CN106909817A - A kind of generation method of user oriented intelligent substation integrated configuration access rights - Google Patents
A kind of generation method of user oriented intelligent substation integrated configuration access rights Download PDFInfo
- Publication number
- CN106909817A CN106909817A CN201710083016.7A CN201710083016A CN106909817A CN 106909817 A CN106909817 A CN 106909817A CN 201710083016 A CN201710083016 A CN 201710083016A CN 106909817 A CN106909817 A CN 106909817A
- Authority
- CN
- China
- Prior art keywords
- data
- user
- accessed
- logical node
- configuration
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/30—Authentication, i.e. establishing the identity or authorisation of security principals
- G06F21/31—User authentication
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2221/00—Indexing scheme relating to security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F2221/21—Indexing scheme relating to G06F21/00 and subgroups addressing additional information or applications relating to security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F2221/2141—Access rights, e.g. capability lists, access control lists, access tables, access matrices
Landscapes
- Engineering & Computer Science (AREA)
- Computer Security & Cryptography (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Software Systems (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Storage Device Security (AREA)
Abstract
The invention discloses a kind of generation method of user oriented intelligent substation integrated configuration access rights, based on data configuration authority list of overall importance, locality data user zone of responsibility table, logical device inst and the mapping table and logical node group of specialty and the mapping table of specialty, the data that intelligent Substation System configuration tool is accessed when carrying out integrated configuration to user automatically generate user's operating right that is configurable or only browsing.The method of the present invention is used in intelligent Substation System integrated configuration, can prevent the personnel beyond system integrator from changing any configuration data, configuration data system integrator changes itself responsible configuration task by mistake outside is also prevented from simultaneously, being conducive to raising multi-person synergy carries out the reliability of system integration configuration work, contribute to parellel arranged implementation, accelerate system integration progress.
Description
Technical field
The invention belongs to field of electric power automation, and in particular to a kind of user oriented intelligent substation integrated configuration is accessed
The generation method of authority.
Background technology
At present, the system integration work of intelligent Substation System is mainly responsible for by system integrator, in this stage, integrated
Commissioning staff needs to import the ICD texts of the device provided by each equipment supplier using intelligent Substation System configuration tool
Part, carries out substantial amounts of configuration work, and SCD file can be correctly derived after all debugging.Due to intelligent Substation System
Configuration information type that integrated work is related to is complicated, and configuration work amount is very big, therefore in real work, often multi-person synergy
Carry out integrated configuration work, and the responsible scope of personnel has been also carried out the task division of labor, such as:Somebody is responsible for drafting and once connects
Line chart, somebody is responsible for configuration system messaging parameter;Somebody is responsible for the device configuration at each interval in 220kV voltage class, has
People be responsible for the device configuration at each interval in 110kV voltage class;The integrated personnel of specialty are protected to be responsible for protecting related data
Configuration, the integrated personnel of Automation Specialty are responsible for the configuration of observing and controlling related data.However, in system configuration utility integrated personnel
But it is possible to mistakenly to being modified beyond the configuration data for itself being responsible for scope, if not solving this problem, can causes
Intelligent Substation System is debugged while integrated and is faced with huge risk, as it is possible that part configuration content is by debugging
Afterwards, and by other integrated personnel change by mistake.Therefore, system configuration utility is highly desirable to carry out user the control of operating right
System, such as the personnel for being merely responsible for the device configuration at each interval in 220kV voltage class can not be changed each in 110kV voltage class
Every device configuration, the professional integrated personnel of protection for being merely responsible for protecting the configuration of related data can not be changed by Automation Specialty
Integrated personnel are responsible for the data of configuration.But, existing system configuration utility, either standalone version, or many people is online
, all general lack of the Precise control of the configuration data modification authority to user.Patent No. CN201210058092.X, specially
Profit is entitled:In the Patent Publication of intelligent substation design configurations integral system, the configuration for referring to or the authority for browsing
Total data is applied to, the configuring authority management carried out for the user task division of labor is proposed, it is no to limit
Undertaking the user of different configuration tasks can only configure its data being responsible in scope, and can not change the number outside responsible scope
According to.
