CN106902986A - The installation method of electric precipitator pole plate - Google Patents

The installation method of electric precipitator pole plate Download PDF

Info

Publication number
CN106902986A
CN106902986A CN201710142110.5A CN201710142110A CN106902986A CN 106902986 A CN106902986 A CN 106902986A CN 201710142110 A CN201710142110 A CN 201710142110A CN 106902986 A CN106902986 A CN 106902986A
Authority
CN
China
Prior art keywords
lifting
cathode filament
combined bay
truss
filament combined
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710142110.5A
Other languages
Chinese (zh)
Inventor
徐红磊
芦建成
豆志远
王晓琳
宋文卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Henan Engineering Co Ltd
Original Assignee
PowerChina Henan Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Henan Engineering Co Ltd filed Critical PowerChina Henan Engineering Co Ltd
Priority to CN201710142110.5A priority Critical patent/CN106902986A/en
Publication of CN106902986A publication Critical patent/CN106902986A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B03SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03CMAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03C3/00Separating dispersed particles from gases or vapour, e.g. air, by electrostatic effect
    • B03C3/34Constructional details or accessories or operation thereof
    • B03C3/40Electrode constructions
    • B03C3/45Collecting-electrodes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B03SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03CMAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03C3/00Separating dispersed particles from gases or vapour, e.g. air, by electrostatic effect
    • B03C3/34Constructional details or accessories or operation thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Electrostatic Separation (AREA)

Abstract

The invention discloses a kind of installation method of electric precipitator pole plate, comprise the following steps:(1)Preparation of construction;(2)Make positive plate lifting rigid frame;(3)Lifting rigid frame;(4)Make lifting positive plate instrument;(5)Lifting positive plate;(6)Set up cathode filament combined bay;(7)Measurement cathode filament combined bay levelness;(8)Make cathode filament combined bay lifting truss;(9)Lifting cathode filament combined bay and truss;I-steel and hanger full weld in the lifting device, a hanger is averagely arranged in bottom and top every 400mm, 24 hangers are arranged altogether, select two hangers connection hanging belt on top, the connecting steel wire ropes on the hanger of bottom, the cathode filament combined bay lifting truss lower disposed I-steel horizontal positioned, No. 16 channel-section steels are main frame, No. 12 channel-section steels are auxiliary frame, do that cable-stayed support is fixed by angle steel, and wheel is arranged on below truss.The present invention can control positive plate with cathode filament in the gap deviation of erection stage, improve dust removing effects.

Description

The installation method of electric precipitator pole plate
Technical field:
The present invention relates to a kind of pole plate installation method, more particularly to a kind of installation method of electric precipitator pole plate.
Background technology:
Electric precipitator positive plate and cathode filament factor amount are more, and working procedure step is more, influence factor complicated, gap deviation control It is more difficult, but the installation gap deviation control of heteropole spacing is directly connected to the efficiency of dust collection of deduster, and then have influence on outlet cigarette The defeated grey quality of the concentration of emission of dirt and bottom, error is excessive, and dust granule may be caused excessive and then ash conveying pipe is blocked, and low The efficiency of dust collection of effect can cause outlet smoke dust discharge concentration excessive, pollute air, and deduster longtime running also results in positive plate And cathode filament local deformation, influence the normal operation of deduster.
The content of the invention:
The technical problems to be solved by the invention are:Overcome the deficiencies in the prior art, there is provided one kind can improve installation quality and enter And improve the installation method of the electric precipitator pole plate of efficiency of dust collection.
The present invention is for the technical solution adopted for solving the technical problem:
A kind of installation method of electric precipitator pole plate, comprises the following steps:
(1)Preparation of construction:Material before material according to required for pole plate is installed is constructed prepares, and positive plate and cathode filament will Go through without bending;
(2)Make positive plate lifting rigid frame:Rigid frame is made using No. 12 channel-section steels, No. 16 channel-section steels and angle steel;
(3)Lifting rigid frame:It is placed on positive plate is bundled inside the rigid frame of making, by an end seal of rigid frame Extremely, rigid frame is then lifted, rigid frame is vertically stood in electric precipitation steelframe side, it is then firm with fixation with steel wire;
(4)Make lifting positive plate instrument:Clearance requirement when being installed according to two-plate, makes lifting positive plate instrument;Lifting Instrument is mainly made up of hanging belt one, hanger 24, one, I-steel, 12, steel wire rope;
(5)Lifting positive plate:Using steel wire rope while 12 positive plates of vertical lifting;
(6)Set up cathode filament combined bay:Cathode filament combined bay is set up according to field condition, and limit is set on cathode filament combined bay Position block;
(7)Measurement cathode filament combined bay levelness:After the completion of cathode filament combined bay is set up, the levelness to cathode filament combined bay is entered Row measurement is checked and accepted;
(8)Make cathode filament combined bay lifting truss:Cathode filament combined bay lifting truss it is main by square tube, angle steel ∠ 50 × 50, No. 14 channel-section steels, No. 18 channel-section steels and two wheels son composition;
(9)Lifting cathode filament combined bay and truss:Double cars are needed to coordinate lifting during lifting, on main crane lifting cathode filament combined bay End, secondary crane lifting truss top, secondary crane lifting truss first, when truss and ground row are into 60 ° of angles, main crane starts Lifting cathode filament combined bay, cathode filament combined bay and truss are separated, and cathode filament combined bay is smoothly lifted by crane.
In step(2)In, the positive plate lifting rigid frame bottom and surrounding are welded into framework using No. 16 channel-section steels, on Portion is reinforced with No. 12 channel-section steel sealings, the both sides of framework with angle steel.
In step(4)In, I-steel and hanger full weld in the lifting device, the bottom and top of I-steel every 400mm averagely arranges a hanger, and 24 hangers are arranged altogether, two hangers connection hanging belt on top is selected, in bottom Hanger on connecting steel wire ropes.
In step(8)In, the cathode filament combined bay lifting truss lower disposed square tube horizontal positioned, based on No. 18 channel-section steels Framework, No. 14 channel-section steels are auxiliary frame, do that cable-stayed support is fixed by angle steel ∠ 50 × 50, and wheel is arranged under truss Face.
Positive beneficial effect of the invention is:
1st, being capable of controlling plate gap deviation, the defeated grey matter of concentration of emission and bottom of raising house outlet flue dust between the present invention Amount, improves efficiency of dust collection, and exports smoke dust discharge concentration less, meets environment protectment protection, with good economic benefit.
2nd, homemade positive plate lifting rigid frame and cathode filament combined bay lifting truss are able to ensure that lifting in the present invention Process is without deformation, it is ensured that pole plate can smoothly be installed in place.
Brief description of the drawings:
Fig. 1 is the schematic flow sheet of the installation method of electric precipitator pole plate of the present invention;
Fig. 2 is the rigid frame structure schematic diagram in the installation method of electric precipitator pole plate of the present invention;
Fig. 3 is the lifting positive plate tool construction schematic diagram in the installation method of electric precipitator pole plate of the present invention.
Specific embodiment:
The present invention is made further explanation and description with specific embodiment below in conjunction with the accompanying drawings:
Referring to Fig. 1, Fig. 2 and Fig. 3:In figure, 1-16 channel-section steels, 2-12 channel-section steels, 3- angle steel, 4- hanging belts, 5- hangers, 6- I-shapeds Steel, 8- steel wire ropes, 9- positive plates.
Embodiment:A kind of installation method of electric precipitator pole plate, comprises the following steps:
(1)Preparation of construction:Material preparation before required material is constructed, positive plate 8 and cathode filament are installed according to pole plate Go through without bending;
(2)Make positive plate lifting rigid frame:Rigid frame is made using 2, No. 16 channel-section steels 1 of No. 12 channel-section steels and angle steel 3;
(3)Lifting rigid frame:It is placed on positive plate is bundled inside the rigid frame of making, by an end seal of rigid frame Extremely, rigid frame is then lifted, rigid frame is vertically stood in electric precipitation steelframe side, it is then firm with fixation with steel wire;
(4)Make lifting positive plate instrument:Clearance requirement when being installed according to two-plate, makes lifting positive plate instrument;Lifting Instrument is mainly made up of hanging belt 4 one, hanger 5 two ten four, 6 one, I-steel, 70 two, steel wire rope;
(5)Lifting positive plate:Using steel wire rope 7 while 12 positive plates 8 of vertical lifting;
(6)Set up cathode filament combined bay:Cathode filament combined bay is set up according to field condition, and limit is set on cathode filament combined bay Position block;
(7)Measurement cathode filament combined bay levelness:After the completion of cathode filament combined bay is set up, the levelness to cathode filament combined bay is entered Row measurement is checked and accepted;
(8)Make cathode filament combined bay lifting truss:Cathode filament combined bay lifting truss it is main by square tube, angle steel ∠ 50 × 50, No. 14 channel-section steels, No. 18 channel-section steels and two wheels son composition;
(9)Lifting cathode filament combined bay and truss:Double cars are needed to coordinate lifting during lifting, on main crane lifting cathode filament combined bay End, secondary crane lifting truss top, secondary crane lifting truss first, when truss and ground row are into 60 ° of angles, main crane starts Lifting cathode filament combined bay, cathode filament combined bay and truss are separated, and cathode filament combined bay is smoothly lifted by crane.
In step(2)In, the positive plate lifting rigid frame bottom and surrounding are welded into framework using No. 16 channel-section steels 1, Top is reinforced with No. 12 sealings of channel-section steel 2, the both sides of framework with angle steel 3.
In step(4)In, I-steel 6 and the full weld of hanger 5 in the lifting device, the bottom and top of I-steel 6 every 400mm averagely arranges a hanger 5, and 24 hangers 5 are arranged altogether, selects two hangers 5 connection hanging belt 4 on top, Connecting steel wire ropes 7 on the hanger 5 of bottom.
In step(8)In, the cathode filament combined bay lifting truss lower disposed square tube horizontal positioned, based on No. 18 channel-section steels Framework, No. 14 channel-section steels are auxiliary frame, do that cable-stayed support is fixed by angle steel ∠ 50 × 50, and wheel is arranged under truss Face.
The above, is only preferred embodiments of the invention, and any formal limitation is not made to the present invention, all It is any simple modification, equivalent variations and the modification made to above example according to technical spirit of the invention, still falls within In the protection domain of technical solution of the present invention.

Claims (4)

1. a kind of installation method of electric precipitator pole plate, it is characterised in that comprise the following steps:
(1)Preparation of construction:Material before material according to required for pole plate is installed is constructed prepares, positive plate(8)And negative electrode Silk will be gone through without bending;
(2)Make positive plate lifting rigid frame:Using No. 12 channel-section steels(2), No. 16 channel-section steels(1)And angle steel(3)Make rigid frame Frame;
(3)Lifting rigid frame:It is placed on positive plate is bundled inside the rigid frame of making, by an end seal of rigid frame Extremely, rigid frame is then lifted, rigid frame is vertically stood in electric precipitation steelframe side, it is then firm with fixation with steel wire;
(4)Make lifting positive plate instrument:Clearance requirement when being installed according to two-plate, makes lifting positive plate instrument;Lifting Instrument is main by hanging belt(4)One, hanger(5)24, I-steel(6)One, steel wire rope(7)12 compositions;
(5)Lifting positive plate:Using steel wire rope(7)While 12 positive plates of vertical lifting(8);
(6)Set up cathode filament combined bay:Cathode filament combined bay is set up according to field condition, and limit is set on cathode filament combined bay Position block;
(7)Measurement cathode filament combined bay levelness:After the completion of cathode filament combined bay is set up, the levelness to cathode filament combined bay is entered Row measurement is checked and accepted;
(8)Make cathode filament combined bay lifting truss:Cathode filament combined bay lifting truss it is main by square tube, angle steel ∠ 50 × 50, No. 14 channel-section steels, No. 18 channel-section steels and two wheels son composition;
(9)Lifting cathode filament combined bay and truss:Double cars are needed to coordinate lifting during lifting, on main crane lifting cathode filament combined bay End, secondary crane lifting truss top, secondary crane lifting truss first, when truss and ground row are into 60 ° of angles, main crane starts Lifting cathode filament combined bay, cathode filament combined bay and truss are separated, and cathode filament combined bay is smoothly lifted by crane.
2. the installation method of electric precipitator pole plate according to claim 1, it is characterised in that:In step(2)In, it is described Positive plate lifts by crane rigid frame bottom and surrounding utilizes No. 16 channel-section steels(1)It is welded into framework, top is with No. 12 channel-section steels(2)Sealing, The both sides angle steel of framework(3)Reinforced.
3. the installation method of electric precipitator pole plate according to claim 1, it is characterised in that:In step(4)In, it is described I-steel in lifting device(6)With hanger(5)Full weld, I-steel(6)Bottom and top averagely arrange that one is hung every 400mm Ear(5), 24 hangers are arranged altogether(5), select two hangers on top(5)Connection hanging belt(4), in the hanger of bottom (5)Upper connecting steel wire ropes(7).
4. the installation method of electric precipitator pole plate according to claim 1, it is characterised in that:In step(8)In, it is described Cathode filament combined bay lifting truss lower disposed square tube horizontal positioned, No. 18 channel-section steels are main frame, and No. 14 channel-section steels are auxiliary frame, Cable-stayed support is done by angle steel ∠ 50 × 50 fixed, wheel is arranged on below truss.
CN201710142110.5A 2017-03-10 2017-03-10 The installation method of electric precipitator pole plate Pending CN106902986A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710142110.5A CN106902986A (en) 2017-03-10 2017-03-10 The installation method of electric precipitator pole plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710142110.5A CN106902986A (en) 2017-03-10 2017-03-10 The installation method of electric precipitator pole plate

Publications (1)

Publication Number Publication Date
CN106902986A true CN106902986A (en) 2017-06-30

Family

ID=59187639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710142110.5A Pending CN106902986A (en) 2017-03-10 2017-03-10 The installation method of electric precipitator pole plate

Country Status (1)

Country Link
CN (1) CN106902986A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107263101A (en) * 2017-08-18 2017-10-20 中国十七冶集团有限公司 A kind of electric cleaner pole plate burst integral installation method
CN112024127A (en) * 2020-07-30 2020-12-04 上海二十冶建设有限公司 Method for mounting cathode hanger of sintering electric dust remover
CN112871454A (en) * 2021-01-04 2021-06-01 中国神华能源股份有限公司国华电力分公司 Cathode and anode installation method of electric dust collector

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01262955A (en) * 1988-04-12 1989-10-19 Matsushita Seiko Co Ltd Electric precipitator
CN101708804A (en) * 2009-12-18 2010-05-19 北京首钢建设集团有限公司 Construction method of lifting carbon bricks at blast furnace bottom
CN101885448A (en) * 2010-07-06 2010-11-17 中冶宝钢技术服务有限公司 Electric precipitator positive plate lifting tool and process
CN103111371A (en) * 2013-01-30 2013-05-22 北京思源通能科技发展有限公司 Electrostatic dust collection device of thermal power plant and installation method of device
CN203044170U (en) * 2012-09-07 2013-07-10 福建龙净环保股份有限公司 Large cathode frame of electric dust removal device
CN104043528A (en) * 2014-05-14 2014-09-17 武汉永磁科技有限公司 Electromagnetic vibration shock wave purification mechanism and method thereof used in industrial dedusting and oil smoke purifying
CN204281030U (en) * 2014-11-10 2015-04-22 唐山港集团股份有限公司 A kind of special hanger lifting section bar
CN104941805A (en) * 2015-06-12 2015-09-30 中国能源建设集团湖南火电建设有限公司 Wet electric precipitation system mounting method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01262955A (en) * 1988-04-12 1989-10-19 Matsushita Seiko Co Ltd Electric precipitator
CN101708804A (en) * 2009-12-18 2010-05-19 北京首钢建设集团有限公司 Construction method of lifting carbon bricks at blast furnace bottom
CN101885448A (en) * 2010-07-06 2010-11-17 中冶宝钢技术服务有限公司 Electric precipitator positive plate lifting tool and process
CN203044170U (en) * 2012-09-07 2013-07-10 福建龙净环保股份有限公司 Large cathode frame of electric dust removal device
CN103111371A (en) * 2013-01-30 2013-05-22 北京思源通能科技发展有限公司 Electrostatic dust collection device of thermal power plant and installation method of device
CN104043528A (en) * 2014-05-14 2014-09-17 武汉永磁科技有限公司 Electromagnetic vibration shock wave purification mechanism and method thereof used in industrial dedusting and oil smoke purifying
CN204281030U (en) * 2014-11-10 2015-04-22 唐山港集团股份有限公司 A kind of special hanger lifting section bar
CN104941805A (en) * 2015-06-12 2015-09-30 中国能源建设集团湖南火电建设有限公司 Wet electric precipitation system mounting method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107263101A (en) * 2017-08-18 2017-10-20 中国十七冶集团有限公司 A kind of electric cleaner pole plate burst integral installation method
CN112024127A (en) * 2020-07-30 2020-12-04 上海二十冶建设有限公司 Method for mounting cathode hanger of sintering electric dust remover
CN112024127B (en) * 2020-07-30 2022-07-08 上海二十冶建设有限公司 Method for mounting cathode hanger of sintering electric dust remover
CN112871454A (en) * 2021-01-04 2021-06-01 中国神华能源股份有限公司国华电力分公司 Cathode and anode installation method of electric dust collector

Similar Documents

Publication Publication Date Title
CN106395628B (en) A kind of method of the aerial group pair of heavy tower equipment segmental hoisting
CN206376515U (en) High-lift operation hanging cradle device
CN106902986A (en) The installation method of electric precipitator pole plate
CN106836498A (en) A kind of super-span Stadium roof system steel truss lifting construction engineering method
CN103643800B (en) The erection & lift system of buckling-restrained bracing member and construction method thereof
CN106848938B (en) Cable testing bridge hangs installation method under a kind of High Altitude Platform
CN207211634U (en) A kind of segmented hoistway structure and integrated form hoistway elevator
CN106836836A (en) A kind of Flue Gas Desulphurization for Coal-burning Power Plant tower transforms secondary hydraulic lifting installation method
CN106544959B (en) The construction method of king-tower lifting segment and bridge main tower saddle containing saddle
CN103161350A (en) Large span heavy steel structure mast hoisting construction method
CN203359755U (en) Assembly and lifting integrated device for anode plate
CN105888227B (en) Superelevation is tubaeform steel structure exterior finish operation platform and its building method
CN104973517A (en) Electric gantry platform for installing sintering machine head equipment and application method thereof
CN105781205B (en) A kind of guider in place of the aerial group pair of heavy tower equipment segmental hoisting
CN212599995U (en) Welding installation equipment for hot-melt welded pipe
CN207090863U (en) A kind of furnace throat steel watt apparatus for examination and repair
CN107416685A (en) Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge
CN106016233B (en) A kind of long solder joint of span few boiler penthouse and its hanging method
CN108675170A (en) Roofing monorail crane and its construction method
CN208732486U (en) Roofing monorail crane
CN109629812A (en) The fast assembling-disassembling method of super high-rise steel pipe column operating platform
CN116044178A (en) Installation method of large-inclination end screen with cantilever structure at upper part
CN215925689U (en) Arch bridge steel pipe arch rib installing support
CN107447931B (en) The closed factory building roof skylight frame installation method of overlarge area
CN206450544U (en) A kind of rail transit platform screen door physical performance detecting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 450000 Zhengzhou, China Central Plains District, North Street, No. 2 West Station

Applicant after: China Electrical Construction Group Henan Engineering Co., Ltd.

Address before: 450051 Zhengzhou, China Central Plains District, North Street, No. 2 West Station

Applicant before: China Electric Power Construction Group Henan engineering company

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20170630

RJ01 Rejection of invention patent application after publication