CN106917408A CN201710092909.8A CN201710092909A CN106917408A CN 106917408 A CN106917408 A CN 106917408A CN 201710092909 A CN201710092909 A CN 201710092909A CN 106917408 A CN106917408 A CN 106917408A
Authority
CN
China
Prior art keywords
building stones
area
concrete
rhone
sprinkling irrigation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710092909.8A
Other languages
Chinese (zh)
Other versions
CN106917408B (en
Inventor
刘学应
朱海东
邬如彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Water Resources and Electric Power
Original Assignee
Zhejiang University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Water Resources and Electric Power filed Critical Zhejiang University of Water Resources and Electric Power
Priority to CN201710092909.8A priority Critical patent/CN106917408B/en
Publication of CN106917408A publication Critical patent/CN106917408A/en
Application granted granted Critical
Publication of CN106917408B publication Critical patent/CN106917408B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/70Grouts, e.g. injection mixtures for cables for prestressed concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Ceramic Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Inorganic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of slope shoulder building stones gap sprinkling irrigation concrete construction method, comprise the following steps:(a) slope shoulder building stones region division;Plastic base plate laying in (b) second building stones area;C () cleans rhone;D building stones are put in () second building stones area;Sprayed between building stones gap in (e) second building stones area concrete;F building stones are put in () first building stones area;Sprayed between building stones gap in (g) first building stones area concrete;H () the second building stones area and the first building stones area conserve.The present invention carries out sprinkling irrigation concrete for slope Jian Fenliangge building stones area, second building stones area carries out sprinkling irrigation concrete in metalling, period can be in rhone injected clear water, increase the consolidation effect to metalling, first building stones area carries out sprinkling irrigation concrete in rock layer, to rock layer consolidation effect so that the second building stones area and the first building stones area have some strength, certain thickness mixture, so that slope shoulder has protection effect, the erosion of wave at the incoming tide can be resisted.

Description

A kind of slope shoulder building stones gap sprinkling irrigation concrete construction method
Technical field
The invention belongs to slope shoulder reinforcement technique field, and in particular to a kind of slope shoulder building stones gap sprinkling irrigation concrete construction method.
Background technology
In civil engineering production practices activity, with the construction and development of the engineerings such as railway, highway, reservoir area or place, Substantial amounts of slope project technical task is relate to, engineers and technicians actively apply relevant engineering geology, rock mass mechanics, ground The knowledge and achievement of the subject such as engineering science and soil mechanics, have accumulated abundant slope project experience, at the aspect of theory and practice two All achieve significant progress and development.
In recent years, extend and develop to mountain area with expressway construction, because its industrial grade is higher, and China mountain Area, difficult coastal area orographic condition, geologic structure complexity, geologic setting are fragile, and evaluation is very universal, side slope work Cheng Wenti becomes increasingly conspicuous.Particularly in some coastal areas, there is more strict demand for the structure of side slope, it is desirable to be able to support The wave of imperial some strength.Existing slope structure is general, it is impossible to the larger situation of enough storm resistings, larger when stormy waves is run into Easily occur caving in during situation, so needing to optimize domatic structure.
The content of the invention
Present invention aim at above-mentioned technical problem present in solution prior art, there is provided a kind of slope shoulder building stones gap spray Concrete construction method is filled, sprinkling irrigation concrete is carried out for slope Jian Fenliangge building stones area, the second building stones area carries out sprinkling irrigation concrete, phase in metalling Between can be in rhone injected clear water, clear water gradually penetrates into plastic base plate, keeps the metalling moistening on plastic base plate, is conducive to The final setting time of concrete in proper extension metalling, increases the consolidation effect to metalling, and the first building stones area is carried out in rock layer Sprinkling irrigation concrete, to rock layer consolidation effect so that the second building stones area and the first building stones area have some strength, certain thickness mixing Body so that slope shoulder has protection effect, can resist the erosion of wave at the incoming tide.
In order to solve the above-mentioned technical problem, the present invention is adopted the following technical scheme that:
A kind of slope shoulder building stones gap sprinkling irrigation concrete construction method, it is characterised in that comprise the following steps:
(a) slope shoulder building stones region division:Whole slope shoulder is divided into the first building stones area and the second building stones area, the first of division Near riverbank, away from riverbank, the first building stones area is laid using stone in the second building stones area of division, the second building stones area in building stones area Laid using rubble, then the zone line in the first building stones area and the second building stones area excavates built-in groove, then in built-in groove In be downwardly into baffle plate, then backfill soil in built-in groove, and using being manually compacted;
Plastic base plate laying in (b) second building stones area:First the boundary in the second building stones area sets fixed mount, then in fixation Batten is laterally shelved on frame, and mutually splicing is fixed between adjacent two battens, and then plastic base plate is put on rhone, then Junction injection fluid sealant between plastic base plate and rhone, then slides on batten rhone, in rhone Mounting hole matches with batten, and the plastic base plate on rhone is bonded to each other, and U-shaped wooden unit is then snapped on batten, U-shaped Wooden unit is arranged on the both sides of rhone, then hammers into iron nail on U-shaped wooden unit, U-shaped wooden unit is fixed on the both sides of rhone, then Soil is inserted at the lower section of plastic base plate;
C () cleans rhone;
D building stones are put in () second building stones area:Rubble is transported to by job site using transport vehicle, then manually rubble inclines It is poured on plastic base plate, and by broken stone leveling, first time rubble puts height on the basis of the bottom of batten, when rubble puts height Degree is reached when at the bottom of batten, in rhone injected clear water, is then carried out on the metalling that first time puts second again Rubble is put, and batten is embedded in metalling, and the height of metalling is on the basis of the top of rhone;
Sprayed between building stones gap in (e) second building stones area concrete:Selection cement, water, sand, rubble, alkali-free quick-coagulant and diminishing Agent is matched according to setting ratio, then stirs 5~8min with mixer, is downwardly into metalling before sprinkling irrigation concrete perpendicular Bar, then the mark of sprinkling irrigation concrete thickness is made of red paint on montant, then the concrete after stirring is injected into spraying machine, will spray At nozzle alignment rubble gap on machine, 0~10cm of gap, nozzle and vertical, the nozzle in course of injection by spray plane holding are stretched into Moved along rubble gap, the top-down direction of spraying machine carries out sprinkling irrigation concrete, the width control system of jet-action section 1.5~ 2.0m, sprayed between the second building stones area medium stone gap concrete when, constantly toward clear water is entered in rhone, more than plastic base plate Metalling keep moistening;
F building stones are put in () first building stones area:Stone is transported to by job site using transport vehicle, is operated with excavator, Stone is flattened and is compacted;
Sprayed between building stones gap in (g) first building stones area concrete:Select the concrete configured in the second building stones area to be sprayed, then use Mixer stirs 6~10min, is downwardly into montant before sprinkling irrigation concrete in rock layer, then do sprinkling irrigation with red paint on montant , then be injected into the concrete after stirring in spraying machine by the mark of concrete thickness, by nozzle and by spray plane distance controlling 0.2~ 0.5m, nozzle and is kept vertical by spray plane, and nozzle is moved along helical trajectory, and the top-down direction of spraying machine is sprayed Concrete, the width control system of jet-action section is in 2.0~2.5m.
H () the second building stones area and the first building stones area conserve.
Further, in step (a), during the shoulder building stones region division of slope, in the first building stones area and the second building stones area Peripheral 5m at build guard rail, and construction bulletin is set, it is to avoid in work progress to construction after mixed structure destruction, energy Play a part of job site protection.
Further, in step (b), the mutually fixed operation of splicing is to be opened in the bottom of batten between adjacent two battens If groove, then adjacent two battens are mutually spliced, the groove of adjacent two battens is mutually aligned, then in adjacent two battens Groove between be encased inside the lumps of wood, the bottom surface of the lumps of wood is mutually flush with the bottom surface of batten, and iron nail is then hammered on the lumps of wood, realizes phase Mutually splicing is fixed between adjacent two battens.
Further, in step (c), during rhone is cleaned, shower nozzle is first kept into horizontality, shower nozzle is along row The inwall of tank is cleaned, and coordinates banister brush to be scrubbed in cleaning process, then shower nozzle kept into plumbness, shower nozzle towards The apopore of rhone is cleaned, and the scavenging period of each rhone is maintained at 5~10min so that rhone water outlet is smooth.
Further, in step (e), the match ratio of cement, water, sand, rubble, alkali-free quick-coagulant and water reducer is cement: Water:Sand:Rubble:Alkali-free quick-coagulant:Water reducer=1:0.58:2.45:2.41:0.05:0.01.The concrete of so proportioning can be shorter Higher-strength is obtained in time, typically final set is just can reach in 30~40min, and compression strength is high so that after sprinkling irrigation concrete Mixed structure can resist the erosion of wave at the incoming tide.
Further, in step (h), after the concrete final set sprayed in the second building stones area and the first building stones area, in the second building stones The surrounding in area and the first building stones area pulls out protection rope, then starts watering and is conserved, and curing time is no less than 7d, and raising is applied Working medium amount.
The present invention is by adopting the above-described technical solution, have the advantages that:
Whole slope shoulder is divided into the first building stones area and the second building stones area by the present invention, and the first building stones area of division is near river Bank, the second building stones area of division is away from riverbank.The periphery in the second building stones area is mainly used in planting trees, promotes ecodevelopment, because This selects rubble as the basic unit in the second building stones area.When carrying out sprinkling irrigation concrete in the metalling in the second building stones area, due to metalling Particle it is small so that the moisture in metalling is easily lost in, and the second building stones area is away from riverbank, therefore plastic base plate is put into Onto rhone, then the junction injection fluid sealant between plastic base plate and rhone, rhone is then slided into batten On, rubble is placed on plastic base plate, when sprinkling irrigation concrete between the building stones gap in the second building stones area, according to concrete of being sprayed on montant The mark of thickness, the concrete after stirring is injected into spraying machine, at the nozzle alignment rubble gap on spraying machine, stretches into gap 0~10cm, nozzle and is kept vertical by spray plane, and nozzle is moved along rubble gap in course of injection, and spraying machine is top-down Direction carries out sprinkling irrigation concrete, and the width control system of jet-action section is sprayed in 1.5~2.0m between the second building stones area medium stone gap During concrete, constantly toward clear water is entered in rhone, clear water gradually penetrates into plastic base plate, keeps the metalling on plastic base plate wet Profit, is conducive to the final setting time of concrete in proper extension metalling, increases the consolidation effect to metalling.
The erosion for being mainly used in resisting wave at the incoming tide in the first building stones area, therefore selection stone is used as the second building stones area Basic unit.When carrying out sprinkling irrigation concrete in the metalling in the second building stones area, because gap is larger between stone, and first for dividing Building stones area is moistened near riverbank without injected clear water.First building stones area carries out sprinkling irrigation concrete in rock layer, with stirring Machine stirs 6~10min, is downwardly into montant before sprinkling irrigation concrete in rock layer, then do sprinkling irrigation concrete thickness with red paint on montant , then be injected into the concrete after stirring in spraying machine by the mark of degree, by nozzle and by spray plane distance controlling in 0.2~0.5m, Nozzle and kept vertical by spray plane, nozzle is moved along helical trajectory, and the top-down direction of spraying machine carries out sprinkling irrigation concrete, injection The width control system of section is acted in 2.0~2.5m, to rock layer consolidation effect.
The second building stones area and the first building stones area after present invention construction have some strength, certain thickness mixture, make Obtaining slope shoulder has protection effect, can resist the erosion of wave at the incoming tide.
Brief description of the drawings
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of plastic base plate laying in the present invention;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the structural representation of rhone in the present invention;
Fig. 4 is the structural representation of plastic base plate in the present invention;
Fig. 5 is a kind of flow chart of slope shoulder building stones gap sprinkling irrigation concrete construction method of the invention.
Specific embodiment
As shown in Figures 1 to 5, it is a kind of slope shoulder building stones gap sprinkling irrigation concrete construction method of the invention, comprises the following steps:
(a) slope shoulder building stones region division:Between region division, can clear up domatic, domatic loose is floated Stone and rock slag remove it is clean, will be domatic on barrier remove, then mended with stone and build cavity, then using reverse shovel grab pair Treating the surface of spray plane building stones carries out smooth compacting, improves the domatic degree of packing to be painted, is easy to the later stage to domatic treatment and construction.
