CN106906749A - The construction method of full assembled steel-concrete combined structure box beam - Google Patents

The construction method of full assembled steel-concrete combined structure box beam Download PDF

Info

Publication number
CN106906749A
CN106906749A CN201710136792.9A CN201710136792A CN106906749A CN 106906749 A CN106906749 A CN 106906749A CN 201710136792 A CN201710136792 A CN 201710136792A CN 106906749 A CN106906749 A CN 106906749A
Authority
CN
China
Prior art keywords
steel
steel plate
box beam
prefabricated
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710136792.9A
Other languages
Chinese (zh)
Other versions
CN106906749B (en
Inventor
汤意
李斐然
乔倩妃
李国普
莫杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Provincial Communication Planning and Design Institute Co Ltd
Original Assignee
Henan Provincial Communication Planning and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Provincial Communication Planning and Design Institute Co Ltd filed Critical Henan Provincial Communication Planning and Design Institute Co Ltd
Priority to CN201710136792.9A priority Critical patent/CN106906749B/en
Publication of CN106906749A publication Critical patent/CN106906749A/en
Application granted granted Critical
Publication of CN106906749B publication Critical patent/CN106906749B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type

Abstract

The invention discloses a kind of construction method of full assembled steel-concrete combined structure box beam, top board prefabricated first, the shear connector for upwardly extending first is welded on the crest face of first waveform steel plate, steel form or the air bag consistent with trough shape are filled in trough as inner membrance, then first waveform steel plate top assembling reinforcement concrete slab framework of steel reinforcement, finally pour into a mould concrete;Prefabricated panel, the alignment of the second corrugated sheet steel is placed on above straight steel plate, and connected by high-strength bolt again;If box beam size is smaller, when base plate is only with straight steel plate, then this step is omitted;Then the prefabricated Wavelike steel webplate for being fixedly linked with top board and base plate;I-shaped structure connector is processed into web end, or overhanging connector is respectively welded on first waveform steel plate and the second corrugated sheet steel/straight steel plate;Last assembled in situ.The present invention efficiently solves the problems, such as deformation between steel construction and concrete structure.

Description

The construction method of full assembled steel-concrete combined structure box beam
Technical field
The present invention relates to technical field of bridge engineering, more particularly, to a kind of applying for full assembled steel-concrete combined structure box beam Work method.
Background technology
In science of bridge building field, the advantage of steel construction and concrete structure is had concurrently due to steel-concrete combined structure box beam, both may be used Effectively to mitigate dead load, the span ability of bridge can be improved again, therefore with significant economic benefit and social benefit, should With having a extensive future.But existing assembled steel-concrete combined structure box beam is applied only on ocean or navigable river, typically Constructed using the all-welded method of integral prefabricated, girder steel, with the fireballing advantage of site operation, but due to overall dimensions Greatly, weight is big, and its requirement to hanging device is high, and factory's welding capacity is big, and scene needs also remain for carrying out welding job, this form Combining structure box beam do not only exist the not enough problem of weld seam anti-fatigue performance, and there is the temperature of steel and concrete and shrink The nonsynchronous problem of time deformation, it is cracking to easily cause pier top position armoured concrete slab, influences attractive in appearance or even weakens bridge The holistic resistant behavior of girder construction.
The content of the invention
The present invention provides a kind of construction method of full assembled steel-concrete combined structure box beam, it is therefore intended that solve assembled steel The problems such as mixed combining structure box beam overall dimensions are big, lifting is difficult, welding job amount is big, holistic resistant behavior is poor.
To achieve the above object, the present invention can take following technical proposals:
The construction method of full assembled steel-concrete combined structure box beam of the present invention, it is specific as follows:
The first step, prefabricated top board:
First the shear connector for upwardly extending is welded on the crest face of first waveform steel plate, in trough fill steel form or with The consistent air bag of trough shape as inner membrance, then first waveform steel plate top assembling reinforcement concrete slab reinforcing bar Frame, finally pours into a mould concrete;
Second step, prefabricated panel:
The alignment of second corrugated sheet steel is placed on above straight steel plate, and is connected by high-strength bolt;If box beam size is smaller, bottom When plate is only with straight steel plate, then this step is omitted;
3rd step, prefabricated web and making connector:
The prefabricated Wavelike steel webplate for being fixedly linked with top board and base plate;I-shaped structure connection is processed into web end Part, or it is respectively welded overhanging connector on first waveform steel plate and the second corrugated sheet steel/straight steel plate;
4th step, assembled in situ.
The construction method of the full assembled steel-concrete combined structure box beam that the present invention is provided, fully combines concrete, waveform Steel plate, the respective advantage of straight steel plate, using the wrinkle effect of corrugated sheet steel efficiently solve steel construction and concrete structure it Between deform problem of disharmony, while make box beam under load action have stronger bending strength;Box beam top board, base plate and web Construction precision can be improve in factory's precast block;Site Welding amount is reduced, a series of diseases brought by weld seam are reduced Evil;As a result of prefabrication, the form of construction work of on-site consolidation, substantially reduce the site operation cycle, accelerate construct into Degree.
Brief description of the drawings
Fig. 1 is the construction procedure figure of top board.
Fig. 2 is the construction procedure figure of base plate.
Fig. 3 is the structural representation of full assembled steel-concrete combined structure box beam of the present invention(Web end is welding Attachment structure).
Fig. 4 is the enlarged drawing in A portions in Fig. 3.
Fig. 5 is the structural representation of full assembled steel-concrete combined structure box beam of the present invention(Web end is bolt Attachment structure).
Fig. 6 is the enlarged drawing in B portions in Fig. 5.
Specific embodiment
The construction method of full assembled steel-concrete combined structure box beam of the present invention is specific as follows:
The first step, prefabricated top board:
During construction, first first waveform steel plate 1.1 is laid on smooth ground(See Fig. 1 a), weld upward on its crest face The shear connector 1.3 of extension, fills steel form or the air bag consistent with trough shape as inner membrance 1.5 in trough(See Fig. 1 b), then the top of first waveform steel plate 1.1 according to code requirement assembling reinforcement concrete slab 1.2 framework of steel reinforcement 1.6 (See Fig. 1 c), finally pour into a mould concrete(See Fig. 1 d), form combined bridge deck.
Second step, prefabricated panel:
During construction, first reserved in the corresponding position of the corrugated sheet steel 2.2 of straight steel plate 2.1 and second respectively according to design size high-strength , then be laid in straight steel plate 2.1 on smooth ground by bolt hole(See Fig. 2 a), the alignment of the second corrugated sheet steel 2.2 is placed on Above straight steel plate 2.1(See Fig. 2 b), high-strength bolt 2.3 is carried out then according to symmetry principle just twisting, after being fully completed, according to right Claim principle that high-strength bolt 2.3 is screwed onto into design load eventually(See Fig. 2 c), that is, complete the construction of box beam base plate.When box beam size is smaller, When box beam base plate is only with straight steel plate 2.1, then this step is omitted.
3rd step, prefabricated web and making connector:
Prefabricated Wavelike steel webplate 3.1,3.2, when being connected using welding manner, I-shaped structure connector is processed into by its end 3.3;When being connected by screw bolts, it is respectively welded on first waveform steel plate 1.1, the second corrugated sheet steel 2.2 or straight steel plate 2.1 outer Stretch connector 1.4.
4th step, assembled in situ:
Wavelike steel webplate 3.1,3.2, prefabricated panel, prefabricated top board etc. are lifted respectively at the scene it is in place, then using bolt/or With prefabricated top board and prefabricated panel be connected Wavelike steel webplate 3.1,3.2 by welding manner, ultimately forms a box beam knot for entirety Structure.
The full assembled steel-concrete combined structure box beam that above-mentioned assembling is completed as seen in figures 3-6, including top board, base plate and fixation It is arranged on the web between top board and base plate.
Top board of the invention is combined bridge deck, including the first waveform steel plate 1.1 being fixedly linked with web 3.1,3.2, The top of first waveform steel plate 1.1 is provided with armoured concrete slab 1.2, and the shearing being welded on the crest of first waveform steel plate 1.1 connects The end of fitting 1.3 is extended in armoured concrete slab 1.2.
When box beam size is smaller, base plate is only with straight steel plate 2.1;When box beam size is larger, base plate uses combined type, Specifically, the second corrugated sheet steel 2.2 being fixedly linked with web 3.1,3.2, straight steel are provided with the top of straight steel plate 2.1 of base plate Plate 2.1 be connected by high-strength bolt 2.3 at the trough of the second corrugated sheet steel 2.2, common stress.
Web 3.1,3.2 is the steel plate of waveform configuration, can improve the resist bending ability of web, and the entirety of enhancing box beam is strong Degree.Web 3.1,3.2 and top board and base plate are connected by welding structure or/and bolt fastening structure.With web 3.2 and top board Connection as a example by, as shown in figure 4, being provided with the I-shaped structure being weldingly connected with first waveform steel plate 1.1 in the end of web 3.2 Connector 3.3, or as shown in fig. 6, be welded with overhanging connector 1.4 on first waveform steel plate 1.1, the end card of web 3.2 It is connected between overhanging connector 1.4, both are connected by bolt 3.4.The connection that base plate is connected with web can also use above-mentioned knot Any one or two kinds of in structure.
It is of the invention compared with the box beam of existing assembled steel-concrete combined structure, mainly with advantages below:
1)Relative to traditional steel reinforced concrete combined box beam, corrugated sheet steel has extremely strong anti-shearing flexion capabilities, and in transverse temperature Under effect and concrete shrinkage effect, it is nonsynchronous with concrete deformation that the fold effect of corrugated sheet steel can significantly reduce steel plate Problem, can reduce the stress of floorings direction across bridge, it is to avoid the cracking of floorings direction across bridge, so that the entirety for strengthening combined box beam is received Power performance.
2)The current existing ripe production equipment of corrugated sheet steel, and form corrugated sheet steel production line, it is easy to it is extensive Standardized production, accelerating construction progress saves construction investment cost.
3)The present invention employs corrugated sheet steel on a large scale, fully combines that concrete crushing strength is high and corrugated sheet steel shearing resistance The good advantage of yield strength high fatigue resistance so that material obtains more rational application, bulk strength is high.
4)The arrangement and method for construction of full assembling, steel construction is broken the whole up into parts, and effectively reduces the time of site operation, makes construction Efficiency is increased substantially.
5)The welding capacity of steel construction is farthest reduced, the overall anti-fatigue performance of steel construction is favorably improved, carried The life-span of bridge high.

Claims (1)

1. a kind of construction method of full assembled steel-concrete combined structure box beam, it is characterised in that:
The first step, prefabricated top board:
The shear connector for upwardly extending is welded on the crest face of first waveform steel plate first, in trough fill steel form or The air bag consistent with trough shape as inner membrance, then first waveform steel plate top assembling reinforcement concrete slab reinforcing bar Skeleton, finally pours into a mould concrete;
Second step, prefabricated panel:
The alignment of second corrugated sheet steel is placed on above straight steel plate, and is connected by high-strength bolt;If box beam size is smaller, bottom When plate is only with straight steel plate, then this step is omitted;
3rd step, prefabricated web and making connector:
The prefabricated Wavelike steel webplate for being fixedly linked with top board and base plate;I-shaped structure connection is processed into web end Part, or it is respectively welded overhanging connector on first waveform steel plate and the second corrugated sheet steel/straight steel plate;
4th step, assembled in situ.
CN201710136792.9A 2017-03-09 2017-03-09 The construction method of full assembled steel-concrete combined structure box beam Active CN106906749B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710136792.9A CN106906749B (en) 2017-03-09 2017-03-09 The construction method of full assembled steel-concrete combined structure box beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710136792.9A CN106906749B (en) 2017-03-09 2017-03-09 The construction method of full assembled steel-concrete combined structure box beam

Publications (2)

Publication Number Publication Date
CN106906749A true CN106906749A (en) 2017-06-30
CN106906749B CN106906749B (en) 2018-10-23

Family

ID=59186241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710136792.9A Active CN106906749B (en) 2017-03-09 2017-03-09 The construction method of full assembled steel-concrete combined structure box beam

Country Status (1)

Country Link
CN (1) CN106906749B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724224A (en) * 2017-09-30 2018-02-23 深圳市市政设计研究院有限公司 Trapezoidal clad steel plate mixed structure box beam and method of construction
CN108457182A (en) * 2018-05-18 2018-08-28 中山职业技术学院 A kind of cross bridge floor board and its construction technology
CN112211083A (en) * 2020-11-10 2021-01-12 湖南工学院 Steel-concrete composite beam slab for small bridge and culvert and production method thereof
CN108457182B (en) * 2018-05-18 2024-04-30 中山职业技术学院 Orthotropic bridge deck and construction process thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3623899B2 (en) * 1999-09-13 2005-02-23 新日本製鐵株式会社 Joint structure of concrete slab and steel web in composite box girder
CN103614964A (en) * 2013-12-10 2014-03-05 东南大学 Steel box beam orthotropic deck slab
CN104195959A (en) * 2014-09-26 2014-12-10 中铁二十局集团第五工程有限公司 Construction technology for prefabricating a corrugated steel web PC I beam into combined box girder bridge
CN105064198A (en) * 2015-07-30 2015-11-18 苏交科集团股份有限公司 Semi-prefabricated and assembled composite box girder with corrugated steel webs and preparation method thereof
KR20160069155A (en) * 2014-12-08 2016-06-16 현인호 Composite Box Girder with concrete composite section in Compression Zone of Steel Box Girder

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3623899B2 (en) * 1999-09-13 2005-02-23 新日本製鐵株式会社 Joint structure of concrete slab and steel web in composite box girder
CN103614964A (en) * 2013-12-10 2014-03-05 东南大学 Steel box beam orthotropic deck slab
CN104195959A (en) * 2014-09-26 2014-12-10 中铁二十局集团第五工程有限公司 Construction technology for prefabricating a corrugated steel web PC I beam into combined box girder bridge
KR20160069155A (en) * 2014-12-08 2016-06-16 현인호 Composite Box Girder with concrete composite section in Compression Zone of Steel Box Girder
CN105064198A (en) * 2015-07-30 2015-11-18 苏交科集团股份有限公司 Semi-prefabricated and assembled composite box girder with corrugated steel webs and preparation method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724224A (en) * 2017-09-30 2018-02-23 深圳市市政设计研究院有限公司 Trapezoidal clad steel plate mixed structure box beam and method of construction
CN108457182A (en) * 2018-05-18 2018-08-28 中山职业技术学院 A kind of cross bridge floor board and its construction technology
CN108457182B (en) * 2018-05-18 2024-04-30 中山职业技术学院 Orthotropic bridge deck and construction process thereof
CN112211083A (en) * 2020-11-10 2021-01-12 湖南工学院 Steel-concrete composite beam slab for small bridge and culvert and production method thereof
CN112211083B (en) * 2020-11-10 2022-04-08 湖南工学院 Steel-concrete composite beam slab for small bridge and culvert and production method thereof

Also Published As

Publication number Publication date
CN106906749B (en) 2018-10-23

Similar Documents

Publication Publication Date Title
CN106894326B (en) The construction method of assembled pretensioned prestressing corrugated steel web plate composite box girder
CN206570672U (en) The box beam of full assembled steel-concrete combined structure
CN104988844B (en) Two times tensioning prestressing force assembled Wavelike steel webplate combination beam
CN206917085U (en) A kind of prefabricated overlapping steel framed concrete beam
CN101230607B (en) Structure combination parts for hollow slab
CN206385460U (en) Combined floorings
CN106968365A (en) A kind of anti-buckling steel plate shear force wall of assembled for taking into account load and power consumption
CN110004822A (en) The wet seam of precast concrete beam connects design
CN108265626A (en) Reinforcing steel bar-steel plate skeleton combined bridge deck and its construction method
CN106906749B (en) The construction method of full assembled steel-concrete combined structure box beam
CN110453584A (en) A kind of Steel-concrete Combined Beam Structures using weather-proof Wavelike steel webplate
CN102587576B (en) Combined precast column with nodes
CN206570671U (en) Based on the prestressed assembled corrugated steel web plate composite box girder of mixing
CN101230659A (en) Force-bearing type underplate component
CN204112200U (en) Edge of a wing enhanced waveform steel web plate composite box girder
CN101230605A (en) Structure combination parts for hollow slab
KR20100089178A (en) Composite girder used steel-concrete and manufacturing method thereof
CN215561828U (en) Corrugated steel-ultrahigh-strength powder concrete combined box girder continuous rigid frame bridge
CN107299721A (en) A kind of precast concrete open tubular column node connecting structure and its construction method
CN206570674U (en) Assembled pretensioned prestressing corrugated steel web plate composite box girder
CN207331424U (en) Steel skeleton prestressed concrete beam
CN101230667A (en) Force-bearing type superposed component
CN202990196U (en) Partially prestressed prefabricated thin plate
CN206844486U (en) A kind of precast concrete open tubular column node connecting structure
CN101230664A (en) Force-bearing type underplate component

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant