CN106917412A - 紧邻河海超深近距双沉井下沉施工方法 - Google Patents
紧邻河海超深近距双沉井下沉施工方法 Download PDFInfo
- Publication number
- CN106917412A CN106917412A CN201710160820.0A CN201710160820A CN106917412A CN 106917412 A CN106917412 A CN 106917412A CN 201710160820 A CN201710160820 A CN 201710160820A CN 106917412 A CN106917412 A CN 106917412A
- Authority
- CN
- China
- Prior art keywords
- sinking
- well
- open caisson
- ultra
- caisson
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D23/00—Caissons; Construction or placing of caissons
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D23/00—Caissons; Construction or placing of caissons
- E02D23/08—Lowering or sinking caissons
Abstract
本发明涉及一种紧邻河海超深近距双沉井下沉施工方法,具体步骤是:沿两井中心连线中垂线位置,在两井之间设置高压旋喷桩重力挡土墙;在两沉井四周布置深井进行降水,隔断沉井下沉需穿越的地下水层;两沉井制作与下沉同步施工,协调下沉,减小相互影响;在沉井下沉期间;根据侧壁摩阻力、侧壁压力大小变化情况,调整各井格内泥面高差或采取定向气幕减阻措施;经计算满足沉井接高要求后回填砂土,完成接高;根据沉井下沉所穿越的土层情况进行计算,采取相应的助沉和纠偏措施,使沉井平稳下沉至设计深度,完成沉井封底。本发明能解决超深近距双沉井互相影响大,易造成沉井出现位移、倾斜等问题,同时能优化临江场地丰富地下水情况下的沉井下沉方式。
Description
技术领域
本发明涉及一种沉井下沉施工方法,尤其涉及一种紧邻河海超深近距双沉井高效安全下沉施工方法。
背景技术
沉井是修筑地下结构和深基础的一种结构形式。是先在地表制作成一个井筒状的结构物,然后在井壁的围护下通过从井内不断挖土,使沉井在自重及上部荷载作用下克服井壁与土层间的侧面阻力和刃脚下的正面阻力逐渐下沉,随着井筒下沉,在地面相应接长井壁,如此周而复始,直至沉至设计深度,达到设计标高后,再进行封底。它的特点是不需要大开挖,占地面积小,不需要特殊专用设备,操作简便,投资省,且稳定可靠,在各类地下空间工程中既可作结构,又可作围护结构,其内部空间可得到充分利用。
最近年来,沉井向着大深度大尺寸发展,在许多特大工程项目中显示了它的优越性。沉井的理论及施工技术虽然取得了长足的发展,且对沉井的相关研究也甚多,但对沿江沿海边超近距相邻超深沉井相关的研究和工程经验相对甚少,在复杂地质条件下紧邻河海且两个沉井相邻的超深沉井施工过程中,易出现:两井相互影响较大,造成沉井出现位移、倾斜现象;制作接高时自重较重,接高时稳定性较差,出现自沉现象,分几次接高、分几次下沉牵涉到施工成本、施工效率甚至能否顺利安全下沉等问题。因此,需要一种高效、安全的紧邻河海超深近距双沉井下沉施工方法显得尤为重要。
发明内容
本发明是要解决紧邻河海超深近距双沉井下沉施工中,易出现位移、倾斜、冲泥难、下沉速度慢等问题,而提供一种高效、安全的紧邻河海超深近距双沉井下沉施工方法,用于解决超深近距双沉井互相影响大,易造成沉井出现位移、倾斜等问题,同时能优化临江场地丰富地下水情况下的沉井下沉方式。
为实现上述目的,本发明的技术方案是:一种紧邻河海超深近距双沉井下沉施工方法,其特征在于,具体步骤是:
(1)沿两井中心连线中垂线位置,在两井之间设置高压旋喷桩重力挡土墙;
(2)在两沉井四周布置深井进行降水,隔断沉井下沉需穿越的地下水层;
(3)两沉井制作与下沉同步施工,协调下沉,减小相互影响;
(4)在沉井下沉期间,跟踪检查深井抽水情况并根据下沉深度,同步保持不间断降水;并根据侧壁摩阻力、侧壁压力大小变化情况,调整各井格内泥面高差或采取定向气幕减阻措施;
(5)经计算满足沉井接高要求后回填砂土,完成接高;
(6)根据沉井下沉所穿越的土层情况进行计算,采取相应的助沉和纠偏措施,使沉井平稳下沉;
(7)下沉至设计深度,完成沉井封底。
当降水井数量及深度不能满降水要求,沉井下沉过程出现流砂或管涌现象时,需及时增加降水井的数量。在沉井制作过程中,井壁内预埋压浆管路及气幕管路。当超深沉井“细长比”大时,在下沉前30m深度内,沉井下沉不掏底梁、不掏刃脚,使沉井均匀受力下沉。在上下两层软硬不均土体交界位置,保持软土一侧的土塞或少冲泥,使沉井总体受力均匀。
本发明的有益效果是:本发明提供的一种高效、安全的紧邻河海超深近距双沉井下沉施工方法,有效解决了紧邻河海超深近距双沉井下沉施工过程中,易出现位移、倾斜、冲泥难、下沉速度慢等问题,确保紧邻河海超深近距双沉井工程高效顺利完成。
附图说明
图1是本发明的紧邻河海超深近距双沉井下沉施工方法流程图。
具体实施方式
下面结合具体实施实例,进一步阐述本发明。应理解,这些实施实例仅用于说明本发明而不用于限制本发明的范围。此外应理解,在阅读了本发明讲授的内容之后,本领域技术人员可以对本发明作各种改动或修改,这些等价形式同样落于本申请所附权利要求书所限定的范围。
两靠近江河的沉井外壁间距较小,且都为超深沉井,穿越土层多,地质条件复杂,制作接高时自重较重,接高时稳定性较差,易出现自沉现象,分几次接高、分几次下沉牵涉到施工成本、施工效率甚至能否顺利安全下沉的问题。
采用本发明的紧邻河海超深近距双沉井下沉施工方法进行沉井施工,具体步骤(图1所示)如下:
(1)沿两井中心连线中垂线位置,在两井之间设置高压旋喷桩重力挡土墙;
(2)在两沉井四周布置深井进行降水,隔断沉井下沉需穿越的地下水层;
(3)两沉井制作与下沉同步施工,协调下沉,减小相互影响;
(4)在沉井下沉期间,跟踪检查深井抽水情况并根据下沉深度,同步保持不间断降水;并根据侧壁摩阻力、侧壁压力大小变化情况,调整各井格内泥面高差或采取定向气幕减阻措施;
(5)经计算满足沉井接高要求后回填砂土,完成接高;
(6)根据沉井下沉所穿越的土层情况进行计算,采取相应的助沉和纠偏措施,使沉井平稳下沉;
(7)下沉至设计深度,完成沉井封底。
上述施工过程中:当降水井数量及深度不能满降水要求,沉井下沉过程出现流砂或管涌现象时,需及时增加降水井的数量。在沉井制作过程中,井壁内预埋压浆管路及气幕管路。当超深沉井“细长比”大时,在下沉前30m深度内,沉井下沉不掏底梁、不掏刃脚,使沉井均匀受力下沉。在上下两层软硬不均土体交界位置,保持软土一侧的土塞或少冲泥,使沉井总体受力均匀。
本发明应用实施实例:
某顶管工作井项目,两个沉井相邻,其外壁间距不足11m,且都为超深沉井,总高度在43m以上,沉井穿越土层多,地质条件复杂。制作接高时自重较重,接高时稳定性较差,易出现自沉现象,分几次接高、分几次下沉牵涉到施工成本、施工效率甚至能否顺利安全下沉的问题。
采用本发明进行沉井施工,通过现场测试,监测井壁摩阻力、沉井结构内力、侧壁土压力、刃脚土压力变化,确认了下沉过程中沉井结构受力和外部水土荷载的变化量在安全值内,保证了工程的顺利安全。
Claims (5)
1.一种紧邻河海超深近距双沉井下沉施工方法,其特征在于,具体步骤是:
(1)沿两井中心连线中垂线位置,在两井之间设置高压旋喷桩重力挡土墙;
(2)在两沉井四周布置深井进行降水,隔断沉井下沉需穿越的地下水层;
(3)两沉井制作与下沉同步施工,协调下沉,减小相互影响;
(4)在沉井下沉期间,跟踪检查深井抽水情况并根据下沉深度,同步保持不间断降水;并根据侧壁摩阻力、侧壁压力大小变化情况,调整各井格内泥面高差或采取定向气幕减阻措施;
(5)经计算满足沉井接高要求后回填砂土,完成接高;
(6)根据沉井下沉所穿越的土层情况进行计算,采取相应的助沉和纠偏措施,使沉井平稳下沉;
(7)下沉至设计深度,完成沉井封底。
2.根据权利要求1所述的紧邻河海超深近距双沉井下沉施工方法,其特征在于:当降水井数量及深度不能满降水要求,沉井下沉过程出现流砂或管涌现象时,需及时增加降水井的数量。
3.根据权利要求1所述的紧邻河海超深近距双沉井下沉施工方法,其特征在于:在沉井制作过程中,井壁内预埋压浆管路及气幕管路。
4.根据权利要求1所述的紧邻河海超深近距双沉井下沉施工方法,其特征在于:当超深沉井“细长比”大时,在下沉前30m深度内,沉井下沉不掏底梁、不掏刃脚,使沉井均匀受力下沉。
5.根据权利要求1所述的紧邻河海超深近距双沉井下沉施工方法,其特征在于:在上下两层软硬不均土体交界位置,保持软土一侧的土塞或少冲泥,使沉井总体受力均匀。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710160820.0A CN106917412A (zh) | 2017-03-17 | 2017-03-17 | 紧邻河海超深近距双沉井下沉施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710160820.0A CN106917412A (zh) | 2017-03-17 | 2017-03-17 | 紧邻河海超深近距双沉井下沉施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106917412A true CN106917412A (zh) | 2017-07-04 |
Family
ID=59461226
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710160820.0A Pending CN106917412A (zh) | 2017-03-17 | 2017-03-17 | 紧邻河海超深近距双沉井下沉施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106917412A (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102454167A (zh) * | 2010-10-21 | 2012-05-16 | 五冶集团上海有限公司 | 大型超深沉井的施工方法 |
CN103195158A (zh) * | 2013-04-03 | 2013-07-10 | 济南城建集团有限公司 | 一种市政排水管线泥水平衡顶管施工方法 |
CN104695457A (zh) * | 2015-03-27 | 2015-06-10 | 济南轨道交通集团有限公司 | 一种新型竖井水平旋喷桩基坑封底隔水层的施工方法 |
US20150162198A1 (en) * | 2013-06-10 | 2015-06-11 | Taiwan Semiconductor Manufacturing Company, Ltd. | Semiconductor device having a double deep well and method of manufacturing same |
-
2017
- 2017-03-17 CN CN201710160820.0A patent/CN106917412A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102454167A (zh) * | 2010-10-21 | 2012-05-16 | 五冶集团上海有限公司 | 大型超深沉井的施工方法 |
CN103195158A (zh) * | 2013-04-03 | 2013-07-10 | 济南城建集团有限公司 | 一种市政排水管线泥水平衡顶管施工方法 |
US20150162198A1 (en) * | 2013-06-10 | 2015-06-11 | Taiwan Semiconductor Manufacturing Company, Ltd. | Semiconductor device having a double deep well and method of manufacturing same |
CN104695457A (zh) * | 2015-03-27 | 2015-06-10 | 济南轨道交通集团有限公司 | 一种新型竖井水平旋喷桩基坑封底隔水层的施工方法 |
Non-Patent Citations (1)
Title |
---|
严国仙;黄斌;蒯军华: "大型相邻双沉井下沉施工技术", 《 施工机械化新技术交流会论文集(第九辑)》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103643918B (zh) | 一种针对奥陶系灰岩矿区的寻找及防止矿井渗水的方法 | |
CN108090291B (zh) | 一种预测承压水悬挂式帷幕基坑涌水量的计算方法 | |
CN105421461B (zh) | 土岩地质条件下邻近既有隧道的建筑基坑开挖工法 | |
CN103924602B (zh) | 深厚软土基坑施工方法 | |
CN106703059B (zh) | 沉井十字形拉槽施工方法 | |
CN111914333A (zh) | 一种考虑既有建筑影响的饱和土盾构施工引起土体变形计算方法 | |
CN207143981U (zh) | 第三系富水半成岩砂岩段地铁车站基坑排水结构 | |
CN111931372A (zh) | 一种考虑多因素的饱和土小曲率盾构施工引起土体变形预测方法 | |
CN106096162A (zh) | 一种确定盾构土仓压力的方法及其数学模型和构建方法 | |
CN108867673A (zh) | 一种基于抽水帷幕的基坑中地下水治理方法 | |
CN101845815A (zh) | 一种软土地层含承压水基坑突涌塑性破坏计算处理方法 | |
CN203939036U (zh) | 一种适用于河道的钢板桩围堰结构 | |
Calin et al. | Dewatering system of a deep of excavation in urban area–Bucharest case study | |
Ormann et al. | Numerical analysis of curved embankment of an upstream tailings dam | |
CN107700434A (zh) | 一种拱形格栅式钢筋混凝土泥石流拦挡坝及其建筑方法 | |
CN104727289B (zh) | 一种控制多层含水层越流补给保护周围环境的施工方法 | |
CN104727325B (zh) | 一种海涂围垦用海堤的建造方法 | |
CN103806444A (zh) | 一种软土层旋挖桩施工方法 | |
CN106917412A (zh) | 紧邻河海超深近距双沉井下沉施工方法 | |
CN104775444B (zh) | 一种用于潮湿环境保护考古现场土遗址降排水的方法 | |
CN203475453U (zh) | 桥梁深埋式承台帷幕结构 | |
CN109881697A (zh) | 一种沉井松土检侧压下沉方法 | |
CN105951864A (zh) | 一种沉井制作引起的软土地基沉降防治方法 | |
Li et al. | Evolution Characteristic Analysis of Pressure-arch of a Double-arch Tunnel in Water-rich Strata | |
CN206034466U (zh) | 一种应用于建筑施工的基坑或基槽降水系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170704 |
|
RJ01 | Rejection of invention patent application after publication |