Because the result of intelligent Substation System integrated configuration is SCD file, SCD file is mainly made up of 5 parts:
Header sections, Substation sections, Communication sections, IED sections and DataTypeTemplate sections.Wherein, Header
Section essentially describes the related information of allocation project, and Substation sections essentially describes transforming plant primary equipment, Topology connection
And first and second related information, Communication segment descriptions whole station secondary device communication protocol stack relevant configuration information, IED
The function of segment description whole station device and service, the definition of LN types and data type of DataTypeTemplate segment descriptions.
Therefore the content beyond IED sections is the information of whole station scope, often configured more suitable by single people, and IED sections includes
The information of all devices of whole station, this part certainly will need the integrated Collaboration of different majors to configure.Simultaneously as
In different voltage class and its interval in Substation sections with each device in IED sections in intelligent substation
Distribution situation, these information can be used for domination set and be only capable of changing the number within the scope of oneself being responsible in configuration process into personnel
According to.The function of device and service are mainly reflected in the logical node LN of logical device LD and its subordinate in IED sections.National grid
Corporation Instructions《The engineering relay protection application models of IEC 61850》Mentioned in Q/GDW 396-2012 the division of logical device preferably according to
Carried out according to function, and measurement, protection, the inst for controlling, recording ripple LD names are specified.On the other hand, IEC61850 rule
Model 7-4 parts specify that its type must be started with logical node group identifier letter to logical node, such as Automated condtrol
The identifier of logical node group is A, and the identifier of the logical node group of defencive function is P.Above about logical device inst's
The definition of name regulation and logical node group identifier and its corresponding logical node group, can aid in system configuration utility
In for different majors personnel set configuration authority.
The content of the invention
For the problem that multi-person synergy in current intelligent substation integrated configuration is present, the present invention proposes a kind of user oriented
Intelligent substation integrated configuration access rights generation method, be the configuration zone of responsibility information based on user, be that it uses system
The Various types of data that system configuration tool accessed during intelligent substation integrated configuration automatically generates the side of user's operating right
Method, the of overall importance and class of locality two is divided into by by intelligent Substation System configuration data, is that data of overall importance are set up user and matched somebody with somebody
Put authority list, be the mapping table that locality data set up the inst of logical device and specialty, and logical node group with it is special
The mapping table of industry, and for user specifies specialty belonging to it and is responsible for the transformer station region of configuration, so as to realize that user exists
During using intelligent Substation System configuration tool, by configuration tool automatically according to the number that the information of user is its access
According to operating right is generated, i.e.,:Can be that configuration is still only capable of browsing.It can be used for carrying out system integration configuration in multi-person synergy
During avoid integrated personnel modification belong to the data that other staff are responsible for configuration by mistake, improve many people and implement system integrations configuration
Concurrency and reliability, the efficiency of lifting system integrated configuration.
Above-mentioned technical purpose is realized, above-mentioned technique effect is reached, the present invention is achieved through the following technical solutions:
A kind of generation method of user oriented intelligent substation integrated configuration access rights, comprises the following steps:
(1) type of the user that judgement is logged in;
(2) when the type for judging user is system integrator, and detect that it is locality data to be accessed for data, together
When detect the user have the right to configure accessed data where device when, inspection be accessed for data whether be IED logic
Data within equipment;
(3) when the data being accessed within the logical device that data are IED are checked, according to being accessed for data institute
Logical device inst, judge whether the inst relevant with the specialty that user is responsible for;
(4) when judging that the inst is relevant with the specialty that user is responsible for, inspection is accessed for whether data are logic section
The data or the data set element for logical node LLN0 or Inputs elements of the logical node beyond point LLN0;
(5) data are accessed for for the data of the logical node beyond LLN0 or are logical node LLN0's when checking
Data set element or Inputs elements, the logical node group identifier of the logical node according to belonging to accessed data check quilt
Whether the logical node accessed belonging to data is relevant with the specialty that user is responsible for, and configurable authority is returned if relevant.
As a further improvement on the present invention, the type of user for judging to log in, detailed process is:Stepped on according to user
The user name that input during record intelligent Substation System configuration tool, checked in user message table user's owning user group whether be
System integrator;Described user message table includes:User name and affiliated subscriber group information, subscriber group information is used to record to be used
User's group belonging to family.
As a further improvement on the present invention, the step (2) is further comprising the steps of:
When the type for judging user is not system integrator, only browse right is returned;
Inspection is accessed for whether data are data of overall importance, if data of overall importance, is then weighed in data configuration of overall importance
Inquiry is accessed for whether data of overall importance have been allocated by user configuring in limit table, if then returning to configurable authority, otherwise
Return to only browse right.
As a further improvement on the present invention, the data configuration authority list of overall importance, have recorded all kinds of data of overall importance
And its user is configured, data of overall importance therein refer to primary connection figure, the incidence relation of a secondary device, the title of whole station IED
With description, whole station secondary device communication protocol stack relevant configuration.
As a further improvement on the present invention, detect that the user has the right to configure accessed data in the step (2)
The device at place, detailed process is:Check whether user is responsible for accessed data institute in the table of locality data user zone of responsibility
Device, if not then returning to only browse right;Described locality data user zone of responsibility table, have recorded IED data
Each the be responsible for zone of responsibility information of configuration personnel, including:User name, be responsible for scope type, be responsible for scope title, be responsible for
Major name.
As a further improvement on the present invention, step (3) detailed process is:Logic according to where accessed data
The inst of equipment, logical device inst with specialty mapping table in check the inst whether the specialty being responsible for user
It is relevant, only browse right is returned if unrelated, step (4) is performed if relevant.
As a further improvement on the present invention, the inst of described logical device and the mapping table of specialty, have recorded
The relevant specialized information of each logical device.
As a further improvement on the present invention, the step (3) also includes:Data are accessed for for IED when checking
During data outside logical device, then configurable authority is returned.
As a further improvement on the present invention, the detailed process of the step (5) is:Patrolling according to belonging to accessed data
The logical node group identifier of node is collected, is checked belonging to accessed data in mapping table of the logical node group with specialty
Whether logical node is relevant with the specialty that user is responsible for, and only browse right is returned if unrelated, and configurable power is returned if relevant
Limit;Affiliated step (5) also includes working as the data for checking and being accessed for that data are logical node LLN0, but is not logical node
The data set element of LLN0 and be not Inputs elements or when checking that it is LD attribute datas in itself to be accessed for data, then
Return to configurable authority.
As a further improvement on the present invention, the mapping table of described logical node group and specialty, have recorded with respectively
The relevant specialized information of logical node, logical node group identifier includes the English capitalization from A to Z, logical node
The initial of lnClass is the logical node group identifier belonging to it.
Beneficial effects of the present invention:
The present invention realizes that multi-person synergy carries out the system integration and matches somebody with somebody suitable for the system integration configuration work of intelligent substation
When putting, the data that intelligent Substation System configuration tool can be accessed user automatically generate user's operating right, to possessing
The configurable authority of user's generation of authority is configured, only browse right is otherwise generated.
The present invention can realize, in intelligent Substation System integrated configuration, on the one hand preventing beyond system integrator
Personnel change any configuration data, are on the other hand also prevented from system integrator and change by mistake outside itself responsible configuration task
Configuration data, is conducive to raising multi-person synergy to carry out the reliability of system integration configuration work, contributes to parellel arranged implementation,
Accelerate system integration progress.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of an embodiment of the present invention.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to embodiments, to the present invention
It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to
Limit the present invention.
Application principle of the invention is explained in detail below in conjunction with the accompanying drawings.
Embodiment one
As shown in figure 1, a kind of generation method of user oriented intelligent substation integrated configuration access rights, including it is following
Step:
(1) type of the user that judgement is logged in;
(2) when the type for judging user is system integrator, and detect that it is locality data to be accessed for data, together
When detect the user have the right to configure accessed data where device when, inspection be accessed for data whether be IED (intelligence electricity
Sub- equipment) logical device within data;
(3) when the data outside being accessed for the logical device that data are IED are checked, then configurable authority is returned;
When the data being accessed within the logical device that data are IED are checked, the logic according to where being accessed for data sets
Standby inst, judges whether the inst is relevant with the specialty that user is responsible for;
(4) when judging that the inst is relevant with the specialty that user is responsible for, inspection is accessed for whether data are logic section
The data or the data set element for logical node LLN0 or Inputs elements of the logical node beyond point LLN0;
(5) data are accessed for for the data of the logical node beyond LLN0 or are logical node LLN0's when checking
Data set element or Inputs elements, the logical node group identifier of the logical node according to belonging to accessed data is (according to IEC
The initial of the regulation of 61850 standards, i.e. lnClass), check whether the logical node belonging to accessed data is responsible for user
It is professional relevant, configurable authority is returned if relevant.
