CN106917631A - Supporting type tunnel linkage section sealing device in a kind of water - Google Patents

Supporting type tunnel linkage section sealing device in a kind of water Download PDF

Info

Publication number
CN106917631A
CN106917631A CN201710230184.4A CN201710230184A CN106917631A CN 106917631 A CN106917631 A CN 106917631A CN 201710230184 A CN201710230184 A CN 201710230184A CN 106917631 A CN106917631 A CN 106917631A
Authority
CN
China
Prior art keywords
sealing ring
steel plates
lower sealing
upper sealing
rubber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710230184.4A
Other languages
Chinese (zh)
Other versions
CN106917631B (en
Inventor
贺维国
江水德
张伟
江婕瑞
徐玉峰
朱剑平
徐韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Original Assignee
China Railway Liuyuan Group Co Ltd
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Liuyuan Group Co Ltd, CRTG Survey and Design Institute Co Ltd filed Critical China Railway Liuyuan Group Co Ltd
Priority to CN201710230184.4A priority Critical patent/CN106917631B/en
Publication of CN106917631A publication Critical patent/CN106917631A/en
Application granted granted Critical
Publication of CN106917631B publication Critical patent/CN106917631B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/385Sealing means positioned between adjacent lining members
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/381Setting apparatus or devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to supporting type tunnel linkage section sealing device in a kind of water, belong to under-water structure project technical field.Upright post base is located in the middle of the side bottom of upper sealing ring two, firm welding on the outside of upright post base side and upper sealing ring, column is connected by bolt with upright post base, column top is installed on cucurbit, crossbeam is provided between the top of two columns, suspension ring are provided with the middle of crossbeam, the side roof part of lower sealing ring two is respectively equipped with two blocks of A steel plates and two blocks of B steel plates, firm welding on the outside of A steel plates and B steel plates side and lower sealing ring, a circular hole is provided with the middle of A steel plates, B steel plates bottom is provided with downwardly open U-lag, U-lag bottom is provided with a rubber strip, rubber strip two ends are connected by bolt with B steel plates, linkage section pouring construction space is provided under the protection of sealing device;Sealing device is easy to operate;Sealing device can be reclaimed, reused.

Description

Supporting type tunnel linkage section sealing device in a kind of water
Technical field
The present invention relates to supporting type tunnel linkage section sealing device in a kind of water, belong to under-water structure project technical field.
Background technology
Immersed tunnelling method is the submerged tunnel construction method of comparative maturity, and immersed tunnelling method tunnel usage history has had more than 100 years.Cross Immersed tube tunnel is gone to be embedded in riverbed under water or sea bed soil layer.If immersed tube tunnel is locally higher by riverbed, foundation trench excavated volume can be reduced With immersed tube length, construction costs is effectively reduced.For example, across the port highway immersed tube tunnel in Hong Kong, Greece Pu Liwei sand-Acker are gloomy heavy Pipe tunnel is in the presence of the local pipeline section for being higher by 2~4m of riverbed.
If tunnel line closes on seashore locally pool, if tunnel is all built below sea bed face, tunnel Buried depth it is larger, the section on the bank for closing on pool side is very long, and whole construction costs is higher;If in pool location using " supporting Formula tunnel ", that is, close reinforced concrete structure and be installed in some supporting structures, and supporting structure is higher by sea bed face, and closing reinforcing bar is mixed Xtah Crude Clay structure is entirely located in seawater, and closing reinforced concrete structure top surface plan range off sea meets Navigation in Navigable where engineering It is required that, " supporting type tunnel " technical scheme is feasible, and " supporting type tunnel " construction costs is relatively low relative to the full tunnel that buries, and It is built difficulty and construction risk and will substantially reduce.
Closing reinforced concrete structure includes prefabricated tube section and linkage section, and dry-docking makes prefabricated tube section on the coast, prefabricated pipe Section is installed on two or more supporting structures by transportation by driving and sinking, between having 2m or so between prefabricated tube section before and after circuit Gap, linkage section needs cast in situs under water between front and rear prefabricated tube section.In order to linkage section pours the offer condition that applies under water, need Sealing device is installed in linkage section surrounding.
The content of the invention
Defect and deficiency it is an object of the invention to be directed to prior art, there is provided a kind of simple structure, it is reasonable in design, make With supporting type tunnel linkage section sealing device in convenient water.
To achieve the above object, the technical solution adopted by the present invention is:It includes upper sealing ring, lower sealing ring, column, vertical Post base, coarse-wire rope, cucurbit, crossbeam, A steel plates, B steel plates, seizing wire, rubber strip, rubber fastening band, rubber slab, pin And suspension ring, upper sealing ring be installed in linkage section top, lower sealing ring be located at connection pars infrasegmentalis, upright post base be located at upper sealing ring two In the middle of side bottom, firm welding on the outside of upright post base side and upper sealing ring, column is connected by bolt with upright post base, column Top is installed on cucurbit, and crossbeam is provided between the top of two columns, and suspension ring, the side roof part of lower sealing ring two difference are provided with the middle of crossbeam Two blocks of A steel plates and two blocks of B steel plates are provided with, firm welding on the outside of A steel plates and B steel plates side and lower sealing ring is provided with the middle of A steel plates One circular hole, B steel plates bottom are provided with downwardly open U-lag, and U-lag bottom is provided with a rubber strip, and rubber strip two ends pass through Bolt is connected with B steel plates, at regular intervals along circuit side's line between two blocks of A steel plates, has one along circuit side's line between two blocks of B steel plates Capel is made in determining deviation, coarse-wire rope bottom, and coarse-wire rope capel is placed between two blocks of A steel plates or two blocks of B steel plates, pin The U-lag and the capel of coarse-wire rope of the circular hole or B steel plates through A steel plates are fastened, the coarse-wire rope other end passes through column bottom Seat centre bore and the cucurbit positioned at column top connect, and every rubber strip is connected with a seizing wire, the seizing wire other end It is fixed on the top of column;Lower sealing ring is provided with A and enters osculum on the inside of linkage section;Pass through cucurbit and coarse-wire rope first Upper sealing ring and the preliminary drawing of lower sealing ring, the water that secondly will be located at linkage section are entered into osculum discharge, profit by lower sealing ring A Rubber fastening band between prefabricated tube section before and after making upper sealing ring and linkage section with the outer lateral water pressure of upper sealing ring and lower sealing ring, Sealing plate densification stops between rubber fastening band, upper sealing ring and lower sealing ring between prefabricated tube section before and after lower sealing ring and linkage section Water, is attached section construction under upper sealing ring, the protection of lower sealing ring.
Preferably, the upper sealing ring contacts end face with lower sealing ring is provided with rubber slab, upper sealing ring and front and rear prefabricated Between pipeline section, there is rubber fastening band between lower sealing ring and front and rear prefabricated tube section respectively, rubber water-proof carries two ways:First The mode of kind is that upper sealing ring and lower sealing ring rear and front end inner side are provided with rubber fastening band, the rubber fastening band position of upper sealing ring With the position consistency of the rubber fastening band of lower sealing ring, while the vulcanization of rubber slab side and rubber fastening band bottom surface is connected, rubber Waterstop respectively with side bonds in upper sealing ring and lower sealing ring or be bolted;The second way is prefabricated tube section two ends The rubber fastening band of ring-type is respectively equipped with, rubber fastening band is Nian Jie with prefabricated tube section L or is bolted.
Preferably, the upper sealing ring and lower sealing ring are using closing steel construction, the side bottom of upper sealing ring two is provided with C and enters Osculum, lower sealing ring bottom is provided with D and enters osculum, and the nominal unit weight of upper sealing ring and lower sealing ring can be by water filling draining Adjustment.
Preferably, the column uses vertical section splicing structure, every section of column is by four angle steel, top connection steel Plate, bottom junction steel plate and some batten plates are welded, and are connected by screw bolts between every section of column.
Preferably, after the linkage section has been constructed, the pretightning force of coarse-wire rope is released, by seizing wire by B steel plates On rubber strip break or come off, manually moving down the coarse-wire rope with B steel plates the same side makes pin leave U-lag, It is last lower sealing ring and upper sealing ring is disconnected section to the intake-discharge pipe A water filling pressurizations of lower sealing ring inner side, from upper sealing ring C enter water drainage and the D of lower sealing ring enters water drainage, float upper sealing ring and lower sealing ring, set using lifting It is standby that upper sealing ring and lower sealing ring are hung out into the water surface.
After said structure, the present invention has the beneficial effect that:Supporting type tunnel linkage section in a kind of water of the present invention Sealing device has the advantages that:
(1) linkage section pouring construction space is provided under the protection of sealing device;
(2) sealing device is easy to operate;
(3) sealing device can be reclaimed, reused;
(4) prefabricated tube section is caused to deform stress when sealing device is installed in prefabricated tube section smaller.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also Other accompanying drawings are obtained with according to these accompanying drawings.
Supporting type tunnel linkage section sealing device schematic cross section in a kind of water that Fig. 1 is provided for the present invention;
Supporting type tunnel linkage section sealing device vertical section schematic diagram in a kind of water that Fig. 2 is provided for the present invention;
A kind of upper sealing ring elevational schematic view that Fig. 3 is provided for the present invention
Fig. 4 is a kind of schematic elevation view of upper sealing ring that the present invention is provided;
The middle section figure of the upper sealing ring that Fig. 5 is provided for the present invention;
The upper sealing ring bottom face part sectioned view that Fig. 6 is provided for the present invention;
A kind of lower sealing ring elevational schematic view that Fig. 7 is provided for the present invention;
A kind of schematic elevation view of lower sealing ring that Fig. 8 is provided for the present invention;
A kind of schematic elevation view of upright post base that Fig. 9 is provided for the present invention
A kind of profile of upright post base that Figure 10 is provided for the present invention;
The A steel plate schematic diagrames that Figure 11 is provided for the present invention;
The B steel plate schematic diagrames that Figure 12 is provided for the present invention;
The column schematic diagram that Figure 13 is provided for the present invention;
Figure 14 is the top view of Figure 13;
The partial assembly drawings such as coarse-wire rope, pin and the upright post base that Figure 15 is provided for the present invention;
Figure 16 is rubber fastening band and connection diagram in the present invention.
Specific embodiment
The present invention is further illustrated below in conjunction with the accompanying drawings.
Referring to such as Fig. 1 -- shown in Figure 16, including upper sealing ring 1, lower sealing ring 2, column 3, upright post base 4, coarse-wire rope 5th, cucurbit 6, crossbeam 7, A steel plates 8, B steel plates 9, seizing wire 10, suspension ring 11, rubber strip 13, capel 14, pin fasten 15, rubber slab 16th, rubber fastening band 17, A enters osculum 18;Upper sealing ring 1 is installed in linkage section X tops, and lower sealing ring 2 is located at linkage section X bottoms Portion, upright post base 4 is located in the middle of the two bottom sides of upper sealing ring 1, the side of upright post base 4 and the outside plate of upper sealing ring 1 Firm welding, column 3 is connected by bolt with upright post base 4, and the top of two root posts 3 is installed on cucurbit 6, two root posts respectively Crossbeam 7 is provided between 3 top, suspension ring 11 are provided with the middle of crossbeam, two blocks of A steel plates are provided with the middle of the left side top of lower sealing ring 2 8, the outside steel of two blocks of B steel plates 9, A steel plates 8 and the side of B steel plates 9 and lower sealing ring 2 is provided with the middle of the right hand top of lower sealing ring 2 Plate weld firmly, is provided with a circular hole in the middle of A steel plates 8, the bottom of B steel plates 9 is provided with downwardly open U-lag 12, each U-lag 12 Bottom be provided with a rubber strip 13, the two ends of rubber strip 13 are connected by bolt with B steel plates 9, bolt be located at U-lag both sides, It is at regular intervals along line direction between two blocks of A steel plates 8, at regular intervals along circuit side's line between two blocks of B steel plates 9, thicker wire Capel 14 is made in the bottom of rope 5, and capel 14 is placed between two blocks of A steel plates 8, and a pin fastens 15 through two blocks of A steel plates 8 Garden hole and capel 14, another pin fasten 15 through two pieces of U-lags 12 and another capel of coarse-wire rope 14 of B steel plates 9, The coarse-wire rope other end is connected through the centre bore of upright post base 4 and cucurbit 6, and every rubber strip 13 and a seizing wire connect Connect, the other end of seizing wire 10 is fixed on the top of column.Upper sealing ring 1, the inner side of lower sealing ring 2 are provided with A and enter osculum 18.On The bottom face of sealing ring 1 and the top end face of lower sealing ring 2 are respectively equipped with rubber slab 16, upper sealing ring 1 and front and rear prefabricated tube section L it Between be provided with rubber fastening band 17, be provided with rubber fastening band 17 between lower sealing ring 2 and front and rear prefabricated tube section L, rubber water-proof is carried Two ways:First way is to be respectively equipped with rubber fastening band 17 on the inside of the rear and front end of upper sealing ring 1 and lower sealing ring 2, The position consistency of the position of rubber fastening band 17 of upper sealing ring 1 and the rubber fastening band 17 of lower sealing ring 2, the side of rubber slab 16 with The bottom surface of rubber fastening band 17 vulcanization connection, rubber fastening band 17 is bolted with upper sealing ring 1, lower sealing ring 2 respectively;The Two kinds of modes are the rubber fastening bands 17 that prefabricated tube section L is respectively arranged at two ends with ring-type, and rubber fastening band 17 passes through with prefabricated tube section L Bolt connection;, using closing steel construction, 1 liang of side bottom of upper sealing ring is provided with C and enters osculum 20 for upper sealing ring 1 and lower sealing ring 2, The bottom of lower sealing ring 2 is provided with D and enters osculum 21;Column 3 uses vertical section splicing structure, and every section of column is by four angle steel, top Portion's junction steel plate, bottom junction steel plate and some batten plates are welded, and are connected by screw bolts between every section of column.
By cucurbit 6 and coarse-wire rope 5 by upper sealing ring 1 and the preliminary drawing of lower sealing ring 2, and make upper sealing ring 1 and connect Connect before and after section X between prefabricated tube section L rubber fastening band 17, lower sealing ring 2 and rubber stops between prefabricated tube section L before and after linkage section X Water with the preliminary densification sealing of rubber slab 16 between 17, upper sealing ring 1 and lower sealing ring 2, under the water for being located at linkage section X is passed through The A of sealing ring enters osculum 18 and discharges, and the outer lateral water pressure using upper sealing ring 1 and lower sealing ring 2 makes upper sealing ring 1 and is connected Rubber fastening band 17, lower sealing ring 2 and rubber water-proof between prefabricated tube section L before and after linkage section X between prefabricated tube section L before and after section X Band 17, the densification sealing of rubber slab 16 between upper sealing ring 1 and lower sealing ring 2, under the protection of upper sealing ring 1 and lower sealing ring 2 It is attached a section X pouring constructions.
After having been constructed Deng linkage section X, the pretightning force of coarse-wire rope 5 is released, by seizing wire 10 by the rubber on B steel plates Bar 13 is broken or is come off, and manually moving down the coarse-wire rope 5 with the same side of rubber strip 13 makes latching 15 leave U-lag, Entering the water filling of osculum 18 by the A of lower sealing ring 2 and pressurizeing makes upper sealing ring 1 and lower sealing ring 2 be disconnected a section X, leads to from upper close Seal ring 1 and the internal drainage of lower sealing ring 2 float upper sealing ring 1 and lower sealing ring 2, using lifting appliance by upper sealing ring 1 and under Sealing ring 2 hangs out the water surface
Embodiment:
Such as Fig. 1~Figure 13, prefabricated tube section L outer radius 3.5m, linkage section X tunnel outer radius 3.5m, prefabricated tube section L is along circuit The spacing 2.0m (linkage section X is along line length 2.0m) in direction, upper sealing ring and lower sealing ring outer radius R1=4.10m, it is upper close Seal ring and lower sealing ring inside radius R2=3.56m (thickness after 3.5m+0.06m- rubber fastening band densification), rubber fastening band is high Degree 135mm, rubber fastening band compressed thickness=75mm, clear height H0=3500mm+100mm=on the inside of upper sealing ring and lower sealing ring (depth of section after 3500mm- tunnels outer radius, the preliminary densification of 100mm- rubber fastening bands, 3600mm includes rubber to 3600mm The thickness of plate, it is assumed that upper sealing ring starts to connect with lower sealing ring end face after upper sealing ring top rubber waterstop primary compression 35mm Touch), sealing ring seals ring radial thickness H1=500mm along line direction length 6.0m, sealing ring by one piece of outside plate 131, One block of inner side steel plate, 132, two pieces of doughnut-shaped steel plates 134, some doughnut-shaped steel plates 133, some angle steel 135 and two blocks of end face steel plates 136 It is welded, the thickness of outside plate 131, inner side steel plate 132, doughnut-shaped steel plate 133 and doughnut-shaped steel plate 134 is 10mm, angle steel 135 use L100 × 100 × 10, and the physical dimension of doughnut-shaped steel plate 133 is shown in Fig. 7, and the physical dimension of doughnut-shaped steel plate 134 is shown in Fig. 8, its Middle R2=3500mm, b=10mm.Upper sealing ring bottom and lower sealing ring top structure are shown in Fig. 6, and the thickness of rubber slab 16 is 100mm.Doughnut-shaped steel plate 133 is 350mm along the spacing of line direction, the physical dimension of end face steel plate 136 for 480mm × 6000mm, thickness is 10mm.
Fig. 9 is the schematic diagram of upright post base 4, upright post base welded by 1 block of steel plate, 41,2 blocks of steel plates 42 and 2 blocks of steel plates 43 and Into the thickness of steel plate 41 and steel plate 42 is 30mm, the one side of steel plate 42 and upper sealing ring firm welding, and steel plate 41 is installed in steel plate 42 Upper left side, is provided with a garden hole 44 in the middle of steel plate 41, garden bore dia is 40mm.
The physical dimension of A steel plates 8 is shown in Figure 10, steel plate thickness 30mm, right side and the lower sealing ring firm welding, two pieces of A steel plates 8 Spacing between A steel plates 8 is 50mm, is provided with a garden hole in the middle of A steel plates 8, garden bore dia 80mm.
The physical dimension of B steel plates 9 is shown in Figure 11, steel plate thickness 30mm, left side and the lower sealing ring firm welding, B steel of B steel plates 9 The bottom of plate 9 is provided with downward U-lag, and the top of U-lag is semicircle, well width 80mm.
Column uses vertical section splicing structure, and every section of column is by four angle steel 32, junction steel plate 31 and some batten plates 33 It is welded, is connected by screw bolts between every section of column, the structure of every section of column 3 is shown in Figure 12, and the size of junction steel plate 31 is 700mm × 700mm, thickness 20mm, the center of junction steel plate 31 are provided with garden hole, garden bore dia 60mm.Angle steel 32 be L200 × 200 × 20, the length 2000mm of angle steel 32.The size 500 × 350 of batten plate 33, steel plate thickness 12mm, the spacing 600mm of batten plate 33.
The above, is merely illustrative of the technical solution of the present invention and unrestricted, and those of ordinary skill in the art are to this hair Other modifications or equivalent that bright technical scheme is made, without departing from the spirit and scope of technical solution of the present invention, All should cover in the middle of scope of the presently claimed invention.

Claims (5)

1. supporting type tunnel linkage section sealing device in a kind of water, it is characterised in that:It includes upper sealing ring, lower sealing ring, stands Post, upright post base, coarse-wire rope, cucurbit, crossbeam, A steel plates, B steel plates, seizing wire, rubber strip, rubber fastening band, rubber slab, Pin and suspension ring, upper sealing ring are installed in linkage section top, and lower sealing ring is located at connection pars infrasegmentalis, and upright post base is located at upper sealing In the middle of the side bottom of ring two, firm welding on the outside of upright post base side and upper sealing ring, column is connected by bolt with upright post base, Column top is installed on cucurbit, and crossbeam is provided between the top of two columns, and suspension ring, the side roof part of lower sealing ring two are provided with the middle of crossbeam It is respectively equipped with two blocks of A steel plates and two blocks of B steel plates, firm welding on the outside of A steel plates and B steel plates side and lower sealing ring, in the middle of A steel plates It is provided with a circular hole, B steel plates bottom and is provided with downwardly open U-lag, U-lag bottom is provided with a rubber strip, rubber strip two ends It is connected with B steel plates by bolt, it is at regular intervals along circuit side's line between two blocks of A steel plates, along circuit side's line between two blocks of B steel plates At regular intervals, capel is made in coarse-wire rope bottom, coarse-wire rope capel be placed in two blocks of A steel plates or two blocks of B steel plates it Between, pin fastens the U-lag and the capel of coarse-wire rope of the circular hole or B steel plates through A steel plates, and the coarse-wire rope other end is passed through Upright post base centre bore and the cucurbit positioned at column top connect, and every rubber strip is connected with a seizing wire, seizing wire The other end is fixed on the top of column;Lower sealing ring is provided with A and enters osculum on the inside of linkage section.
2. supporting type tunnel linkage section sealing device in a kind of water according to claim 1, it is characterised in that:It is described close Seal ring contacts end face with lower sealing ring and is provided with rubber slab, between upper sealing ring and front and rear prefabricated tube section, lower sealing ring and front and rear pre- There is rubber fastening band between tubulation section respectively, rubber water-proof carries two ways:First way is upper sealing ring and lower sealing Ring rear and front end inner side is provided with rubber fastening band, the rubber fastening band position of upper sealing ring and the rubber fastening band of lower sealing ring Position consistency, while the vulcanization of rubber slab side and rubber fastening band bottom surface is connected, rubber fastening band respectively with upper sealing ring and under Side bonds or it is bolted in sealing ring;The second way is the rubber water-proof that prefabricated tube section is respectively arranged at two ends with ring-type Band, rubber fastening band is Nian Jie with prefabricated tube section L or is bolted.
3. supporting type tunnel linkage section sealing device in a kind of water according to claim 1, it is characterised in that:It is described close , using closing steel construction, the side bottom of upper sealing ring two is provided with C and enters osculum, and lower sealing ring bottom is provided with D for seal ring and lower sealing ring Enter osculum, the nominal unit weight of upper sealing ring and lower sealing ring can be adjusted by water filling draining.
4. supporting type tunnel linkage section sealing device in a kind of water according to claim 1, it is characterised in that:The column Using vertical section splicing structure, every section of column is welded by four angle steel, top junction steel plate, bottom junction steel plate and some batten plates Connect and form, be connected by screw bolts between every section of column.
5. supporting type tunnel linkage section sealing device in a kind of water according to claim 1, it is characterised in that:The connection After section has been constructed, the pretightning force of coarse-wire rope is released, the rubber strip on B steel plates is broken or come off by seizing wire, employment Work moves down the coarse-wire rope with B steel plates the same side makes pin leave U-lag, finally to lower sealing ring inner side intake-discharge pipe A water fillings pressurization makes lower sealing ring and upper sealing ring be disconnected section, and water drainage and lower sealing ring are entered from the C of upper sealing ring D enters water drainage, floats upper sealing ring and lower sealing ring, and upper sealing ring and lower sealing ring are hung out into water using lifting appliance Face.
CN201710230184.4A 2017-04-10 2017-04-10 Sealing device for underwater supporting type tunnel connecting section Active CN106917631B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710230184.4A CN106917631B (en) 2017-04-10 2017-04-10 Sealing device for underwater supporting type tunnel connecting section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710230184.4A CN106917631B (en) 2017-04-10 2017-04-10 Sealing device for underwater supporting type tunnel connecting section

Publications (2)

Publication Number Publication Date
CN106917631A true CN106917631A (en) 2017-07-04
CN106917631B CN106917631B (en) 2023-06-30

Family

ID=59567315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710230184.4A Active CN106917631B (en) 2017-04-10 2017-04-10 Sealing device for underwater supporting type tunnel connecting section

Country Status (1)

Country Link
CN (1) CN106917631B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978688A (en) * 2018-07-23 2018-12-11 中交航局第三工程有限公司 Facilitate hood type waling and the application of installing and dismounting

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0525990A (en) * 1991-07-22 1993-02-02 Takenaka Komuten Co Ltd Water stop joint structure for segment in vertical type shield method
CN101918644A (en) * 2007-12-20 2010-12-15 斯特拉顿大众项目有限责任公司 Apparatus for positioning a sinking tunnel section
CN102345465A (en) * 2011-06-21 2012-02-08 上海隧道工程股份有限公司 Hooping sealing device used in shield arrival
CN103452565A (en) * 2013-08-30 2013-12-18 中铁第四勘察设计院集团有限公司 Hermetic water-proof device for use in shield launching and receiving
CN203452807U (en) * 2013-08-30 2014-02-26 中铁第四勘察设计院集团有限公司 Waterproof sealing device for shield starting and receiving
CN103741725A (en) * 2014-01-17 2014-04-23 天津市市政工程设计研究院 Immersed tunnel final joint and shoreside dry-work construction method thereof
CN203925512U (en) * 2013-09-30 2014-11-05 曾达成 Submarine tunnel with submarine floating pipe anchored seabed frame
CN104652491A (en) * 2015-02-16 2015-05-27 中交第二航务工程局有限公司 Waterstop protection device and immersed tube tunnel structure comprising device
CN104947714A (en) * 2015-04-24 2015-09-30 中国交通建设股份有限公司 End sealing door structure for immersed tube tunnel
CN105065010A (en) * 2015-07-16 2015-11-18 中交第二航务工程局有限公司 Shield with-water receiving tunnel hole temporary sealing device and shield with-water receiving tunnel hole temporary sealing method
CN206874294U (en) * 2017-04-10 2018-01-12 中铁隧道勘测设计院有限公司 Supporting type tunnel linkage section sealing device in a kind of water

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0525990A (en) * 1991-07-22 1993-02-02 Takenaka Komuten Co Ltd Water stop joint structure for segment in vertical type shield method
CN101918644A (en) * 2007-12-20 2010-12-15 斯特拉顿大众项目有限责任公司 Apparatus for positioning a sinking tunnel section
CN102345465A (en) * 2011-06-21 2012-02-08 上海隧道工程股份有限公司 Hooping sealing device used in shield arrival
CN103452565A (en) * 2013-08-30 2013-12-18 中铁第四勘察设计院集团有限公司 Hermetic water-proof device for use in shield launching and receiving
CN203452807U (en) * 2013-08-30 2014-02-26 中铁第四勘察设计院集团有限公司 Waterproof sealing device for shield starting and receiving
CN203925512U (en) * 2013-09-30 2014-11-05 曾达成 Submarine tunnel with submarine floating pipe anchored seabed frame
CN103741725A (en) * 2014-01-17 2014-04-23 天津市市政工程设计研究院 Immersed tunnel final joint and shoreside dry-work construction method thereof
CN104652491A (en) * 2015-02-16 2015-05-27 中交第二航务工程局有限公司 Waterstop protection device and immersed tube tunnel structure comprising device
CN104947714A (en) * 2015-04-24 2015-09-30 中国交通建设股份有限公司 End sealing door structure for immersed tube tunnel
CN105065010A (en) * 2015-07-16 2015-11-18 中交第二航务工程局有限公司 Shield with-water receiving tunnel hole temporary sealing device and shield with-water receiving tunnel hole temporary sealing method
CN206874294U (en) * 2017-04-10 2018-01-12 中铁隧道勘测设计院有限公司 Supporting type tunnel linkage section sealing device in a kind of water

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
唐旭: "节段式沉管预应力孔道压浆施工技术" *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978688A (en) * 2018-07-23 2018-12-11 中交航局第三工程有限公司 Facilitate hood type waling and the application of installing and dismounting

Also Published As

Publication number Publication date
CN106917631B (en) 2023-06-30

Similar Documents

Publication Publication Date Title
CN111254981B (en) Draw formula suspension tunnel structure to one side under water
KR100438794B1 (en) Construction method for three arch excavation tunnel
CN206874310U (en) Be applicable to high-pressure rich water district tunnel decompression drainage device
CN107700475B (en) Assembled concrete underground diaphragm wall structure and construction process
CN107905811B (en) Inverted arch-free lining of foundation hollow longitudinal beam bearing arch structure
CN108301440A (en) With waterproof, the underground pipe gallery construction method of drain function
CN104847375A (en) Supporting method for small-clear-distance four-lane shallow-buried large-span tunnel
CN104847365A (en) Construction method for small-clear-distance four-lane shallow-buried large-span tunnel
CN112012763B (en) Construction method of double-layer primary support multi-arch tunnel structure
CN113774936A (en) Floating transportation, positioning and sinking construction method for double-wall steel cofferdam with pile foundation firstly and cofferdam secondly
CN206874294U (en) Supporting type tunnel linkage section sealing device in a kind of water
CN112012762B (en) Construction method of double-layer secondary lining multi-arch tunnel structure
CN106917631A (en) Supporting type tunnel linkage section sealing device in a kind of water
CN110016889B (en) Hydraulic engineering vertical water stop structure and construction method thereof
CN108005677B (en) Frame type integral tunnel bottom arch lining and drainage system thereof
CN216108621U (en) Immersed tube structure suitable for high water pressure condition
CN107974875B (en) High-speed railway foundation reinforcing structure with lossless candela function and construction method
CN110004959A (en) Concrete cofferdam rapid constructing method and template under circumstance of flowing water
CN112012761B (en) Construction method of anti-disturbance double-arch tunnel structure
CN108193695A (en) A kind of enclosure structure of foundation pit of subway station support and construction method
CN212272300U (en) Water collecting and draining structure of mine method tunnel
CN210599100U (en) There is tiny fragments of stone, coal, etc. tunnel center ditch manhole
CN102322065B (en) Bottom channel inner support of foundation pit supporting structure
CN216474591U (en) Long-distance anti-seepage culvert structure
CN219909229U (en) Tailing pond drainage tower capable of tightly installing arch bars

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190211

Address after: Room 2-3116, 88 Huanhan Road, Tianjin Free Trade Zone (Airport Economic Zone), Tianjin 300000

Applicant after: CHINA RAILWAY LIUYUAN GROUP Co.,Ltd.

Address before: 300000 Hongqiao District, Tianjin City, Bridge South East Road

Applicant before: CHINA RAILWAY TUNNEL SURVEY & DESIGN INSTITUTE Co.,Ltd.

Applicant before: CHINA RAILWAY LIUYUAN GROUP Co.,Ltd.

GR01 Patent grant
GR01 Patent grant