CN106914381A - A kind of electricity-saving lamp making spot gluing equipment - Google Patents

A kind of electricity-saving lamp making spot gluing equipment Download PDF

Info

Publication number
CN106914381A
CN106914381A CN201710305047.2A CN201710305047A CN106914381A CN 106914381 A CN106914381 A CN 106914381A CN 201710305047 A CN201710305047 A CN 201710305047A CN 106914381 A CN106914381 A CN 106914381A
Authority
CN
China
Prior art keywords
slide rail
mounting bracket
sliding block
fixed pulley
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710305047.2A
Other languages
Chinese (zh)
Inventor
张晓艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Grace (ningbo) Lighting Co Ltd
Original Assignee
Grace (ningbo) Lighting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Grace (ningbo) Lighting Co Ltd filed Critical Grace (ningbo) Lighting Co Ltd
Priority to CN201710305047.2A priority Critical patent/CN106914381A/en
Publication of CN106914381A publication Critical patent/CN106914381A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C5/00Apparatus in which liquid or other fluent material is projected, poured or allowed to flow on to the surface of the work
    • B05C5/02Apparatus in which liquid or other fluent material is projected, poured or allowed to flow on to the surface of the work the liquid or other fluent material being discharged through an outlet orifice by pressure, e.g. from an outlet device in contact or almost in contact, with the work
    • B05C5/027Coating heads with several outlets, e.g. aligned transversally to the moving direction of a web to be coated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C11/00Component parts, details or accessories not specifically provided for in groups B05C1/00 - B05C9/00
    • B05C11/10Storage, supply or control of liquid or other fluent material; Recovery of excess liquid or other fluent material
    • B05C11/1047Apparatus or installations for supplying liquid or other fluent material comprising a buffer container or an accumulator between the supply source and the applicator
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C11/00Component parts, details or accessories not specifically provided for in groups B05C1/00 - B05C9/00
    • B05C11/11Vats or other containers for liquids or other fluent materials
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C13/00Means for manipulating or holding work, e.g. for separate articles
    • B05C13/02Means for manipulating or holding work, e.g. for separate articles for particular articles

Abstract

The present invention relates to a kind of spot gluing equipment, more particularly to a kind of electricity-saving lamp making spot gluing equipment.The technical problem to be solved in the present invention is to provide a kind of colloid and is difficult to condense, be easily controlled the electricity-saving lamp making spot gluing equipment of dispensing amount.In order to solve the above-mentioned technical problem, the invention provides such a electricity-saving lamp making spot gluing equipment, mounting bracket is included, to place plate, lowering or hoisting gear, the first pole, storage tank, dispensing first-class;Mounting bracket inner bottom part is provided with lowering or hoisting gear, lowering or hoisting gear top is provided with placement plate, mounting bracket inner left wall middle part is provided with the first pole, first pole right-hand member is connected with storage tank, storage tank bottom even is provided with Glue dripping head, mounting bracket inner left wall top is provided with the second pole, and the second pole right-hand member is connected with casing, and casing top right side is provided with feed pipe.The present invention needs LED support for dispensing glue to reach suitable height by stepping on pedal and causing to place on plate so that dispensing position is more accurate, and dispensing effect is more preferable.

Description

A kind of electricity-saving lamp making spot gluing equipment
Technical field
The present invention relates to a kind of spot gluing equipment, more particularly to a kind of electricity-saving lamp making spot gluing equipment.
Background technology
Electricity-saving lamp, is also called Electricity-saving lamp bulb, electronic bulbs, compact fluorescent lamp and Integral fluorescent lamp, refers to by fluorescence Lamp and ballast combinations an into lighting apparatus for entirety.Country starts " green illumination " engineering, urban and rural residents and enterprise within 2008 Industry enjoys a certain proportion of subsidy using acceptance of the bid industry energy conservation lamp.The dissemination of electricity-saving lamp is great, however, waste energy-saving lamps pair The harm of environment also result in concern.By in by the end of October, 2012, energy efficiency promotion engineering has more than one hundred million electricity-saving lamps to scrap, every only to pollute 180 tons of water and five or six mu of soil, the treatment of waste energy-saving lamps and recovery problem cause concern.Even so, people are for energy-conservation The demand of lamp is still constantly increasing, and especially 2015 for just having arrived, demand is still increasing.In the system of electricity-saving lamp During work, it is necessary on the relevant position point of LED support elargol or insulating cement.Critical technological point is the control of dispensing amount, There is detailed technological requirement colloid height, dispensing position.Due to elargol and insulating cement storage and using have it is strict will Ask, awake material, stirring, the use time of elargol are all the items that must be noted that in technique.For this, we need research and development a kind of special Give energy-saving lamp support frame equipment for dispensing glue.
To sum up, need to research and develop a kind of colloid at present and be difficult to condense, be easily controlled the electricity-saving lamp making of dispensing amount and set with dispensing It is standby to overcome colloid in the prior art easily to condense, the shortcoming of dispensing amount whard to control.
The content of the invention
(1) technical problem to be solved
The present invention is in order to overcome colloid in the prior art easily to condense, the shortcoming of dispensing amount whard to control, and the present invention will be solved Technical problem certainly is to provide a kind of colloid and is difficult to condense, be easily controlled the electricity-saving lamp making spot gluing equipment of dispensing amount.
(2) technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a electricity-saving lamp making spot gluing equipment, include Mounting bracket, placement plate, lowering or hoisting gear, the first pole, storage tank, Glue dripping head, the second pole, casing, feed pipe and blanking device, Mounting bracket inner bottom part is provided with lowering or hoisting gear, and lowering or hoisting gear top is provided with placement plate, and mounting bracket inner left wall middle part is provided with the first pole, First pole right-hand member is connected with storage tank, and storage tank bottom even is provided with Glue dripping head, and mounting bracket inner left wall top is provided with second Bar, the second pole right-hand member is connected with casing, and casing top right side is provided with feed pipe, is connected between bottom half and storage tank top There is blanking device.
Preferably, lowering or hoisting gear include the first slide rail, the first sliding block, the first wedge, the second slide rail, the second sliding block, First spring, the first fixed pulley, the second fixed pulley, the 3rd fixed pulley, the 3rd slide rail, the 3rd sliding block, pedal, the second wedge and First bracing wire, mounting bracket inner bottom part center is provided with the first slide rail, and the first slide rail top slide formula is connected with the first sliding block, and first slides Block top is provided with the first wedge, and mounting bracket inner left wall bottom is provided with the second slide rail, and the second slide rail right side slidingtype is connected with the Two sliding blocks, are connected with the first spring between the second slide rail lower right side and the first wedge left side, the first spring is located at second and slides Block lower section, the second sliding block right side is provided with placement plate, places plate bottom centre and is provided with the second wedge, the second wedge bottom and the One wedge top contact, mounting bracket inner right wall bottom is provided with the first fixed pulley, and it is fixed sliding that mounting bracket inner right wall middle part is provided with second Wheel, mounting bracket right side central is provided with the 3rd fixed pulley, and mounting bracket lower right side is provided with the 3rd slide rail, the 3rd slide rail right side slidingtype The 3rd sliding block is connected with, the 3rd sliding block right side is provided with pedal, and the first wedge right side is connected with the first bracing wire, and the first bracing wire is successively The first fixed pulley, the second fixed pulley and the 3rd fixed pulley are bypassed, bottom is connected with the 3rd slider top.
Preferably, blanking device includes the 4th slide rail, Four-slider, baffle plate, second spring, block, the second bracing wire, rubber Glueballs and tremie pipe, storage tank top are provided with the 4th slide rail, and the 4th slide rail top slide formula is connected with Four-slider, Four-slider Left side is provided with baffle plate, and the 4th slide rail top center is provided with block, is connected between block left lower and Four-slider right side central There is second spring, Four-slider right upper portion is connected with the second bracing wire, and second is drawstring through block and mounting bracket right wall top, it is right End is connected with ball, and tremie pipe is connected between bottom half left side and storage tank top left side, and baffle plate left part passes through blanking Pipe bottom, and blocked.
Preferably, bearing, rotating shaft, blade, gear, the 5th slide rail, the 5th sliding block, tooth bar, the 3rd spring, are also included Four fixed pulleys and the 3rd bracing wire, casing top front side center are provided with bearing, and rotating shaft is provided with bearing, and rotating shaft bottom is provided with blade, Rotating shaft top is provided with gear, and casing top rear side is provided with the 5th slide rail, and the 5th slide rail top slide formula is connected with the 5th sliding block, the Five slider tops are provided with tooth bar, and rack and pinion engagement is connected with the 3rd bullet between tooth bar left end and mounting bracket inner left wall top Spring, mounting bracket right upper portion is provided with the 4th fixed pulley, and tooth bar right-hand member is connected with the 3rd bracing wire, and the 3rd is drawstring through mounting bracket right wall Top, bypasses the 4th fixed pulley, and bottom is connected with pedal top left side.
Preferably, the 4th spring and steel ball are also included, rotating shaft bottom is symmetrical to be connected with the 4th spring, the 4th spring Bottom is connected with steel ball.
Preferably, it is stainless steel to install frame material.
Preferably, it is Q235 steel to place plate material.
Preferably, storing tank material is high-quality steel, surface covering zinc coat.
Operation principle:When needing on the relevant position point of LED support elargol or during insulating cement, will need first for dispensing glue LED support is placed on the suitable position of placement plate, and elargol or insulating cement are poured into casing by feed pipe then, is then led to Blanking device is crossed toward proper amount of elargol or insulating cement is loaded in storage tank, plate and thereon then will be placed by lowering or hoisting gear LED support rises to correct position, the dispensing on LED support by Glue dripping head, after dispensing is finished, is put by lowering or hoisting gear handle Put plate and LED support thereon drops to initial position, the LED support after then dispensing is finished is removed.Thus by uniform Be provided with Glue dripping head carries out dispensing to LED support so that dispensing is more uniform.
Because lowering or hoisting gear includes the first slide rail, the first sliding block, the first wedge, the second slide rail, the second sliding block, first Spring, the first fixed pulley, the second fixed pulley, the 3rd fixed pulley, the 3rd slide rail, the 3rd sliding block, pedal, the second wedge and first Bracing wire, mounting bracket inner bottom part center is provided with the first slide rail, and the first slide rail top slide formula is connected with the first sliding block, the first sliding block top Portion is provided with the first wedge, and mounting bracket inner left wall bottom is provided with the second slide rail, and the second slide rail right side slidingtype is connected with the second cunning Block, is connected with the first spring between the second slide rail lower right side and the first wedge left side, the first spring is located under the second sliding block Side, the second sliding block right side is provided with placement plate, places plate bottom centre and is provided with the second wedge, the second wedge bottom and first wedge Shape block top contact, mounting bracket inner right wall bottom is provided with the first fixed pulley, and mounting bracket inner right wall middle part is provided with the second fixed pulley, pacifies Shelve right side central and be provided with the 3rd fixed pulley, mounting bracket lower right side is provided with the 3rd slide rail, the slidingtype connection of the 3rd slide rail right side There is the 3rd sliding block, the 3rd sliding block right side is provided with pedal, and the first wedge right side is connected with the first bracing wire, and the first bracing wire is bypassed successively First fixed pulley, the second fixed pulley and the 3rd fixed pulley, bottom are connected with the 3rd slider top, when needs will be placed on plate When LED support rises to correct position, pedal being stepped on downwards, driving the 3rd sliding block to move downward, the is pulled by the first bracing wire One wedge is moved right, and the first spring is stretched, the first wedge move right drive the second wedge and thereon device to Upper motion so that LED support is moved upwards, when LED support rises to suitable position, pedal, Glue dripping head pair are stepped in stopping LED support carries out dispensing, after dispensing is finished, unclamps pedal, and the first spring restores to the original state, and drives the first wedge to be returned to left movement To initial position, the second wedge and thereon device move back down to initial position under gravity, then remove dispensing The LED support for finishing.The height of LED support for dispensing glue is needed on plate thus by stepping on pedal regulation and placing so that dispensing position Put more accurate, dispensing effect is more preferable.
Because blanking device includes the 4th slide rail, Four-slider, baffle plate, second spring, block, the second bracing wire, rubber Ball and tremie pipe, storage tank top are provided with the 4th slide rail, and the 4th slide rail top slide formula is connected with Four-slider, and Four-slider is left Side is provided with baffle plate, and the 4th slide rail top center is provided with block, is connected between block left lower and Four-slider right side central Second spring, Four-slider right upper portion is connected with the second bracing wire, and second is drawstring through block and mounting bracket right wall top, right-hand member Ball is connected with, tremie pipe is connected between bottom half left side and storage tank top left side, baffle plate left part passes through tremie pipe Bottom, and blocked, when needing to inject a certain amount of colloid toward in storage tank, ball is pulled to the right, drawn by second Line pulls Four-slider to slide to the right, and second spring is compressed, and Four-slider slides to the right drive baffle plate and moves right, tremie pipe It is opened at leisure, the elargol or insulating cement in casing enter in storage tank, when the elargol or insulating cement of storage tank reach properly During amount, ball is unclamped, second spring restores to the original state, drive Four-slider to slide to the left, and then drive baffle plate to be returned to left movement To initial position, tremie pipe is blocked again.The amount of colloid is adjusted thus by ball is pulled so that dispensing is more Uniformly, and colloid will not be wasted, has reached cost-effective effect.
Because also including bearing, rotating shaft, blade, gear, the 5th slide rail, the 5th sliding block, tooth bar, the 3rd spring, the 4th Fixed pulley and the 3rd bracing wire, casing top front side center are provided with bearing, and rotating shaft is provided with bearing, and rotating shaft bottom is provided with blade, turns Axle top is provided with gear, and casing top rear side is provided with the 5th slide rail, and the 5th slide rail top slide formula is connected with the 5th sliding block, the 5th Slider top is provided with tooth bar, and rack and pinion engagement is connected with the 3rd spring between tooth bar left end and mounting bracket inner left wall top, Mounting bracket right upper portion is provided with the 4th fixed pulley, and tooth bar right-hand member is connected with the 3rd bracing wire, and the 3rd is drawstring through in mounting bracket right wall Portion, bypasses the 4th fixed pulley, and bottom is connected with pedal top left side, when stepping on pedal downwards, tooth bar is pulled by the 3rd bracing wire Move right, the 3rd spring is drawn high, tooth bar moves right band moving gear and rotates clockwise, and then drive rotating shaft to turn clockwise Dynamic, so as to drive vane clockwise to rotate, when unclamping pedal, the 3rd spring is restored to the original state, and band carry-over bar is moved to the left, and then band Moving gear is rotated counterclockwise, so as to drive rotating shaft to rotate counterclockwise, rotating shaft rotates counterclockwise drive blade and rotates counterclockwise.So While pedal is stepped on, blade constantly along rotating counterclockwise, is constantly stirred so that colloid to the colloid in casing It is difficult to condense, it is ensured that the quality of colloid.
Because preferably, also including the 4th spring and steel ball, rotating shaft bottom is symmetrical to be connected with the 4th spring, the 4th Spring bottom end is connected with steel ball, when rotating shaft is along rotating counterclockwise, the 4th spring and steel ball is driven along rotating counterclockwise, by casing The colloid of inwall residual is scraped, and reaches the effect that bed material is difficult residual.
(3) beneficial effect
The present invention needs LED support for dispensing glue to reach suitable height by stepping on pedal and causing to place on plate so that point Glue position is more accurate, dispensing effect more preferably, by stepping on pedal it is also possible that blade is constantly along rotating counterclockwise, to case Internal colloid is constantly stirred, and then causes that colloid is difficult to condense, it is ensured that the quality of colloid.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the invention.
Fig. 2 is the main structure diagram of lowering or hoisting gear of the present invention.
Fig. 3 is the main structure diagram of blanking device of the present invention.
