The crossed construction intelligent graphic displaying of subway engineering Gui Hang areas and collision detecting system
Technical field
The invention belongs to city track traffic engineering technical field, more particularly to a set of subway engineering Gui Hang areas crossed construction
Intelligent graphic displaying and collision detecting system.
Background technology
At present, in the subway construction of China, Gui Hang areas are related to even tens of enterprises of up to several families while carrying out engineering
Construction, various rail vehicles and engineering equipment are constructed in long and narrow and bad visibility Gui Hang areas simultaneously, the construction for interacting
Arranging conflict may trigger serious damage sequence.Current Gui Hang areas construction arrangement fully relies on paper list and reports or electricity
Sub-table is reported, and is investigated one by one by Gui Hang areas administrative staff, the risk investigation for carrying out manualization is classified, because construction is looked forward to
Industry is more, and greatly, administrative staff whether there is conflict to the construction request for data amount of tabular by between tens of constructions of investigation by hand
Workload and difficulty it is very big.The long-term mass data that carries out is investigated by hand, the probability of investigation careless omission and digital mistake of statistics occurs
Height, it is found that the difficulty of careless omission is very big.The potential safety hazard of Gui Hang areas crossed construction management has become urgently to be resolved hurrily in industry asking
Topic.
The content of the invention
The present invention constructs for craft Hua Guihang areas, and the workload for arranging is big, human factor is big, be difficult to reflection intersection directly perceived
The problems such as construction collision, the crossed construction intelligent graphic displaying of subway engineering Gui Hang areas and collision detecting system are have developed, can be by
The crossed construction information of a large amount of tabulars is patterned displaying directly perceived, and carries out Fast Collision Detection, can improve the friendship of Gui Hang areas
The efficiency for arranging of constructing, the reasonability for improving Gui Hang area's crossed construction arrangements are pitched, the collision of crossed construction arrangement is reduced and is caused
The risk of construction accident.
To solve the above problems, the present invention is adopted the following technical scheme that:
The invention provides a kind of subway engineering Gui Hang areas crossed construction intelligent graphic displaying and collision detecting system, its
Constructed distributed data management module, crossed construction collision detection mould including construction distribution two dimensionization graphic plotting module, Gui Hang areas
Block and authority management module.
Further optimization as the present invention to such scheme, the construction distribution two dimensionization graphic plotting module is used to paint
Zhi Yiguihang areas respectively construct group engineering time as abscissa, using interval of constructing as ordinate, and by not isolabeling
The two dimension construction distribution map of the different construction ranks of sign;
The Gui Hang areas construction distributed data management function realizes respectively applying to construction distribution two dimensionization graphic plotting module
The engineering time of work group, construct interval and construction rank increase, deletion, modification and inquiry;
The crossed construction collision detection module mainly judges to conflict with the presence or absence of construction between each construction group, and sends
Conflict warning;
The authority management module realizes that each construction group can be used the system to carry out Gui Hang areas construction information and declare,
And two dimension construction distribution map can be checked, but have no right modifications and changes construction information.
Further optimization as the present invention to such scheme, the construction is distributed two dimensionization graphic plotting module with daily
Time is abscissa, according to actual needs, carries out time lattice as minimum unit at a suitable time;It is with Gui Hang areas mileage
Ordinate, according to actual needs, interval lattice of constructing, continuous 24 hours displaying institutes is carried out using suitable distance as minimum unit
All construction distribution situations of each time period and space segment in rail row area, and will be in fact present in the way of electronic computer
In Computer Graphics Display region, the rank constructed by different colours differentiation, the more obvious condition of construction for distinguishing mutual exclusion, when
Mutual exclusion construction figure can determine whether there is construction conflict when graphics display area produces any intersection and overlaps, and to scheduling people
Member sends conflict warning, is coordinated by dispatcher and changed, until conflicting in the absence of construction.
Further optimization as the present invention to such scheme, the time lattice mode is using daily 24 hours as horizontal stroke
Coordinate, according to the characteristics of subway work, using 18 points as between at the beginning of daily, each whole hour draws a thicker vertical line
Bar, draws a thinner vertical moulding in every 10 minutes;The interval lattice mode of construction is by the length picture in whole Gui Hang areas
Element forms ordinate after being converted, by the position of each website, tracklaying base and road fork according to ratiometric conversion after, draw horizontal
Line.
The beneficial effects of the present invention are:The system instead of the craft that current subway rail row area crossed construction management is used
The mode of form, the method for employing time and space coordinate system carries out crossed construction expression, is applied in current urban track traffic
It is a kind of system of innovation in work;The system is formed after the actual state and feature for summarizing subway rail row area crossed construction
The mode of spacetime coordinate carries out construction management, and this method is embodied as into a set of information system using computer programming, leads to
Crossing computer carries out the construction conflict of automatic input, automatic Display and automatic decision, with certain advance;This system improves
Gui Hang areas administrative staff improve the security that Gui Hang areas crossed construction is arranged to the processing speed of Gui Hang areas construction plan, carry
The time of Gao Liaoguihang areas construction and interval availability, alleviate Gui Hang areas administrative staff and the work of personnel are declared by construction enterprises
Amount.For complicated construction, the process time that week plans can rise to or so 1 hour by original 2-3 days;By the two of issue
Dimension construction distribution map, construction enterprises can intuitively check all construction distributions in Gui Hang areas, it is thus understood that it nearby whether there is high-risk
Construction, in advance improve safeguard procedures and consciousness of self-protection, enhance working security;By checking two dimension construction distribution map, apply
Work enterprise can intuitively understand the occupancy situation in whole Gui Hang areas, if it find that white space, then can immediately augment Contingency plans, carry
Efficiency of construction high.
Brief description of the drawings
Fig. 1 is present system functional block diagram;
Fig. 2 is the two dimension construction distribution map in the embodiment of the present invention.
Specific embodiment
For technological means, creation characteristic, reached purpose and effect for making present invention realization are easy to understand, with reference to
Specific embodiment, is expanded on further the present invention.
A kind of subway engineering Gui Hang areas crossed construction intelligent graphic displaying as shown in Figure 1 and collision detecting system, its
Constructed distributed data management module, crossed construction collision detection mould including construction distribution two dimensionization graphic plotting module, Gui Hang areas
Block and authority management module;The construction distribution two dimensionization graphic plotting module is used to draw respectively is constructed the applying of group with Gui Hang areas
Between man-hour as abscissa, using interval of constructing as ordinate, and applied by the two dimension that not isolabeling indicates different construction ranks
Work point Butut;The Gui Hang areas construction distributed data management function realizes respectively applying to construction distribution two dimensionization graphic plotting module
The engineering time of work group, construct interval and construction rank increase, deletion, modification and inquiry;The crossed construction collision inspection
Survey module mainly to judge to conflict with the presence or absence of construction between each construction group, concurrent entry/exit conflicts warning;The authority management module
Realize that each construction group can be used the system to carry out Gui Hang areas construction information and declare, and two dimension construction distribution map can be checked,
But have no right modifications and changes construction information.
In this example, daily 24 hours as abscissa according to the characteristics of subway work, are opened using 18 points as daily
Time beginning, each whole hour draws a thicker vertical moulding, draws a thinner vertical moulding within every 10 minutes;By whole rail row
The length in area forms ordinate after being converted with pixel, by the position of each website, tracklaying base and road fork according to ratio
After conversion, horizontal line is drawn;This kind two dimension construction distribution map can be clearly interval by website and the time is clearly divided.
In this example, construction rank is divided into the construction of A1 classes by two dimension construction distribution map as shown in Figure 2, system, and A2 classes are applied
Work, the construction of A3 classes and the construction of A4 classes, the wherein construction of A1 classes represent that the construction needs to use engineering train, other shadows in the range of it
Ring the construction of driving can not therewith generation time and space staggeredly;The construction of A2 classes is represented and uses rail vehicle in gate position
Carry out goods short distance handling and transport, it is desirable to be equal to the construction of A1 classes;The construction of A3 classes is represented and carries out rail row using small machine
Area constructs, and small machine use can take track, but can be moved away within a short period of time, and other in-orbit row areas are likely to result in and invade
The construction of limit but rail-free train transportation behavior falls within the construction of A3 classes;The construction of A4 classes represents that only having personnel carries simple tool
The construction of Gui Hang areas is carried out, is not resulted in and is invaded restricted driving and be.4 kinds of construction-grades are plotted in the two dimension for designing with different signs by more than
Construction distribution map.
The application information of all units is imported the system by system manager according to daily crossed construction application, is
Engineering time and the interval united according to each unit, will be constructed with block diagram and are labeled in the coordinate system for designing.It judges rule
It is then:
1st, the construction of A1 classes and A1 classes, A2 classes, A3 classes construction histogram can not produce alternation sum to overlap.
2nd, the construction of A2 classes and A1 classes, A2 classes, A3 classes construction histogram can not produce alternation sum to overlap.
3rd, A3 classes construction can not produce alternation sum to overlap with A1 classes, A2 classes construction histogram.
4th, A4 classes construction can produce alternation sum Chong Die in the case of without special instruction with any construction.
In actual treatment, whether dispatcher is produced not by all construction rectangles drawn in two dimension construction distribution map
The alternation sum of permission overlaps to judge whether construction conflict, after conflict is found, by coordinating and changing, is applied until all
Untill the equal Lothrus apterus of work.As shown in Figure 2, along the running route of vehicle in figure, the construction of A3 classes can produce punching with the construction of A1 classes
Prominent, by two dimension, construction distribution map dispatcher can timely have found conflict, and then coordinate and change, and substantially increase
The efficiency of work progress.
Those of ordinary skill in the art it should be appreciated that the embodiment of the above be intended merely to explanation the present invention,
And be not used as being limitation of the invention, as long as in spirit of the invention, the change to embodiment described above
Change, modification will all fall in scope of the presently claimed invention.