CN106897448A - The crossed construction intelligent graphic displaying of subway engineering Gui Hang areas and collision detecting system - Google Patents

The crossed construction intelligent graphic displaying of subway engineering Gui Hang areas and collision detecting system Download PDF

Info

Publication number
CN106897448A
CN106897448A CN201710123696.0A CN201710123696A CN106897448A CN 106897448 A CN106897448 A CN 106897448A CN 201710123696 A CN201710123696 A CN 201710123696A CN 106897448 A CN106897448 A CN 106897448A
Authority
CN
China
Prior art keywords
construction
gui hang
crossed
hang areas
areas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710123696.0A
Other languages
Chinese (zh)
Other versions
CN106897448B (en
Inventor
金辉
张仓海
韩文利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Rio Tinto Technology Co ltd
Shanghai Civil Engineering Co Ltd of CREC
Guangzhou Metro Group Co Ltd
Original Assignee
Shaanxi Rio Tinto Intelligent Transportation Technology Co Ltd
Shanghai Civil Engineering Co Ltd of CREC
Guangzhou Metro Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Rio Tinto Intelligent Transportation Technology Co Ltd, Shanghai Civil Engineering Co Ltd of CREC, Guangzhou Metro Group Co Ltd filed Critical Shaanxi Rio Tinto Intelligent Transportation Technology Co Ltd
Priority to CN201710123696.0A priority Critical patent/CN106897448B/en
Publication of CN106897448A publication Critical patent/CN106897448A/en
Application granted granted Critical
Publication of CN106897448B publication Critical patent/CN106897448B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/904Browsing; Visualisation therefor
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group

Abstract

The invention discloses the crossed construction intelligent graphic displaying of subway engineering Gui Hang areas and collision detecting system, including construction distribution two dimensionization graphic plotting module, Gui Hang areas are constructed distributed data management module, crossed construction collision detection module and authority management module.System has used a kind of new patterned crossed construction displaying and collision checking method, and the programming realization for passing through computer in the present invention.System has the function that please be sold sheet format construction and figure is a little automatically converted to by computer, subway rail row area construction data management function, subway rail row area construction distribution collision checking function, the construction of subway rail row area distribution pattern displaying function and rights management function.Point data is asked by each unit in charge of construction of system input, by the calculation process of computer, form class data are realized to graphical conversion, and the reasonability that automatic detection construction is arranged, efficiency and security that a large amount of crossed constructions in tunnel Nei Guihang areas are arranged can be greatly improved.

Description

The crossed construction intelligent graphic displaying of subway engineering Gui Hang areas and collision detecting system
Technical field
The invention belongs to city track traffic engineering technical field, more particularly to a set of subway engineering Gui Hang areas crossed construction Intelligent graphic displaying and collision detecting system.
Background technology
At present, in the subway construction of China, Gui Hang areas are related to even tens of enterprises of up to several families while carrying out engineering Construction, various rail vehicles and engineering equipment are constructed in long and narrow and bad visibility Gui Hang areas simultaneously, the construction for interacting Arranging conflict may trigger serious damage sequence.Current Gui Hang areas construction arrangement fully relies on paper list and reports or electricity Sub-table is reported, and is investigated one by one by Gui Hang areas administrative staff, the risk investigation for carrying out manualization is classified, because construction is looked forward to Industry is more, and greatly, administrative staff whether there is conflict to the construction request for data amount of tabular by between tens of constructions of investigation by hand Workload and difficulty it is very big.The long-term mass data that carries out is investigated by hand, the probability of investigation careless omission and digital mistake of statistics occurs Height, it is found that the difficulty of careless omission is very big.The potential safety hazard of Gui Hang areas crossed construction management has become urgently to be resolved hurrily in industry asking Topic.
The content of the invention
The present invention constructs for craft Hua Guihang areas, and the workload for arranging is big, human factor is big, be difficult to reflection intersection directly perceived The problems such as construction collision, the crossed construction intelligent graphic displaying of subway engineering Gui Hang areas and collision detecting system are have developed, can be by The crossed construction information of a large amount of tabulars is patterned displaying directly perceived, and carries out Fast Collision Detection, can improve the friendship of Gui Hang areas The efficiency for arranging of constructing, the reasonability for improving Gui Hang area's crossed construction arrangements are pitched, the collision of crossed construction arrangement is reduced and is caused The risk of construction accident.
To solve the above problems, the present invention is adopted the following technical scheme that:
The invention provides a kind of subway engineering Gui Hang areas crossed construction intelligent graphic displaying and collision detecting system, its Constructed distributed data management module, crossed construction collision detection mould including construction distribution two dimensionization graphic plotting module, Gui Hang areas Block and authority management module.
Further optimization as the present invention to such scheme, the construction distribution two dimensionization graphic plotting module is used to paint Zhi Yiguihang areas respectively construct group engineering time as abscissa, using interval of constructing as ordinate, and by not isolabeling The two dimension construction distribution map of the different construction ranks of sign;
The Gui Hang areas construction distributed data management function realizes respectively applying to construction distribution two dimensionization graphic plotting module The engineering time of work group, construct interval and construction rank increase, deletion, modification and inquiry;
The crossed construction collision detection module mainly judges to conflict with the presence or absence of construction between each construction group, and sends Conflict warning;
The authority management module realizes that each construction group can be used the system to carry out Gui Hang areas construction information and declare, And two dimension construction distribution map can be checked, but have no right modifications and changes construction information.
Further optimization as the present invention to such scheme, the construction is distributed two dimensionization graphic plotting module with daily Time is abscissa, according to actual needs, carries out time lattice as minimum unit at a suitable time;It is with Gui Hang areas mileage Ordinate, according to actual needs, interval lattice of constructing, continuous 24 hours displaying institutes is carried out using suitable distance as minimum unit All construction distribution situations of each time period and space segment in rail row area, and will be in fact present in the way of electronic computer In Computer Graphics Display region, the rank constructed by different colours differentiation, the more obvious condition of construction for distinguishing mutual exclusion, when Mutual exclusion construction figure can determine whether there is construction conflict when graphics display area produces any intersection and overlaps, and to scheduling people Member sends conflict warning, is coordinated by dispatcher and changed, until conflicting in the absence of construction.
Further optimization as the present invention to such scheme, the time lattice mode is using daily 24 hours as horizontal stroke Coordinate, according to the characteristics of subway work, using 18 points as between at the beginning of daily, each whole hour draws a thicker vertical line Bar, draws a thinner vertical moulding in every 10 minutes;The interval lattice mode of construction is by the length picture in whole Gui Hang areas Element forms ordinate after being converted, by the position of each website, tracklaying base and road fork according to ratiometric conversion after, draw horizontal Line.