Fig. 4 is the first part main structure diagram of the invention.
Fig. 5 is second part of the invention main structure diagram.
Mark in accompanying drawing for:1- mounting brackets, 2- placement plates, 3- lowering or hoisting gears, the slide rails of 31- first, the sliding blocks of 32- first, The wedges of 33- first, the slide rails of 34- second, the sliding blocks of 35- second, the springs of 36- first, the fixed pulleys of 37- first, 38- second is calmly sliding Wheel, the fixed pulleys of 39- the 3rd, the slide rails of 310- the 3rd, the sliding blocks of 311- the 3rd, 312- pedals, the wedges of 313- second, 314- first draws Line, the poles of 4- first, 5- storage tanks, 6- Glue dripping heads, the poles of 7- second, 8- casings, 9- feed pipes, 10- blanking devices, 101- Four slide rails, 102- Four-sliders, 103- baffle plates, 104- second springs, 105- blocks, the bracing wires of 106- second, 107- balls, 108- tremie pipes, 11- bearings, 12- rotating shafts, 13- blades, 14- gears, the slide rails of 15- the 5th, the sliding blocks of 16- the 5th, 17- tooth bars, The springs of 18- the 3rd, the fixed pulleys of 19- the 4th, the bracing wires of 20- the 3rd, the springs of 21- the 4th, 22- steel balls.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of electricity-saving lamp making spot gluing equipment, as Figure 1-5, include mounting bracket 1, place plate 2, lowering or hoisting gear 3, First pole 4, storage tank 5, Glue dripping head 6, the second pole 7, casing 8, feed pipe 9 and blanking device 10, the inner bottom part of mounting bracket 1 set There is lowering or hoisting gear 3, the top of lowering or hoisting gear 3 is provided with placement plate 2, and the inner left wall of mounting bracket 1 middle part is provided with the first pole 4, the first pole 4 Right-hand member is connected with storage tank 5, and the bottom even of storage tank 5 is provided with Glue dripping head 6, and the inner left wall top of mounting bracket 1 is provided with the second pole 7, The right-hand member of second pole 7 is connected with casing 8, and the top right side of casing 8 is provided with feed pipe 9, between the bottom of casing 8 and the top of storage tank 5 It is connected with blanking device 10.
Embodiment 2
A kind of electricity-saving lamp making spot gluing equipment, as Figure 1-5, include mounting bracket 1, place plate 2, lowering or hoisting gear 3, First pole 4, storage tank 5, Glue dripping head 6, the second pole 7, casing 8, feed pipe 9 and blanking device 10, the inner bottom part of mounting bracket 1 set There is lowering or hoisting gear 3, the top of lowering or hoisting gear 3 is provided with placement plate 2, and the inner left wall of mounting bracket 1 middle part is provided with the first pole 4, the first pole 4 Right-hand member is connected with storage tank 5, and the bottom even of storage tank 5 is provided with Glue dripping head 6, and the inner left wall top of mounting bracket 1 is provided with the second pole 7, The right-hand member of second pole 7 is connected with casing 8, and the top right side of casing 8 is provided with feed pipe 9, between the bottom of casing 8 and the top of storage tank 5 It is connected with blanking device 10.
Lowering or hoisting gear 3 includes the first slide rail 31, the first sliding block 32, the first wedge 33, the second slide rail 34, the second sliding block 35th, the first spring 36, the first fixed pulley 37, the second fixed pulley 38, the 3rd fixed pulley 39, the 3rd slide rail 310, the 3rd sliding block 311, Pedal 312, the second wedge 313 and the first bracing wire 314, the inner bottom part center of mounting bracket 1 are provided with the first slide rail 31, the first slide rail 31 Top slide formula is connected with the first sliding block 32, and the top of the first sliding block 32 is provided with the first wedge 33, and the inner left wall bottom of mounting bracket 1 sets There is the second slide rail 34, the right side slidingtype of the second slide rail 34 is connected with the second sliding block 35, the lower right side of the second slide rail 34 and first wedge The first spring 36 is connected between the left side of shape block 33, the first spring 36 is located at the lower section of the second sliding block 35, and the right side of the second sliding block 35 sets There is placement plate 2, place the bottom centre of plate 2 and be provided with the second wedge 313, the bottom of the second wedge 313 is pushed up with the first wedge 33 Portion contacts, and the inner right wall bottom of mounting bracket 1 is provided with the first fixed pulley 37, and the inner right wall of mounting bracket 1 middle part is provided with the second fixed pulley 38, pacifies Shelve 1 right side central and be provided with the 3rd fixed pulley 39, the lower right side of mounting bracket 1 is provided with the 3rd slide rail 310, the right side of the 3rd slide rail 310 Slidingtype is connected with the 3rd sliding block 311, and the right side of the 3rd sliding block 311 is provided with pedal 312, and the right side of the first wedge 33 is connected with first Bracing wire 314, the first bracing wire 314 bypasses the first fixed pulley 37, the second fixed pulley 38 and the 3rd fixed pulley 39, bottom and the 3rd successively The connection of the top of sliding block 311.
Embodiment 3
A kind of electricity-saving lamp making spot gluing equipment, as Figure 1-5, include mounting bracket 1, place plate 2, lowering or hoisting gear 3, First pole 4, storage tank 5, Glue dripping head 6, the second pole 7, casing 8, feed pipe 9 and blanking device 10, the inner bottom part of mounting bracket 1 set There is lowering or hoisting gear 3, the top of lowering or hoisting gear 3 is provided with placement plate 2, and the inner left wall of mounting bracket 1 middle part is provided with the first pole 4, the first pole 4 Right-hand member is connected with storage tank 5, and the bottom even of storage tank 5 is provided with Glue dripping head 6, and the inner left wall top of mounting bracket 1 is provided with the second pole 7, The right-hand member of second pole 7 is connected with casing 8, and the top right side of casing 8 is provided with feed pipe 9, between the bottom of casing 8 and the top of storage tank 5 It is connected with blanking device 10.
Lowering or hoisting gear 3 includes the first slide rail 31, the first sliding block 32, the first wedge 33, the second slide rail 34, the second sliding block 35th, the first spring 36, the first fixed pulley 37, the second fixed pulley 38, the 3rd fixed pulley 39, the 3rd slide rail 310, the 3rd sliding block 311, Pedal 312, the second wedge 313 and the first bracing wire 314, the inner bottom part center of mounting bracket 1 are provided with the first slide rail 31, the first slide rail 31 Top slide formula is connected with the first sliding block 32, and the top of the first sliding block 32 is provided with the first wedge 33, and the inner left wall bottom of mounting bracket 1 sets There is the second slide rail 34, the right side slidingtype of the second slide rail 34 is connected with the second sliding block 35, the lower right side of the second slide rail 34 and first wedge The first spring 36 is connected between the left side of shape block 33, the first spring 36 is located at the lower section of the second sliding block 35, and the right side of the second sliding block 35 sets There is placement plate 2, place the bottom centre of plate 2 and be provided with the second wedge 313, the bottom of the second wedge 313 is pushed up with the first wedge 33 Portion contacts, and the inner right wall bottom of mounting bracket 1 is provided with the first fixed pulley 37, and the inner right wall of mounting bracket 1 middle part is provided with the second fixed pulley 38, pacifies Shelve 1 right side central and be provided with the 3rd fixed pulley 39, the lower right side of mounting bracket 1 is provided with the 3rd slide rail 310, the right side of the 3rd slide rail 310 Slidingtype is connected with the 3rd sliding block 311, and the right side of the 3rd sliding block 311 is provided with pedal 312, and the right side of the first wedge 33 is connected with first Bracing wire 314, the first bracing wire 314 bypasses the first fixed pulley 37, the second fixed pulley 38 and the 3rd fixed pulley 39, bottom and the 3rd successively The connection of the top of sliding block 311.
Blanking device 10 include the 4th slide rail 101, Four-slider 102, baffle plate 103, second spring 104, block 105, Second bracing wire 106, ball 107 and tremie pipe 108, the top of storage tank 5 are provided with the 4th slide rail 101, and the top of the 4th slide rail 101 is sliding Dynamic formula is connected with Four-slider 102, and the left side of Four-slider 102 is provided with baffle plate 103, and the top center of the 4th slide rail 101 is provided with block 105, second spring 104, the right side of Four-slider 102 are connected between the left lower of block 105 and the right side central of Four-slider 102 Top is connected with the second bracing wire 106, and the second bracing wire 106 passes through block 105 and the right wall top of mounting bracket 1, and right-hand member is connected with rubber Ball 107, is connected with tremie pipe 108 between the bottom left of casing 8 and the top left side of storage tank 5, the left part of baffle plate 103 passes through tremie pipe 108 bottoms, and blocked.
Embodiment 4
A kind of electricity-saving lamp making spot gluing equipment, as Figure 1-5, include mounting bracket 1, place plate 2, lowering or hoisting gear 3, First pole 4, storage tank 5, Glue dripping head 6, the second pole 7, casing 8, feed pipe 9 and blanking device 10, the inner bottom part of mounting bracket 1 set There is lowering or hoisting gear 3, the top of lowering or hoisting gear 3 is provided with placement plate 2, and the inner left wall of mounting bracket 1 middle part is provided with the first pole 4, the first pole 4 Right-hand member is connected with storage tank 5, and the bottom even of storage tank 5 is provided with Glue dripping head 6, and the inner left wall top of mounting bracket 1 is provided with the second pole 7, The right-hand member of second pole 7 is connected with casing 8, and the top right side of casing 8 is provided with feed pipe 9, between the bottom of casing 8 and the top of storage tank 5 It is connected with blanking device 10.
Lowering or hoisting gear 3 includes the first slide rail 31, the first sliding block 32, the first wedge 33, the second slide rail 34, the second sliding block 35th, the first spring 36, the first fixed pulley 37, the second fixed pulley 38, the 3rd fixed pulley 39, the 3rd slide rail 310, the 3rd sliding block 311, Pedal 312, the second wedge 313 and the first bracing wire 314, the inner bottom part center of mounting bracket 1 are provided with the first slide rail 31, the first slide rail 31 Top slide formula is connected with the first sliding block 32, and the top of the first sliding block 32 is provided with the first wedge 33, and the inner left wall bottom of mounting bracket 1 sets There is the second slide rail 34, the right side slidingtype of the second slide rail 34 is connected with the second sliding block 35, the lower right side of the second slide rail 34 and first wedge The first spring 36 is connected between the left side of shape block 33, the first spring 36 is located at the lower section of the second sliding block 35, and the right side of the second sliding block 35 sets There is placement plate 2, place the bottom centre of plate 2 and be provided with the second wedge 313, the bottom of the second wedge 313 is pushed up with the first wedge 33 Portion contacts, and the inner right wall bottom of mounting bracket 1 is provided with the first fixed pulley 37, and the inner right wall of mounting bracket 1 middle part is provided with the second fixed pulley 38, pacifies Shelve 1 right side central and be provided with the 3rd fixed pulley 39, the lower right side of mounting bracket 1 is provided with the 3rd slide rail 310, the right side of the 3rd slide rail 310 Slidingtype is connected with the 3rd sliding block 311, and the right side of the 3rd sliding block 311 is provided with pedal 312, and the right side of the first wedge 33 is connected with first Bracing wire 314, the first bracing wire 314 bypasses the first fixed pulley 37, the second fixed pulley 38 and the 3rd fixed pulley 39, bottom and the 3rd successively The connection of the top of sliding block 311.
Blanking device 10 include the 4th slide rail 101, Four-slider 102, baffle plate 103, second spring 104, block 105, Second bracing wire 106, ball 107 and tremie pipe 108, the top of storage tank 5 are provided with the 4th slide rail 101, and the top of the 4th slide rail 101 is sliding Dynamic formula is connected with Four-slider 102, and the left side of Four-slider 102 is provided with baffle plate 103, and the top center of the 4th slide rail 101 is provided with block 105, second spring 104, the right side of Four-slider 102 are connected between the left lower of block 105 and the right side central of Four-slider 102 Top is connected with the second bracing wire 106, and the second bracing wire 106 passes through block 105 and the right wall top of mounting bracket 1, and right-hand member is connected with rubber Ball 107, is connected with tremie pipe 108 between the bottom left of casing 8 and the top left side of storage tank 5, the left part of baffle plate 103 passes through tremie pipe 108 bottoms, and blocked.
Also include bearing 11, rotating shaft 12, blade 13, gear 14, the 5th slide rail 15, the 5th sliding block 16, tooth bar the 17, the 3rd Spring 18, the 4th fixed pulley 19 and the 3rd bracing wire 20, the top of casing 8 front side center are provided with bearing 11, bearing 11 and are provided with rotating shaft 12, the bottom of rotating shaft 12 is provided with blade 13, and the top of rotating shaft 12 is provided with gear 14, and the top rear of casing 8 is provided with the 5th slide rail 15, the 5th The top slide formula of slide rail 15 is connected with the 5th sliding block 16, and the top of the 5th sliding block 16 is provided with tooth bar 17, and tooth bar 17 is engaged with gear 14, The 3rd spring 18 is connected between the left end of tooth bar 17 and the inner left wall top of mounting bracket 1, it is fixed sliding that the right upper portion of mounting bracket 1 is provided with the 4th Wheel 19, the right-hand member of tooth bar 17 is connected with the 3rd bracing wire 20, and the 3rd bracing wire 20 passes through the right wall top of mounting bracket 1, bypasses the 4th fixed pulley 19, bottom is connected with the top left side of pedal 312.
The 4th spring 21 and steel ball 22 are also included, the bottom of rotating shaft 12 is symmetrical to be connected with the 4th spring 21, the 4th bullet The bottom of spring 21 is connected with steel ball 22.
The material of mounting bracket 1 is stainless steel.
It is Q235 steel to place the material of plate 2.
The material of storage tank 5 is high-quality steel, surface covering zinc coat.
Operation principle:When needing on the relevant position point of LED support elargol or during insulating cement, will need first for dispensing glue LED support is placed on the 2-in-1 suitable position of placement plate, and elargol or insulating cement are poured into casing 8 by feed pipe 9 then, is connect By blanking device 10 toward the proper amount of elargol of loading or insulating cement in storage tank 5, plate then will be placed by lowering or hoisting gear 3 2 and LED support thereon rise to correct position, the dispensing on LED support by Glue dripping head 6, after dispensing is finished, by rise LED support of the falling unit 3 placement plate 2 and thereon drops to initial position, and the LED support after then dispensing is finished is removed. Dispensing is carried out to LED support thus by Glue dripping head 6 is uniformly provided with so that dispensing is more uniform.
Because lowering or hoisting gear 3 includes the first slide rail 31, the first sliding block 32, the first wedge 33, the second slide rail 34, second Sliding block 35, the first spring 36, the first fixed pulley 37, the second fixed pulley 38, the 3rd fixed pulley 39, the 3rd slide rail 310, the 3rd sliding block 311st, pedal 312, the second wedge 313 and the first bracing wire 314, the inner bottom part center of mounting bracket 1 are provided with the first slide rail 31, and first slides The top slide formula of rail 31 is connected with the first sliding block 32, and the top of the first sliding block 32 is provided with the first wedge 33, under the inner left wall of mounting bracket 1 Portion is provided with the second slide rail 34, and the right side slidingtype of the second slide rail 34 is connected with the second sliding block 35, the lower right side of the second slide rail 34 and the The first spring 36 is connected between the left side of one wedge 33, the first spring 36 is located at the lower section of the second sliding block 35, and the second sliding block 35 is right Side is provided with placement plate 2, places the bottom centre of plate 2 and is provided with the second wedge 313, the bottom of the second wedge 313 and the first wedge 33 top contacts, the inner right wall bottom of mounting bracket 1 is provided with the first fixed pulley 37, and the inner right wall of mounting bracket 1 middle part is provided with the second fixed pulley 38, the right side central of mounting bracket 1 is provided with the 3rd fixed pulley 39, and the lower right side of mounting bracket 1 is provided with the 3rd slide rail 310, the 3rd slide rail 310 Right side slidingtype is connected with the 3rd sliding block 311, and the right side of the 3rd sliding block 311 is provided with pedal 312, and the right side of the first wedge 33 is connected with First bracing wire 314, the first bracing wire 314 bypasses the first fixed pulley 37, the second fixed pulley 38 and the 3rd fixed pulley 39 successively, bottom with The connection of the top of 3rd sliding block 311, when needing for the LED support placed on plate 2 to rise to correct position, steps on downwards pedal 312, drive the 3rd sliding block 311 to move downward, pull the first wedge 33 to move right by the first bracing wire 314, the first spring 36 are stretched, and the first wedge 33 moves right the second wedge 313 of drive and device is moved upwards thereon so that LED support Motion upwards, when LED support rises to suitable position, pedal 312 is stepped in stopping, and Glue dripping head 6 is carried out a little to LED support Glue, after dispensing is finished, unclamps pedal 312, and the first spring 36 restores to the original state, and drives the first wedge 33 to move back into the left initially Position, the second wedge 313 and device moves back down to initial position under gravity thereon is then removed dispensing and is finished LED support.The height of LED support for dispensing glue is needed on plate 2 thus by stepping on the regulation of pedal 312 and placing so that dispensing position Put more accurate, dispensing effect is more preferable.
Because blanking device 10 includes the 4th slide rail 101, Four-slider 102, baffle plate 103, second spring 104, block 105th, the second bracing wire 106, ball 107 and tremie pipe 108, the top of storage tank 5 are provided with the 4th slide rail 101, and the 4th slide rail 101 is pushed up Portion's slidingtype is connected with Four-slider 102, and the left side of Four-slider 102 is provided with baffle plate 103, and the top center of the 4th slide rail 101 is provided with Block 105, is connected with second spring 104, Four-slider 102 between the left lower of block 105 and the right side central of Four-slider 102 Right upper portion is connected with the second bracing wire 106, and the second bracing wire 106 passes through block 105 and the right wall top of mounting bracket 1, and right-hand member is connected with Ball 107, is connected with tremie pipe 108 between the bottom left of casing 8 and the top left side of storage tank 5, the left part of baffle plate 103 is passed through down The bottom of expects pipe 108, and blocked, when needing to inject a certain amount of colloid toward in storage tank 5, ball 107 is pulled to the right, Four-slider 102 is pulled to slide to the right by the second bracing wire 106, second spring 104 is compressed, and Four-slider 102 is slided to the right Baffle plate 103 is driven to move right, tremie pipe 108 is opened at leisure, the elargol or insulating cement in casing 8 enter in storage tank 5, When the elargol or insulating cement of storage tank 5 reach appropriate amount, ball 107 is unclamped, second spring 104 restores to the original state, drive the Four-slider 102 is slided to the left, and then drives baffle plate 103 to move back into initial position to the left, again blocks tremie pipe 108.Such as This is adjusted by pulling ball 107 to the amount of colloid so that dispensing is more uniform, and will not waste colloid, is reached Cost-effective effect.
Because also include bearing 11, rotating shaft 12, blade 13, gear 14, the 5th slide rail 15, the 5th sliding block 16, tooth bar 17, 3rd spring 18, the 4th fixed pulley 19 and the 3rd bracing wire 20, the top of casing 8 front side center are provided with bearing 11, bearing 11 and are provided with Rotating shaft 12, the bottom of rotating shaft 12 is provided with blade 13, and the top of rotating shaft 12 is provided with gear 14, and the top rear of casing 8 is provided with the 5th slide rail 15, The top slide formula of 5th slide rail 15 is connected with the 5th sliding block 16, and the top of the 5th sliding block 16 is provided with tooth bar 17, tooth bar 17 and gear 14 Engagement, is connected with the 3rd spring 18 between the left end of tooth bar 17 and the inner left wall top of mounting bracket 1, the right upper portion of mounting bracket 1 is provided with the Four fixed pulleys 19, the right-hand member of tooth bar 17 is connected with the 3rd bracing wire 20, and the 3rd bracing wire 20 passes through the right wall top of mounting bracket 1, bypasses the 4th Fixed pulley 19, bottom is connected with the top left side of pedal 312, when stepping on pedal 312 downwards, tooth bar 17 is pulled by the 3rd bracing wire 20 Move right, the 3rd spring 18 is drawn high, tooth bar 17 moves right band moving gear 14 and rotates clockwise, and then drive rotating shaft 12 suitable Hour hands are rotated, so as to drive blade 13 to rotate clockwise, when unclamping pedal 312, the 3rd spring 18 restores to the original state, band carry-over bar 17 Rotated counterclockwise to left movement, and then band moving gear 14, so as to drive rotating shaft 12 to rotate counterclockwise, rotating shaft 12 rotates counterclockwise band Movable vane piece 13 is rotated counterclockwise.So while pedal 312 are stepped on, blade 13 is constantly suitable to be rotated counterclockwise, in casing 8 Colloid be constantly stirred so that colloid be difficult condense, it is ensured that the quality of colloid.
The 4th spring 21 and steel ball 22 are also included, the bottom of rotating shaft 12 is symmetrical to be connected with the 4th spring 21, the 4th bullet The bottom of spring 21 is connected with steel ball 22, when rotating shaft 12 is along rotating counterclockwise, drives the 4th spring 21 and steel ball 22 to turn along counterclockwise It is dynamic, the colloid that the inwall of casing 8 is remained is scraped, reach the effect that bed material is difficult residual.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations, improvement can also be made and substituted, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (8)

1. a kind of electricity-saving lamp making spot gluing equipment, it is characterised in that include mounting bracket (1), place plate (2), lowering or hoisting gear (3), the first pole (4), storage tank (5), Glue dripping head (6), the second pole (7), casing (8), feed pipe (9) and blanking device (10), mounting bracket (1) inner bottom part is provided with lowering or hoisting gear (3), and lowering or hoisting gear (3) top is provided with placement plate (2), mounting bracket (1) Left wall middle part is provided with the first pole (4), and the first pole (4) right-hand member is connected with storage tank (5), and storage tank (5) bottom even is provided with Glue dripping head (6), mounting bracket (1) inner left wall top is provided with the second pole (7), and the second pole (7) right-hand member is connected with casing (8), case Body (8) top right side is provided with feed pipe (9), and blanking device (10) is connected between casing (8) bottom and storage tank (5) top.
2. a kind of electricity-saving lamp making spot gluing equipment according to claim 1, it is characterised in that lowering or hoisting gear (3) includes There are the first slide rail (31), the first sliding block (32), the first wedge (33), the second slide rail (34), the second sliding block (35), the first spring (36), the first fixed pulley (37), the second fixed pulley (38), the 3rd fixed pulley (39), the 3rd slide rail (310), the 3rd sliding block (311), pedal (312), the second wedge (313) and the first bracing wire (314), mounting bracket (1) inner bottom part center is provided with the first cunning Rail (31), the first slide rail (31) top slide formula is connected with the first sliding block (32), and the first sliding block (32) top is provided with the first wedge shape Block (33), mounting bracket (1) inner left wall bottom is provided with the second slide rail (34), and the second slide rail (34) right side slidingtype is connected with the second cunning Block (35), the first spring (36), the first bullet are connected between the second slide rail (34) lower right side and the first wedge (33) left side Spring (36) is provided with placement plate (2) positioned at the second sliding block (35) lower section, the second sliding block (35) right side, places plate (2) bottom centre and sets There are the second wedge (313), the second wedge (313) bottom and the first wedge (33) top contact, mounting bracket (1) inner right wall Bottom is provided with the first fixed pulley (37), and mounting bracket (1) inner right wall middle part is provided with the second fixed pulley (38), in mounting bracket (1) right side Portion is provided with the 3rd fixed pulley (39), and mounting bracket (1) lower right side is provided with the 3rd slide rail (310), and the 3rd slide rail (310) right side is slided Formula is connected with the 3rd sliding block (311), and the 3rd sliding block (311) right side is provided with pedal (312), and the first wedge (33) right side is connected with First bracing wire (314), the first bracing wire (314) bypasses the first fixed pulley (37), the second fixed pulley (38) and the 3rd fixed pulley successively (39), bottom is connected with the 3rd sliding block (311) top.
3. a kind of electricity-saving lamp making spot gluing equipment according to claim 2, it is characterised in that blanking device (10) includes There are the 4th slide rail (101), Four-slider (102), baffle plate (103), second spring (104), block (105), the second bracing wire (106), ball (107) and tremie pipe (108), storage tank (5) top are provided with the 4th slide rail (101), the 4th slide rail (101) top Portion's slidingtype is connected with Four-slider (102), and Four-slider (102) left side is provided with baffle plate (103), the 4th slide rail (101) top Center is provided with block (105), and second spring is connected between block (105) left lower and Four-slider (102) right side central (104), Four-slider (102) right upper portion is connected with the second bracing wire (106), and the second bracing wire (106) is through block (105) and pacifies (1) right wall top is shelved, right-hand member is connected with ball (107), between casing (8) bottom left and storage tank (5) top left side Tremie pipe (108) is connected with, baffle plate (103) left part passes through tremie pipe (108) bottom, and is blocked.
4. a kind of electricity-saving lamp making spot gluing equipment according to claim 3, it is characterised in that also include bearing (11), rotating shaft (12), blade (13), gear (14), the 5th slide rail (15), the 5th sliding block (16), tooth bar (17), the 3rd spring (18), the 4th fixed pulley (19) and the 3rd bracing wire (20), casing (8) top front side center are provided with bearing (11), bearing (11) Rotating shaft (12) is provided with, rotating shaft (12) bottom is provided with blade (13), and rotating shaft (12) top is provided with gear (14), behind casing (8) top Side is provided with the 5th slide rail (15), and the 5th slide rail (15) top slide formula is connected with the 5th sliding block (16), the 5th sliding block (16) top Tooth bar (17) is provided with, tooth bar (17) is engaged with gear (14), is connected between tooth bar (17) left end and mounting bracket (1) inner left wall top There is the 3rd spring (18), mounting bracket (1) right upper portion is provided with the 4th fixed pulley (19), and tooth bar (17) right-hand member is connected with the 3rd bracing wire (20), the 3rd bracing wire (20) bypasses the 4th fixed pulley (19), bottom and pedal (312) top through mounting bracket (1) right wall top Left side connects.
5. a kind of electricity-saving lamp making spot gluing equipment according to claim 4, it is characterised in that also include the 4th spring (21) and steel ball (22), rotating shaft (12) bottom is symmetrical to be connected with the 4th spring (21), and the 4th spring (21) bottom is connected with Steel ball (22).
6. a kind of electricity-saving lamp making spot gluing equipment according to claim 5, it is characterised in that mounting bracket (1) material is Stainless steel.
7. a kind of electricity-saving lamp making spot gluing equipment according to claim 6, it is characterised in that placing plate (2) material is Q235 steel.
8. a kind of electricity-saving lamp making spot gluing equipment according to claim 7, it is characterised in that storage tank (5) material is High-quality steel, surface covering zinc coat.
CN201710305047.2A 2017-05-03 2017-05-03 A kind of electricity-saving lamp making spot gluing equipment Withdrawn CN106914381A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710305047.2A CN106914381A (en) 2017-05-03 2017-05-03 A kind of electricity-saving lamp making spot gluing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710305047.2A CN106914381A (en) 2017-05-03 2017-05-03 A kind of electricity-saving lamp making spot gluing equipment

Publications (1)

Publication Number Publication Date
CN106914381A true CN106914381A (en) 2017-07-04

Family

ID=59568801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710305047.2A Withdrawn CN106914381A (en) 2017-05-03 2017-05-03 A kind of electricity-saving lamp making spot gluing equipment

Country Status (1)

Country Link
CN (1) CN106914381A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107597505A (en) * 2017-10-30 2018-01-19 安徽世林照明股份有限公司 A kind of LED elargol spot gluing equipment and dispensing method
CN108064573A (en) * 2017-12-05 2018-05-25 皮强义 One boar before green forage feeding with cutting off equipment
CN109224206A (en) * 2018-08-06 2019-01-18 刘庚坤 It is a kind of to remove device using rear syringe needle
WO2019104515A1 (en) * 2017-11-29 2019-06-06 张佩嫦 Adhesive dispensing equipment for production of led lamp electronic components
CN110983524A (en) * 2019-12-24 2020-04-10 苏州新育达精密机械有限公司 Method for manufacturing biphenyl heat box

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020040681A1 (en) * 2000-10-06 2002-04-11 Kenji Furuya Chucking device
CN105327832A (en) * 2015-11-27 2016-02-17 苏州兴亚净化工程有限公司 Uniform-glue-mixing glue filling machine
CN205146601U (en) * 2015-11-27 2016-04-13 苏州兴亚净化工程有限公司 Thoughtlessly join in marriage glue -pouring machine
CN105944900A (en) * 2016-07-05 2016-09-21 成都联超工业自动化有限公司 Dispensing device with relatively low cost
CN106334652A (en) * 2016-08-20 2017-01-18 浙江卡嘉莉鞋业有限公司 Efficient wax coating device for shoemaking fabrics
CN106493049A (en) * 2017-01-04 2017-03-15 南昌诺义弘科技有限公司 A kind of electronic devices and components dispensing and drying integrated device
CN106584551A (en) * 2016-12-08 2017-04-26 安徽利得隆包装有限公司 Uniform blister package material cutting device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020040681A1 (en) * 2000-10-06 2002-04-11 Kenji Furuya Chucking device
CN105327832A (en) * 2015-11-27 2016-02-17 苏州兴亚净化工程有限公司 Uniform-glue-mixing glue filling machine
CN205146601U (en) * 2015-11-27 2016-04-13 苏州兴亚净化工程有限公司 Thoughtlessly join in marriage glue -pouring machine
CN105944900A (en) * 2016-07-05 2016-09-21 成都联超工业自动化有限公司 Dispensing device with relatively low cost
CN106334652A (en) * 2016-08-20 2017-01-18 浙江卡嘉莉鞋业有限公司 Efficient wax coating device for shoemaking fabrics
CN106584551A (en) * 2016-12-08 2017-04-26 安徽利得隆包装有限公司 Uniform blister package material cutting device
CN106493049A (en) * 2017-01-04 2017-03-15 南昌诺义弘科技有限公司 A kind of electronic devices and components dispensing and drying integrated device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107597505A (en) * 2017-10-30 2018-01-19 安徽世林照明股份有限公司 A kind of LED elargol spot gluing equipment and dispensing method
WO2019104515A1 (en) * 2017-11-29 2019-06-06 张佩嫦 Adhesive dispensing equipment for production of led lamp electronic components
CN108064573A (en) * 2017-12-05 2018-05-25 皮强义 One boar before green forage feeding with cutting off equipment
CN109224206A (en) * 2018-08-06 2019-01-18 刘庚坤 It is a kind of to remove device using rear syringe needle
CN110983524A (en) * 2019-12-24 2020-04-10 苏州新育达精密机械有限公司 Method for manufacturing biphenyl heat box
CN110983524B (en) * 2019-12-24 2021-02-26 苏州新育达精密机械有限公司 Method for manufacturing biphenyl heat box

Similar Documents

Publication Publication Date Title
CN106914381A (en) A kind of electricity-saving lamp making spot gluing equipment
CN206996970U (en) A kind of electricity-saving lamp making spot gluing equipment
CN106738374A (en) A kind of building brick head efficient cutting
CN205702780U (en) A kind of for Type-C welding streamline equipment tool backflow mechanism
CN204381615U (en) Automatic interpolation scaling powder EGR and full-automatic tin soldering device
CN105345440B (en) Frame made of aluminum profiles corner brace automatic mounting machine
CN105151683B (en) Workpiece automatically feeding equipment and its method of work
CN206502851U (en) Rotary blowing formula aluminium liquid degasification slag removal equipment
CN107132094A (en) A kind of blood smear producing device
CN204823337U (en) Last unloader of glass panels printing machine
CN209157894U (en) A kind of centerless grinding machine feeding device
CN207951714U (en) A kind of automatic iron collector
CN107287646A (en) A kind of automatic electroplating stand arrangement
CN207296917U (en) A kind of petroleum well workover pipe racking device
CN206370343U (en) A kind of power distribution network transformer making apparatus containing three-phase three-column iron core
CN107887150B (en) A kind of power distribution network transformer automated production equipment containing three-phase three-column iron core
CN114561609B (en) Automatic logistics device capable of automatically returning to steel pipe hot galvanizing pretreatment of hanging strip
CN202671031U (en) Lifting beam tilting device for electroless nickel immersion gold
CN206527275U (en) A kind of bender
CN201572993U (en) Numerical-control case cover welding machine
CN106273604B (en) A kind of plastic honeycomb board production technology and its production line
CN203807058U (en) Lifting mechanism
CN104313342A (en) Metal electroslag remelting and smelting equipment
CN205010914U (en) Work piece autoloading equipment
CN107962012A (en) A kind of water tower high-efficiency washing device and production and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170704

WW01 Invention patent application withdrawn after publication