CN106897517A - Line of high-speed railway gale monitoring optimizes automatic search method of arranging net - Google Patents

Line of high-speed railway gale monitoring optimizes automatic search method of arranging net Download PDF

Info

Publication number
CN106897517A
CN106897517A CN201710097147.0A CN201710097147A CN106897517A CN 106897517 A CN106897517 A CN 106897517A CN 201710097147 A CN201710097147 A CN 201710097147A CN 106897517 A CN106897517 A CN 106897517A
Authority
CN
China
Prior art keywords
system module
line
parameter
speed railway
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710097147.0A
Other languages
Chinese (zh)
Other versions
CN106897517B (en
Inventor
周帅
曾永平
杨国静
陶奇
郑晓龙
苏延文
董俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201710097147.0A priority Critical patent/CN106897517B/en
Publication of CN106897517A publication Critical patent/CN106897517A/en
Application granted granted Critical
Publication of CN106897517B publication Critical patent/CN106897517B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/40Business processes related to the transportation industry

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Computer Hardware Design (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Engineering & Computer Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)

Abstract

Optimize automatic search method of arranging net the invention discloses a kind of line of high-speed railway gale monitoring, comprise the following steps:Determine the corresponding system module of the various terrain environments of line of high-speed railway, to limited variable condition of individual module different topographic characteristics parameter acquiring, using corresponding wind load charge values as control data point, calculated by the way of interpolation in the corresponding scope of actual landform situation under the conditions of continuous variable operating mode value, the corresponding wind load charge values interpolated data storehouse of the system module, search for and determine maximum wind load charge values, under the conditions of continuous variable operating mode value in the range of actual landform, gale monitoring optimizes monitoring point of arranging net to the as system module along the line.The automatic search method can provide quantitative basis for high-speed railway gale monitoring station along circuit longitudinal direction Optimizing, the Optimizing can react the real-time high wind conditions of the landform, easy to operate, precision is higher, is particularly suited for the optimum choice of the Along Railway gale monitoring cloth site of High aititude mountain area complexity landform.

Description

Line of high-speed railway gale monitoring optimizes automatic search method of arranging net
Technical field
The present invention relates to a kind of railway construction of railways field of measuring technique, more particularly to a kind of line of high-speed railway strong wind prison Optimization is surveyed to arrange net automatic search method.
Background technology
High-speed railway plays increasing effect in present traffic and transport field, but present bullet train exists It is very sensitive to the particularly horizontal wind action of strong wind on high speed railway track in running, driving of the wind effect to train Safety and on schedule operation bring greatly challenge.For example, and in " the Bai Lifeng areas " of China's Lan-xing Railway, since being open to traffic, Because big wind-induced train derailing, capsizing case are up to 30,110, lorry is turned over;2003, because strong wind off-period is up to 50 Hour, cause 28,000,000 yuan of direct economic loss.
Therefore, in order to reduce influence of the strong wind to bullet train safe operation, current high-speed railway both domestic and external is taken precautions against natural calamities peace Total system typically all uses wind monitoring system, during the Design of High-speed Railway of China, pair set to the related of wind monitoring system The standard of putting has carried out clear and definite regulation, including wind monitoring station set up wind friction velocity, density of setting along the line, installation method and Type of sensor etc..But, even if many high-speed railways are provided with wind monitoring system both at home and abroad, because wind effect causes Train safety and the accident run on schedule but happen occasionally, the reliability and efficiency of operation of wind monitoring system also have very big carrying Rise space.
For example, gale monitoring system is set up along the Shinkansen of eastern Japanese railway company, 2005, in monitoring system just Often in the case of operation, " spike of rice 14 " train but derails under the speed of 100km/h, causes 4 people dead, and 33 people are injured, thing The main cause of investigation result display train is subjected to afterwards beam wind effect exactly train derailment and overturning, and wind monitoring system is not Can give warning in advance.Early in the end of the year 2004, just gale monitoring system has been installed in the air port along Xinjiang Railway to Urumqi Railway Bureau of China System, 2007, but still there occurs charming appearance and behaviour train derailing disturbing accident, cause 4 people dead, and people more than 30 is injured., typhoon in 2013 " Lepus " is passed by, and wide Shenzhen and Hong Kong " Harmony " EMUs that ShenZhen,GuangDong station originates all are stopped transport and are up to two day time, and typhoon is true Active influence high ferro circuit operation but only have so short dozens of minutes, gale monitoring system it is overly conservative, this also has a strong impact on The efficiency that high-speed railway should be played.
In sum, the method for arranging of the monitoring point along the line of existing gale monitoring system, also has the following disadvantages:
(1) air measuring station lacks the reconnaissance foundation of scientific quantification along the determination that high ferro circuit is longitudinally arranged position, sets and surveys wind Stand catch along least favorable wind monitoring point it is inefficient;China《Design of High-speed Railway specification》Middle regulation mountain area bealock, gorge Paddy, the average headway of river valley wind monitoring point are 1~5km, and the section spacing such as bridge, embankment high is then 5~10km;But in reality Engineering-environment in, for the landform node of this category feature, often with the feature of " miniclimate ", high ferro circuit wind environment is to week The change of exclosure shape is very sensitive, in specification advise 1~5km or 5~10km wind monitoring point layout principle it is excessively extensive, Precision is relatively low, and the scientific basis for not possessing quantization, practical operation difficulty is big;
(2) do not formed a set of normative and reasonable along the reconnaissance of wind monitoring station standard and method, air measuring station cloth at the scene During putting, big with artificial feel and empirically determined composition, operating efficiency is not high.
Therefore, letter wait to need it is a kind of in real time, accurately and efficiently gale monitoring system, especially setting in gale monitoring system During vertical, it is basis and the premise of whole system Effec-tive Function that the optimization of monitoring point along the line is arranged net, for High Speed Railway Trains Traffic safety and on schedule operation it is critical that.
The content of the invention
It is an object of the invention to overcome the existing gale monitoring system position in the presence of prior art really Surely the reconnaissance of scientific quantification is lacked according to, precision is relatively low, operating difficulties above-mentioned deficiency, there is provided a kind of line of high-speed railway strong wind Monitoring optimizing is arranged net automatic search method, and the reconnaissance of arranging net of the gale monitoring system can more optimize, and make gale monitoring system Real-time high wind conditions can be reacted, the wind load of its reflection is relatively more accurate, and efficiently.
In order to realize foregoing invention purpose, the invention provides following technical scheme:
A kind of line of high-speed railway gale monitoring optimizes automatic search method of arranging net, and comprises the following steps:
Step one, determine the various terrain environments of line of high-speed railway, the transitional region between at least two different terrains As system module, system module group is set up;
Step 2, to the features of terrain parameter of each system module in system module group as research variable, set up described System module correspondence independent model in wind tunnel or CFD numerical simulators;