Preferably, the type of user for judging to log in, detailed process is:According to User logs in intelligent Substation System
The user name being input during configuration tool, checks whether user's owning user group is system integrator, if not in user message table
It is system integrator, then returns to only browse right, otherwise performs step (2).
Wherein, described user message table includes:User name and affiliated subscriber group information, subscriber group information are used to record
User's group belonging to user, in an embodiment of the present invention, the title of user's group can include design, system integrator,
Equipment supplier, O&M.One user can only belong to a user's group, such as certain user is designer, the user where him
Group exactly " is designed ", referring specifically to table 1.
Table 1
User name | User's group |
Zhang San | Design |
Li Si | System integrator |
King five | Equipment supplier |
Zhao six | O&M |
Preferably, the step (2) also includes:Inspection is accessed for whether data are data of overall importance, if of overall importance
Data, then inquiry is accessed for whether data of overall importance have been allocated by user configuring in data configuration authority list of overall importance,
If being accessed for data of overall importance to be allocated by user configuring, configurable authority is returned to, otherwise return to only browse right.
Wherein, the data configuration authority list of overall importance, have recorded all kinds of data of overall importance and its configuration user, therein
Data of overall importance refer to primary connection figure, the incidence relation of a secondary device, the Name and Description of whole station intelligent electronic device IED,
Whole station secondary device communication protocol stack relevant configuration.
Preferably, in the step (2) detect the user have the right to configure accessed data where device, specific mistake
Cheng Wei:Device where whether the responsible accessed data of user are checked in the table of locality data user zone of responsibility, if not then
Only browse right is returned to, if then performing step (3).
Preferably, described locality data user zone of responsibility table, the configuration personnel that have recorded IED data are each responsible for
Zone of responsibility information, including user name, be responsible for scope type, be responsible for scope title, be responsible for major name, in the present embodiment
Responsible major name can include:Protection, automation, electric flux, on-line monitoring etc., the title for being responsible for scope include:Need to be by
Voltage class, interval, the information of device of its configuration.
Preferably, step (3) detailed process is:The inst of the logical device according to where accessed data, is patrolling
The inst of the equipment of collecting checks whether the inst is relevant with the specialty that user is responsible for, and is returned if unrelated with the mapping table of specialty
Only browse right is returned, step (4) is performed if relevant.
Preferably, the inst of described logical device and the mapping table of specialty, have recorded each logical device relevant
Specialized information, the inst of logical device include PROT, RCD, MEAS, CTRL, METR, PIGO, PISV, RPIT, MUGO,
The title of MUSV, foregoing inst is all from State Grid Corporation of China's specification《The engineering relay protection application models of IEC 61850》Q/
To measurement, protection, control, the inst names of record ripple LD in GDW 396-2012.It should be noted that logical device and logic section
Point has respective inst attributes.In system configuration utility, logical device is represented with inst attributes, and in logical device
Logical node be to be stitched together what is represented with the value of prefix, lnClass, inst this 3 attributes, existing skill is herein
Art, excessive repeating is not done.
Preferably, the detailed process of the step (5) is:The logic section of the logical node according to belonging to being accessed for data
Whether point group identifier, checks be accessed for logical node belonging to data in mapping table of the logical node group with specialty
It is relevant with the specialty that user is responsible for, only browse right is returned if unrelated, configurable authority is returned if relevant.
Preferably, affiliated step (5) also includes working as the data for checking and being accessed for that data are logical node LLN0, but not
It is the data set element of logical node LLN0 and is not Inputs elements or checks that it is LD category in itself to be accessed for data
Property data when, then return to configurable authority.
Preferably, the mapping table of described logical node group and specialty, have recorded relevant with each logical node special
Industry information, logical node group identifier includes the English capitalization from A to Z, and the initial of the lnClass of logical node is
Logical node group identifier belonging to it
The present invention can be based on the user's group of user, user and be responsible for the transformer station region of configuration and the letter such as specialty belonging to user
Breath, is that the Various types of data accessed when it carries out intelligent substation integrated configuration using system configuration utility is automatically generated and can matched somebody with somebody
The user's operating right put or only browse.
Embodiment two
In the present embodiment, to be responsible for the protection integrated personnel (user of specialty of the system integrator that 220kV voltage class is configured
Entitled user2201) use the auspicious intelligent Substation System configuration tool NARI Configuration Tool in state's electricity south (below
Abbreviation configuration tool) the Inputs editing interfaces in 220kV intelligent Substation System integrated configuration engineerings choose 220kV voltages
The Inputs of the device IL2201A (the intelligent terminal A of circuit 1) at the interval of circuit 1 of grade:IL2201ARPIT/LLN0.Inputs
One the element RPIT/ that empty terminal establishes annexation is sent with the GOOSE of other devices
After GOINGGOI1.SPCSO1.stVal, as a example by configuration tool automatically generates user to the operating right of the data, specific steps
It is as follows:
The first step:System configuration utility reads user message table .xls Excel files, the Sheet1 tables of the Excel file
Lattice include 2 row:User name, user's group, configuration tool inquire record " the user2201 system integrations according to user name user2201
Business ", confirms that the login user belongs to system integrator's user's group, into next step inspection;
Second step:What configuration tool checked that user checks is the Inputs elements of device, belongs to locality data,
Rather than data of overall importance, therefore perform next step inspection;
3rd step:Locality data user zone of responsibility table .xls Excel files are read in configuration tool, the Excel file
Sheet1 forms include 4 row:User name, the type for being responsible for scope, the title for being responsible for scope, responsible major name.Configuration tool
Voltage class 220kV according to where user name user2201 and IL2201A inquires record " user2201 voltage class
220kV is protected ", confirm that the configuration scope that user is responsible for includes device IL2201A, therefore perform next step inspection;
4th step:What configuration tool checked that user checks be device IL2201A logical device RPIT in logic
The element of the Inputs in node LLN0, is the data in the logical device of IED, therefore performs next step inspection;
5th step:The inst of logical device and the mapping table .xls Excel files of specialty are read in configuration tool, should
The Sheet1 forms of Excel file include 2 row:Inst, relevant speciality.Logic of the configuration tool according to where being accessed for data
The inst of equipment is that the specialty " protection " that " RPIT " and user are responsible for inquires record " RPIT protections ", confirm the logical device with
The specialty that user is responsible for is related, therefore performs next step inspection;
6th step:Configuration tool checks the element for being accessed for that data are the Inputs in logical node LLN0, therefore
Perform next step inspection;
7th step:The mapping table .xls Excel files of logical node group and specialty, the Excel are read in configuration tool
The Sheet1 forms of file include 2 row:Logical node group identifier, relevant speciality.Configuration tool is according to selected data
RPIT/GOINGGOI1.SPCSO1.stVal finds the logical node GOINGGOI1 belonging to it in the model data of device, its
Middle prefix is GOIN, and lnClass is GGOI, and inst is 1 (representing the inst attributes of logical node LN), therefore uses lnClass
Initial (logical device group identifier) be GGOI initial G, and the specialty " protection " that user is responsible for inquires record
" G protections ", confirms that the logical device group is relevant with the specialty that user is responsible for, therefore to being accessed for the configurable authority of data genaration,
Complete automatically generating for access rights.
It should be noted that the relevant speciality corresponding with the inst of logical device being previously mentioned in the present invention and logic section
The corresponding relevant speciality of point group indications, and the specialty that user is responsible for is all referring to specialties such as protection, automations.
General principle of the invention and principal character and advantages of the present invention has been shown and described above.The technology of the industry
Personnel it should be appreciated that the present invention is not limited to the above embodiments, simply explanation described in above-described embodiment and specification this
The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appending claims and its
Equivalent thereof.
Claims (10)
1. a kind of generation method of user oriented intelligent substation integrated configuration access rights, it is characterised in that including following
Step:
(1) type of the user that judgement is logged in;
(2) when the type for judging user is system integrator, and detect that it is locality data to be accessed for data, while inspection
When measuring the device where the user has the right to configure accessed data, inspection be accessed for data whether be IED logical device
Within data;
(3) when the data being accessed within the logical device that data are IED are checked, according to being accessed for where data
The inst of logical device, judges whether the inst is relevant with the specialty that user is responsible for;
(4) when judging that the inst is relevant with the specialty that user is responsible for, inspection is accessed for whether data are logical node
The data of the logical node beyond LLN0 or the data set element for logical node LLN0 or Inputs elements;
(5) when the data for checking the logical node beyond being accessed for data for LLN0 or the data for logical node LLN0
Collection element or Inputs elements, the logical node group identifier of the logical node according to belonging to accessed data check accessed
Whether the logical node belonging to data is relevant with the specialty that user is responsible for, and configurable authority is returned if relevant.
2. the generation method of a kind of user oriented intelligent substation integrated configuration access rights according to claim 1,
It is characterized in that:The type of user for judging to log in, detailed process is:Configured according to User logs in intelligent Substation System
The user name being input during instrument, checks whether user's owning user group is system integrator in user message table;Described use
Family information table includes:User name and affiliated subscriber group information, subscriber group information are used to record the user's group belonging to user.
3. the generation method of a kind of user oriented intelligent substation integrated configuration access rights according to claim 1,
It is characterized in that:The step (2) is further comprising the steps of:
When the type for judging user is not system integrator, only browse right is returned;
Inspection is accessed for whether data are data of overall importance, if data of overall importance, then in data configuration authority list of overall importance
Middle inquiry is accessed for whether data of overall importance have been allocated by user configuring, if then returning to configurable authority, otherwise returns
Only browse right.
4. the generation method of a kind of user oriented intelligent substation integrated configuration access rights according to claim 3,
It is characterized in that:The data configuration authority list of overall importance, have recorded all kinds of data of overall importance and its configuration user, therein complete
Office's property data refer to that primary connection figure, the incidence relation of a secondary device, the Name and Description of whole station IED, whole station secondary device lead to
Letter protocol stack relevant configuration.
5. the generation method of a kind of user oriented intelligent substation integrated configuration access rights according to claim 1,
It is characterized in that:In the step (2) detect the user have the right to configure accessed data where device, detailed process
For:Device where whether the responsible accessed data of user are checked in the table of locality data user zone of responsibility, if not then returning
Return only browse right;Described locality data user zone of responsibility table, the configuration personnel that have recorded IED data are each be responsible for
Zone of responsibility information, including:User name, the type for being responsible for scope, the title for being responsible for scope, responsible major name.
6. the generation method of a kind of user oriented intelligent substation integrated configuration access rights according to claim 1,
It is characterized in that:Step (3) detailed process is:The inst of the logical device according to where accessed data, sets in logic
Standby inst checks whether the inst is relevant with the specialty that user is responsible for, and is returned only if unrelated with the mapping table of specialty
Browse right, performs step (4) if relevant.
7. the generation method of a kind of user oriented intelligent substation integrated configuration access rights according to claim 6,
It is characterized in that:The mapping table of the inst of described logical device and specialty, have recorded relevant special of each logical device
Industry information.
8. the generation method of a kind of user oriented intelligent substation integrated configuration access rights according to claim 6,
It is characterized in that:The step (3) also includes:When the data outside being accessed for the logical device that data are IED are checked,
Then return to configurable authority.
9. the generation method of a kind of user oriented intelligent substation integrated configuration access rights according to claim 1,
It is characterized in that:The detailed process of the step (5) is:The logical node group mark of the logical node according to belonging to accessed data
Know symbol, check whether the logical node belonging to accessed data is negative with user in mapping table of the logical node group with specialty
Duty it is professional relevant, only browse right is returned if unrelated, configurable authority is returned if relevant;Affiliated step (5) also includes
When checking the data that are accessed for that data are logical node LLN0, but it is not the data set element of logical node LLN0 and is not
Inputs elements, or when checking that it is LD attribute datas in itself to be accessed for data, then return to configurable authority.
10. the generation method of a kind of user oriented intelligent substation integrated configuration access rights according to claim 9,
It is characterized in that:Described logical node group and the mapping table of specialty, have recorded the specialty letter relevant with each logical node
Breath, logical node group identifier includes the English capitalization from A to Z, and the initial of the lnClass of logical node is its institute
The logical node group identifier of category.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710083016.7A CN106909817B (en) | 2017-02-16 | 2017-02-16 | A kind of generation method of user oriented intelligent substation integrated configuration access authority |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710083016.7A CN106909817B (en) | 2017-02-16 | 2017-02-16 | A kind of generation method of user oriented intelligent substation integrated configuration access authority |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106909817A true CN106909817A (en) | 2017-06-30 |
CN106909817B CN106909817B (en) | 2019-11-05 |
Family
ID=59208662
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710083016.7A Active CN106909817B (en) | 2017-02-16 | 2017-02-16 | A kind of generation method of user oriented intelligent substation integrated configuration access authority |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106909817B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110851185A (en) * | 2019-11-08 | 2020-02-28 | 杭州宇泛智能科技有限公司 | Automatic configuration method and device for equipment, electronic equipment and storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101232203A (en) * | 2006-12-28 | 2008-07-30 | 通用电气公司 | Apparatus, methods and system for role-based access in an intelligent electronic device |
CN102571745A (en) * | 2011-11-16 | 2012-07-11 | 烽火通信科技股份有限公司 | User access authority management method aiming at large capacity of objects |
WO2013070480A2 (en) * | 2011-11-11 | 2013-05-16 | International Business Machines Corporation | Securely accessing remote systems |
EP2713303A1 (en) * | 2012-09-28 | 2014-04-02 | ABB Technology AG | Area of responsibility based access in control systems |
-
2017
- 2017-02-16 CN CN201710083016.7A patent/CN106909817B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101232203A (en) * | 2006-12-28 | 2008-07-30 | 通用电气公司 | Apparatus, methods and system for role-based access in an intelligent electronic device |
WO2013070480A2 (en) * | 2011-11-11 | 2013-05-16 | International Business Machines Corporation | Securely accessing remote systems |
CN102571745A (en) * | 2011-11-16 | 2012-07-11 | 烽火通信科技股份有限公司 | User access authority management method aiming at large capacity of objects |
EP2713303A1 (en) * | 2012-09-28 | 2014-04-02 | ABB Technology AG | Area of responsibility based access in control systems |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110851185A (en) * | 2019-11-08 | 2020-02-28 | 杭州宇泛智能科技有限公司 | Automatic configuration method and device for equipment, electronic equipment and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN106909817B (en) | 2019-11-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Blair et al. | An open platform for rapid-prototyping protection and control schemes with IEC 61850 | |
CN104123271B (en) | Intelligent substation secondary design system based on Excel | |
CN102522819B (en) | Record wave pattern modeling method for fault record device of intelligent transformer substation | |
Yamashita et al. | Modelling and aggregation of loads in flexible power networks–scope and status of the work of CIGRE WG C4. 605 | |
CN107180314B (en) | Operation and maintenance business model modeling method based on primary and secondary system incidence relation | |
CN108414849A (en) | Intelligent substation automatization test system and method | |
CN110570101A (en) | Intelligent OMS system for power grid distribution network | |
CN102930111B (en) | The generation method of transformer station's SCD model file and device | |
CN106021203A (en) | Intelligent substation misoperation-preventive locking logic imaging expressing method | |
CN110825834B (en) | Method, system and readable storage medium for matching distribution transformer association of metering automation terminal data and GIS (gas insulated switchgear) | |
CN202600765U (en) | Data comprehensive management system for intelligent power supply system | |
CN107944659B (en) | Method and device for automatically generating plant station monitoring system report | |
CN107591802A (en) | A kind of abstract method of calibration of distribution network model | |
Giraldez et al. | Distribution feeder modeling for time-series simulation of voltage management strategies | |
CN106909817B (en) | A kind of generation method of user oriented intelligent substation integrated configuration access authority | |
Hong et al. | Standardization of power system protection settings using IEC 61850 for improved interoperability | |
CN110489729B (en) | Automatic conversion method and system for D5000-matpower grid multi-disaster coupling cascading failure model | |
CN105447261A (en) | Inspection tool used for virtual loop of intelligent substation | |
CN108564261A (en) | Method, apparatus and computer equipment are determined based on the power information of work ticket | |
Kezunovic et al. | Substation data integration for automated data analysis systems | |
CN104933519A (en) | Relay protection device condition-based maintenance aided decision making system | |
CN107480883A (en) | A kind of transformer station secondary system resource allocation method and system | |
CN114049082A (en) | Power grid technical improvement overhaul cost data structuring method | |
Huang et al. | Extracting substation cyber-physical architecture through intelligent electronic devices' data | |
CN106066860A (en) | A kind of method of electric power meter management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |