术》", 《现代矿业》 *
杨本生等: "《下向进路高水充填采矿工艺试验研究》", 《黄金》 *
谷元勋: "《红布金矿采矿工艺的改进措施》", 《黄金》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109519191A (zh) * 2018-10-19 2019-03-26 太原理工大学 一种防止综采工作面回撤阶段调节巷过度变形的方法
CN109611095A (zh) * 2019-01-17 2019-04-12 福州大学 三台阶七步形成凹凸无筋镶嵌结构的充填采矿方法
CN109611095B (zh) * 2019-01-17 2020-07-07 福州大学 三台阶七步形成凹凸无筋镶嵌结构的充填采矿方法
CN112761639A (zh) * 2021-01-22 2021-05-07 江西理工大学 一种控制高阶段采场充填体稳定的方法
CN113585336A (zh) * 2021-08-16 2021-11-02 中铁十五局集团第二工程有限公司 软弱地基环境中下沉式混凝土拌合站的快速施工方法
CN113585336B (zh) * 2021-08-16 2023-01-31 中铁十五局集团第二工程有限公司 软弱地基环境中下沉式混凝土拌合站的快速施工方法
CN113738439A (zh) * 2021-10-11 2021-12-03 金川镍钴研究设计院有限责任公司 一种下向水平分层充填采矿法进路回填废石的方法
CN114215558A (zh) * 2021-11-30 2022-03-22 西北矿冶研究院 一种尾矿库近淹民采巷道的封堵方法
CN114215558B (zh) * 2021-11-30 2023-10-10 西北矿冶研究院 一种尾矿库近淹民采巷道的封堵方法
CN115324580A (zh) * 2022-07-06 2022-11-11 山东黄金矿业(莱州)有限公司三山岛金矿 上向进路充填采矿中防止矿石贫化的方法

Similar Documents

Publication Publication Date Title
CN106930762A (zh) 一种采场充填体边帮加固方法
US10989051B2 (en) Multi-section non-pillar staggered protected roadway for deep inclined thick coal seam and method for coal pillar filling between sections
CN105041314B (zh) 一种深部嗣后回采矿房—分层回采矿柱的联合采矿法
CN110318761B (zh) 一种控制巷道变形的施工方法
CN105317459B (zh) 一种用于控制坚硬顶板大面积垮落灾害的分区充填方法
CN104632220B (zh) 缓倾斜中厚矿体条柱再造采场结构尺寸可调可控采矿方法
CN102661169B (zh) 一种用于无煤柱开采的锚栓网矸石袋墙体沿空留巷方法
Li Rock support design based on the concept of pressure arch
CN103291305B (zh) 一种地采矿山快捷低成本人工假顶构筑方法
CN103628911B (zh) 一种综采/放工作面分段式沿空留巷方法
CN105804748B (zh) 一种露天运输系统下分区开采挂帮矿的方法
CN107035405A (zh) 一种用于沿空留巷双充填墙结构切顶卸压方法
CN103104259A (zh) 倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法
CN111878117B (zh) 一种下向进路充填法人工假顶设施的构筑方法
CN102562093A (zh) 全长锚固密集型树脂锚杆喷锚网支护方法
CN103244123A (zh) 一种急倾斜中厚矿体采矿方法
CN107387083A (zh) 一种利用矸石支撑的中厚煤层沿空留巷巷旁支护体构筑方法
CN105019924A (zh) 一种强力顶板支护墩柱和用于保护区段煤柱的方法
CN105952492A (zh) 一种高瓦斯煤层工作面钻采预抽瓦斯方法
CN104234716A (zh) 袋装围堰充填采矿法
CN207499900U (zh) 充填采矿的砼假底结构
CN104790991A (zh) 一种回采巷道围岩强长顶锚固技术
CN106121678B (zh) 一种基于雷达探测技术的顶板空顶区探测及巷道修复方法
Townend et al. Mitigation strategies for mining in high stress sill pillars at Coleman Mine–a case study
Yao et al. Examples of ground support practice in challenging ground conditions at Vale� deep operations in Sudbury

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170707

RJ01 Rejection of invention patent application after publication