CN104596787B - A kind of experimental rig of parachute gear - Google Patents
A kind of experimental rig of parachute gear Download PDFInfo
- Publication number
- CN104596787B CN104596787B CN201510036872.8A CN201510036872A CN104596787B CN 104596787 B CN104596787 B CN 104596787B CN 201510036872 A CN201510036872 A CN 201510036872A CN 104596787 B CN104596787 B CN 104596787B
- Authority
- CN
- China
- Prior art keywords
- derrick
- walking beam
- adjusting screw
- ground
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Instructional Devices (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
A kind of experimental rig of parachute gear,It is related to a kind of experimental rig,Including ground,Derrick,Head sheave,Test cage,Hoist house,Land wheel,Steel wire rope,Steel rope guide adjusting apparatus and rigid cage guide adjusting apparatus,Derrick is arranged on the upper and lower part on ground,Include two layers of one layer of derrick and derrick in the derrick in portion on the ground,Include B1 in the derrick of ground bottom,Two layers of underground and F3/B3,Steel rope guide adjusting apparatus is fixed with two layers of derrick and F3/B3,Rigid cage guide adjusting apparatus is respectively and fixedly provided with two layers of one layer of derrick and underground,Head sheave is provided with the top of derrick,Land wheel is provided with the ground inside derrick,Hoist house is provided with the ground outside derrick,One end of the steel wire rope is connected with hoist house,The other end of steel wire rope pile warp land wheel successively,It is fixedly connected after head sheave with experiment cage;This invention ensures that cage is that purpose is safely and steadily run on walking beam in cage guide.
Description
【Technical field】
The present invention relates to a kind of experimental rig, more particularly, to a kind of experimental rig of parachute gear.
【Background technology】
Known, in shaft production, shaft hoisting system is one of important link, once occurring in lifting process
Disconnected rope accident of cage crashing, not only directly affects production, goes back the personal safety of entail dangers to mine worker, in order to ensure the peace of staff
Entirely, safety regulations in coal mine provides:Single rope winding cage of lifts personnel or lifts personnel and material must fill reliable catching device;
When boom hoist cable or attachment means are pulled off, catching device can be such that cage is smoothly supported on cage guide or check band, without
Pendant well is caused to cause major accident;Due to being limited by various conditions, winding cage is diversified in specifications, and catching device experiment can only be in work
Done experiment in factory using simple testing stand to simple, small-sized or single flexible cage guide, for large cage and different cage guides
Unhook experiment can only be completed at user scene, but field test can not ensure the accuracy and integrality of experimental data,
The performance parameter of equipment can not be reflected completely.
【The content of the invention】
In order to overcome the shortcomings of in background technology, the invention discloses a kind of experimental rig of parachute gear, by
Steel rope guide adjusting apparatus and rigid cage guide adjusting apparatus are set respectively on derrick, realize cage safety and stability on walking beam
The purpose of operation, and an experimental provision can complete different type, different size cage and the quiet of catching device, dynamic load examination
Test.
In order to realize the goal of the invention, the present invention adopts the following technical scheme that:
A kind of experimental rig of parachute gear, including ground, derrick, head sheave, experiment cage, hoist house, land wheel, steel wire
Rope, steel rope guide adjusting apparatus and rigid cage guide adjusting apparatus, the derrick are arranged on the upper and lower part on ground, on the ground
Include two layers of one layer of derrick and derrick in the derrick in portion, B1, two layers of underground and ground are included in the derrick of ground bottom
Lower three layers, steel rope guide adjusting apparatus is fixed with two layers of derrick and F3/B3, in two layers of one layer of derrick and underground
On be respectively and fixedly provided with rigid cage guide adjusting apparatus, be provided with head sheave at the top of derrick, land wheel be provided with the ground inside derrick,
Ground outside derrick is provided with hoist house, and one end of the steel wire rope is connected with hoist house, the other end of steel wire rope successively around
It is fixedly connected after land wheel, head sheave with experiment cage.
The experimental rig of described parachute gear, described steel rope guide adjusting apparatus include two cunnings being arranged side by side
Rail, fixed beam adjusting screw, feed screw nut, walking beam adjusting screw A, steel wire rope fix sliding block and walking beam A, in two slide rails
Between middle part be provided with the walking beam A that is fixed by feed screw nut, fixed beam adjusting screw is equipped with two slide rails, in activity
Beam A is provided with walking beam adjusting screw A, and being provided with steel wire rope at walking beam adjusting screw A middle part fixes sliding block.
The experimental rig of described parachute gear, described rigid cage guide adjusting apparatus include fixed beam, walking beam B,
Walking beam adjusting screw B and fixed girder steel, described fixed beam and walking beam B are disposed as two, and are arranged at intervals, in fixation
Beam and walking beam B two sides are equipped with walking beam adjusting screw B, are arranged on the fixed beam and walking beam B opposite faces of centre
Middle part is equipped with fixed girder steel.
The experimental rig of described parachute gear, described fixed beam adjusting screw, walking beam adjusting screw A with electricity
Machine connects.
The experimental rig of described parachute gear, described walking beam adjusting screw B and motor connection.
By adopting the above-described technical solution, the present invention has the advantages that:
The present invention is effectively ensured by setting steel rope guide adjusting apparatus and rigid cage guide adjusting apparatus respectively on derrick
Cage is safely and steadily run on walking beam in cage guide, and steel rope guide adjusting apparatus and rigid cage guide adjusting apparatus are mutually not
Interference, can synchronous interaction also separate and act, an experimental provision can complete different type, different size cage and catching device
The experiment of quiet, dynamic load.
【Brief description of the drawings】
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the structural representation of steel rope guide adjusting apparatus of the present invention;
Fig. 3 is the structural representation of rigid cage guide adjusting apparatus of the present invention;
In figure:1st, head sheave;2nd, derrick;3rd, steel rope guide adjusting apparatus;4th, two layers of derrick ground;5th, rigid cage guide fixes dress
Put;6th, one layer of derrick ground;7th, cage is tested;8th, ground;9th, hoist house;10th, land wheel;11st, slide rail;12nd, fixed beam regulation silk
Thick stick;13rd, feed screw nut;14th, walking beam adjusting screw A;15th, steel wire rope fixes sliding block;16th, walking beam A;17th, fixed beam;18、
Walking beam B;19th, walking beam adjusting screw B;20th, fixed girder steel;21st, B1;22nd, two layers of underground;23rd, F3/B3;
24th, steel wire rope.
【Embodiment】
Explanation that can be detailed by the following examples is of the invention, and the open purpose of the present invention is intended to protect model of the present invention
Enclose all interior technological improvements.
With reference to the experimental rig of accompanying drawing 1-3 parachute gears, including ground 8, derrick 2, head sheave 1, experiment cage 7, winch
Room 9, land wheel 10, steel wire rope 24, steel rope guide adjusting apparatus 3 and rigid cage guide adjusting apparatus 5, the derrick 2 are arranged on ground 8
Upper and lower part, the top of ground 8 derrick 2 in include two layer 4 of one layer 6 of derrick and derrick, the derrick 2 in the bottom of ground 8
It is interior including B1 21, two layer 22 of underground and F3/B3 23, be fixed with steel on two layer 4 of derrick and F3/B3 23
Cable guide adjusting apparatus 3, rigid cage guide adjusting apparatus 5 is respectively and fixedly provided with two layer 22 of one layer 6 of derrick and underground, in derrick 2
Top is provided with head sheave 1, and land wheel 10 is provided with the ground 8 inside derrick 2, hoist house 9 is provided with the ground 8 outside derrick 2,
One end of the steel wire rope 24 is connected with hoist house 9, the other end of steel wire rope 24 successively after pile warp land wheel 10, head sheave 1 with experiment
Cage 7 is fixedly connected.
The experimental rig of described parachute gear, what described steel rope guide adjusting apparatus 3 was arranged side by side including two
Slide rail 11, fixed beam adjusting screw 12, feed screw nut 13, walking beam adjusting screw A14, steel wire rope fix sliding block 15 and walking beam
A16, the middle part between two slide rails 11 are provided with the walking beam A16 fixed by feed screw nut 13, are all provided with two slide rails 11
There is fixed beam adjusting screw 12, walking beam adjusting screw A14 is provided with walking beam A16, in walking beam adjusting screw A14
Portion is provided with steel wire rope and fixes sliding block 15.
The experimental rig of described parachute gear, described rigid cage guide adjusting apparatus 5 include fixed beam 17, walking beam
B18, walking beam adjusting screw B19 and fixed girder steel 20, described fixed beam 17 and walking beam B18 are disposed as two, and
Every setting, walking beam adjusting screw B19 is equipped with two sides of fixed beam 17 and walking beam B18, is arranged on the fixation of centre
Fixed girder steel 20 is equipped with the middle part of beam 17 and walking beam B18 opposite faces.
The experimental rig of described parachute gear, described fixed beam adjusting screw 12, walking beam adjusting screw A14 are equal
With motor connection.
The experimental rig of described parachute gear, described walking beam adjusting screw B19 and motor connection.
Implement the experimental rig of parachute gear of the present invention, when in use, motor driven walking beam adjusting screw
When A14 is rotated, driving steel wire rope to fix sliding block 15 and move up and down, walking beam A16 is arranged on the middle part between two slide rails 11, Gu
Determine beam adjusting screw 12 and pass through walking beam A16, when motor driven fixed beam adjusting screw 12 rotates, walking beam A16 can be driven left
Move right, so as to realize that steel wire rope fixes the movement of the upper and lower, left and right of sliding block 15;Rigid cage guide is arranged on by fixed girder steel 20 and lived
On dynamic beam B18, walking beam B18 is arranged on walking beam adjusting screw B19, when motor driven walking beam adjusting screw B19 is rotated,
Drive walking beam B18 to move up and down, realize apart from adjustable;The present invention by setting steel rope guide adjustment dress respectively on derrick
Put with rigid cage guide adjusting apparatus, cage has been effectively ensured and has been safely and steadily run in cage guide on walking beam, and steel rope guide
Adjusting apparatus and rigid cage guide adjusting apparatus are not interfere with each other, can synchronous interaction also separate act, an experimental provision can be complete
Into different type, different size cage and the quiet of catching device, dynamic load experiment.
Part not in the detailed description of the invention is existing technology.
The embodiment selected herein for the goal of the invention of the open present invention, is presently considered to be suitable, still,
It is to be understood that it is contemplated that all changes and improvement including all embodiments belonged in this design and invention scope.
Claims (3)
1. a kind of experimental rig of parachute gear, including ground(8), derrick(2), head sheave(1), experiment cage(7), hoist house
(9), land wheel(10), steel wire rope(24), steel rope guide adjusting apparatus(3)With rigid cage guide adjusting apparatus(5), it is characterized in that:Institute
State derrick(2)It is arranged on ground(8)Upper and lower part, on ground(8)The derrick on top(2)It is interior including one layer of derrick(6)With
Two layers of derrick(4), on ground(8)The derrick of bottom(2)It is interior including B1(21), two layers of underground(22)And F3/B3
(23), in two layers of derrick(4)And F3/B3(23)On be fixed with steel rope guide adjusting apparatus(3), in one layer of derrick(6)
With two layers of underground(22)On be respectively and fixedly provided with rigid cage guide adjusting apparatus(5), described steel rope guide adjusting apparatus(3)Including two
The slide rail being arranged side by side(11), fixed beam adjusting screw(12), feed screw nut(13), walking beam adjusting screw A(14), steel wire rope
Fixed sliding block(15)With walking beam A(16), in two slide rails(11)Between middle part be provided with by feed screw nut(13)Fixed work
Dynamic beam A(16), in two slide rails(11)On be equipped with fixed beam adjusting screw(12), in walking beam A(16)It is provided with walking beam
Adjusting screw A(14), in walking beam adjusting screw A(14)Middle part be provided with steel wire rope fix sliding block(15);Described rigid tank
Road adjusting apparatus(5)Including fixed beam(17), walking beam B(18), walking beam adjusting screw B(19)With fixed girder steel(20), institute
The fixed beam stated(17)With walking beam B(18)Two are disposed as, and is arranged at intervals, in fixed beam(17)With walking beam B(18)
Two sides be equipped with walking beam adjusting screw B(19), it is arranged on middle fixed beam(17)With walking beam B(18)Opposite face
Middle part is equipped with fixed girder steel(20);In derrick(2)Top be provided with head sheave(1), in derrick(2)Internal ground(8)On set
There is land wheel(10), in derrick(2)Outside ground(8)It is provided with hoist house(9), the steel wire rope(24)One end and hoist house
(9)Connection, steel wire rope(24)Other end pile warp land wheel successively(10), head sheave(1)Afterwards with testing cage(7)It is fixedly connected.
2. the experimental rig of parachute gear according to claim 1, it is characterized in that:Described fixed beam adjusting screw
(12), walking beam adjusting screw A(14)And motor connection.
3. the experimental rig of parachute gear according to claim 1, it is characterized in that:Described walking beam adjusting screw B
(19)With motor connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510036872.8A CN104596787B (en) | 2015-01-26 | 2015-01-26 | A kind of experimental rig of parachute gear |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510036872.8A CN104596787B (en) | 2015-01-26 | 2015-01-26 | A kind of experimental rig of parachute gear |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104596787A CN104596787A (en) | 2015-05-06 |
CN104596787B true CN104596787B (en) | 2017-11-10 |
Family
ID=53122712
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510036872.8A Active CN104596787B (en) | 2015-01-26 | 2015-01-26 | A kind of experimental rig of parachute gear |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104596787B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106124235B (en) * | 2016-06-17 | 2018-09-28 | 中国矿业大学 | A kind of promotion simulation system and analogy method that flexible guide rail is oriented to |
CN110608912B (en) * | 2019-10-22 | 2022-06-07 | 徐州立方机电设备制造有限公司 | Vertical inclined shaft protection dynamic simulation test bed |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3663152B2 (en) * | 2001-07-10 | 2005-06-22 | 共栄テクニカ株式会社 | Shock absorber inspection equipment |
CN100411965C (en) * | 2006-02-14 | 2008-08-20 | 中国矿业大学 | Device and method of detecting braking performance of safety catcher |
CN102229395B (en) * | 2011-07-08 | 2013-01-16 | 中国矿业大学 | Multi-functional simulation experiment system for mining elevator |
CN203894064U (en) * | 2014-01-09 | 2014-10-22 | 中国石油大学(华东) | Downhole tool mode test platform |
CN104062113B (en) * | 2014-06-23 | 2017-01-04 | 浙江华电器材检测研究所 | A kind of catching device self-locking machine for testing reliability |
CN203908797U (en) * | 2014-06-30 | 2014-10-29 | 四川易博测控技术有限公司 | Falling protector test bench |
CN204422229U (en) * | 2015-01-26 | 2015-06-24 | 中信重工机械股份有限公司 | A kind of test unit of parachute gear |
-
2015
- 2015-01-26 CN CN201510036872.8A patent/CN104596787B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104596787A (en) | 2015-05-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102229395B (en) | Multi-functional simulation experiment system for mining elevator | |
CN103818797A (en) | Speed limiter and safety gear linkage system based on elevator | |
CN205634713U (en) | Be suitable for narrow and small space long distance transport hoisting apparatus | |
CN104596787B (en) | A kind of experimental rig of parachute gear | |
CN103863955A (en) | From introduction system and have this tower machine from introduction system | |
CN103274315A (en) | Installing and hoisting device for side plate and upright of gas chamber | |
CN203269405U (en) | Hoisting device for mounting side plates and upright columns of gas cabinet | |
CN105329818B (en) | Ship unloaders electric turnover grab bucket inspection platform | |
CN204422229U (en) | A kind of test unit of parachute gear | |
CN202064842U (en) | Gear-rack drilling machine | |
CN208995018U (en) | A kind of construction material lifting device | |
CN208996484U (en) | It is a kind of to pitch servo-actuated wiring armed lever mechanism and crossing frame | |
CN204625053U (en) | A kind of winch rope guide | |
CN204530513U (en) | The manned maintenance Hanging Basket of suspension cable | |
CN107190967A (en) | A kind of climbing frame bottom pulley formula walkway board | |
CN203832507U (en) | Flexible vehicle blocking bar lifting device | |
CN206437813U (en) | A kind of efficient hoist engine for massif geological disaster Emergency management | |
CN203359825U (en) | Hydraulic hoisting device for wellhead equipment | |
CN102913016B (en) | Ground, subway train lowering or hoisting gear | |
CN202156852U (en) | Linkage type safety gear device | |
CN102616678B (en) | Inclined-pulling device of tower crane and tower crane | |
CN206735688U (en) | Gantry sampling system for coal at railway carriage sampling head elevating mechanism falling proof device | |
CN206487461U (en) | Self-elevating drilling platform logging truck top sheave suspension | |
CN110451418A (en) | A kind of novel large-tonnage haulage gear | |
CN206375621U (en) | Lifting type turner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |