CN106930543A - Build a wall, one step completed device and method of plastering a wall - Google Patents

Build a wall, one step completed device and method of plastering a wall Download PDF

Info

Publication number
CN106930543A
CN106930543A CN201710104984.1A CN201710104984A CN106930543A CN 106930543 A CN106930543 A CN 106930543A CN 201710104984 A CN201710104984 A CN 201710104984A CN 106930543 A CN106930543 A CN 106930543A
Authority
CN
China
Prior art keywords
wall
template
brick
layer
positioning strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710104984.1A
Other languages
Chinese (zh)
Inventor
钟达国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710104984.1A priority Critical patent/CN106930543A/en
Publication of CN106930543A publication Critical patent/CN106930543A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/16Implements for after-treatment of plaster or the like before it has hardened or dried, e.g. smoothing-tools, profile trowels

Abstract

The present invention relates to manually build a wall, technology of plastering a wall, particularly one kind are built a wall, one step completed device and method of plastering a wall.Device of the invention, including column, template, locator, described locator can be slided up and down and be locked on the arbitrary height of column along column;Template is parallel with metope and is connected on locator, and higher than one layer of height of brick, the raised area is the thickness of screed between brick layer to the height of template;A positioning strip parallel with template is provided with front of template, there is spacing between positioning strip and template, spacing is the thickness of coat of plaster.Once can complete to build a wall and plaster a wall using device of the invention, improve operating efficiency, substantially reduce the construction period.

Description

Build a wall, one step completed device and method of plastering a wall
Technical field
The present invention relates to manually build a wall, technology of plastering a wall, particularly one kind are built a wall, one step completed device and method of plastering a wall.
Background technology
Artificial building a wall generally first position vertical line (non-cement frame room) in position of building a wall, and vertical line is exactly corner (wall end) Line, first puzzles two corners (wall end) vertically, then pulled up datum line at two corners (wall end), it is possible to build two walls Wall between angle (wall end), so can just finish building whole face wall repeatedly.Because datum line is resilient, brick (building block) can not be touched Line, the brick built consistent offline must just can determine that the smooth and vertical of metope, corner (wall end) it is vertical critically important, thus Technical merit requirement to the workman that builds a wall is high, inefficiency.
Plastering a wall to be finished building in whole face wall can just be carried out, and the project tight for the duration has an impact unavoidably, and it is to use to plaster a wall Mortar is little by little spread metope by patter, and operating efficiency is relatively low.
The content of the invention
Built a wall it is an object of the invention to provide one kind, one step completed device and method of plastering a wall.
Technical scheme:One kind is built a wall, one step completed device of plastering a wall, including column, template, locator, institute The locator stated can be slided up and down and be locked on the arbitrary height of column along column;Template is parallel with metope and is connected to positioning On device, higher than one layer of height of brick, the raised area is the thickness of screed between brick layer to the height of template;The front of template is set There is a positioning strip parallel with template, there is spacing between positioning strip and template, spacing is the thickness of coat of plaster.
Described template is higher by one layer of 10-20mm of brick height.
Spacing between positioning strip and template is 15--20mm.
Described locator is sliding sleeve, is furnished with lock-screw on sliding sleeve.
Described positioning strip is movably connected in template.
One kind is built a wall, one step completed method of plastering a wall, and is comprised the following steps:
Column and template are installed, it is determined that after wall position and thickness, fixing the column on one side, column should be perpendicular to water Plane, template is connected on the locator on column;Ground floor brick is puzzled with traditional approach, then is fixed in the another side of wall Good column and template, insert mortar formation and plaster a wall, and mortar is filled to and template top edge in ground floor brick and the space of template Flush, now also completed mortar above ground floor brick, the positioning strip closed on a cheek board (need not pacify on another cheek board Dress positioning strip), second layer brick is spread on the basis of positioning strip;
The positioning strip in template is removed, locator is brought Forward between brick and brick layer after screed thickness along column, locked Determine locator, insert mortar and formed in second layer brick and the space of template and plaster a wall, and mortar is filled to is flushed with template top edge, Mortar is also now completed above second layer brick, the positioning strip closed in template spreads third layer brick on the basis of positioning strip;
The positioning strip in template is removed, locator is brought Forward between brick and brick layer after screed thickness along column, locked Determine locator, insert mortar and formed in third layer brick and the space of template and plaster a wall, and mortar is filled to is flushed with template top edge, Mortar is also now completed above third layer brick, the positioning strip closed in template spreads the 4th layer of brick on the basis of positioning strip;Weight Multiple such work can complete building a wall, plastering a wall for after brick layer;
Should ensure that there is the contact of 5-10mm the bottom of template with preceding once plastering a wall during upper shifting formwork plate;
Locator should be locked in time after being moved along column, should first release locking during upper shifting again.
Due to device picture frame container of the invention, after arranging, brick, mortar only need to be loaded into simply, to workman Technical requirements are low, and once complete and build a wall and plaster a wall, and improve operating efficiency, substantially reduce the construction period.
Brief description of the drawings
Fig. 1 is the structural representation of apparatus of the present invention.
In figure:1 column, 2 templates, 3 positioning strips.
Specific embodiment
As shown in figure 1, the inventive system comprises column 1, template 2, locator, template 2 can be slided up and down simultaneously along column 1 (template 2 connects sliding sleeve, slides over and slided on column 1, is furnished with lock-screw on sliding sleeve) is locked on the arbitrary height of column 1, The height of template is more than one layer of 10-20mm of height of brick;A positioning strip 3, positioning strip 3 and template are provided with described template 2 2 distance is usually 15--20mm (thickness is determined by plastering a wall), and template 2 and positioning strip 3 are connected with loose-leaf.
It is furnished with locator on column 1, locator is sliding sleeve, is furnished with lock-screw on sliding sleeve, under can positions and preventing template 2 Pendant.
Be detailed below build a wall, one step completed step of plastering a wall:
Column 1 and template 2 are installed, it is determined that after wall position and thickness, fixing the column 1 on one side, column 1 should be vertical In horizontal plane, template 2 is connected on the sliding sleeve on column 1;Ground floor brick is puzzled with traditional approach, then in the another side of wall Column 1 and template 2 are fixed, mortar formation is inserted in ground floor brick and the space of template 2 and is plastered a wall, and mortar is filled to and template 2 top edges are flushed, and have now also completed mortar above ground floor brick, (another cheek board of positioning strip 3 closed on a cheek board 2 On positioning strip need not be installed), second layer brick is spread on the basis of positioning strip 3;
The positioning strip 3 in template 2 is removed, sliding sleeve is brought Forward between brick and brick layer after screed thickness along column 1, locked Determine sliding sleeve, insert mortar and formed in second layer brick and the space of template 2 and plaster a wall, and mortar is filled to is flushed with the top edge of template 2, Mortar is also now completed above second layer brick, the positioning strip 3 in template of closing 2 spreads third layer on the basis of positioning strip 3 Brick;
The positioning strip 3 in template 2 is removed, sliding sleeve is brought Forward between brick and brick layer after screed thickness along column 1, locked Determine sliding sleeve, insert mortar and formed in third layer brick and the space of template 2 and plaster a wall, and mortar is filled to is flushed with the top edge of template 2, Mortar is also now completed above third layer brick, the positioning strip 3 in template of closing 2 spreads the 4th layer on the basis of positioning strip 3 Brick;Repeating such work can complete building a wall, plastering a wall for after brick layer;
Should ensure that there is the contact of 5-10mm the bottom of template 2 with preceding once plastering a wall during upper shifting formwork plate 2;
Sliding sleeve should be locked in time after being moved along column 1, should first release locking during upper shifting again.
The locking or release of sliding sleeve are to come completion by the lock-screw turned on sliding sleeve.
Poured be poured in cement frame in build a wall, plaster a wall when, because top is limited, it should first remove template 2, and use and pass System builds a wall, plaster a wall mode to complete last, the building a wall of two layers of brick, plaster a wall.

Claims (6)

1. one kind build a wall, one step completed device of plastering a wall, it is characterized in that:Including column, template, locator, described locator Can slide up and down and be locked on the arbitrary height of column along column;Template is parallel with metope and is connected on locator, template Height of the height higher than one layer of brick, the raised area is the thickness of screed between brick layer;One and mould are provided with front of template The parallel positioning strip of plate, there is spacing between positioning strip and template, spacing is the thickness of coat of plaster.
2. one kind according to claim 1 build a wall, one step completed device of plastering a wall, it is characterized in that:Described template is higher by One layer of 10-20mm of brick height.
3. one kind according to claim 1 build a wall, one step completed device of plastering a wall, it is characterized in that:Positioning strip and template it Between spacing be 15--20mm.
4. one kind according to claim 1 build a wall, one step completed device of plastering a wall, it is characterized in that:Described locator is Sliding sleeve, is furnished with lock-screw on sliding sleeve.
5. one kind according to claim 1 build a wall, one step completed device of plastering a wall, it is characterized in that:Described positioning strip is lived It is dynamic to be connected in template.
6. the device described in usage right requirement 1 once completes the method built a wall, plaster a wall, it is characterized in that:Comprise the following steps:
Column and template are installed, it is determined that after wall position and thickness, fixing the column on one side, column should be perpendicular to level Face, template is connected on the locator on column;Ground floor brick is puzzled with traditional approach, then is fixed in the another side of wall Column and template, insert mortar formation and plaster a wall, and mortar is filled to neat with template top edge in ground floor brick and the space of template It is flat, mortar has also now been completed above ground floor brick, the positioning strip closed on a cheek board spreads second on the basis of positioning strip Layer brick;
The positioning strip in template is removed, locator is brought Forward between brick and brick layer after screed thickness along column, locking is fixed Position device, inserts mortar formation and plasters a wall in second layer brick and the space of template, and mortar is filled to is flushed with template top edge, now Mortar is also completed above second layer brick, the positioning strip closed in template spreads third layer brick on the basis of positioning strip;
The positioning strip in template is removed, locator is brought Forward between brick and brick layer after screed thickness along column, locking is fixed Position device, inserts mortar formation and plasters a wall in third layer brick and the space of template, and mortar is filled to is flushed with template top edge, now Mortar is also completed above third layer brick, the positioning strip closed in template spreads the 4th layer of brick on the basis of positioning strip;Repeat this The work of sample can complete to after the building a wall of brick layer, plaster a wall;
Should ensure that there is the contact of 5-10mm the bottom of template with preceding once plastering a wall during upper shifting formwork plate;
Locator should be locked in time after being moved along column, should first release locking during upper shifting again.
CN201710104984.1A 2017-02-25 2017-02-25 Build a wall, one step completed device and method of plastering a wall Pending CN106930543A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710104984.1A CN106930543A (en) 2017-02-25 2017-02-25 Build a wall, one step completed device and method of plastering a wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710104984.1A CN106930543A (en) 2017-02-25 2017-02-25 Build a wall, one step completed device and method of plastering a wall

Publications (1)

Publication Number Publication Date
CN106930543A true CN106930543A (en) 2017-07-07

Family

ID=59423159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710104984.1A Pending CN106930543A (en) 2017-02-25 2017-02-25 Build a wall, one step completed device and method of plastering a wall

Country Status (1)

Country Link
CN (1) CN106930543A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108396978A (en) * 2018-04-19 2018-08-14 王勇 One kind is built a wall auxiliary device
CN110984597A (en) * 2019-11-21 2020-04-10 钟达国 Wall building and plastering tiling integrated device and using method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB604655A (en) * 1945-12-19 1948-07-07 Archibald Flint Watkins Gauge means used for laying bricks
US3999920A (en) * 1975-06-20 1976-12-28 Cerillo Jr Patrick J Combined mortar dispenser and joint striker device
CN201202281Y (en) * 2007-06-24 2009-03-04 史文章 Vibrating formwork walling machine
CN103899094A (en) * 2014-04-20 2014-07-02 王辉 Lifting type walling clamp plate
CN203947788U (en) * 2014-07-02 2014-11-19 宋仲华 A kind of integrated apparatus of laying bricks fast, spreading slurry, joint filling

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB604655A (en) * 1945-12-19 1948-07-07 Archibald Flint Watkins Gauge means used for laying bricks
US3999920A (en) * 1975-06-20 1976-12-28 Cerillo Jr Patrick J Combined mortar dispenser and joint striker device
CN201202281Y (en) * 2007-06-24 2009-03-04 史文章 Vibrating formwork walling machine
CN103899094A (en) * 2014-04-20 2014-07-02 王辉 Lifting type walling clamp plate
CN203947788U (en) * 2014-07-02 2014-11-19 宋仲华 A kind of integrated apparatus of laying bricks fast, spreading slurry, joint filling

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108396978A (en) * 2018-04-19 2018-08-14 王勇 One kind is built a wall auxiliary device
CN110984597A (en) * 2019-11-21 2020-04-10 钟达国 Wall building and plastering tiling integrated device and using method thereof
CN110984597B (en) * 2019-11-21 2022-04-22 钟达国 Wall building and plastering tiling integrated device and using method thereof

Similar Documents

Publication Publication Date Title
CN207538350U (en) A kind of assembled cantilever stair
CN106894640B (en) A kind of masonry device and its application method
CN106930543A (en) Build a wall, one step completed device and method of plastering a wall
CN102888977B (en) Interior wall screeding method
CN108708559B (en) Masonry ash laying auxiliary tool and using method thereof
CN102433958A (en) Prefabricated wall board construction member
CN103255906A (en) Ash smearing device and construction method in large-area ground flatness control of ash smearing device
CN104514358A (en) Screeding machine
JP2017064928A (en) Method for production of precast concrete having three-dimensional curved surface, and mold form
CN204703535U (en) Equipment built by laying bricks or stones by brick wall
CN209457376U (en) Structural wall boundary Template Location fixed structure
CN204510756U (en) Ceramic tile screeder
HRP20151065A2 (en) Device levelling stairs
CN206397079U (en) Ground floating screed chi
CN212453703U (en) Simple leveling controller for mortar thickness
CN212406174U (en) Mortar joint control tool for building
CN218374972U (en) Plastering tool special for stair step
CN105464242A (en) Building method of plastering-free high-precision infilled wall
US1653863A (en) Apparatus for use in erecting walls of blocks, bricks, or the like
KR20090030125A (en) Apparatus and method for constructing stairs and stairs room
EP3402943B1 (en) System and method for application of a plaster on a surface
CN209855153U (en) Ground ash laying tool
CN206397090U (en) Patch block leveling chi
CN109736484B (en) Parametric brick splicing and building method for clean water bricks
CN206397094U (en) Ground floating rule

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170707