CN106895478A - 一种供热管网调节方法和系统 - Google Patents
一种供热管网调节方法和系统 Download PDFInfo
- Publication number
- CN106895478A CN106895478A CN201710073548.2A CN201710073548A CN106895478A CN 106895478 A CN106895478 A CN 106895478A CN 201710073548 A CN201710073548 A CN 201710073548A CN 106895478 A CN106895478 A CN 106895478A
- Authority
- CN
- China
- Prior art keywords
- network
- temperature
- primary
- reference value
- supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010438 heat treatment Methods 0.000 title claims abstract description 159
- 238000000034 method Methods 0.000 title claims abstract description 26
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 307
- 238000012549 training Methods 0.000 claims abstract description 126
- 238000013461 design Methods 0.000 claims description 70
- 238000013528 artificial neural network Methods 0.000 claims description 29
- 239000008400 supply water Substances 0.000 claims description 14
- 238000004364 calculation method Methods 0.000 claims description 12
- 238000012546 transfer Methods 0.000 claims description 12
- 230000001105 regulatory effect Effects 0.000 claims description 10
- 238000005259 measurement Methods 0.000 abstract description 16
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000007792 addition Methods 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D19/00—Details
- F24D19/10—Arrangement or mounting of control or safety devices
- F24D19/1006—Arrangement or mounting of control or safety devices for water heating systems
- F24D19/1009—Arrangement or mounting of control or safety devices for water heating systems for central heating
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Air Conditioning Control Device (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710073548.2A CN106895478B (zh) | 2017-02-10 | 2017-02-10 | 一种供热管网调节方法和系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710073548.2A CN106895478B (zh) | 2017-02-10 | 2017-02-10 | 一种供热管网调节方法和系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106895478A true CN106895478A (zh) | 2017-06-27 |
CN106895478B CN106895478B (zh) | 2019-10-29 |
Family
ID=59199013
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710073548.2A Expired - Fee Related CN106895478B (zh) | 2017-02-10 | 2017-02-10 | 一种供热管网调节方法和系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106895478B (zh) |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108386902A (zh) * | 2018-03-27 | 2018-08-10 | 沈阳久沃能源科技有限公司 | 一种智能换热站二次网平均温度控制方法 |
CN108427459A (zh) * | 2018-05-18 | 2018-08-21 | 成都市自来水有限责任公司 | 多水源环状供水管网的活塞式调流阀自动控制方法 |
CN108488898A (zh) * | 2018-03-29 | 2018-09-04 | 浙江盾安自控科技有限公司 | 一种换热站系统一次侧供水网水力动态平衡调节的方法 |
CN108826439A (zh) * | 2018-07-27 | 2018-11-16 | 北京吉顿特网络技术有限公司 | 热网调节方法、装置和电子设备 |
CN109237602A (zh) * | 2018-09-20 | 2019-01-18 | 哈尔滨顺易天翔热力技术开发有限公司 | 供热人工智能控制系统及方法 |
CN109539378A (zh) * | 2018-11-20 | 2019-03-29 | 王建浮 | 自动调节供热二次管网水力平衡的方法、装置及系统 |
CN110375370A (zh) * | 2019-08-16 | 2019-10-25 | 烟台华蓝新瑞节能科技有限公司 | 一种智慧供热均温管控系统 |
CN110513763A (zh) * | 2019-08-03 | 2019-11-29 | 北京庆阳世纪科技有限公司 | 外管网平衡调节系统 |
CN110736129A (zh) * | 2019-10-24 | 2020-01-31 | 北京金房暖通节能技术股份有限公司 | 一种城市供热管网智能平衡调控系统及方法 |
CN111765506A (zh) * | 2020-07-14 | 2020-10-13 | 戢森 | 智能管网控制方法及系统 |
CN111765287A (zh) * | 2020-06-29 | 2020-10-13 | 瑞纳智能设备股份有限公司 | 一种内嵌人工智能计算模块的阀门及其调节方法 |
CN112032800A (zh) * | 2020-09-09 | 2020-12-04 | 山东鲁航智能科技有限公司 | 一种智能化管网平衡系统及其调控方法 |
CN112240595A (zh) * | 2020-06-15 | 2021-01-19 | 山东建筑大学 | 一种蓄热供热系统及泄漏检测方法 |
CN112367809A (zh) * | 2020-11-02 | 2021-02-12 | 中国电子科技集团公司第二十研究所 | 基于深度学习的定向高效散热装置及安装监控方法 |
CN112432227A (zh) * | 2020-11-26 | 2021-03-02 | 华润智慧能源有限公司 | 一种二次网供热调控方法、装置、设备及可读存储介质 |
CN112856572A (zh) * | 2021-02-01 | 2021-05-28 | 大连热电工程设计有限公司 | 基于特征参数辨识的供热系统自动化运行调节方法 |
CN113418229A (zh) * | 2021-06-11 | 2021-09-21 | 沈阳工业大学 | 一种基于卷积-自编码神经网络的供暖管控阀门智能调控系统 |
CN113983543A (zh) * | 2021-10-11 | 2022-01-28 | 河北工大科雅能源科技股份有限公司 | 用于热力站循环泵控制的方法、装置、终端及存储介质 |
CN114251716A (zh) * | 2021-12-29 | 2022-03-29 | 北京华大智宝电子系统有限公司 | 一种供热管网调节阀门的调节参数确定方法和系统 |
CN117329581A (zh) * | 2023-09-26 | 2024-01-02 | 山东和同信息科技股份有限公司 | 一种用于供热二次管网的大数据分析管控系统及方法 |
CN118912569A (zh) * | 2024-10-10 | 2024-11-08 | 克拉玛依市广盛供热有限责任公司 | 供热管网水力平衡调节系统及方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102005045198C5 (de) * | 2005-09-21 | 2009-06-25 | Techem Energy Services Gmbh | Verfahren und Vorrichtung zur Bestimmung von Wärmekenndaten eines Heizkörpers |
CN103017253A (zh) * | 2012-12-06 | 2013-04-03 | 鞍山市海汇自动化有限公司 | 一种集中供热全网热平衡控制方法 |
CN104764084A (zh) * | 2015-04-02 | 2015-07-08 | 北京京能未来燃气热电有限公司 | 一种智能热网控制方法及系统 |
CN105910169A (zh) * | 2016-04-27 | 2016-08-31 | 常州英集动力科技有限公司 | 基于机理模型预测控制的城市供热系统热网调节方法及系统 |
-
2017
- 2017-02-10 CN CN201710073548.2A patent/CN106895478B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102005045198C5 (de) * | 2005-09-21 | 2009-06-25 | Techem Energy Services Gmbh | Verfahren und Vorrichtung zur Bestimmung von Wärmekenndaten eines Heizkörpers |
CN103017253A (zh) * | 2012-12-06 | 2013-04-03 | 鞍山市海汇自动化有限公司 | 一种集中供热全网热平衡控制方法 |
CN104764084A (zh) * | 2015-04-02 | 2015-07-08 | 北京京能未来燃气热电有限公司 | 一种智能热网控制方法及系统 |
CN105910169A (zh) * | 2016-04-27 | 2016-08-31 | 常州英集动力科技有限公司 | 基于机理模型预测控制的城市供热系统热网调节方法及系统 |
Cited By (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108386902A (zh) * | 2018-03-27 | 2018-08-10 | 沈阳久沃能源科技有限公司 | 一种智能换热站二次网平均温度控制方法 |
CN108488898A (zh) * | 2018-03-29 | 2018-09-04 | 浙江盾安自控科技有限公司 | 一种换热站系统一次侧供水网水力动态平衡调节的方法 |
CN108427459A (zh) * | 2018-05-18 | 2018-08-21 | 成都市自来水有限责任公司 | 多水源环状供水管网的活塞式调流阀自动控制方法 |
CN108826439B (zh) * | 2018-07-27 | 2020-08-14 | 北京吉顿特网络技术有限公司 | 热网调节方法、装置和电子设备 |
CN108826439A (zh) * | 2018-07-27 | 2018-11-16 | 北京吉顿特网络技术有限公司 | 热网调节方法、装置和电子设备 |
CN109237602A (zh) * | 2018-09-20 | 2019-01-18 | 哈尔滨顺易天翔热力技术开发有限公司 | 供热人工智能控制系统及方法 |
CN109539378A (zh) * | 2018-11-20 | 2019-03-29 | 王建浮 | 自动调节供热二次管网水力平衡的方法、装置及系统 |
CN109539378B (zh) * | 2018-11-20 | 2020-10-27 | 王建浮 | 自动调节供热二次管网水力平衡的方法、装置及系统 |
CN110513763A (zh) * | 2019-08-03 | 2019-11-29 | 北京庆阳世纪科技有限公司 | 外管网平衡调节系统 |
CN110513763B (zh) * | 2019-08-03 | 2021-03-02 | 北京庆阳世纪科技有限公司 | 外管网平衡调节系统 |
CN110375370A (zh) * | 2019-08-16 | 2019-10-25 | 烟台华蓝新瑞节能科技有限公司 | 一种智慧供热均温管控系统 |
CN110375370B (zh) * | 2019-08-16 | 2024-03-08 | 烟台华蓝新瑞节能科技有限公司 | 一种智慧供热均温管控系统 |
CN110736129A (zh) * | 2019-10-24 | 2020-01-31 | 北京金房暖通节能技术股份有限公司 | 一种城市供热管网智能平衡调控系统及方法 |
CN112240595A (zh) * | 2020-06-15 | 2021-01-19 | 山东建筑大学 | 一种蓄热供热系统及泄漏检测方法 |
CN111765287A (zh) * | 2020-06-29 | 2020-10-13 | 瑞纳智能设备股份有限公司 | 一种内嵌人工智能计算模块的阀门及其调节方法 |
CN111765506A (zh) * | 2020-07-14 | 2020-10-13 | 戢森 | 智能管网控制方法及系统 |
CN112032800A (zh) * | 2020-09-09 | 2020-12-04 | 山东鲁航智能科技有限公司 | 一种智能化管网平衡系统及其调控方法 |
CN112367809A (zh) * | 2020-11-02 | 2021-02-12 | 中国电子科技集团公司第二十研究所 | 基于深度学习的定向高效散热装置及安装监控方法 |
CN112432227A (zh) * | 2020-11-26 | 2021-03-02 | 华润智慧能源有限公司 | 一种二次网供热调控方法、装置、设备及可读存储介质 |
CN112856572A (zh) * | 2021-02-01 | 2021-05-28 | 大连热电工程设计有限公司 | 基于特征参数辨识的供热系统自动化运行调节方法 |
CN113418229A (zh) * | 2021-06-11 | 2021-09-21 | 沈阳工业大学 | 一种基于卷积-自编码神经网络的供暖管控阀门智能调控系统 |
CN113983543A (zh) * | 2021-10-11 | 2022-01-28 | 河北工大科雅能源科技股份有限公司 | 用于热力站循环泵控制的方法、装置、终端及存储介质 |
CN113983543B (zh) * | 2021-10-11 | 2023-04-04 | 河北工大科雅能源科技股份有限公司 | 用于热力站循环泵控制的方法、装置、终端及存储介质 |
CN114251716B (zh) * | 2021-12-29 | 2023-05-30 | 北京华大智宝电子系统有限公司 | 一种供热管网调节阀门的调节参数确定方法和系统 |
CN114251716A (zh) * | 2021-12-29 | 2022-03-29 | 北京华大智宝电子系统有限公司 | 一种供热管网调节阀门的调节参数确定方法和系统 |
CN117329581A (zh) * | 2023-09-26 | 2024-01-02 | 山东和同信息科技股份有限公司 | 一种用于供热二次管网的大数据分析管控系统及方法 |
CN117329581B (zh) * | 2023-09-26 | 2024-04-19 | 山东和同信息科技股份有限公司 | 一种用于供热二次管网的大数据分析管控系统及方法 |
CN118912569A (zh) * | 2024-10-10 | 2024-11-08 | 克拉玛依市广盛供热有限责任公司 | 供热管网水力平衡调节系统及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106895478B (zh) | 2019-10-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106895478B (zh) | 一种供热管网调节方法和系统 | |
CN112128841B (zh) | 一种基于负荷预测和室温反馈修正的全网平衡调节方法 | |
WO2021232734A1 (zh) | 一种热泵与电蓄热设备自适应优化控制方法、系统及装置 | |
CN108826436B (zh) | 基于回水温度的二次侧供热自动平衡调节方法及其智能能耗监控系统 | |
CN103363585B (zh) | 一种城镇区域集中供热系统调节方法 | |
CN103093017B (zh) | 分布式能源系统设计方法 | |
CN108644887B (zh) | 基于室温的二次侧供热自动平衡调节方法及其智能能耗监控系统 | |
CN103017253A (zh) | 一种集中供热全网热平衡控制方法 | |
CN109340900B (zh) | 基于供回水平均温度的二次侧供热自动平衡调节方法 | |
CN108009683A (zh) | 一种大容量直控负荷提高风电接纳能力的调度方法 | |
CN111578371A (zh) | 一种数据驱动的城市集中供热系统精准调控方法 | |
CN114576698B (zh) | 基于多目标监控主动抗扰源网末端协同自趋优供热调控方法 | |
CN105674390B (zh) | 一种集中供热系统动态水力平衡调节方法及调节装置 | |
CN107634547B (zh) | 基于新能源出力预测误差的电气联合系统出电控制方法 | |
CN113446661B (zh) | 一种智能高效的热网运行调节方法 | |
CN107860057B (zh) | 一种热电联产供暖系统热负荷经济优化调度方法 | |
CN106593771A (zh) | 一种热电联产系统中的电热解耦系统及其控制方法 | |
CN106196234B (zh) | 一种再生水源热泵供暖系统协同优化运行方法 | |
CN114811714A (zh) | 一种基于模型预测控制的供暖房间室温控制方法 | |
CN113375221B (zh) | 一种供热系统网源协同调节方法 | |
CN115585501A (zh) | 基于网联智控的集中供暖用户侧自主调节系统及方法 | |
CN107559946B (zh) | 一种换热站二级泵控制仪 | |
CN116780531B (zh) | 一种基于经济优化目标的空气源热泵系统电网调峰方法 | |
CN111146819B (zh) | 一种考虑热网特性的电热联合系统辅助服务调度方法 | |
CN118584855A (zh) | 循环冷却水系统全流程多目标智控方法及系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A regulating method and system of heating pipe network Effective date of registration: 20201019 Granted publication date: 20191029 Pledgee: Qingdao Huitong Chinese financing Company limited by guarantee Pledgor: QINGDAO GAOXIAO INFORMATION INDUSTRY Corp.,Ltd. Registration number: Y2020370010044 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20211112 Granted publication date: 20191029 Pledgee: Qingdao Huitong Chinese financing Company limited by guarantee Pledgor: QINGDAO GAOXIAO INFORMATION INDUSTRY Corp.,Ltd. Registration number: Y2020370010044 |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191029 |