The beneficial effects of the present invention are:The system instead of the craft that current subway rail row area crossed construction management is used The mode of form, the method for employing time and space coordinate system carries out crossed construction expression, is applied in current urban track traffic It is a kind of system of innovation in work;The system is formed after the actual state and feature for summarizing subway rail row area crossed construction The mode of spacetime coordinate carries out construction management, and this method is embodied as into a set of information system using computer programming, leads to Crossing computer carries out the construction conflict of automatic input, automatic Display and automatic decision, with certain advance;This system improves Gui Hang areas administrative staff improve the security that Gui Hang areas crossed construction is arranged to the processing speed of Gui Hang areas construction plan, carry The time of Gao Liaoguihang areas construction and interval availability, alleviate Gui Hang areas administrative staff and the work of personnel are declared by construction enterprises Amount.For complicated construction, the process time that week plans can rise to or so 1 hour by original 2-3 days;By the two of issue Dimension construction distribution map, construction enterprises can intuitively check all construction distributions in Gui Hang areas, it is thus understood that it nearby whether there is high-risk Construction, in advance improve safeguard procedures and consciousness of self-protection, enhance working security;By checking two dimension construction distribution map, apply Work enterprise can intuitively understand the occupancy situation in whole Gui Hang areas, if it find that white space, then can immediately augment Contingency plans, carry Efficiency of construction high.
Brief description of the drawings
Fig. 1 is present system functional block diagram;
Fig. 2 is the two dimension construction distribution map in the embodiment of the present invention.
Specific embodiment
For technological means, creation characteristic, reached purpose and effect for making present invention realization are easy to understand, with reference to Specific embodiment, is expanded on further the present invention.
A kind of subway engineering Gui Hang areas crossed construction intelligent graphic displaying as shown in Figure 1 and collision detecting system, its Constructed distributed data management module, crossed construction collision detection mould including construction distribution two dimensionization graphic plotting module, Gui Hang areas Block and authority management module;The construction distribution two dimensionization graphic plotting module is used to draw respectively is constructed the applying of group with Gui Hang areas Between man-hour as abscissa, using interval of constructing as ordinate, and applied by the two dimension that not isolabeling indicates different construction ranks Work point Butut;The Gui Hang areas construction distributed data management function realizes respectively applying to construction distribution two dimensionization graphic plotting module The engineering time of work group, construct interval and construction rank increase, deletion, modification and inquiry;The crossed construction collision inspection Survey module mainly to judge to conflict with the presence or absence of construction between each construction group, concurrent entry/exit conflicts warning;The authority management module Realize that each construction group can be used the system to carry out Gui Hang areas construction information and declare, and two dimension construction distribution map can be checked, But have no right modifications and changes construction information.
In this example, daily 24 hours as abscissa according to the characteristics of subway work, are opened using 18 points as daily Time beginning, each whole hour draws a thicker vertical moulding, draws a thinner vertical moulding within every 10 minutes;By whole rail row The length in area forms ordinate after being converted with pixel, by the position of each website, tracklaying base and road fork according to ratio After conversion, horizontal line is drawn;This kind two dimension construction distribution map can be clearly interval by website and the time is clearly divided.
In this example, construction rank is divided into the construction of A1 classes by two dimension construction distribution map as shown in Figure 2, system, and A2 classes are applied Work, the construction of A3 classes and the construction of A4 classes, the wherein construction of A1 classes represent that the construction needs to use engineering train, other shadows in the range of it Ring the construction of driving can not therewith generation time and space staggeredly;The construction of A2 classes is represented and uses rail vehicle in gate position Carry out goods short distance handling and transport, it is desirable to be equal to the construction of A1 classes;The construction of A3 classes is represented and carries out rail row using small machine Area constructs, and small machine use can take track, but can be moved away within a short period of time, and other in-orbit row areas are likely to result in and invade The construction of limit but rail-free train transportation behavior falls within the construction of A3 classes;The construction of A4 classes represents that only having personnel carries simple tool The construction of Gui Hang areas is carried out, is not resulted in and is invaded restricted driving and be.4 kinds of construction-grades are plotted in the two dimension for designing with different signs by more than Construction distribution map.
The application information of all units is imported the system by system manager according to daily crossed construction application, is Engineering time and the interval united according to each unit, will be constructed with block diagram and are labeled in the coordinate system for designing.It judges rule It is then:
1st, the construction of A1 classes and A1 classes, A2 classes, A3 classes construction histogram can not produce alternation sum to overlap.
2nd, the construction of A2 classes and A1 classes, A2 classes, A3 classes construction histogram can not produce alternation sum to overlap.
3rd, A3 classes construction can not produce alternation sum to overlap with A1 classes, A2 classes construction histogram.
4th, A4 classes construction can produce alternation sum Chong Die in the case of without special instruction with any construction.
In actual treatment, whether dispatcher is produced not by all construction rectangles drawn in two dimension construction distribution map The alternation sum of permission overlaps to judge whether construction conflict, after conflict is found, by coordinating and changing, is applied until all Untill the equal Lothrus apterus of work.As shown in Figure 2, along the running route of vehicle in figure, the construction of A3 classes can produce punching with the construction of A1 classes Prominent, by two dimension, construction distribution map dispatcher can timely have found conflict, and then coordinate and change, and substantially increase The efficiency of work progress.
Those of ordinary skill in the art it should be appreciated that the embodiment of the above be intended merely to explanation the present invention, And be not used as being limitation of the invention, as long as in spirit of the invention, the change to embodiment described above Change, modification will all fall in scope of the presently claimed invention.

Claims (4)

1. the crossed construction intelligent graphic displaying of subway engineering Gui Hang areas and collision detecting system, it is characterised in that including construction Distribution two dimensionization graphic plotting module, Gui Hang areas are constructed distributed data management module, crossed construction collision detection module and authority Management module.
2. subway engineering Gui Hang areas crossed construction intelligent graphic displaying according to claim 1 and collision detecting system, Characterized in that, the construction distribution two dimensionization graphic plotting module is used to draw the engineering time of group of respectively being constructed with Gui Hang areas As abscissa, using interval of constructing as ordinate, and the two dimension construction distribution of different construction ranks is indicated by not isolabeling Figure;
The Gui Hang areas construction distributed data management function realizes each construction group to construction distribution two dimensionization graphic plotting module The engineering time of body, construct interval and construction rank increase, deletion, modification and inquiry;
The crossed construction collision detection module mainly judges to conflict with the presence or absence of construction between each construction group, concurrent entry/exit conflicts Warning;
The authority management module realizes that each construction group can be used the system to carry out Gui Hang areas construction information and declare, and can Two dimension construction distribution map is checked, but haves no right modifications and changes construction information.
3. subway engineering Gui Hang areas crossed construction intelligent graphic displaying according to claim 2 and collision detecting system, Characterized in that, the construction distribution two dimensionization graphic plotting module is with every Time of Day as abscissa, according to actual needs, to close The suitable time carries out time lattice as minimum unit;With Gui Hang areas mileage as ordinate, according to actual needs, with suitably away from Interval lattice of constructing is carried out from as minimum unit, each time period and space segment in continuous 24 hours rail row areas of displaying institute All construction distribution situations, and will in fact in present Computer Graphics Display region, by different face in the way of electronic computer Color distinguishes the rank of construction, the more obvious condition of construction for distinguishing mutual exclusion, when mutual exclusion construction figure is produced in graphics display area Can determine whether to exist to construct when any intersection of life and overlap and conflict, and conflict is sent to dispatcher and alert, by dispatcher Coordinate and change, until conflicting in the absence of construction.
4. subway engineering Gui Hang areas crossed construction intelligent graphic displaying according to claim 3 and collision detecting system, Characterized in that, the time lattice mode is using daily 24 hours as abscissa, according to the characteristics of subway work, with 18 points Between at the beginning of daily, each whole hour draws a thicker vertical moulding, draws a thinner vertical line within every 10 minutes Bar;The interval lattice mode of construction is to form ordinate after the length in whole Gui Hang areas is converted with pixel, by each After the position of website, tracklaying base and road fork is according to ratiometric conversion, horizontal line is drawn.
CN201710123696.0A 2017-03-03 2017-03-03 Subway engineering rail-running area cross construction intelligent graphical display and collision detection system Active CN106897448B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710123696.0A CN106897448B (en) 2017-03-03 2017-03-03 Subway engineering rail-running area cross construction intelligent graphical display and collision detection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710123696.0A CN106897448B (en) 2017-03-03 2017-03-03 Subway engineering rail-running area cross construction intelligent graphical display and collision detection system

Publications (2)

Publication Number Publication Date
CN106897448A true CN106897448A (en) 2017-06-27
CN106897448B CN106897448B (en) 2020-09-25

Family

ID=59184910

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710123696.0A Active CN106897448B (en) 2017-03-03 2017-03-03 Subway engineering rail-running area cross construction intelligent graphical display and collision detection system

Country Status (1)

Country Link
CN (1) CN106897448B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110807831A (en) * 2019-09-18 2020-02-18 重庆大学 Sensor coverage area calculation method based on minimum unit collision detection
CN110889596A (en) * 2019-11-08 2020-03-17 中国铁道科学研究院集团有限公司电子计算技术研究所 Construction plan scheduling method and system for railway engineering line
CN113256155A (en) * 2021-06-17 2021-08-13 温州开晨科技有限公司 Digital management method and system for foundation engineering construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101009001A (en) * 2006-12-14 2007-08-01 中国核工业第二三建设公司 Method and system for implementing four-dimensional visualization of engineering model
CN102409678A (en) * 2011-09-26 2012-04-11 武汉理工大学 GPS (global positioning system)-based dam concrete material tank collision monitoring and navigation positioning method
CN102663168A (en) * 2012-03-20 2012-09-12 上海市电力公司 Method for three-dimensional conversion and pipeline conflict processing of two-dimensional drawing of cable layer
CN102750618A (en) * 2012-06-27 2012-10-24 西安理工大学 {0>Auxiliary management system for subway integrated pipeline construction and implementation method thereof
CN104063580A (en) * 2014-05-28 2014-09-24 广联达软件股份有限公司 Conflict analysis method and equipment for construction
CN105930973A (en) * 2016-04-22 2016-09-07 广州硕品物联网科技有限公司 BIM-based construction site griddization management system and control method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101009001A (en) * 2006-12-14 2007-08-01 中国核工业第二三建设公司 Method and system for implementing four-dimensional visualization of engineering model
CN102409678A (en) * 2011-09-26 2012-04-11 武汉理工大学 GPS (global positioning system)-based dam concrete material tank collision monitoring and navigation positioning method
CN102663168A (en) * 2012-03-20 2012-09-12 上海市电力公司 Method for three-dimensional conversion and pipeline conflict processing of two-dimensional drawing of cable layer
CN102750618A (en) * 2012-06-27 2012-10-24 西安理工大学 {0>Auxiliary management system for subway integrated pipeline construction and implementation method thereof
CN104063580A (en) * 2014-05-28 2014-09-24 广联达软件股份有限公司 Conflict analysis method and equipment for construction
CN105930973A (en) * 2016-04-22 2016-09-07 广州硕品物联网科技有限公司 BIM-based construction site griddization management system and control method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110807831A (en) * 2019-09-18 2020-02-18 重庆大学 Sensor coverage area calculation method based on minimum unit collision detection
CN110889596A (en) * 2019-11-08 2020-03-17 中国铁道科学研究院集团有限公司电子计算技术研究所 Construction plan scheduling method and system for railway engineering line
CN110889596B (en) * 2019-11-08 2023-10-27 中国铁道科学研究院集团有限公司电子计算技术研究所 Construction plan scheduling method and system for railway engineering line
CN113256155A (en) * 2021-06-17 2021-08-13 温州开晨科技有限公司 Digital management method and system for foundation engineering construction

Also Published As

Publication number Publication date
CN106897448B (en) 2020-09-25

Similar Documents

Publication Publication Date Title
Ouyang et al. STAMP-based analysis on the railway accident and accident spreading: Taking the China–Jiaoji railway accident for example
Kuo et al. Using geographical information systems to organize police patrol routes effectively by grouping hotspots of crash and crime data
CN108960566B (en) Traffic visual monitoring system
CN106897448A (en) The crossed construction intelligent graphic displaying of subway engineering Gui Hang areas and collision detecting system
CN111125236B (en) Three-dimensional dynamic information physical system based on GIS
CN108806259B (en) BIM-based traffic control model construction and labeling method
CN110688545A (en) 3D visual analysis method for rail transit passenger flow OD data
CN111539690A (en) Construction project collaborative management method and system based on BIM
Khan et al. Applications of artificial intelligence in transportation
Chen et al. An effective detection algorithm of zebra-crossing
CN106777220B (en) processing method for continuous abnormal change of power distribution network graph model
CN103605680A (en) Function realization method for database map
García-Cerrud et al. Proposal for greenhouse gas emissions reduction in public passenger transportation
Jin et al. The Realization of Decision Support System for Cross-border Transportation based on the Multi-dimensional Database.
Xiong et al. Parallel bus rapid transit (BRT) operation management system based on ACP approach
Liu et al. Evaluating the impacts of vehicle-mounted Variable Message Signs on passing vehicles: implications for protecting roadside incident and service personnel
Shi et al. Traffic Big Data in the Development of Intelligent Transportation System
CN112036714A (en) Dragging type based quick and intelligent scheduling method
Moeller Airport Technology Management
Wang et al. Applying hierarchical task analysis to improve the safety of high-speed railway: How dispatchers can better handle the breakdown of rail-switch
WO2021159357A1 (en) Traveling scenario information processing method and apparatus, electronic device, and readable storage medium
Waheeb Increasing Safety in Highways Transit Systems by Using Ethical Artificial Intelligence AI
Li et al. A planning control strategy based on dynamic safer buffer to avoid traffic collisions in an emergency for CAVs at nonsignalized intersections
Helgerson et al. Developing an optimized UI for traffic incident managers
Ma et al. Fast obstacle detection platform based on yolo

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 22nd Floor, Tower A, Wansheng Plaza, Xingang East Road, Haizhu District, Guangzhou City, Guangdong Province, 510000

Patentee after: GUANGZHOU METRO GROUP Co.,Ltd.

Patentee after: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Patentee after: Shaanxi Rio Tinto Technology Co.,Ltd.

Address before: 22nd Floor, Tower A, Wansheng Plaza, Xingang East Road, Haizhu District, Guangzhou City, Guangdong Province, 510000

Patentee before: GUANGZHOU METRO GROUP Co.,Ltd.

Patentee before: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Patentee before: SHAANXI LITUO INTELLIGENT TRAFFIC TECHNOLOGY CO.,LTD.