Whole slope shoulder is divided into the first building stones area and the second building stones area, the first building stones area of division divides near riverbank The second building stones area away from riverbank.During the shoulder building stones region division of slope, in the first building stones area and the periphery in the second building stones area Guard rail is built at 5m, and construction bulletin is set, it is to avoid in work progress to construction after mixed structure destruction, can play and apply The effect of work scene protection.First building stones area is laid using stone, and the second building stones area is laid using rubble.Then exist The zone line in the first building stones area and the second building stones area excavates built-in groove, then baffle plate is downwardly into built-in groove, then pre- Bury and backfill in groove soil, and using being manually compacted.
B plastic base plate 3 is laid in () second building stones area:First the boundary in the second building stones area sets fixed mount, then solid Determine laterally to shelve batten 1 on frame, mutually splicing is fixed between adjacent two battens 1.Mutually splicing is solid between adjacent two battens 1 Fixed operation is to open up groove in the bottom of batten 1, then adjacent two battens 1 are mutually spliced, by the recessed of adjacent two battens 1 Groove is mutually aligned, then the lumps of wood is encased inside between the groove of adjacent two battens 1, and the bottom surface of the lumps of wood is mutually neat with the bottom surface of batten 1 It is flat, iron nail is then hammered on the lumps of wood, mutually splicing is fixed between realizing adjacent two battens 1.Then plastic base plate 3 is put into Onto rhone 2, then the junction injection fluid sealant between plastic base plate 3 and rhone 2, then rhone 2 is slided into On batten 1, the mounting hole in rhone 2 matches with batten 1, and the plastic base plate 3 on rhone 2 is bonded to each other.Then U-shaped wooden unit 4 is snapped on batten 1, U-shaped wooden unit 4 is arranged on the both sides of rhone 2, then hammers into iron nail on U-shaped wooden unit 4, by U Type wooden unit 4 is fixed on the both sides of rhone 2, then inserts soil at the lower section of plastic base plate 3.
C () cleans rhone 2:Shower nozzle is first kept into horizontality, shower nozzle is cleaned along the inwall of rhone 2, clearly Banister brush is coordinated to be scrubbed during washing.Shower nozzle is kept into plumbness again, shower nozzle is carried out clearly towards the apopore of rhone 2 Wash, the scavenging period of each rhone 2 is maintained at 5~10min so that the water outlet of rhone 2 is smooth.
D building stones are put in () second building stones area:Rubble is transported to by job site using transport vehicle, then manually rubble inclines It is poured on plastic base plate 3, and by broken stone leveling, first time rubble puts height on the basis of the bottom of batten 1.When rubble is put Highly reach when at the bottom of batten 1, in the injected clear water of rhone 2.Then the is carried out on the metalling put of first time again Secondary rubble is put, and batten 1 is embedded in metalling, and the height of metalling is on the basis of the top of rhone 2.
Sprayed between building stones gap in (e) second building stones area concrete:Selection cement, water, sand, rubble, alkali-free quick-coagulant and diminishing Agent is matched according to setting ratio, and sand is middle sand, then stirs 5~8min with mixer.Cement, water, sand, rubble, alkali-free speed The match ratio of solidifying agent and water reducer is cement:Water:Sand:Rubble:Alkali-free quick-coagulant:Water reducer=1:0.58:2.45:2.41: 0.05:0.01.The concrete of so proportioning can within a short period of time obtain higher-strength, typically just can reach final set in 30~40min, And compression strength is high so that the mixed structure after sprinkling irrigation concrete can resist the erosion of wave at the incoming tide.Broken before sprinkling irrigation concrete Montant is downwardly into rock layers, then makes the mark of sprinkling irrigation concrete thickness of red paint on montant.Then the concrete after stirring is injected To in spraying machine, at the nozzle alignment rubble gap on spraying machine, 0~10cm of gap is stretched into, nozzle and kept hanging down by spray plane Directly, nozzle is moved along rubble gap in course of injection, and the top-down direction of spraying machine carries out sprinkling irrigation concrete, jet-action section Width control system in 1.5~2.0m.Sprayed between the second building stones area medium stone gap concrete when, constantly toward entering in rhone 2 Clear water, moistening is kept by the metalling of plastic base plate more than 3.
F building stones are put in () first building stones area:Stone is transported to by job site using transport vehicle, is operated with excavator, Stone is flattened and is compacted.
Sprayed between building stones gap in (g) first building stones area concrete:Select the concrete configured in the second building stones area to be sprayed, then use Mixer stirs 6~10min.Montant is downwardly into before sprinkling irrigation concrete in rock layer, then sprinkling irrigation is done with red paint on montant The mark of concrete thickness.Then the concrete after stirring is injected into spraying machine, by nozzle and by spray plane distance controlling 0.2~ 0.5m, nozzle and is kept vertical by spray plane, and nozzle is moved along helical trajectory, and the top-down direction of spraying machine is sprayed Concrete, the width control system of jet-action section is in 2.0~2.5m.
H () the second building stones area and the first building stones area conserve:After the concrete final set sprayed in second building stones area and the first building stones area, Surrounding in the second building stones area and the first building stones area pulls out protection rope, then starts watering and is conserved, and curing time is many In 7d, construction quality is improved.
Whole slope shoulder is divided into the first building stones area and the second building stones area by the present invention, and the first building stones area of division is near river Bank, the second building stones area of division is away from riverbank.The periphery in the second building stones area is mainly used in planting trees, promotes ecodevelopment, because This selects rubble as the basic unit in the second building stones area.When carrying out sprinkling irrigation concrete in the metalling in the second building stones area, due to metalling Particle it is small so that the moisture in metalling is easily lost in, and the second building stones area is away from riverbank, therefore plastic base plate 3 is put Enter onto rhone 2, then the junction injection fluid sealant between plastic base plate 3 and rhone 2, then rhone 2 is slipped into Onto batten 1, rubble is placed on plastic base plate 3, when sprinkling irrigation concrete between the building stones gap in the second building stones area, according to montant The mark of upper sprinkling irrigation concrete thickness, the concrete after stirring is injected into spraying machine, at the nozzle alignment rubble gap on spraying machine, Stretch into 0~10cm of gap, nozzle and kept vertical by spray plane, nozzle is moved along rubble gap in course of injection, spraying machine from Direction under above carries out sprinkling irrigation concrete, and the width control system of jet-action section is stitched in 1.5~2.0m in the second building stones area medium stone Sprayed between gap concrete when, constantly toward clear water is entered in rhone 2, clear water gradually penetrates into plastic base plate 3, keeps plastic base plate 3 On metalling moistening, be conducive to the final setting time of concrete in proper extension metalling, increase the consolidation effect to metalling.
The erosion for being mainly used in resisting wave at the incoming tide in the first building stones area, therefore selection stone is used as the second building stones area Basic unit.When carrying out sprinkling irrigation concrete in the metalling in the second building stones area, because gap is larger between stone, and first for dividing Building stones area is moistened near riverbank without injected clear water.First building stones area carries out sprinkling irrigation concrete in rock layer, with stirring Machine stirs 6~10min, is downwardly into montant before sprinkling irrigation concrete in rock layer, then do sprinkling irrigation concrete thickness with red paint on montant , then be injected into the concrete after stirring in spraying machine by the mark of degree, by nozzle and by spray plane distance controlling in 0.2~0.5m, Nozzle and kept vertical by spray plane, nozzle is moved along helical trajectory, and the top-down direction of spraying machine carries out sprinkling irrigation concrete, injection The width control system of section is acted in 2.0~2.5m, to rock layer consolidation effect.
The second building stones area and the first building stones area after present invention construction have some strength, certain thickness mixture, make Obtaining slope shoulder has protection effect, can resist the erosion of wave at the incoming tide.
Specific embodiment of the invention is these are only, but technical characteristic of the invention is not limited thereto.It is any with this hair It is to solve essentially identical technical problem based on bright, realizes essentially identical technique effect, done simple change, etc. With replacement or modification etc., all it is covered by among protection scope of the present invention.

Claims (6)

1. a kind of slope shoulder building stones gap sprinkling irrigation concrete construction method, it is characterised in that comprise the following steps:
(a) slope shoulder building stones region division:Whole slope shoulder is divided into the first building stones area and the second building stones area, the first building stones of division Near riverbank, away from riverbank, the first building stones area is laid using stone in the second building stones area of division in area, and the second building stones area uses Rubble is laid, then the first building stones area and the second building stones area zone line excavate built-in groove, then in built-in groove to Lower insertion baffle plate, then backfills soil in built-in groove, and use is manually compacted;
Plastic base plate laying in (b) second building stones area:First the boundary in the second building stones area sets fixed mount, then on fixed mount Batten laterally is shelved, and mutually splicing is fixed between adjacent two battens, and then plastic base plate is put on rhone, then in modeling Junction injection fluid sealant between backing strap plate and rhone, then slides on batten rhone, the installation in rhone Hole matches with batten, and the plastic base plate on rhone is bonded to each other, and U-shaped wooden unit, U-shaped wooden unit are then snapped on batten The both sides of rhone are arranged on, then iron nail is hammered on U-shaped wooden unit, U-shaped wooden unit is fixed on the both sides of rhone, then in modeling Soil is inserted at the lower section of backing strap plate;
C () cleans rhone;
D building stones are put in () second building stones area:Rubble is transported to by job site using transport vehicle, then is manually poured over rubble On plastic base plate, and by broken stone leveling, first time rubble puts height on the basis of the bottom of batten, puts height when rubble and arrives When at up to the bottom of batten, in rhone injected clear water, then second rubble is carried out on the metalling that first time puts again Put, batten is embedded in metalling, the height of metalling is on the basis of the top of rhone;
Sprayed between building stones gap in (e) second building stones area concrete:Selection cement, water, sand, rubble, alkali-free quick-coagulant and water reducer are pressed Matched according to setting ratio, then 5~8min is stirred with mixer, montant is downwardly into metalling before sprinkling irrigation concrete, then The mark of sprinkling irrigation concrete thickness is made of red paint on montant, then the concrete after stirring is injected into spraying machine, by spraying machine Nozzle alignment rubble gap at, stretch into 0~10cm of gap, nozzle and kept vertical by spray plane, in course of injection nozzle along Rubble gap is moved, and the top-down direction of spraying machine carries out sprinkling irrigation concrete, the width control system of jet-action section 1.5~ 2.0m, sprayed between the second building stones area medium stone gap concrete when, constantly toward clear water is entered in rhone, more than plastic base plate Metalling keep moistening;
F building stones are put in () first building stones area:Stone is transported to by job site using transport vehicle, is operated with excavator, by stone Block leveling compacting;
Sprayed between building stones gap in (g) first building stones area concrete:The concrete configured in the second building stones area is selected to be sprayed, then with stirring Machine stirs 6~10min, is downwardly into montant before sprinkling irrigation concrete in rock layer, then do sprinkling irrigation concrete thickness with red paint on montant , then be injected into the concrete after stirring in spraying machine by the mark of degree, by nozzle and by spray plane distance controlling in 0.2~0.5m, Nozzle and kept vertical by spray plane, nozzle is moved along helical trajectory, and the top-down direction of spraying machine carries out sprinkling irrigation concrete, injection The width control system of section is acted in 2.0~2.5m;
H () the second building stones area and the first building stones area conserve.
2. sprinkling irrigation concrete construction method in a kind of slope shoulder building stones gap according to claim 1, it is characterised in that:In step (a) In, during the shoulder building stones region division of slope, guard rail is built at the peripheral 5m in the first building stones area and the second building stones area, and set Put construction bulletin.
3. sprinkling irrigation concrete construction method in a kind of slope shoulder building stones gap according to claim 1, it is characterised in that:In step (b) In, mutually the fixed operation of splicing is to open up groove in the bottom of batten between adjacent two battens, then by adjacent two battens Mutually splicing, the groove of adjacent two battens is mutually aligned, then be encased inside the lumps of wood, the lumps of wood between the groove of adjacent two battens Bottom surface be mutually flush with the bottom surface of batten, iron nail is then hammered on the lumps of wood, realize mutually splicing between adjacent two battens It is fixed.
4. sprinkling irrigation concrete construction method in a kind of slope shoulder building stones gap according to claim 1, it is characterised in that:In step (c) In, during rhone is cleaned, shower nozzle first being kept into horizontality, shower nozzle is cleaned along the inwall of rhone, cleaning During coordinate banister brush to be scrubbed, then shower nozzle is kept into plumbness, shower nozzle is cleaned towards the apopore of rhone, The scavenging period of each rhone is maintained at 5~10min.
5. sprinkling irrigation concrete construction method in a kind of slope shoulder building stones gap according to claim 1, it is characterised in that:In step (e) In, the match ratio of cement, water, sand, rubble, alkali-free quick-coagulant and water reducer is cement:Water:Sand:Rubble:Alkali-free quick-coagulant:Subtract Aqua=1:0.58:2.45:2.41:0.05:0.01.
6. sprinkling irrigation concrete construction method in a kind of slope shoulder building stones gap according to claim 1, it is characterised in that:In step (h) In, after the concrete final set sprayed in the second building stones area and the first building stones area, the surrounding in the second building stones area and the first building stones area is pulled out Protection rope, then starts watering and is conserved, and curing time is no less than 7d.
CN201710092909.8A 2017-02-21 2017-02-21 A kind of slope shoulder building stones gap sprinkling irrigation concrete construction method Active CN106917408B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710092909.8A CN106917408B (en) 2017-02-21 2017-02-21 A kind of slope shoulder building stones gap sprinkling irrigation concrete construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710092909.8A CN106917408B (en) 2017-02-21 2017-02-21 A kind of slope shoulder building stones gap sprinkling irrigation concrete construction method

Publications (2)

Publication Number Publication Date
CN106917408A true CN106917408A (en) 2017-07-04
CN106917408B CN106917408B (en) 2019-04-09

Family

ID=59453589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710092909.8A Active CN106917408B (en) 2017-02-21 2017-02-21 A kind of slope shoulder building stones gap sprinkling irrigation concrete construction method

Country Status (1)

Country Link
CN (1) CN106917408B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385613A (en) * 2018-01-25 2018-08-10 浙江水利水电学院 A kind of construction method filling building block stone protection slab

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010009777A (en) * 1999-07-14 2001-02-05 김인희 A Slope Greening Vegetation Construction Method for using Permeable Concrete
CN102071697A (en) * 2011-02-12 2011-05-25 河海大学 Hard reinforced concrete revetment slope biological repairing method
JP2011153441A (en) * 2010-01-26 2011-08-11 Nikken Kogaku Co Ltd Retaining wall structure, method for manufacturing the same, and drilling machine
CN103122641A (en) * 2012-12-21 2013-05-29 陕西红叶园林绿化设计工程集团有限公司 Slope reinforced structure and reinforcing method thereof
CN103496901A (en) * 2013-09-23 2014-01-08 大同煤矿集团有限责任公司 Poor-quality surrounding rock concrete wet-spraying method
CN105862887A (en) * 2016-04-18 2016-08-17 江西理工大学 Ecological slope protection structure for ion rare earth mine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010009777A (en) * 1999-07-14 2001-02-05 김인희 A Slope Greening Vegetation Construction Method for using Permeable Concrete
JP2011153441A (en) * 2010-01-26 2011-08-11 Nikken Kogaku Co Ltd Retaining wall structure, method for manufacturing the same, and drilling machine
CN102071697A (en) * 2011-02-12 2011-05-25 河海大学 Hard reinforced concrete revetment slope biological repairing method
CN103122641A (en) * 2012-12-21 2013-05-29 陕西红叶园林绿化设计工程集团有限公司 Slope reinforced structure and reinforcing method thereof
CN103496901A (en) * 2013-09-23 2014-01-08 大同煤矿集团有限责任公司 Poor-quality surrounding rock concrete wet-spraying method
CN105862887A (en) * 2016-04-18 2016-08-17 江西理工大学 Ecological slope protection structure for ion rare earth mine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385613A (en) * 2018-01-25 2018-08-10 浙江水利水电学院 A kind of construction method filling building block stone protection slab

Also Published As

Publication number Publication date
CN106917408B (en) 2019-04-09

Similar Documents

Publication Publication Date Title
CN102776897B (en) Wash apron anti-settling anti-cracking construction method and structure
CN105201513A (en) Shaft construction method for rail transit
CN106192907B (en) Add the construction method of 150m~300m grade high concrete panel rock-fill dams of cement sand and gravel structure sheaf
CN109853832A (en) A kind of construction method of filling wall masonry and electrical pre-embedded pipe synchronous construction
CN109853592A (en) The dry ecological safeguard structure and method for spraying work sash beam and substrate of fractured rock side slope
CN101446082A (en) Construction method of building anti-permeability channel using soil curing agent
CN109503052A (en) Raw celluar concrete of a plant and preparation method and application
CN110214634A (en) A kind of construction method suitable for steep rock side slope TBS greening
CN106869143A (en) For environmental combination bank protection and the construction method of the punishment of road runoff pollution
CN109235365A (en) A kind of self-locking ecological revetment brick construction method
CN106917410B (en) A kind of construction method of downstream slope slope shoulder safeguard structure
CN112544350A (en) Construction method for protecting side slope of ecological grass planting roadbed in geocell
CN104499492A (en) Side slope surface guniting solidification protection method
CN106150032A (en) A kind of construction method of the type high-wear-resistant alloy terrace that paves
CN209669895U (en) Intercept water side slope of embankment ecological protection
CN207228298U (en) A kind of landscape drought small stream structure
CN103953053B (en) Plant-growing type eco-concrete anti-overflow device and construction method are built in inclined-plane
CN106917408B (en) A kind of slope shoulder building stones gap sprinkling irrigation concrete construction method
CN108385614A (en) A kind of concrete facing board construction method of anti-floating towing force
CN110284509A (en) Anchored frame beam slope protection construction technique in road engineering
CN113605173B (en) Sponge football field integral solution method
CN108547306A (en) A kind of building waste block stone does the construction method of bank protection
CN114908630A (en) Factory road structure and secondary permanent-temporary combined layered construction method
CN106638632A (en) Construction technology of landscape soil blocking and slope protecting member
CN114164843A (en) Construction method of high slope excavation slope protection system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant