CN106898826B - 用于数据中心备用的二级电池解决方案 - Google Patents
用于数据中心备用的二级电池解决方案 Download PDFInfo
- Publication number
- CN106898826B CN106898826B CN201611100191.4A CN201611100191A CN106898826B CN 106898826 B CN106898826 B CN 106898826B CN 201611100191 A CN201611100191 A CN 201611100191A CN 106898826 B CN106898826 B CN 106898826B
- Authority
- CN
- China
- Prior art keywords
- battery apparatus
- electric power
- electricity exception
- duration
- electricity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05F—SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G05F1/00—Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
- G05F1/66—Regulating electric power
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/263—Arrangements for using multiple switchable power supplies, e.g. battery and AC
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/0063—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with circuits adapted for supplying loads from the battery
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J9/00—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J9/00—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
- H02J9/04—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
- H02J9/06—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
- H02J9/062—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for AC powered loads
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K7/00—Constructional details common to different types of electric apparatus
- H05K7/14—Mounting supporting structure in casing or on frame or rack
- H05K7/1485—Servers; Data center rooms, e.g. 19-inch computer racks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/0013—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries acting upon several batteries simultaneously or sequentially
- H02J7/0025—Sequential battery discharge in systems with a plurality of batteries
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/007—Regulation of charging or discharging current or voltage
- H02J7/00712—Regulation of charging or discharging current or voltage the cycle being controlled or terminated in response to electric parameters
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Emergency Management (AREA)
- Business, Economics & Management (AREA)
- Automation & Control Theory (AREA)
- General Engineering & Computer Science (AREA)
- Electromagnetism (AREA)
- Radar, Positioning & Navigation (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910405287.9A CN110165733B (zh) | 2015-12-04 | 2016-12-02 | 用于数据中心备用的二级电池解决方案 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/959,231 | 2015-12-04 | ||
US14/959,231 US9973032B2 (en) | 2015-12-04 | 2015-12-04 | Two-tier battery solution for data center backup |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910405287.9A Division CN110165733B (zh) | 2015-12-04 | 2016-12-02 | 用于数据中心备用的二级电池解决方案 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106898826A CN106898826A (zh) | 2017-06-27 |
CN106898826B true CN106898826B (zh) | 2019-06-21 |
Family
ID=57354172
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611100191.4A Active CN106898826B (zh) | 2015-12-04 | 2016-12-02 | 用于数据中心备用的二级电池解决方案 |
CN201910405287.9A Active CN110165733B (zh) | 2015-12-04 | 2016-12-02 | 用于数据中心备用的二级电池解决方案 |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910405287.9A Active CN110165733B (zh) | 2015-12-04 | 2016-12-02 | 用于数据中心备用的二级电池解决方案 |
Country Status (5)
Country | Link |
---|---|
US (3) | US9973032B2 (fr) |
EP (1) | EP3176906B1 (fr) |
CN (2) | CN106898826B (fr) |
DE (1) | DE202016107457U1 (fr) |
DK (1) | DK3176906T3 (fr) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110165733A (zh) * | 2015-12-04 | 2019-08-23 | 谷歌有限责任公司 | 用于数据中心备用的二级电池解决方案 |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20170063127A1 (en) * | 2015-08-26 | 2017-03-02 | The Aes Corporation | Battery Backup Capacity Method and System |
US11061458B2 (en) * | 2019-03-15 | 2021-07-13 | Microsoft Technology Licensing, Llc | Variable redundancy data center power topology |
EP3726685A1 (fr) | 2019-04-16 | 2020-10-21 | Carrier Corporation | Procédé permettant de répondre à une demande de source d'alimentation électrique |
EP3726307A1 (fr) | 2019-04-17 | 2020-10-21 | Carrier Corporation | Procédé de régulation de la consommation d'énergie de construction |
US11661948B2 (en) | 2019-05-10 | 2023-05-30 | Carrier Corporation | Compressor with vibration sensor |
US11962152B2 (en) | 2019-05-31 | 2024-04-16 | Carrier Corporation | Method for supervisory control of building power consumption |
US11489356B2 (en) | 2019-07-02 | 2022-11-01 | Abb Schweiz Ag | MVDC link-powered battery chargers and operation thereof |
US11271259B2 (en) * | 2019-09-04 | 2022-03-08 | Baidu Usa Llc | Airflow management for battery module cooling |
CN112086954A (zh) * | 2020-09-29 | 2020-12-15 | 东莞铭普光磁股份有限公司 | 一种智能直流配电装置、配电方法及电子设备 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7980905B2 (en) * | 2007-11-25 | 2011-07-19 | C-Mar Holdings, Ltd. | Method and apparatus for providing power to a marine vessel |
Family Cites Families (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5549984A (en) | 1994-07-25 | 1996-08-27 | Globe-Union Inc. | Control and indicator circuit for a dual battery system |
US6329792B1 (en) | 1997-07-04 | 2001-12-11 | Estco Energy Inc. | Device and system for management of battery back up power source |
US7141894B2 (en) | 2002-11-01 | 2006-11-28 | Rudy Kraus | Apparatus for providing high quality power |
US20050134239A1 (en) | 2003-12-22 | 2005-06-23 | Harris Shaun L. | Multiple input redundant power system |
US7196495B1 (en) | 2004-04-27 | 2007-03-27 | Concord Technologies, Lp | Dual battery and monitor arrangement |
JP4673019B2 (ja) | 2004-09-10 | 2011-04-20 | 日立コンピュータ機器株式会社 | 情報処理装置 |
JP4401954B2 (ja) | 2004-12-20 | 2010-01-20 | 富士通株式会社 | 電源制御装置及び電源制御プログラム |
CN101563829B (zh) * | 2006-06-01 | 2012-07-04 | 埃克弗洛普公司 | 数据中心不间断配电架构 |
US8785023B2 (en) | 2008-07-07 | 2014-07-22 | Enervault Corparation | Cascade redox flow battery systems |
WO2013126800A1 (fr) | 2012-02-22 | 2013-08-29 | Viridity Energy, Inc. | Facilitation de la génération de recettes issue d'un déplacement de données réalisé par des centres informatiques |
US9614374B2 (en) * | 2009-11-02 | 2017-04-04 | General Electric Company | Method for controlling energy storage system |
US8487473B2 (en) * | 2010-06-24 | 2013-07-16 | Microsoft Corporation | Hierarchical power smoothing |
TWI431899B (zh) * | 2010-11-30 | 2014-03-21 | Inventec Corp | 伺服電腦機組 |
JP5427762B2 (ja) * | 2010-12-16 | 2014-02-26 | 株式会社日立製作所 | 電力変換装置、電力変換装置の制御装置及び電力変換装置の制御方法 |
US9696770B2 (en) | 2011-03-09 | 2017-07-04 | Yahoo! Inc. | Flexible tier data center |
US9252631B2 (en) | 2011-06-08 | 2016-02-02 | Andrew V. Latham | Data center battery enhancement method and system |
US8850237B2 (en) * | 2011-09-24 | 2014-09-30 | Eaton Corporation | Data processing system power distribution using UPS units selectively coupled to loads by reserve bus based on the load states |
JP6008040B2 (ja) | 2013-03-15 | 2016-10-19 | 富士電機株式会社 | 無停電電源装置 |
US20150032301A1 (en) | 2013-07-29 | 2015-01-29 | Electro-Motive Diesel, Inc. | Two tiered energy storage for a mobile vehicle |
EP3055842B1 (fr) * | 2013-10-07 | 2020-01-22 | Google LLC | Détecteur de risques de maison intelligente émettant des signaux de statut hors alarme à des moments opportuns |
DE102014201345A1 (de) | 2014-01-27 | 2015-07-30 | Robert Bosch Gmbh | Bordnetz und Verfahren zum Betrieb eines Bordnetzes |
CN204696782U (zh) | 2015-05-18 | 2015-10-07 | 刘粤荣 | 一种ups的双电源系统和ups设备 |
US10063092B2 (en) * | 2015-10-02 | 2018-08-28 | Facebook, Inc. | Data center power network with multiple redundancies |
US9973032B2 (en) * | 2015-12-04 | 2018-05-15 | Google Llc | Two-tier battery solution for data center backup |
-
2015
- 2015-12-04 US US14/959,231 patent/US9973032B2/en active Active
-
2016
- 2016-11-17 DE DE202016107457.6U patent/DE202016107457U1/de active Active
- 2016-11-17 EP EP16199381.1A patent/EP3176906B1/fr active Active
- 2016-11-17 DK DK16199381.1T patent/DK3176906T3/da active
- 2016-12-02 CN CN201611100191.4A patent/CN106898826B/zh active Active
- 2016-12-02 CN CN201910405287.9A patent/CN110165733B/zh active Active
-
2018
- 2018-04-11 US US15/950,852 patent/US10559972B2/en active Active
-
2019
- 2019-12-18 US US16/719,950 patent/US11146099B2/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7980905B2 (en) * | 2007-11-25 | 2011-07-19 | C-Mar Holdings, Ltd. | Method and apparatus for providing power to a marine vessel |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110165733A (zh) * | 2015-12-04 | 2019-08-23 | 谷歌有限责任公司 | 用于数据中心备用的二级电池解决方案 |
CN110165733B (zh) * | 2015-12-04 | 2023-01-03 | 谷歌有限责任公司 | 用于数据中心备用的二级电池解决方案 |
Also Published As
Publication number | Publication date |
---|---|
DE202016107457U1 (de) | 2017-03-07 |
US9973032B2 (en) | 2018-05-15 |
CN110165733A (zh) | 2019-08-23 |
US20200127488A1 (en) | 2020-04-23 |
EP3176906B1 (fr) | 2019-09-18 |
EP3176906A1 (fr) | 2017-06-07 |
CN106898826A (zh) | 2017-06-27 |
CN110165733B (zh) | 2023-01-03 |
US20180233946A1 (en) | 2018-08-16 |
US20170163084A1 (en) | 2017-06-08 |
US11146099B2 (en) | 2021-10-12 |
US10559972B2 (en) | 2020-02-11 |
DK3176906T3 (da) | 2019-12-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106898826B (zh) | 用于数据中心备用的二级电池解决方案 | |
US11455021B2 (en) | Datacenter power management using AC and DC power sources | |
US20190258307A1 (en) | Time varying power management within datacenters | |
US10013040B2 (en) | Rack server system and control method thereof | |
US7560829B2 (en) | Power system using multiple battery pack types | |
KR20110005377A (ko) | 하이브리드 데이터 센터 전력 공급 장치 | |
KR101899123B1 (ko) | 국가 전력의 효율적 운용을 위한 국가 전력 통합 운용 시스템 | |
AU2016101769A4 (en) | Power system and method | |
US20210294406A1 (en) | Datacenter power management using current injection | |
Zhou et al. | Lifetime estimation of electrolytic capacitors in a fuel cell power converter at various confidence levels | |
US20100100756A1 (en) | Power Supply Wear Leveling in a Multiple-PSU Information Handling System | |
US11461513B2 (en) | Data center power scenario simulation | |
Addabbo et al. | Availability and reliability modeling of multicore controlled UPS for datacenter applications | |
JP7161271B2 (ja) | 電源、バッテリ電圧をブーストするための方法、バッテリ電圧をブーストするためのコンピュータ・プログラム製品、およびコンピュータ・プログラム | |
US9032250B1 (en) | Online testing of secondary power unit | |
US10234917B2 (en) | Sequential resets of redundant subsystems with random delays | |
US20210296900A1 (en) | Datacenter power management through phase balancing | |
WO2019213466A1 (fr) | Gestion de puissance à variation dans le temps à l'intérieur de centres informatiques | |
KR20150013072A (ko) | 배터리 히터 시스템 및 방법 | |
US10886749B2 (en) | Synchronized startup of power supplies in electrical systems | |
Loeffler et al. | Uninterruptible power supply system | |
TW201546605A (zh) | 整合型不斷電供電系統與方法 | |
KR101717357B1 (ko) | 에너지 관리 시스템의 스터디 모드 관리 장치 및 방법 | |
CN118040772A (zh) | 一种舰船综合电力系统故障后用于供电恢复的重构方法 | |
Mitra et al. | Emergency Power Supply for Load Point Reliability |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: American California Applicant after: Google limited liability company Address before: American California Applicant before: Google Inc. |
|
CB02 | Change of applicant information | ||
REG | Reference to a national code |
Ref country code: HK Ref legal event code: DE Ref document number: 1235915 Country of ref document: HK |
|
GR01 | Patent grant | ||
GR01 | Patent grant |