CN106915685B - Coal mine shaft lining cage contracting rope method - Google Patents
Coal mine shaft lining cage contracting rope method Download PDFInfo
- Publication number
- CN106915685B CN106915685B CN201710142793.4A CN201710142793A CN106915685B CN 106915685 B CN106915685 B CN 106915685B CN 201710142793 A CN201710142793 A CN 201710142793A CN 106915685 B CN106915685 B CN 106915685B
- Authority
- CN
- China
- Prior art keywords
- rope
- steel wire
- contracting
- hydraulic cylinder
- cage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
- B66B19/02—Installing or exchanging ropes or cables
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The invention discloses a kind of coal mine shaft lining cage contracting rope methods, first block the fag end of every steel wire rope, then the hydraulic cylinder for adjusting rope of wherein steel cable is carried out oiling and is suppressed, and hydraulic cylinder for adjusting rope is made to extend, and oil cylinder elongation makes the steel wire rope looseness get off no longer stress;The extra cable wire end that do not stress is sliced off with tool is cut according to the contracting rope amount calculated, this is analogized, and contracting rope process is carried out to remaining steel wire rope.The present invention only needs personnel to be carried out in the above position of well head, and overlapping activity is climbed down without repeatedly climbing up, disposable to complete.Cage is in band rope suspension status always, and cage will not tilt, entirely without danger of falling, construction personnel's safety.
Description
Technical field
The present invention relates to the installation maintenance technologies of coal mine shaft lining cage.
Background technology
As coal adopts deep increase, the raising of mine yield is promoted using vertical cage as mine main lift side
Formula is more and more common.The promotion of vertical cage at least four steel wire ropes, every steel wire rope pass through hydraulic cylinder for adjusting rope and winding cage
Connection, the stress that hydraulic cylinder for adjusting rope is used to adjust steel wire rope are consistent.The increasing loaded after winding cage is used for a long time and in cage
Add, steel wire rope necessarily occurs extending phenomenon.The elongation of steel wire rope can cause cage to stop tank position and cage chair absolute altitude in upper and lower well head
It is inconsistent.When rope stretch amount is little, by asking tank beam to carry out horizontal retort to cage;If rope stretch amount is larger,
It then must just can guarantee that cage is parked in well head plane by the rope that contracts, ensure to go into the well on normal mine car and personnel.So each
The time that the moon must all be extracted out 1-2 days carries out contracting rope.
Existing vertical contracting rope walking or dancing art is to coordinate two sets of big boards and auxiliary tool with 4 I-steel and multiple chain blocks
It is several to complete entire contracting rope process, and need that 20 people or so professional team is engaged to construct, entire contracting rope process is extremely
Need 20 hours that could complete less, personnel need repeatedly to climb up and climb down in head sheave, well head, underground, overlapping activity, once occur
Unbalance stress is easy to cause cage inclination, jeopardizes construction personnel's safety, causes that mine idle time is long, influence the production of mine
Amount.
Therefore studying a kind of coal mine shaft lining cage, safely and fast contracting rope walking or dancing art is necessary.
Invention content
The purpose of the present invention is to propose to a kind of coal mine shaft lining cage contracting rope methods.
A kind of coal mine shaft lining cage contracting rope method, which is characterized in that steps are as follows:
The first step, survey calculation contracting rope amount well;Elevator is started, the cage of emptying is parked in the well head operated suitable for personnel
Position, the position on cage hoisting steel wire rope wedge rope_ring with big board and coordinate screw that all steel wire ropes is whole
It blocks locked, and is again blocked the fag end of every steel wire rope with rope clip, all steel wire ropes become a stress entirety at this time;
Second step, then the hydraulic cylinder for adjusting rope of wherein steel cable is subjected to oiling and is suppressed, so that hydraulic cylinder for adjusting rope is extended, oil cylinder is stretched
Long amount is equal to contracting rope amount, and oil cylinder elongation makes the steel wire rope looseness get off no longer stress, closing hydraulic cylinder for adjusting rope valve, by other steel wires
Rope undertakes original pulling force;
Third walks, and unclamps the rope clip not stressed on cable wire end, the steel wire that do not stress is fixed with chain block chain
Rope fag end, chain block is hung on stress point, is unclamped the fixture block of former wedge rope_ring, chain block is pulled, in wedge rope_ring
The steel wire rope that do not stress for extracting relaxation out, tightens the fixture block of wedge rope_ring, and it is extra to be sliced off according to the contracting rope amount calculated a section tool
The cable wire end that do not stress, fixation do not stress the wedge rope_ring of steel wire rope, then adjusts hydraulic cylinder for adjusting rope and make the steel wire that do not stress
Stress of restricting tensioning, and oil cylinder valve is closed, complete the contracting rope process of wherein steel cable;
Then 4th step carries out contracting rope process to remaining steel wire rope successively with third step same method;
5th step opens the oil cylinder valve of all steel wire rope hydraulic cylinder for adjusting rope after the completion of contracting is restricted, and so that hydraulic cylinder for adjusting rope is retracted and ensures
The uniform tension in order of all steel wire ropes;Remove big board and rope clip;Stop tank position according still further to the upper and lower cage of conventional method inspection
It sets, again by the stroke of adjustment hydraulic cylinder for adjusting rope, makes to stop tank position to meet prescribed requirement.
The positive effect of the present invention:
1, the present invention need to only be can be completed using chain block, 1 set of big board and some common tools, few using tool,
Reduce the consumption of materials and supplies.
2, the present invention need not engage professional team to construct, and 5 maintenance personals of Zhi Xu our units can be completed,
15 people or so are reduced than original method, reduce cost of labor.
3, the present invention only needs or so 4 hours can be completed, than the time that original method shortens 75%, idle time
It is short, improve the hoisting power of mine.
4, the present invention only needs personnel to be carried out in the above position of well head, climbs down overlapping activity without repeatedly climbing up, disposably
It completes.Cage is in band rope suspension status always, and cage will not tilt, entirely without danger of falling, construction personnel's safety.
Description of the drawings
Fig. 1 is the front view of the embodiment of the present invention;
Fig. 2 is the side view of the embodiment of the present invention.
In figure, 1- cages, 2- hydraulic cylinder for adjusting rope, 3- rope clips, 4- wedge rope_rings, the big boards of 5-, 6- steel wire ropes.
Specific implementation mode
Technical scheme of the present invention is further appreciated that below in conjunction with the accompanying drawings.
Coal mine shaft lining cage contracting rope method as depicted in figs. 1 and 2, includes the following steps:
The first step, survey calculation contracting rope amount well;Elevator is started, the cage 1 of emptying is parked in the well operated suitable for personnel
Mouth position, the appropriate location on cage hoisting steel wire rope wedge rope_ring 4 with big board 5 and coordinates screw by all steel
Cord 6 is all blocked locked, and is again blocked the fag end of every steel wire rope 6 with rope clip 3, all steel wire ropes 6 become at this time
One stress entirety;
Second step, then the hydraulic cylinder for adjusting rope 2 of wherein steel cable 6 is subjected to oiling and is suppressed, so that hydraulic cylinder for adjusting rope 2 is extended, oil
Cylinder elongation is equal to contracting rope amount, and the elongation of hydraulic cylinder for adjusting rope 2 makes the steel wire rope 6 relax no longer stress, closing 2 valve of hydraulic cylinder for adjusting rope
Door, original pulling force is undertaken by other steel wire ropes;
Third walks, and unclamps the rope clip 3 not stressed on 6 fag end of steel wire rope, the steel that do not stress is fixed with chain block chain
6 fag end of cord, chain block is hung on stress point, is unclamped the fixture block of former wedge rope_ring 4, is pulled chain block, is restricted in wedge shape
The steel wire rope of extraction relaxation, tightens the fixture block of wedge rope_ring 4 in ring 4, according to the contracting rope amount calculated with cut have slice off not by
The extra fag end of power steel wire rope 6, the wedge rope_ring 4 of the fixation steel wire rope 6 that do not stress, then adjust hydraulic cylinder for adjusting rope 2 make not by
6 stress of power steel wire rope is tensioned, and closes 2 valve of hydraulic cylinder for adjusting rope, completes the contracting rope process of wherein steel cable;
Then 4th step carries out contracting rope process to remaining steel wire rope successively with third step same method;
5th step opens the oil cylinder valve of all steel wire rope hydraulic cylinder for adjusting rope 2 after the completion of contracting is restricted, and so that hydraulic cylinder for adjusting rope 2 is retracted and protects
Demonstrate,prove the uniform tension in order of all steel wire ropes 6;Remove big board 5 and rope clip 3;According still further to stopping for the upper and lower cage of conventional method inspection 1
Tank position makes to stop tank position to meet prescribed requirement again by the stroke of adjustment hydraulic cylinder for adjusting rope 2.
Claims (1)
1. a kind of coal mine shaft lining cage contracting rope method, which is characterized in that steps are as follows:
The first step, survey calculation contracting rope amount well;Elevator is started, the cage of emptying is parked in the well head position operated suitable for personnel
It sets, the position on cage hoisting steel wire rope wedge rope_ring, with big board and screw is coordinated all to block all steel wire ropes
It firmly locks, and is again blocked the fag end of every steel wire rope with rope clip, all steel wire ropes become a stress entirety at this time;
Second step, then the hydraulic cylinder for adjusting rope of wherein steel cable is subjected to oiling and is suppressed, so that hydraulic cylinder for adjusting rope is extended, oil cylinder elongation
Equal to contracting rope amount, oil cylinder elongation makes the steel wire rope looseness get off no longer stress, closes hydraulic cylinder for adjusting rope valve, is held by other steel wire ropes
Carry on a shoulder pole original pulling force;
Third walks, and unclamps the rope clip not stressed on cable wire end, the steel wire rope that do not stress is fixed with chain block chain
Head hangs over chain block on stress point, unclamps the fixture block of former wedge rope_ring, pulls chain block, extracted out in wedge rope_ring
The loose steel wire rope that do not stress, tightens the fixture block of wedge rope_ring, according to the contracting rope amount that has calculated with cut tool slice off it is extra not
Stressed wire rope fag end, fixation do not stress the wedge rope_ring of steel wire rope, then adjust hydraulic cylinder for adjusting rope make not stress steel wire rope by
Power is tensioned, and closes oil cylinder valve, completes the contracting rope process of wherein steel cable;
Then 4th step carries out contracting rope process to remaining steel wire rope successively with third step same method;
5th step opens the oil cylinder valve of all steel wire rope hydraulic cylinder for adjusting rope after the completion of contracting is restricted, and so that hydraulic cylinder for adjusting rope is retracted and ensures own
The uniform tension in order of steel wire rope;Remove big board and rope clip;Stop tank position according still further to the upper and lower cage of conventional method inspection, then
The secondary stroke by adjusting hydraulic cylinder for adjusting rope, makes to stop tank position to meet prescribed requirement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710142793.4A CN106915685B (en) | 2017-03-10 | 2017-03-10 | Coal mine shaft lining cage contracting rope method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710142793.4A CN106915685B (en) | 2017-03-10 | 2017-03-10 | Coal mine shaft lining cage contracting rope method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106915685A CN106915685A (en) | 2017-07-04 |
CN106915685B true CN106915685B (en) | 2018-11-06 |
Family
ID=59460990
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710142793.4A Active CN106915685B (en) | 2017-03-10 | 2017-03-10 | Coal mine shaft lining cage contracting rope method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106915685B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108975138B (en) * | 2018-07-27 | 2020-09-15 | 首钢集团有限公司 | Cage guide rope replacing method |
CN110715555B (en) * | 2019-10-18 | 2024-04-16 | 河北工业大学 | Spiral multi-cavity preheater |
CN112456276B (en) * | 2020-11-25 | 2022-07-05 | 中煤新集能源股份有限公司 | Mine friction type lifter rope adjusting process |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2489143Y (en) * | 2001-06-22 | 2002-05-01 | 徐书林 | Adjustable wedge rope ring |
CN2666868Y (en) * | 2003-12-31 | 2004-12-29 | 中国矿业大学 | Apparatus for exchanging ropes |
CN200946062Y (en) * | 2006-05-26 | 2007-09-12 | 罗戎 | Hydraulic rope regulating device of upright well friction wheel type hoister |
CN101786570A (en) * | 2010-03-17 | 2010-07-28 | 山东煤安矿山提升设备安装有限公司 | Process for replacing hoisting ropes |
CN101941632A (en) * | 2010-08-28 | 2011-01-12 | 徐州中翰矿山设备制造有限公司 | Vertical shaft single rope automatic adjusting and changing lifting gear |
CN105016184A (en) * | 2015-07-08 | 2015-11-04 | 徐州九益科技有限公司 | Replacement process for lifting steel wire rope of vertical shaft multi-rope friction lifter |
CN205662215U (en) * | 2016-06-06 | 2016-10-26 | 淮南矿业(集团)有限责任公司 | Main hoisting rope adjusting device of vertical shaft hoisting system |
CN106081836A (en) * | 2016-08-31 | 2016-11-09 | 山东黄金矿业(玲珑)有限公司 | Vertical shaft head rope and tail rope replacing options |
CN106219374A (en) * | 2016-09-05 | 2016-12-14 | 云南永昌铅锌股份有限公司 | Multi-rope friction hoisting machine and head rope replacing options thereof |
-
2017
- 2017-03-10 CN CN201710142793.4A patent/CN106915685B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2489143Y (en) * | 2001-06-22 | 2002-05-01 | 徐书林 | Adjustable wedge rope ring |
CN2666868Y (en) * | 2003-12-31 | 2004-12-29 | 中国矿业大学 | Apparatus for exchanging ropes |
CN200946062Y (en) * | 2006-05-26 | 2007-09-12 | 罗戎 | Hydraulic rope regulating device of upright well friction wheel type hoister |
CN101786570A (en) * | 2010-03-17 | 2010-07-28 | 山东煤安矿山提升设备安装有限公司 | Process for replacing hoisting ropes |
CN101941632A (en) * | 2010-08-28 | 2011-01-12 | 徐州中翰矿山设备制造有限公司 | Vertical shaft single rope automatic adjusting and changing lifting gear |
CN105016184A (en) * | 2015-07-08 | 2015-11-04 | 徐州九益科技有限公司 | Replacement process for lifting steel wire rope of vertical shaft multi-rope friction lifter |
CN205662215U (en) * | 2016-06-06 | 2016-10-26 | 淮南矿业(集团)有限责任公司 | Main hoisting rope adjusting device of vertical shaft hoisting system |
CN106081836A (en) * | 2016-08-31 | 2016-11-09 | 山东黄金矿业(玲珑)有限公司 | Vertical shaft head rope and tail rope replacing options |
CN106219374A (en) * | 2016-09-05 | 2016-12-14 | 云南永昌铅锌股份有限公司 | Multi-rope friction hoisting machine and head rope replacing options thereof |
Also Published As
Publication number | Publication date |
---|---|
CN106915685A (en) | 2017-07-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106915685B (en) | Coal mine shaft lining cage contracting rope method | |
CN205077885U (en) | Building core section of thick bamboo hydraulic pressure intelligence protection platform that climbs | |
CN108678752B (en) | Shaft equipment rapid installation process | |
CN110877852A (en) | System and method for quickly replacing rope of vertical shaft friction type elevator | |
CN102344086B (en) | Method for replacing lifting ropes of multi-rope frictional geared winch | |
CN114436114A (en) | Prefabricated part hoisting device based on bim technology | |
CN206971760U (en) | A kind of full steel structure assembled climbs material platform | |
CN107288640B (en) | A kind of nothing is surely restricted self-supporting modularization vertical shaft driving and masonry construction device | |
CN201144634Y (en) | Assisting device for climbing derrick ladder | |
CN110984555A (en) | Scaffold for elevator well | |
CN205063835U (en) | Novel hydraulic drive derrick mechanism | |
CN105858403A (en) | Device for stabilizing ropes of man-carrying lifting cage in vertical shaft excavating period and application method | |
CN105155427A (en) | Construction method for laying suspension bridge catwalk | |
CN102989091B (en) | A kind of rescue net | |
CN104528506B (en) | Mine hoist and unhooking test method thereof | |
CN101318606A (en) | Rope stringing method for multi-rope friction hoisting machine | |
CN201102869Y (en) | Large arm device of midair-disassembling horizontal lazy-arm type tower crane | |
CN112456276B (en) | Mine friction type lifter rope adjusting process | |
CN110316648B (en) | Integral hoisting method for hydraulic cylinder in limited space | |
CN103306618A (en) | Casing and drilling tool conveying cableway device | |
CN104596787B (en) | A kind of experimental rig of parachute gear | |
RU141338U1 (en) | DRILLING RIG | |
DE102009056012A1 (en) | Personal climbing assistance for climbing over wind turbine, has battery-operated lifting drive arranged at climbing rope and pulling person upwards with adjustable constant force or adjustable constant speed | |
CN110127550A (en) | A kind of hanging method of super high-rise building tubing | |
CN217681845U (en) | Well head rail based on convertible cage chair |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190715 Address after: 271229 Xinwen Mining Group Design and Research Institute Co., Ltd., Xinwen Office, Xintai City, Tai'an City, Shandong Province Patentee after: Xinwen Mining Group Design Institute Co. Ltd. Address before: 271200 Xinyang Energy Company, Xintai Xinwen New Second Road New Mining Group, Taian City, Shandong Province Patentee before: Shandong Xinyang Energy Co., Ltd. |
|
TR01 | Transfer of patent right |