In step 3, the features of terrain parameter for including each system module, change features of terrain parameter value to obtain Limited variable condition, by model in wind tunnel or CFD numerical simulators, obtaining the corresponding wind of each variable condition Load value, and as the corresponding control data point of the variable condition;
Step 4, the limited variable condition according to the system module and corresponding limited control data point, according to In the corresponding scope of actual landform situation under the conditions of continuous variable operating mode value, by the way of interpolation calculation, the system is obtained Corresponding each wind load charge values under the conditions of continuous variable operating mode value in the scope in the transitional region of module of uniting, set up Each variable condition correspondence wind load charge values interpolated data storehouse of the system module independence;
Step 5, for the interpolated data of wind load charge values described in step 4 storehouse, search for and determine maximum wind load charge values, and To the corresponding variable condition of maximum wind load charge values, the corresponding topographical position in the system module of the variable condition, as Under the conditions of continuous variable operating mode value in scope described in actual landform, gale monitoring optimizes prison of arranging net to the system module along the line Measuring point;
Step 6, according to actual landform characteristic parameter, determine corresponding system module, repeat step three to step 5, you can Obtain the corresponding gale monitoring along the line of the features of terrain parameter and optimize monitoring point of arranging net.
The line of high-speed railway gale monitoring optimizes automatic search method of arranging net, by determining line of high-speed railway first The corresponding system module of various terrain environments, then for the research process of individual module in, obtained based on different topographic characteristics parameter The limited variable condition result of study for taking, using this by corresponding wind load charge values as control data point, by the way of interpolation Calculate each variable of the system module independence in the corresponding scope of actual landform situation under the conditions of continuous variable operating mode value Operating mode correspondence wind load charge values interpolated data storehouse, so that formed for individual system block search and determine maximum wind load charge values, i.e., It is the system module under the conditions of continuous variable operating mode value in scope described in actual landform, gale monitoring optimization along the line is arranged net prison Measuring point (will least favorable gale monitoring station be defined as optimize location arrangements), is longitudinal direction of the high-speed railway gale monitoring station along circuit Optimizing provides the foundation for quantifying, and gale monitoring point is reacted the real-time high wind conditions of the landform, the wind of its reflection Load is relatively more accurate, and the method is easy to operate, precision is higher, is particularly suited for the railway edge of High aititude mountain area complexity landform The optimum choice of line gale monitoring cloth site.
Preferably, the line of high-speed railway terrain environment system module in the step one includes:General bridge, tunnel, Valley bridge, embankment high, heavy cut, 6 kinds of landform nodes of Blaps femaralis, according to the principle of combination of two, according to actual conditions, shape Into general bridge+tunnel, general bridge+valley bridge, general bridge+embankment high, general bridge+heavy cut, general bridge+curved Road superelevation, tunnel+valley bridge, valley bridge+embankment high, valley bridge+heavy cut, valley bridge+Blaps femaralis, embankment high + heavy cut, embankment+Blaps femaralis high, heavy cut+Blaps femaralis amount to 12 system modules.
Wherein above-mentioned general bridge refers to build in physical features is relatively flat, depletion region common bridge.
Tunnel refers to the underground structure being embedded in stratum, especially traffic tunnel.
Valley bridge refers to the bridge structure with bearing capacity used across Valleys such as river, mountain valleys.
Embankment high refers to the depth of fill more than 18m soil properties or the embankment of 20m stone matter.
Heavy cut refers to the roadbed of the excavation certain depth less than original ground, i.e., the roadbed for being excavated downwards from original place Form, when roadbed is soil-slope, cutting when vertical excavation depth is more than 20 meters, when roadbed is rock side slope, it hangs down Straight cutting of the excavation depth more than 30 meters.
Blaps femaralis refer to that the single inclined horizontal wall inscription in inside side is set on bend, racetrack portion where the horizontal wall inscription (from Horizontal curve starting point to the end) then it is referred to as Blaps femaralis.
It is further preferred that the parameter of the general bridge in the step one includes span and main beam section form.
It is further preferred that the parameter in the tunnel in the step one includes mountain height and grade of side slope.
It is further preferred that the parameter of the valley bridge in the step one includes the valley gradient, valley depth, bridge span Degree and main beam section form.
It is further preferred that the embankment parameter high in the step one includes height and grade of side slope.
It is further preferred that the heavy cut parameter in the step one includes grade of side slope and slopes horizontal length.
It is further preferred that the Blaps femaralis parameter in the step one includes sweep and circuit angle of inclination.
Preferably, in the step 2 according to the parameter of each topography system module, respectively to each parameter change at least Three values, constitute the corresponding scope of parameter of the system module, if the value for obtaining all parameters is corresponding after changing Dry difference variable condition group, then carries out model in wind tunnel respectively or CFD numerical simulators are calculated, and obtains in the variable The all wind load charge values of correspondence, then carry out continuous variable operating mode in the corresponding scope of parameter of the system module under operating mode group Value, obtains the wind load charge values interpolated data storehouse in the scope, and search obtains maximum wind load from the interpolated data storehouse It is worth corresponding variable condition, the topographical position corresponding to the variable condition, as described system module is in model described in actual landform The monitoring location that gale monitoring optimization is arranged net along in enclosing.
Preferably, the system module correspondence independent model in wind tunnel and CFD numbers are set up in the step 2 simultaneously Value simulation model, respectively by model in wind tunnel and CFD numerical simulators implementation steps three, obtains according to model in wind tunnel The corresponding wind load charge values of each variable condition for arriving, the relevant variable operating mode to being obtained by CFD numerical simulators is corresponding Wind load charge values are modified, and the wind load charge values for then being obtained by revised CFD numerical simulators are defined, then implementation steps four To step 6.The precision of the further optimum choice of arranging net that improve the method.
Compared with prior art, beneficial effects of the present invention:
1st, line of high-speed railway gale monitoring of the present invention optimizes automatic search method of arranging net, by determining first The corresponding system module of the various terrain environments of line of high-speed railway, then for the research process of individual module in, based on differently The limited variable condition result of study that shape characteristic parameter is obtained, using this by corresponding wind load charge values as control data point, adopts The system module in the corresponding scope of actual landform situation under the conditions of continuous variable operating mode value is calculated with the mode of interpolation Independent each variable condition correspondence wind load charge values interpolated data storehouse, so as to be formed for individual system block search and determine maximum Under the conditions of continuous variable operating mode value in scope described in actual landform, strong wind is supervised along the line for wind load charge values, the as system module Survey optimization to arrange net monitoring point (will least favorable gale monitoring station be defined as optimize location arrangements), be high-speed railway gale monitoring station The foundation for quantifying is provided along longitudinal Optimizing of circuit, and gale monitoring point is reacted the landform big landscape in real time Condition, the wind load of its reflection is relatively more accurate, and the method is easy to operate, precision is higher, is particularly suited for High aititude mountain area and answers The optimum choice of the Along Railway gale monitoring cloth site of miscellaneous landform;
2nd, a kind of line of high-speed railway gale monitoring of the present invention optimizes automatic search method of arranging net, there is provided unified rule The principle and method that the high-speed railway gale monitoring station optimization of model is arranged net, can greatly improve operating efficiency.
Brief description of the drawings:
Fig. 1 optimizes automatic search method flow chart of arranging net for a kind of line of high-speed railway gale monitoring of the present invention;
Fig. 2 is the searching method frame that a kind of line of high-speed railway gale monitoring of the invention optimizes automatic search system of arranging net Figure;
Fig. 3 is the schematic diagram of the system module of valley bridge+embankment high.
Specific embodiment
With reference to test example and specific embodiment, the present invention is described in further detail.But this should not be understood For the scope of above-mentioned theme of the invention is only limitted to following embodiment, all technologies realized based on present invention belong to this The scope of invention.
Embodiment 1
As shown in Figure 1, 2, a kind of line of high-speed railway gale monitoring optimizes arrange net automatic search method, including following step Suddenly:
Step one, determine the various terrain environments of line of high-speed railway, the transitional region between at least two different terrains As system module, system module group is set up;
Step 2, to the features of terrain parameter of each system module in system module group as research variable, set up described System module correspondence independent model in wind tunnel or CFD numerical simulators;
In step 3, the features of terrain parameter for including each system module, change features of terrain parameter value to obtain Limited variable condition, by model in wind tunnel or CFD numerical simulators, obtaining the corresponding wind of each variable condition Load value, and as the corresponding control data point of the variable condition;
Step 4, the limited variable condition according to the system module and corresponding limited control data point, according to In the corresponding scope of actual landform situation under the conditions of continuous variable operating mode value, by the way of interpolation calculation, the system is obtained Corresponding each wind load charge values under the conditions of continuous variable operating mode value in the scope in the transitional region of module of uniting, set up Each variable condition correspondence wind load charge values interpolated data storehouse of the system module independence;
Step 5, for the interpolated data of wind load charge values described in step 4 storehouse, search for and determine maximum wind load charge values, and To the corresponding variable condition of maximum wind load charge values, the corresponding topographical position in the system module of the variable condition, as Under the conditions of continuous variable operating mode value in scope described in actual landform, gale monitoring optimizes prison of arranging net to the system module along the line Measuring point;
Step 6, according to actual landform characteristic parameter, determine corresponding system module, repeat step three to step 5, you can Obtain the corresponding gale monitoring along the line of the features of terrain parameter and optimize monitoring point of arranging net.
Line of high-speed railway terrain environment system module in the upper step one includes:General bridge, tunnel, nullah bridge Beam, embankment high, heavy cut, 6 kinds of landform nodes of Blaps femaralis, according to the principle of combination of two, according to actual conditions, form general Bridge+tunnel, general bridge+valley bridge, general bridge+embankment high, general bridge+heavy cut, general bridge+bend surpass Height, tunnel+valley bridge, valley bridge+embankment high, valley bridge+heavy cut, valley bridge+Blaps femaralis, embankment+depth high Cutting, embankment+Blaps femaralis high, heavy cut+Blaps femaralis amount to 12 system modules.
For the step one, the parameter of general bridge therein includes span and main beam section form.The ginseng in the tunnel Number includes mountain height and grade of side slope.The parameter of the valley bridge includes the valley gradient, valley depth, bridge span and girder Form of fracture.The embankment parameter high includes depth of fill high and the side slope of embankment gradient high.The heavy cut parameter includes grade of side slope With slopes horizontal length.The Blaps femaralis parameter includes sweep and circuit angle of inclination.
According to the parameter of each topography system module in step 2 described in upper step 2, respectively to each parameter change extremely Few three values, constitute the corresponding scope of parameter of the system module, obtain all parameters value change after it is corresponding Several different variable condition groups, then carry out model in wind tunnel respectively or CFD numerical simulators are calculated, and obtain in the change The all wind load charge values of correspondence, then carry out continuous variable work in the corresponding scope of parameter of the system module under amount operating mode group Condition value, obtains the wind load charge values interpolated data storehouse in the scope, and search obtains maximum wind load from the interpolated data storehouse The corresponding variable condition of charge values, the topographical position corresponding to the variable condition, as described system module is described in actual landform In the range of along the gale monitoring monitoring location arranged net of optimization, the system by obtaining the correspondence topography system module variable The database of module, the like obtain the database of other systems module.
For example, during the database of system module of valley bridge+embankment high is set up, make respectively 3D bridges, The wind tunnel test test model of valley and embankment high sets up CFD numerical simulators, main beam section form for bridge, across Degree, the gradient in valley, depth, the grade of side slope of embankment, 6 parameters of height, distinguish value 3, then then shape to each parameter Into 3 × 3 × 3 × 3 × 3 × 3=729 variable condition group, the variable condition group is tested or calculated respectively, obtained corresponding Corresponding to the operating mode variable of the maximum wind load charge values (i.e. least favorable wind load) under variable condition in valley bridge+embankment environment high Position as wind monitoring point longitudinal direction optimization position, the amount of air measuring station under the conditions of the parameter value outside 3 control data points Change position, determined by the way of interpolation, then strong wind is supervised along the line in scope described in actual landform to obtain the system module Survey the monitoring location that optimization is arranged net.
The line of high-speed railway gale monitoring optimizes automatic search method of arranging net, by determining line of high-speed railway first The corresponding system module of various terrain environments, then for the research process of individual module in, obtained based on different topographic characteristics parameter The limited variable condition result of study for taking, using this by corresponding wind load charge values as control data point, by the way of interpolation Calculate each variable of the system module independence in the corresponding scope of actual landform situation under the conditions of continuous variable operating mode value Operating mode correspondence wind load charge values interpolated data storehouse, so that formed for individual system block search and determine maximum wind load charge values, i.e., It is the system module under the conditions of continuous variable operating mode value in scope described in actual landform, gale monitoring optimization along the line is arranged net prison Measuring point (will least favorable gale monitoring station be defined as optimize location arrangements), is longitudinal direction of the high-speed railway gale monitoring station along circuit Optimizing provides the foundation for quantifying, and gale monitoring point is reacted the real-time high wind conditions of the landform, the wind of its reflection Load is relatively more accurate, and the method is easy to operate, precision is higher, is particularly suited for the railway edge of High aititude mountain area complexity landform The optimum choice of line gale monitoring cloth site.
In addition, the above-mentioned longitudinal direction optimization position in transitional region air measuring station, under beam wind effect, with single group landform transition region It is research variable with corresponding features of terrain parameter as a example by domain (for example, landform changeover portion of embankment high+valley bridge), uses The research meanses such as wind tunnel test and CFD numerical simulations, obtain variation characteristic of the wind load in transitional region, so that it is determined that least favorable The position of wind monitoring station;
In for the research process of individual module, based on the limited group of result of study of features of terrain parameter acquiring, made with this It is control data point, the value of empty portions is calculated by the way of interpolation, so as to is formed for individual system module least Sharp gale monitoring station optimizes the determination method of location arrangements along longitudinal direction;
For example, the landform changeover portion of embankment high+valley bridge, as shown in figure 3, respectively with side slope of embankment horizontal length high (L), vertical height (H), the gradient (α), the main beam section form (bluff body, fairing) of bridge, size (B × D), span (L), with And the multiple such as the gradient (α) in valley, depth (H), span (L) variable is that research object carries out comparative study under bridge section line, with Wind tunnel test or CFD numerical simulations are research meanses, obtain set of variables parameter under the conditions of different values (research operating mode compared with Many, each research parameter takes a small number of 3 or so control points) result of study, the landform mistake of embankment high+valley bridge is given respectively Cross a section least favorable air measuring station preferred arrangement position;Finally by related interpolation calculation, obtain set of variables and connect within the specific limits Air measuring station preferred arrangement position under the conditions of continuous value.
Similar, optimize method for determining position for single module least favorable air measuring station using above-mentioned, respectively for other Module under landform combination condition conducts a research, thus formed for high-speed railway circuit often meet landform transition condition under least The searching method of longitudinal preferred arrangement position system of sharp air measuring station.
Embodiment 2
The present embodiment 2 describes to optimize automatic searcher of arranging net using line of high-speed railway gale monitoring by a case The application of method, its detailed process includes:
(1) data collection
Respectively for line I (coastal area) and two high ferro circuits of line II (hard and dangerous mountain area) compile along landform, The data such as circuit and meteorology;
(2) research object is determined
1. general bridge:
Line I:DK212+631~DK214+325, tunnel+embankment+bridge high
2. tunnel:Line I DK212+631~DK214+325, tunnel+embankment+bridge high
3. valley bridge:Certain railway, certain bridge
4. embankment high:Line I DK212+631~DK214+325, tunnel+embankment+bridge high
5. heavy cut:Line II D1K210~D1K230, bend+two-wire grand bridge
6. Blaps femaralis:Line II D1K210~D1K230, bend+two-wire grand bridge
(3) wind tunnel test
1. test model standard
The scaling factor of model is about 15m with line width control, such as double track railway width, to ensure model in wind tunnel Middle railway model width is not less than 5~15cm, and model scale is than overall by 1/300~1/100 control.
2. test model classification
Based on actual finding, according to corresponding scaling factor, make respectively general bridge, tunnel, valley bridge, Embankment high, heavy cut, 6 kinds of model in wind tunnel of landform node of Blaps femaralis, note keeping each list during modelling Harmony of the body Model on the overall dimensions such as height, width, it is ensured that can smoothly dock between any two.
3. operating condition of test
Respectively for 6 kinds of development wind tunnel tests of typical landform monomer model, survey different wind speed, wind direction, turbulence level with And the wind angle of attack come flow situation drag wind field be distributed;
It is based respectively on general bridge-tunnel, general bridge-valley bridge, general bridge-embankment high, general bridge-depth road Moat, general bridge-Blaps femaralis, tunnel-valley bridge, tunnel-embankment high, tunnel-heavy cut, tunnel-Blaps femaralis, valley Bridge-embankment high, valley bridge-heavy cut, valley bridge-Blaps femaralis, embankment-heavy cut high, embankment-Blaps femaralis high, Test model under the 15 kinds of landform combinations of heavy cut-Blaps femaralis carries out wind tunnel test, surveys different wind speed, wind direction, turbulence level And the wind angle of attack come flow situation drag wind field be distributed.
4. result of the test is extracted and analysis
Based on results of wind tunnel, the combination of worst landform is specified, obtain the distribution of route section wind field and flow Dependency relation.
(4) CFD numerical simulations
Respectively for general bridge, tunnel, valley bridge, embankment high, heavy cut, 6 kinds of the Blaps femaralis in wind tunnel test Typical landform monomer model sets up 1:1 2D cross sections CFD numerical models simultaneously carry out numerical computations, survey different wind speed, wind direction, Turbulence level and the wind angle of attack come flow situation drag wind field distribution characteristics and with results of wind tunnel contrast, by CFD numbers It is worth the calculating grid adjustment of model and corrects, it is ensured that numerical result is consistent with results of wind tunnel;
(5) field measurement
In the case where study condition is allowed, for the least favorable landform that wind tunnel test and CFD number crunchings determine 3~5 live air measuring stations are installed in combination, the relevant position in actual high ferro circuit, by the wind field data pair of field measurement Research conclusion carries out the confirmation of further check, and within accuracy rating, satisfaction is actually needed check result.
Embodiments of the invention are given for the sake of example and description, and are not exhaustively or by this to send out It is bright to be limited to disclosed form.Many modifications and variations are for the ordinary skill in the art obvious.Choosing It is, in order to more preferably illustrate principle of the invention and practical application, and to make one of ordinary skill in the art to select and describe embodiment It will be appreciated that the present invention is suitable to the various embodiments with various modifications of special-purpose so as to design.

Claims (10)

1. a kind of line of high-speed railway gale monitoring optimizes automatic search method of arranging net, it is characterised in that comprise the following steps:
Step one, determine the various terrain environments of line of high-speed railway, the transitional region conduct between at least two different terrains System module, sets up system module group;
Step 2, to the features of terrain parameter of each system module in system module group as research variable, set up the system Module correspondence independent model in wind tunnel or CFD numerical simulators;
In step 3, the features of terrain parameter included to each system module, change features of terrain parameter value limited to obtain Individual variable condition, by model in wind tunnel or CFD numerical simulators, obtaining the corresponding wind load of each variable condition Value, and as the corresponding control data point of the variable condition;
Step 4, the limited variable condition according to the system module and corresponding limited control data point, according to reality In the corresponding scope of topographic features under the conditions of continuous variable operating mode value, by the way of interpolation calculation, the system mould is obtained Corresponding each wind load charge values under the conditions of continuous variable operating mode value in the scope in the transitional region of block, set up described Each variable condition correspondence wind load charge values interpolated data storehouse of system module independence;
Step 5, for the interpolated data of wind load charge values described in step 4 storehouse, search for and determine maximum wind load charge values, and obtain most The corresponding variable condition of wind loads value, the corresponding topographical position in the system module of the variable condition is as described Under the conditions of continuous variable operating mode value in scope described in actual landform, gale monitoring optimizes monitoring of arranging net to system module along the line Point;
Step 6, according to actual landform characteristic parameter, determine corresponding system module, repeat step three to step 5, you can obtain Gale monitoring optimizes monitoring point of arranging net along the features of terrain parameter is corresponding.
2. a kind of line of high-speed railway gale monitoring according to claim 1 optimizes arrange net automatic search method, its feature It is that the line of high-speed railway terrain environment system module in the step one includes:General bridge, tunnel, valley bridge, height Embankment, heavy cut, 6 kinds of landform nodes of Blaps femaralis, according to the principle of combination of two, according to actual conditions, formed general bridge+ Tunnel, general bridge+valley bridge, general bridge+embankment high, general bridge+heavy cut, general bridge+Blaps femaralis, tunnel + valley bridge, valley bridge+embankment high, valley bridge+heavy cut, valley bridge+Blaps femaralis, embankment+heavy cut high, height Embankment+Blaps femaralis, heavy cut+Blaps femaralis amount to 12 system modules.
3. a kind of line of high-speed railway gale monitoring according to claim 2 optimizes arrange net automatic search method, its feature It is that the parameter of the general bridge in the step one includes span and main beam section form.
4. a kind of line of high-speed railway gale monitoring according to claim 2 optimizes arrange net automatic search method, its feature It is that the parameter in the tunnel in the step one includes mountain height and grade of side slope.
5. a kind of line of high-speed railway gale monitoring according to claim 2 optimizes arrange net automatic search method, its feature It is that the parameter of the valley bridge in the step one includes the valley gradient, valley depth, bridge span and main beam section shape Formula.
6. a kind of line of high-speed railway gale monitoring according to claim 2 optimizes arrange net automatic search method, its feature It is that the embankment parameter high in the step one includes height and grade of side slope.
7. a kind of line of high-speed railway gale monitoring according to claim 2 optimizes arrange net automatic search method, its feature It is that the heavy cut parameter in the step one includes grade of side slope and slopes horizontal length.
8. a kind of line of high-speed railway gale monitoring according to claim 2 optimizes arrange net automatic search method, its feature It is that the Blaps femaralis parameter in the step one includes sweep and circuit angle of inclination.
9. automatic search method of arranging net is optimized according to a kind of any described line of high-speed railway gale monitorings of claim 2-8, Characterized in that, according to the parameter of each topography system module in the step 2, respectively to each parameter change at least three Value, constitutes the corresponding scope of parameter of the system module, obtain all parameters value change after corresponding several Different variable condition groups, then carry out model in wind tunnel respectively or CFD numerical simulators are calculated, and obtain in the variable condition The group all wind load charge values of lower correspondence, then carry out continuous variable operating mode and take in the corresponding scope of parameter of the system module Value, obtains the wind load charge values interpolated data storehouse in the scope, and search obtains maximum wind load charge values from the interpolated data storehouse Corresponding variable condition, the topographical position corresponding to the variable condition, as described system module is in scope described in actual landform The monitoring location that gale monitoring optimization is arranged net along interior.
10. automatic search method of arranging net is optimized according to a kind of any described line of high-speed railway gale monitorings of claim 2-8, Characterized in that, the system module correspondence independent model in wind tunnel and CFD Numerical-Modes are set up in the step 2 simultaneously Analog model, respectively by model in wind tunnel and CFD numerical simulators implementation steps three, obtains according to model in wind tunnel The corresponding wind load charge values of each variable condition, to the corresponding wind load of relevant variable operating mode obtained by CFD numerical simulators Charge values are modified, and the wind load charge values for then being obtained by revised CFD numerical simulators are defined, then implementation steps four are to step Rapid six.
CN201710097147.0A 2017-02-22 2017-02-22 Line of high-speed railway gale monitoring optimizes automatic search method of arranging net Active CN106897517B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710097147.0A CN106897517B (en) 2017-02-22 2017-02-22 Line of high-speed railway gale monitoring optimizes automatic search method of arranging net

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710097147.0A CN106897517B (en) 2017-02-22 2017-02-22 Line of high-speed railway gale monitoring optimizes automatic search method of arranging net

Publications (2)

Publication Number Publication Date
CN106897517A true CN106897517A (en) 2017-06-27
CN106897517B CN106897517B (en) 2019-11-15

Family

ID=59184535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710097147.0A Active CN106897517B (en) 2017-02-22 2017-02-22 Line of high-speed railway gale monitoring optimizes automatic search method of arranging net

Country Status (1)

Country Link
CN (1) CN106897517B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109901244A (en) * 2019-03-29 2019-06-18 云南电网有限责任公司电力科学研究院 A kind of power transmission line in high altitude region gale monitoring points distributing method and device
CN111413065A (en) * 2020-04-24 2020-07-14 石家庄铁道大学 Pneumatic load loading system for simulating train to pass through tunnel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102023317A (en) * 2010-10-14 2011-04-20 北京大学 Method for deploying strong wind monitoring points on rapid transit railway
US20120151769A1 (en) * 2010-12-16 2012-06-21 Inventus Holdings, Llc Method for determining optimum vortex generator placement for maximum efficiency on a retrofitted wind turbine generator of unknown aerodynamic design
CN103745032A (en) * 2013-12-18 2014-04-23 华锐风电科技(集团)股份有限公司 Wind-field turbulence computing method and wind farm micro-siting method and device
CN104021266A (en) * 2013-03-01 2014-09-03 中国船舶工业集团公司第七〇八研究所 Wind load calculation method suitable for ocean engineering ship
CN105740990A (en) * 2016-02-26 2016-07-06 中铁第四勘察设计院集团有限公司 Method for selecting resident monitoring points in railway wind monitoring system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102023317A (en) * 2010-10-14 2011-04-20 北京大学 Method for deploying strong wind monitoring points on rapid transit railway
US20120151769A1 (en) * 2010-12-16 2012-06-21 Inventus Holdings, Llc Method for determining optimum vortex generator placement for maximum efficiency on a retrofitted wind turbine generator of unknown aerodynamic design
CN104021266A (en) * 2013-03-01 2014-09-03 中国船舶工业集团公司第七〇八研究所 Wind load calculation method suitable for ocean engineering ship
CN103745032A (en) * 2013-12-18 2014-04-23 华锐风电科技(集团)股份有限公司 Wind-field turbulence computing method and wind farm micro-siting method and device
CN105740990A (en) * 2016-02-26 2016-07-06 中铁第四勘察设计院集团有限公司 Method for selecting resident monitoring points in railway wind monitoring system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐超: "《高速铁路综合防灾安全监控系统的研究》", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109901244A (en) * 2019-03-29 2019-06-18 云南电网有限责任公司电力科学研究院 A kind of power transmission line in high altitude region gale monitoring points distributing method and device
CN109901244B (en) * 2019-03-29 2021-07-27 云南电网有限责任公司电力科学研究院 High-altitude area power transmission line strong wind monitoring and point distribution method and device
CN111413065A (en) * 2020-04-24 2020-07-14 石家庄铁道大学 Pneumatic load loading system for simulating train to pass through tunnel
CN111413065B (en) * 2020-04-24 2021-08-10 石家庄铁道大学 Pneumatic load loading system for simulating train to pass through tunnel

Also Published As

Publication number Publication date
CN106897517B (en) 2019-11-15

Similar Documents

Publication Publication Date Title
CN102023317B (en) Method for deploying strong wind monitoring points on rapid transit railway
Lai et al. Optimization of rail transit alignments considering vehicle dynamics
CN201177529Y (en) Remote measuring and reporting system for water level
CN103996085B (en) Method for predicting near-ground wind field point domain mapping space along railway
CN107808498A (en) A kind of monitoring method of landslide and the monitoring system of application this method
CN113160593A (en) Mountain road driving safety early warning method based on edge cloud cooperation
CN113011029B (en) Wind measuring site layout optimization method along high-speed rail
CN104900057B (en) A kind of Floating Car map-matching method in the major-minor road of city expressway
CN110009037A (en) A kind of engineering wind speed Forecasting Approach for Short-term and system based on physical message coupling
CN104318085A (en) Torrential flood risk identification and extraction method of drainage basins
Burlando et al. A pilot study of the wind speed along the Rome–Naples HS/HC railway line. Part 1—Numerical modelling and wind simulations
CN106548258A (en) A kind of traffic produced air pollution thing concentration prediction method and system based on meteorological condition
Butler et al. High-resolution observations of the near-surface wind field over an isolated mountain and in a steep river canyon
CN112348050A (en) Anemograph arrangement method based on wind characteristics along high-speed rail
CN106897517B (en) Line of high-speed railway gale monitoring optimizes automatic search method of arranging net
Ding et al. An alternative approach to modelling train stability in high cross winds
CN105427189A (en) Power grid vulnerability evaluation method under landslide hazard
JP4297921B2 (en) Method for creating contour map of physical quantity and method for estimating physical quantity
CN104463442B (en) A kind of detection method of town and country construction concentration
CN206021512U (en) A kind of detection forecasting and warning device of heavy rain type diluted debris flow
JP4043779B2 (en) Basic wind speed map creation method by wind direction and basic wind speed estimation method by wind direction
CN107220219A (en) Railway steel box girder bridge Temperature Gradient evaluation method
Castelli et al. Intercomparison of 3D turbulence parameterizations for dispersion models in complex terrain derived from a circulation model
Yu et al. Experimental study of the impact of upstream mountain terrain and urban exposure on approaching wind characteristics
CN110263369B (en) Building surface wind resistance grade design method based on climate analysis and numerical simulation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant