CN106917338A - Cement concrete pavement joint-cutting method - Google Patents

Cement concrete pavement joint-cutting method Download PDF

Info

Publication number
CN106917338A
CN106917338A CN201710152950.XA CN201710152950A CN106917338A CN 106917338 A CN106917338 A CN 106917338A CN 201710152950 A CN201710152950 A CN 201710152950A CN 106917338 A CN106917338 A CN 106917338A
Authority
CN
China
Prior art keywords
cutting
joint
parts
cement concrete
concrete pavement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710152950.XA
Other languages
Chinese (zh)
Other versions
CN106917338B (en
Inventor
张爱民
卢明智
张本元
樊占东
张志宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Third Highway Engineering Co Ltd
Original Assignee
CCCC Third Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Third Highway Engineering Co Ltd filed Critical CCCC Third Highway Engineering Co Ltd
Priority to CN201710152950.XA priority Critical patent/CN106917338B/en
Publication of CN106917338A publication Critical patent/CN106917338A/en
Application granted granted Critical
Publication of CN106917338B publication Critical patent/CN106917338B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • E01C11/04Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
    • E01C11/06Methods of making joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Repair (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention provides a kind of cement concrete pavement joint-cutting method, joint-cutting is carried out stage by stage so that the inside of cement concrete pavement is adequately cooled and solidifies, and joint-cutting is neatly without flash, is not in unnecessary crack while internal stress can fully be discharged.

Description

Cement concrete pavement joint-cutting method
Technical field
The invention belongs to building field, more particularly to a kind of cement concrete pavement joint-cutting method.
Background technology
Cement concrete pavement refers to the road surface for doing surface layer as main material with concrete, and abbreviation concrete road surface is one Plant high class pavement.But, concrete has a shrinkage, and road deck surface crack can occur because of contraction, how control table facial cleft Seam is a great problem of concrete road surface, and Normal practice is stitched to set contracting.Conventional contracting seam is cut out using grooving machine Joint-cutting, but joint-cutting can because road deck in reinforcing bar presence and cannot farthest play its effect.
The content of the invention
To solve the above problems, the present invention provides a kind of cement concrete pavement joint-cutting method, and it is comprised the following steps:
Step one
Joint-cutting grid is divided according to the cement concrete pavement for treating joint-cutting first, and in the cement concrete for treating joint-cutting Joint-cutting grid described in road surface identification;
Step 2
Cut first after after the concrete road surface solidification 25h-38h of joint-cutting, depth of cut treats joint-cutting for described first / 3rd of the thickness of cement concrete pavement;
Secondary cut is carried out after 7h-10h, the depth of secondary cut is the thickness for treating joint-cutting cement concrete pavement A quarter;
Three cuttings are carried out after 2h-3h, the depth of three cuttings is the thickness for treating joint-cutting cement concrete pavement 1/6th;
Step 3
Filler is inserted in joint-cutting.
Preferably, in described cement concrete pavement joint-cutting method,
Width of the width for cutting first more than the secondary cut;
The width of the secondary cut is more than the described three times width of cutting.
Preferably, in described cement concrete pavement joint-cutting method, the step 3 includes:
Sandstone and other pollutants in joint-cutting are removed, is rinsed repeatedly with water, and dried up with compressed air;
Back lining materials are filled in into joint-cutting bottom, during filler clamp-oned into joint-cutting with caulking gun or pouring machine.
Preferably, in described cement concrete pavement joint-cutting method, it is following that described filler includes by weight Component:
PPG 60-80 parts, methyl diphenylene diisocyanate 40-50 parts, hemp stalk core lignocellulosic in middle glue 10-18 Part, nylon 5-10 parts, light stabilizer 2-10 parts, inorganic nanometer oxide 1-6 parts, antioxidant 10-20 parts, 1-6 parts of sledge mill glass, Coupling agent 2-8 parts, dimethylbenzene 6-10 parts, frothing inhibitor 1-5 parts, waterproofing agent 3-10 parts.
The present invention provides a kind of cement concrete pavement joint-cutting method, joint-cutting is carried out stage by stage so that cement concrete The inside on road surface is adequately cooled and solidifies, and joint-cutting, while internal stress can fully be discharged, is not in neatly without flash Unnecessary crack.
Further advantage of the invention, target and feature embody part by following explanation, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Specific embodiment
The present invention is described in further detail below, with make those skilled in the art with reference to specification word being capable of evidence To implement.
It should be appreciated that it is used herein such as " have ", "comprising" and " including " term do not allot one or many The presence or addition of individual other elements or its combination.
Embodiment one
The present invention provides a kind of cement concrete pavement joint-cutting method, and it is comprised the following steps:
Step one
Joint-cutting grid is divided according to the cement concrete pavement for treating joint-cutting first, and in the cement concrete for treating joint-cutting Joint-cutting grid described in road surface identification;
Step 2
Cut first after after the concrete road surface solidification 25h of joint-cutting, depth of cut treats joint-cutting cement for described first / 3rd of the thickness of concrete road surface;
Secondary cut is carried out after 7h, the depth of secondary cut is the four of the thickness for treating joint-cutting cement concrete pavement / mono-;
Three cuttings are carried out after 2h, the depth of three cuttings is the six of the thickness for treating joint-cutting cement concrete pavement / mono-;
Step 3
Filler is inserted in joint-cutting.
In described cement concrete pavement joint-cutting method,
Width of the width for cutting first more than the secondary cut;
The width of the secondary cut is more than the described three times width of cutting.
In described cement concrete pavement joint-cutting method, the step 3 includes:
Sandstone and other pollutants in joint-cutting are removed, is rinsed repeatedly with water, and dried up with compressed air;
Back lining materials are filled in into joint-cutting bottom, during filler clamp-oned into joint-cutting with caulking gun or pouring machine.
In described cement concrete pavement joint-cutting method, described filler includes following components by weight:
60 parts of PPG, 40 parts of methyl diphenylene diisocyanate, 10 parts of hemp stalk core lignocellulosic in middle glue, nylon 5 Part, 2 parts of light stabilizer, 1 part of inorganic nanometer oxide, 10 parts of antioxidant, 1 part of sledge mill glass, 2 parts of coupling agent, 6 parts of dimethylbenzene, 1 part of frothing inhibitor, 3 parts of waterproofing agent.
Embodiment two
The present invention provides a kind of cement concrete pavement joint-cutting method, and it is comprised the following steps:
Step one
Joint-cutting grid is divided according to the cement concrete pavement for treating joint-cutting first, and in the cement concrete for treating joint-cutting Joint-cutting grid described in road surface identification;
Step 2
Cut first after after the concrete road surface solidification 25h-38h of joint-cutting, depth of cut treats joint-cutting for described first / 3rd of the thickness of cement concrete pavement;
Secondary cut is carried out after 10h, the depth of secondary cut is the thickness for treating joint-cutting cement concrete pavement A quarter;
Three cuttings are carried out after 3h, the depth of three cuttings is the six of the thickness for treating joint-cutting cement concrete pavement / mono-;
Step 3
Filler is inserted in joint-cutting.
In described cement concrete pavement joint-cutting method,
Width of the width for cutting first more than the secondary cut;
The width of the secondary cut is more than the described three times width of cutting.
In described cement concrete pavement joint-cutting method, the step 3 includes:
Sandstone and other pollutants in joint-cutting are removed, is rinsed repeatedly with water, and dried up with compressed air;
Back lining materials are filled in into joint-cutting bottom, during filler clamp-oned into joint-cutting with caulking gun or pouring machine.
In described cement concrete pavement joint-cutting method, described filler includes following components by weight:
80 parts of PPG, 50 parts of methyl diphenylene diisocyanate, 18 parts of hemp stalk core lignocellulosic in middle glue, nylon 10 Part, 10 parts of light stabilizer, 6 parts of inorganic nanometer oxide, 20 parts of antioxidant, 6 parts of sledge mill glass, 8 parts of coupling agent, dimethylbenzene 10 Part, 5 parts of frothing inhibitor, 10 parts of waterproofing agent.
Embodiment three
The present invention provides a kind of cement concrete pavement joint-cutting method, and it is comprised the following steps:
Step one
Joint-cutting grid is divided according to the cement concrete pavement for treating joint-cutting first, and in the cement concrete for treating joint-cutting Joint-cutting grid described in road surface identification;
Step 2
Cut first after after the concrete road surface solidification 29h of joint-cutting, depth of cut treats joint-cutting cement for described first / 3rd of the thickness of concrete road surface;
Secondary cut is carried out after 8h, the depth of secondary cut is the four of the thickness for treating joint-cutting cement concrete pavement / mono-;
Three cuttings are carried out after 2h, the depth of three cuttings is the six of the thickness for treating joint-cutting cement concrete pavement / mono-;
Step 3
Filler is inserted in joint-cutting.
In described cement concrete pavement joint-cutting method,
Width of the width for cutting first more than the secondary cut;
The width of the secondary cut is more than the described three times width of cutting.
In described cement concrete pavement joint-cutting method, the step 3 includes:
Sandstone and other pollutants in joint-cutting are removed, is rinsed repeatedly with water, and dried up with compressed air;
Back lining materials are filled in into joint-cutting bottom, during filler clamp-oned into joint-cutting with caulking gun or pouring machine.
In described cement concrete pavement joint-cutting method, described filler includes following components by weight:
74 parts of PPG, 46 parts of methyl diphenylene diisocyanate, 12 parts of hemp stalk core lignocellulosic in middle glue, nylon 7 Part, 3 parts of light stabilizer, 5 parts of inorganic nanometer oxide, 15 parts of antioxidant, 3 parts of sledge mill glass, 6 parts of coupling agent, 9 parts of diformazan, hair 2 parts of inhibitor of bubble, 5 parts of waterproofing agent.
Although embodiment of the present invention is disclosed as above, it is not restricted to listed in specification and implementation method With, it can be applied to various suitable the field of the invention completely, for those skilled in the art, can be easily Other modification is realized, therefore under the universal limited without departing substantially from claim and equivalency range, the present invention is not limited In specific details.

Claims (4)

1. cement concrete pavement joint-cutting method, it is characterised in that comprise the following steps:
Step one
Joint-cutting grid is divided according to the cement concrete pavement for treating joint-cutting first, and in the cement concrete pavement for treating joint-cutting Identify the joint-cutting grid;
Step 2
Cut first after after the concrete road surface solidification 25h-38h of joint-cutting, depth of cut treats joint-cutting cement for described first / 3rd of the thickness of concrete road surface;
Secondary cut is carried out after 7h-10h, the depth of secondary cut is the four of the thickness for treating joint-cutting cement concrete pavement / mono-;
Three cuttings are carried out after 2h-3h, the depth of three cuttings is the six of the thickness for treating joint-cutting cement concrete pavement / mono-;
Step 3
Filler is inserted in joint-cutting.
2. cement concrete pavement joint-cutting method as claimed in claim 1, it is characterised in that
Width of the width for cutting first more than the secondary cut;
The width of the secondary cut is more than the described three times width of cutting.
3. cement concrete pavement joint-cutting method as claimed in claim 1, it is characterised in that the step 3 includes:
Sandstone and other pollutants in joint-cutting are removed, is rinsed repeatedly with water, and dried up with compressed air;
Back lining materials are filled in into joint-cutting bottom, during filler clamp-oned into joint-cutting with caulking gun or pouring machine.
4. cement concrete pavement joint-cutting method as claimed in claim 1, it is characterised in that described filler is included by weight The following components of meter:
PPG 60-80 parts, methyl diphenylene diisocyanate 40-50 parts, hemp stalk core lignocellulosic in middle glue 10-18 parts, Nylon 5-10 parts, light stabilizer 2-10 parts, inorganic nanometer oxide 1-6 parts, antioxidant 10-20 parts, it is 1-6 parts of sledge mill glass, even 2-8 parts, dimethylbenzene 6-10 parts, frothing inhibitor 1-5 parts, waterproofing agent 3-10 parts of agent of connection.
CN201710152950.XA 2017-03-15 2017-03-15 Cement concrete pavement joint-cutting method Active CN106917338B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710152950.XA CN106917338B (en) 2017-03-15 2017-03-15 Cement concrete pavement joint-cutting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710152950.XA CN106917338B (en) 2017-03-15 2017-03-15 Cement concrete pavement joint-cutting method

Publications (2)

Publication Number Publication Date
CN106917338A true CN106917338A (en) 2017-07-04
CN106917338B CN106917338B (en) 2019-03-29

Family

ID=59460455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710152950.XA Active CN106917338B (en) 2017-03-15 2017-03-15 Cement concrete pavement joint-cutting method

Country Status (1)

Country Link
CN (1) CN106917338B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109811629A (en) * 2019-01-24 2019-05-28 四汇建设集团有限公司 A kind of reparation remodeling method of Old cement concrete
CN113201991A (en) * 2021-04-22 2021-08-03 中冶南方城市建设工程技术有限公司 Concrete pavement pre-crack construction method
CN114277638A (en) * 2021-08-16 2022-04-05 宁波路宝科技实业集团有限公司 Resin concrete shrinkage joint construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01174709A (en) * 1987-12-28 1989-07-11 Gakunan Koki Kk Road zone line erasing device
KR20100111003A (en) * 2009-04-06 2010-10-14 박승민 Injection sealant and the construction way
CN102828464A (en) * 2012-09-21 2012-12-19 河南万里路桥集团有限公司 Cement concrete pavement Y-shaped joint cutting device and cut joint filling and sealing process
CN103334368A (en) * 2013-06-17 2013-10-02 中铁四局集团有限公司 Longitudinal cold joint construction method for large-area asphalt pavement
CN103452028A (en) * 2013-09-06 2013-12-18 山东大学 Method for repairing jointed cement concrete pavement with double-layer continuous reinforcement
CN104846782A (en) * 2015-05-14 2015-08-19 吉林省银河水利水电新技术设计有限公司 Flexible seam sealing method for water of hydraulic concrete expansion joint
CN106087643A (en) * 2016-06-27 2016-11-09 山西四建集团有限公司 Cement concrete pavement is to contracting seam construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01174709A (en) * 1987-12-28 1989-07-11 Gakunan Koki Kk Road zone line erasing device
KR20100111003A (en) * 2009-04-06 2010-10-14 박승민 Injection sealant and the construction way
CN102828464A (en) * 2012-09-21 2012-12-19 河南万里路桥集团有限公司 Cement concrete pavement Y-shaped joint cutting device and cut joint filling and sealing process
CN103334368A (en) * 2013-06-17 2013-10-02 中铁四局集团有限公司 Longitudinal cold joint construction method for large-area asphalt pavement
CN103452028A (en) * 2013-09-06 2013-12-18 山东大学 Method for repairing jointed cement concrete pavement with double-layer continuous reinforcement
CN104846782A (en) * 2015-05-14 2015-08-19 吉林省银河水利水电新技术设计有限公司 Flexible seam sealing method for water of hydraulic concrete expansion joint
CN106087643A (en) * 2016-06-27 2016-11-09 山西四建集团有限公司 Cement concrete pavement is to contracting seam construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109811629A (en) * 2019-01-24 2019-05-28 四汇建设集团有限公司 A kind of reparation remodeling method of Old cement concrete
CN113201991A (en) * 2021-04-22 2021-08-03 中冶南方城市建设工程技术有限公司 Concrete pavement pre-crack construction method
CN114277638A (en) * 2021-08-16 2022-04-05 宁波路宝科技实业集团有限公司 Resin concrete shrinkage joint construction method

Also Published As

Publication number Publication date
CN106917338B (en) 2019-03-29

Similar Documents

Publication Publication Date Title
CN203035080U (en) Structure for preventing hole collapse of pebble layer drilling holes
CN106917338A (en) Cement concrete pavement joint-cutting method
CN105839850B (en) Precompressed construction method is poured into a mould after basement top-down method shaft
CN108755334A (en) A kind of method that concrete road planar defect is quickly repaired
CN106401204A (en) Composite strengthening method through fiber-reinforced high-damping polymer concrete coated with carbon fiber cloth
CN110374254A (en) The plug-in composite wallboard structure of assembled basalt fibre regeneration concrete and production method
CN102745958B (en) Rapid repair material for cement concrete airfield pavement
CN109025352A (en) A kind of building wall cracks in plaster processing method
CN106930402A (en) Outer wall of basement is incubated and fish tail and waterproof layer construction method
CN105401740B (en) Timber structure and timber structure restorative procedure after reparation
CN206233404U (en) The attachment structure of shear wall and after-pouring concrete secondary beam
CN206784164U (en) Bridge expansion joint structure
CN109826446A (en) A kind of environmentally protective assembly construction method
CN109437803A (en) A kind of processing technology of energy conservation and environmental protection pervious concrete
CN108570896A (en) A method of repairing sleeper hole
CN108545996A (en) A kind of preparation method of high intensity corner concrete road dental calculus
CN107013049A (en) A kind of method that new faying face reinforces beam column class component
Shahzada et al. Retrofitting of brick masonry columns by ferocementing
CN107188489A (en) A kind of environmentally friendly rapid hardening high-strength nanometer glue for tile and preparation method thereof
CN206956484U (en) Cement concrete pavement layering disease repairing structure
CN207436515U (en) The hoisting beam of efficient construction of precast floorslab
CN106116389A (en) A kind of environment-friendly type water proof fire retardant dry powder and mortar and preparation method thereof
CN206636012U (en) A kind of plastics cutting for connecting filling box
CN107286541A (en) A kind of preparation method of pitch class waterproof roll barrier film
CN106565172B (en) A kind of dam foundation of concrete delayed expansion fills out pool technique and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant