CN106917511A - The adjustable shoulder-pole hoisting method of long-span roofing plate - Google Patents
The adjustable shoulder-pole hoisting method of long-span roofing plate Download PDFInfo
- Publication number
- CN106917511A CN106917511A CN201510994527.5A CN201510994527A CN106917511A CN 106917511 A CN106917511 A CN 106917511A CN 201510994527 A CN201510994527 A CN 201510994527A CN 106917511 A CN106917511 A CN 106917511A
- Authority
- CN
- China
- Prior art keywords
- adjustable shoulder
- long
- roofing plate
- pole
- span roofing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Abstract
The present invention relates to roof boarding lifting, more particularly to a kind of long-span roofing plate hanging method.A kind of adjustable shoulder-pole hoisting method of long-span roofing plate, including, step one, the design width according to long-span roofing plate determines adjustable shoulder pole length;Step 2, takes some steel pipes, steel pipe headtotail, and end is provided with mantle fiber, and with screwed connection into adjustable shoulder pole;Step 3, big width roof boarding is covered on the adjustable shoulder pole of step 2, and colligation is fixed;Big width roof boarding is hung to installation site and is installed by step 4, the adjustable shoulder pole of lifting.The present invention prevents long-span roofing plate material from deforming, it is ensured that the lifting quality of material.
Description
Technical field
The present invention relates to roof boarding lifting, more particularly to a kind of long-span roofing plate hanging method.
Background technology
When the lifting of long-span roofing plate is carried out using common lift-on/lift-off system, because long-span roofing plate fixing point is very few, it is easy to cause long-span roofing plate material to deform, needs to spend artificial secondary correction after deformation;Limited by space, weather when being lifted using common lift-on/lift-off system, increased the machinery cost of hoisting process, and increase duration cost.
The content of the invention
It is contemplated that overcoming the drawbacks described above of prior art, there is provided a kind of adjustable shoulder-pole hoisting method of long-span roofing plate.The present invention prevents long-span roofing plate material from deforming, it is ensured that the lifting quality of material.
What the present invention was realized in:A kind of adjustable shoulder-pole hoisting method of long-span roofing plate, it includes,
Step one, the design width according to long-span roofing plate determines adjustable shoulder pole length;
Step 2, takes some steel pipes, steel pipe headtotail, and end is provided with mantle fiber, and with screwed connection into adjustable shoulder pole;
Step 3, big width roof boarding is covered on the adjustable shoulder pole of step 2, and colligation is fixed;
Big width roof boarding is hung to installation site and is installed by step 4, the adjustable shoulder pole of lifting.
The adjustable shoulder-pole hoisting method of described long-span roofing plate, the step 2 is additionally included on the screw thread and also covers a clip.
The fixing point of general long-span roofing plate can be fixed on described shoulder pole according to job site demand, prevent long-span roofing plate material from deforming, it is ensured that the lifting quality of material;The method of the present invention is influenceed smaller by space, weather;It is formed by connecting by the round steel pipe of different length, and job site can adjust the length of shoulder pole according to the size of roofing span of slab, and dismounting is flexible, adapts to the roof boarding of different spans.
The features such as technology of the invention has simple execute-in-place, strong applicability;It is easy to process, high recycling rate;The present invention can save material cost, machine cost;Operating efficiency is improved, each work day saves mechanical one-shift 0.26.
Specific embodiment
A kind of adjustable shoulder-pole hoisting method of long-span roofing plate, it includes,
Step one, the design width according to long-span roofing plate determines adjustable shoulder pole length;
Step 2, takes some steel pipes, steel pipe headtotail, and end is provided with mantle fiber, and with screwed connection into adjustable shoulder pole;
Step 3, big width roof boarding is covered on the adjustable shoulder pole of step 2, and colligation is fixed;
Big width roof boarding is hung to installation site and is installed by step 4, the adjustable shoulder pole of lifting.
The adjustable shoulder-pole hoisting method of described long-span roofing plate, the step 2 is additionally included on the screw thread and also covers a clip.
Claims (2)
1. a kind of adjustable shoulder-pole hoisting method of long-span roofing plate, it is characterised in that it includes,
Step one, the design width according to long-span roofing plate determines adjustable shoulder pole length;
Step 2, takes some steel pipes, steel pipe headtotail, and end is provided with mantle fiber, and with screwed connection into adjustable shoulder pole;
Step 3, big width roof boarding is covered on the adjustable shoulder pole of step 2, and colligation is fixed;
Big width roof boarding is hung to installation site and is installed by step 4, the adjustable shoulder pole of lifting.
2. the adjustable shoulder-pole hoisting method of long-span roofing plate according to claim 1, it is characterised in that the step 2 is additionally included on the screw thread and also covers a clip.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510994527.5A CN106917511A (en) | 2015-12-28 | 2015-12-28 | The adjustable shoulder-pole hoisting method of long-span roofing plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510994527.5A CN106917511A (en) | 2015-12-28 | 2015-12-28 | The adjustable shoulder-pole hoisting method of long-span roofing plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106917511A true CN106917511A (en) | 2017-07-04 |
Family
ID=59455228
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510994527.5A Pending CN106917511A (en) | 2015-12-28 | 2015-12-28 | The adjustable shoulder-pole hoisting method of long-span roofing plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106917511A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110723660A (en) * | 2019-09-05 | 2020-01-24 | 中国十七冶集团有限公司 | Novel installation method of steel structure workshop composite roof panel |
CN111535448A (en) * | 2020-05-13 | 2020-08-14 | 中国二十二冶集团有限公司 | Roof truss hoisting method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2006225208B2 (en) * | 2005-10-11 | 2009-06-04 | Mitek Holdings, Inc. | Method and system for producing a building |
CN202687735U (en) * | 2012-04-13 | 2013-01-23 | 中国化学工程第六建设有限公司 | Adjustable hoisting tool |
CN103910279A (en) * | 2014-04-24 | 2014-07-09 | 中国海洋石油总公司 | Stay bar with adjustable length |
CN203794440U (en) * | 2014-04-29 | 2014-08-27 | 马堡 | Assembled roofing color plate lifting frame |
CN204823647U (en) * | 2015-06-18 | 2015-12-02 | 天津市飞奥达风能设备有限公司 | Pipe hoist |
-
2015
- 2015-12-28 CN CN201510994527.5A patent/CN106917511A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2006225208B2 (en) * | 2005-10-11 | 2009-06-04 | Mitek Holdings, Inc. | Method and system for producing a building |
CN202687735U (en) * | 2012-04-13 | 2013-01-23 | 中国化学工程第六建设有限公司 | Adjustable hoisting tool |
CN103910279A (en) * | 2014-04-24 | 2014-07-09 | 中国海洋石油总公司 | Stay bar with adjustable length |
CN203794440U (en) * | 2014-04-29 | 2014-08-27 | 马堡 | Assembled roofing color plate lifting frame |
CN204823647U (en) * | 2015-06-18 | 2015-12-02 | 天津市飞奥达风能设备有限公司 | Pipe hoist |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110723660A (en) * | 2019-09-05 | 2020-01-24 | 中国十七冶集团有限公司 | Novel installation method of steel structure workshop composite roof panel |
CN111535448A (en) * | 2020-05-13 | 2020-08-14 | 中国二十二冶集团有限公司 | Roof truss hoisting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205100547U (en) | A stupefied device of aluminum alloy template back of body for shear force wall | |
CN106917511A (en) | The adjustable shoulder-pole hoisting method of long-span roofing plate | |
CN204081445U (en) | To encorbelment i iron anchor device | |
CN202717501U (en) | Pile foundation reinforcement cage lifting ring | |
CN204850414U (en) | Shaped steel of encorbelmenting draws wire rope instrument formula anchor to one side | |
CN202742509U (en) | Tension device for prestress tubular pile or prestress square pile | |
CN103089010B (en) | The suspension bracket construction equipment of topping at the bottom of a kind of alternative reinforced concrete beam and method | |
CN204299162U (en) | To encorbelment steel I-beam anchor structure | |
CN202702389U (en) | Circular concrete electric pole prestress external tension device | |
CN204001980U (en) | The steel structure enclosure wall that a kind of building site is special | |
CN203923907U (en) | The pre-integer unit cable strand of main rope of suspension bridge | |
CN105019669A (en) | U-shaped suspension ring structure | |
CN204299142U (en) | A kind of unloading-structure of builder's jack | |
CN104453045B (en) | Separate prefabricated truss frame floor bearing plate and construction method thereof | |
CN204238443U (en) | A kind of detachable suspension column fastening devices | |
CN204781520U (en) | Detachable die block steel bar truss building carrier plate | |
CN203775121U (en) | Universal metal roof fixture | |
CN204212302U (en) | A kind of hollowcore slab light pipe float Structure | |
CN203684100U (en) | Upper and lower reinforcement connection device in bridge pier column reinforcement cage | |
CN204040316U (en) | Reinforcing steel bar connecting device | |
CN204879048U (en) | Novel pipeline support | |
CN106329437B (en) | The adjustable distribution network overhead line cross arm support devices of 10kV and application method | |
CN104358355A (en) | Detachable column base fixing device and construction method thereof | |
CN204081504U (en) | A kind of telescopic bar for building | |
CN106147798B (en) | Coke oven flue elbow installation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170704 |
|
RJ01 | Rejection of invention patent application after publication |