CN106930543A - Build a wall, one step completed device and method of plastering a wall - Google Patents
Build a wall, one step completed device and method of plastering a wall Download PDFInfo
- Publication number
- CN106930543A CN106930543A CN201710104984.1A CN201710104984A CN106930543A CN 106930543 A CN106930543 A CN 106930543A CN 201710104984 A CN201710104984 A CN 201710104984A CN 106930543 A CN106930543 A CN 106930543A
- Authority
- CN
- China
- Prior art keywords
- wall
- template
- brick
- layer
- positioning strip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/02—Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
- E04F21/16—Implements for after-treatment of plaster or the like before it has hardened or dried, e.g. smoothing-tools, profile trowels
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to manually build a wall, technology of plastering a wall, particularly one kind are built a wall, one step completed device and method of plastering a wall.Device of the invention, including column, template, locator, described locator can be slided up and down and be locked on the arbitrary height of column along column;Template is parallel with metope and is connected on locator, and higher than one layer of height of brick, the raised area is the thickness of screed between brick layer to the height of template;A positioning strip parallel with template is provided with front of template, there is spacing between positioning strip and template, spacing is the thickness of coat of plaster.Once can complete to build a wall and plaster a wall using device of the invention, improve operating efficiency, substantially reduce the construction period.
Description
Technical field
The present invention relates to manually build a wall, technology of plastering a wall, particularly one kind are built a wall, one step completed device and method of plastering a wall.
Background technology
Artificial building a wall generally first position vertical line (non-cement frame room) in position of building a wall, and vertical line is exactly corner (wall end)
Line, first puzzles two corners (wall end) vertically, then pulled up datum line at two corners (wall end), it is possible to build two walls
Wall between angle (wall end), so can just finish building whole face wall repeatedly.Because datum line is resilient, brick (building block) can not be touched
Line, the brick built consistent offline must just can determine that the smooth and vertical of metope, corner (wall end) it is vertical critically important, thus
Technical merit requirement to the workman that builds a wall is high, inefficiency.
Plastering a wall to be finished building in whole face wall can just be carried out, and the project tight for the duration has an impact unavoidably, and it is to use to plaster a wall
Mortar is little by little spread metope by patter, and operating efficiency is relatively low.
The content of the invention
Built a wall it is an object of the invention to provide one kind, one step completed device and method of plastering a wall.
Technical scheme:One kind is built a wall, one step completed device of plastering a wall, including column, template, locator, institute
The locator stated can be slided up and down and be locked on the arbitrary height of column along column;Template is parallel with metope and is connected to positioning
On device, higher than one layer of height of brick, the raised area is the thickness of screed between brick layer to the height of template;The front of template is set
There is a positioning strip parallel with template, there is spacing between positioning strip and template, spacing is the thickness of coat of plaster.
Described template is higher by one layer of 10-20mm of brick height.
Spacing between positioning strip and template is 15--20mm.
Described locator is sliding sleeve, is furnished with lock-screw on sliding sleeve.
Described positioning strip is movably connected in template.
One kind is built a wall, one step completed method of plastering a wall, and is comprised the following steps:
Column and template are installed, it is determined that after wall position and thickness, fixing the column on one side, column should be perpendicular to water
Plane, template is connected on the locator on column;Ground floor brick is puzzled with traditional approach, then is fixed in the another side of wall
Good column and template, insert mortar formation and plaster a wall, and mortar is filled to and template top edge in ground floor brick and the space of template
Flush, now also completed mortar above ground floor brick, the positioning strip closed on a cheek board (need not pacify on another cheek board
Dress positioning strip), second layer brick is spread on the basis of positioning strip;
The positioning strip in template is removed, locator is brought Forward between brick and brick layer after screed thickness along column, locked
Determine locator, insert mortar and formed in second layer brick and the space of template and plaster a wall, and mortar is filled to is flushed with template top edge,
Mortar is also now completed above second layer brick, the positioning strip closed in template spreads third layer brick on the basis of positioning strip;
The positioning strip in template is removed, locator is brought Forward between brick and brick layer after screed thickness along column, locked
Determine locator, insert mortar and formed in third layer brick and the space of template and plaster a wall, and mortar is filled to is flushed with template top edge,
Mortar is also now completed above third layer brick, the positioning strip closed in template spreads the 4th layer of brick on the basis of positioning strip;Weight
Multiple such work can complete building a wall, plastering a wall for after brick layer;
Should ensure that there is the contact of 5-10mm the bottom of template with preceding once plastering a wall during upper shifting formwork plate;
Locator should be locked in time after being moved along column, should first release locking during upper shifting again.
Due to device picture frame container of the invention, after arranging, brick, mortar only need to be loaded into simply, to workman
Technical requirements are low, and once complete and build a wall and plaster a wall, and improve operating efficiency, substantially reduce the construction period.
Brief description of the drawings
Fig. 1 is the structural representation of apparatus of the present invention.
In figure:1 column, 2 templates, 3 positioning strips.
Specific embodiment
As shown in figure 1, the inventive system comprises column 1, template 2, locator, template 2 can be slided up and down simultaneously along column 1
(template 2 connects sliding sleeve, slides over and slided on column 1, is furnished with lock-screw on sliding sleeve) is locked on the arbitrary height of column 1,
The height of template is more than one layer of 10-20mm of height of brick;A positioning strip 3, positioning strip 3 and template are provided with described template 2
2 distance is usually 15--20mm (thickness is determined by plastering a wall), and template 2 and positioning strip 3 are connected with loose-leaf.
It is furnished with locator on column 1, locator is sliding sleeve, is furnished with lock-screw on sliding sleeve, under can positions and preventing template 2
Pendant.
Be detailed below build a wall, one step completed step of plastering a wall:
Column 1 and template 2 are installed, it is determined that after wall position and thickness, fixing the column 1 on one side, column 1 should be vertical
In horizontal plane, template 2 is connected on the sliding sleeve on column 1;Ground floor brick is puzzled with traditional approach, then in the another side of wall
Column 1 and template 2 are fixed, mortar formation is inserted in ground floor brick and the space of template 2 and is plastered a wall, and mortar is filled to and template
2 top edges are flushed, and have now also completed mortar above ground floor brick, (another cheek board of positioning strip 3 closed on a cheek board 2
On positioning strip need not be installed), second layer brick is spread on the basis of positioning strip 3;
The positioning strip 3 in template 2 is removed, sliding sleeve is brought Forward between brick and brick layer after screed thickness along column 1, locked
Determine sliding sleeve, insert mortar and formed in second layer brick and the space of template 2 and plaster a wall, and mortar is filled to is flushed with the top edge of template 2,
Mortar is also now completed above second layer brick, the positioning strip 3 in template of closing 2 spreads third layer on the basis of positioning strip 3
Brick;
The positioning strip 3 in template 2 is removed, sliding sleeve is brought Forward between brick and brick layer after screed thickness along column 1, locked
Determine sliding sleeve, insert mortar and formed in third layer brick and the space of template 2 and plaster a wall, and mortar is filled to is flushed with the top edge of template 2,
Mortar is also now completed above third layer brick, the positioning strip 3 in template of closing 2 spreads the 4th layer on the basis of positioning strip 3
Brick;Repeating such work can complete building a wall, plastering a wall for after brick layer;
Should ensure that there is the contact of 5-10mm the bottom of template 2 with preceding once plastering a wall during upper shifting formwork plate 2;
Sliding sleeve should be locked in time after being moved along column 1, should first release locking during upper shifting again.
The locking or release of sliding sleeve are to come completion by the lock-screw turned on sliding sleeve.
Poured be poured in cement frame in build a wall, plaster a wall when, because top is limited, it should first remove template 2, and use and pass
System builds a wall, plaster a wall mode to complete last, the building a wall of two layers of brick, plaster a wall.
Claims (6)
1. one kind build a wall, one step completed device of plastering a wall, it is characterized in that:Including column, template, locator, described locator
Can slide up and down and be locked on the arbitrary height of column along column;Template is parallel with metope and is connected on locator, template
Height of the height higher than one layer of brick, the raised area is the thickness of screed between brick layer;One and mould are provided with front of template
The parallel positioning strip of plate, there is spacing between positioning strip and template, spacing is the thickness of coat of plaster.
2. one kind according to claim 1 build a wall, one step completed device of plastering a wall, it is characterized in that:Described template is higher by
One layer of 10-20mm of brick height.
3. one kind according to claim 1 build a wall, one step completed device of plastering a wall, it is characterized in that:Positioning strip and template it
Between spacing be 15--20mm.
4. one kind according to claim 1 build a wall, one step completed device of plastering a wall, it is characterized in that:Described locator is
Sliding sleeve, is furnished with lock-screw on sliding sleeve.
5. one kind according to claim 1 build a wall, one step completed device of plastering a wall, it is characterized in that:Described positioning strip is lived
It is dynamic to be connected in template.
6. the device described in usage right requirement 1 once completes the method built a wall, plaster a wall, it is characterized in that:Comprise the following steps:
Column and template are installed, it is determined that after wall position and thickness, fixing the column on one side, column should be perpendicular to level
Face, template is connected on the locator on column;Ground floor brick is puzzled with traditional approach, then is fixed in the another side of wall
Column and template, insert mortar formation and plaster a wall, and mortar is filled to neat with template top edge in ground floor brick and the space of template
It is flat, mortar has also now been completed above ground floor brick, the positioning strip closed on a cheek board spreads second on the basis of positioning strip
Layer brick;
The positioning strip in template is removed, locator is brought Forward between brick and brick layer after screed thickness along column, locking is fixed
Position device, inserts mortar formation and plasters a wall in second layer brick and the space of template, and mortar is filled to is flushed with template top edge, now
Mortar is also completed above second layer brick, the positioning strip closed in template spreads third layer brick on the basis of positioning strip;
The positioning strip in template is removed, locator is brought Forward between brick and brick layer after screed thickness along column, locking is fixed
Position device, inserts mortar formation and plasters a wall in third layer brick and the space of template, and mortar is filled to is flushed with template top edge, now
Mortar is also completed above third layer brick, the positioning strip closed in template spreads the 4th layer of brick on the basis of positioning strip;Repeat this
The work of sample can complete to after the building a wall of brick layer, plaster a wall;
Should ensure that there is the contact of 5-10mm the bottom of template with preceding once plastering a wall during upper shifting formwork plate;
Locator should be locked in time after being moved along column, should first release locking during upper shifting again.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710104984.1A CN106930543A (en) | 2017-02-25 | 2017-02-25 | Build a wall, one step completed device and method of plastering a wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710104984.1A CN106930543A (en) | 2017-02-25 | 2017-02-25 | Build a wall, one step completed device and method of plastering a wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106930543A true CN106930543A (en) | 2017-07-07 |
Family
ID=59423159
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710104984.1A Pending CN106930543A (en) | 2017-02-25 | 2017-02-25 | Build a wall, one step completed device and method of plastering a wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106930543A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108396978A (en) * | 2018-04-19 | 2018-08-14 | 王勇 | One kind is built a wall auxiliary device |
CN110984597A (en) * | 2019-11-21 | 2020-04-10 | 钟达国 | Wall building and plastering tiling integrated device and using method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB604655A (en) * | 1945-12-19 | 1948-07-07 | Archibald Flint Watkins | Gauge means used for laying bricks |
US3999920A (en) * | 1975-06-20 | 1976-12-28 | Cerillo Jr Patrick J | Combined mortar dispenser and joint striker device |
CN201202281Y (en) * | 2007-06-24 | 2009-03-04 | 史文章 | Vibrating formwork walling machine |
CN103899094A (en) * | 2014-04-20 | 2014-07-02 | 王辉 | Lifting type walling clamp plate |
CN203947788U (en) * | 2014-07-02 | 2014-11-19 | 宋仲华 | A kind of integrated apparatus of laying bricks fast, spreading slurry, joint filling |
-
2017
- 2017-02-25 CN CN201710104984.1A patent/CN106930543A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB604655A (en) * | 1945-12-19 | 1948-07-07 | Archibald Flint Watkins | Gauge means used for laying bricks |
US3999920A (en) * | 1975-06-20 | 1976-12-28 | Cerillo Jr Patrick J | Combined mortar dispenser and joint striker device |
CN201202281Y (en) * | 2007-06-24 | 2009-03-04 | 史文章 | Vibrating formwork walling machine |
CN103899094A (en) * | 2014-04-20 | 2014-07-02 | 王辉 | Lifting type walling clamp plate |
CN203947788U (en) * | 2014-07-02 | 2014-11-19 | 宋仲华 | A kind of integrated apparatus of laying bricks fast, spreading slurry, joint filling |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108396978A (en) * | 2018-04-19 | 2018-08-14 | 王勇 | One kind is built a wall auxiliary device |
CN110984597A (en) * | 2019-11-21 | 2020-04-10 | 钟达国 | Wall building and plastering tiling integrated device and using method thereof |
CN110984597B (en) * | 2019-11-21 | 2022-04-22 | 钟达国 | Wall building and plastering tiling integrated device and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207538350U (en) | A kind of assembled cantilever stair | |
CN106894640B (en) | A kind of masonry device and its application method | |
CN106930543A (en) | Build a wall, one step completed device and method of plastering a wall | |
CN102888977B (en) | Interior wall screeding method | |
CN108708559B (en) | Masonry ash laying auxiliary tool and using method thereof | |
CN102433958A (en) | Prefabricated wall board construction member | |
CN103255906A (en) | Ash smearing device and construction method in large-area ground flatness control of ash smearing device | |
CN104514358A (en) | Screeding machine | |
CN206174489U (en) | Plastering device | |
CN204703535U (en) | Equipment built by laying bricks or stones by brick wall | |
CN204510756U (en) | Ceramic tile screeder | |
CN207526073U (en) | A kind of ceramic tile positioning and gap control device | |
CN113618872A (en) | Building construction equipment and construction method based on BIM modeling | |
CN206397079U (en) | Ground floating screed chi | |
CN212453703U (en) | Simple leveling controller for mortar thickness | |
CN212406174U (en) | Mortar joint control tool for building | |
CN218374972U (en) | Plastering tool special for stair step | |
CN105464242A (en) | Building method of plastering-free high-precision infilled wall | |
US1653863A (en) | Apparatus for use in erecting walls of blocks, bricks, or the like | |
KR20090030125A (en) | Apparatus and method for constructing stairs and stairs room | |
EP3402943B1 (en) | System and method for application of a plaster on a surface | |
CN209855153U (en) | Ground ash laying tool | |
CN109736484B (en) | Parametric brick splicing and building method for clean water bricks | |
CN206397094U (en) | Ground floating rule | |
WO2008093380A2 (en) | A system of guides for levelling plaster |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170707 |