CN106894317A - Pavement spread wire hanging wire stake and preparation method thereof - Google Patents

Pavement spread wire hanging wire stake and preparation method thereof Download PDF

Info

Publication number
CN106894317A
CN106894317A CN201710218243.6A CN201710218243A CN106894317A CN 106894317 A CN106894317 A CN 106894317A CN 201710218243 A CN201710218243 A CN 201710218243A CN 106894317 A CN106894317 A CN 106894317A
Authority
CN
China
Prior art keywords
steel
sleeve pipe
wire
fixed
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710218243.6A
Other languages
Chinese (zh)
Inventor
郭德昌
周训勇
方锦
唐水国
陶福德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Road and Bridge Group Co Ltd
Original Assignee
Guizhou Road and Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Road and Bridge Group Co Ltd filed Critical Guizhou Road and Bridge Group Co Ltd
Priority to CN201710218243.6A priority Critical patent/CN106894317A/en
Publication of CN106894317A publication Critical patent/CN106894317A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/01Devices or auxiliary means for setting-out or checking the configuration of new surfacing, e.g. templates, screed or reference line supports; Applications of apparatus for measuring, indicating, or recording the surface configuration of existing surfacing, e.g. profilographs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of pavement spread wire hanging wire stake and preparation method thereof, including Steel-bar Pile(1)And sleeve pipe(2), it is characterised in that:Steel-bar Pile(1)One end is tip, sleeve pipe(2)It is fixed on Steel-bar Pile(1)On;Crossbeam(4)One end is fixed on sleeve pipe(2)Upper formation cantilever beam, the other end is provided with steel wire(Twist)Line card groove(3).Sleeve pipe(2)On be provided with screw hole(6), standing screw(7)By screw hole(6)By sleeve pipe(2)It is fixed on Steel-bar Pile(1)On.Diagonal brace(5)One end is fixed on sleeve pipe, and the other end is fixed on crossbeam(4)On.The present invention can guarantee that the reasonable control of the flatness and elevation of pavement construction, and the continuity of the making that paves is good, simple structure, high-effective and labour-saving.

Description

Pavement spread wire hanging wire stake and preparation method thereof
Technical field
The invention belongs to high road pavement construction technical field, a kind of pavement spread wire hanging wire stake is related in particular to, together When further relate to the pavement spread wire hanging wire stake preparation method.
Background technology
High road pavement construction typically using Automatic Levelling paver layering making, in order to ensure the horizontal degree of each structure sheaf in road surface, Flatness, process control high and linear straight attractive in appearance, typically longitudinally follow closely in construction in route both sides(Φ 15-25mm reinforcing bars) Stake, hangs a steel wire of Φ 2-3mm(Twist)Line is process control benchmark wire high, and the sensing part of paver is touched in process control high On benchmark wire, by the way of high process control benchmark wire, the control such as elevation, flatness and horizontal wall inscription is carried out, be commonly called as " walking steel Pave silk " construction.Traditional tight-wire walking be using the stake of longitudinal direction nail every 10 meters follow closely one, with binding by steel wire(Twist)Wire is directly tied Tie up in reinforcing bar nail stake, or a Luo bar is installed additional in reinforcing bar nail stake, by steel(Twist)Silk is placed directly on Luo bars, the biography of paver Sensor is along steel wire(Twist)Wire is carried forward laying of roadway and paves, technical parameter, quality control with present pavement construction Index request more and more higher, in order to ensure the comfortableness that the flatness on its road surface, raising are driven a vehicle after being open to traffic, using conventional nail(Φ 15-25mm reinforcing bars)Steel is hung in stake(Twist)The method of line, it may appear that following problem:
1. with binding the steel wire of elevation will be controlled(Twist)Wire, is directly bundled in longitudinal nail(Φ 15-25mm reinforcing bars)Side in stake Method, due to controlling the steel of elevation(Twist)Line wire is directly bundled in the nail stake of longitudinal direction, in work progress, is easily slided up and down, Influence process control high.
2. in work progress, when the sensor of paver is walked follows closely the position of stake to longitudinal wire, need artificial by sensor Temporary close, then after sensor is bypassed longitudinal direction nail stake, then place the sensors on steel wire, it is then turned on sensor.Above-mentioned mistake Journey not only spends human time, and the whole continuity for paving of influence.
If paver sensor walk to wire longitudinally the position of nail stake, if operating personnel's responsibility is not strong or unattended Control, sensor can be lived by longitudinally nail stake shelves, make the road surface elevation of its paver making out of hand, have a strong impact on construction quality And progress.
4. in longitudinal nail(Φ 15-25mm reinforcing bars)A Luo bar is installed additional in stake, by steel(Twist)Silk thread wire is placed directly in Luo On bar, measure inconvenient when paving absolute altitude, and workman is easy by steel wire when constructing(Twist)Wire hanging fascia.So as to influence paves Progress, structure sheaf flatness and thickness.
The content of the invention
A kind of flatness and elevation that can guarantee that pavement construction provided it is an object of the invention to overcome disadvantages mentioned above Reasonable control, the continuity of the making that paves is good, simple structure, the pavement spread wire hanging wire stake of high-effective and labour-saving.
Preparation method another object of the present invention is to provide pavement spread wire hanging wire stake.
The object of the invention and solve its technical problem underlying using following technical scheme and realize:
Pavement spread wire hanging wire stake of the invention, including Steel-bar Pile and sleeve pipe, wherein:Steel-bar Pile one end is tip, and sleeve pipe is solid Due in Steel-bar Pile;Crossbeam one end is fixed on and cantilever beam is formed on sleeve pipe, and the other end is provided with steel wire(Twist)Line card groove.
Above-mentioned pavement spread wire hanging wire stake, wherein:Screw hole is provided with sleeve pipe, standing screw passes through screw hole by sleeve pipe It is fixed in Steel-bar Pile.
Above-mentioned pavement spread wire hanging wire stake, wherein:Diagonal brace one end is fixed on sleeve pipe, and the other end is fixed on crossbeam.
A kind of preparation method of pavement spread wire hanging wire stake, comprises the following steps:
(1)With the round steel of diameter ∮ 18, length is the tip of 60-65cm, one end hammering or polishing 3-5cm, is made Steel-bar Pile;
(2)Use a length of 10cm, the round steel of a diameter of ∮ 40 longitudinally bores the through holes of ∮ 20, does packaged tube, set tube wall on bore the holes of ∮ 12 simultaneously Tapping is into screw hole;
(3)Make crossbeam with the round steel of a diameter of ∮ 10, a length of 20cm, one end is welded on the opposite side of sleeve pipe screw hole, the other end from One 3-5mm steel wire of polishing at the about 2cm of termination(Twist)Line card groove;
(4)It is about 10cm with long, round steel one end of a diameter of ∮ 10 is welded on sleeve pipe, the other end is welded on crossbeam as tiltedly Support, as the support of crossbeam;
(5)With the Luo bars of a diameter of ∮ 12*30mm as fixed Luo bars, fixed sleeve pipe is covered by covering the screw hole on tube wall In in Steel-bar Pile.
The present invention compared with the existing technology, with clear advantage and beneficial effect, from above technical scheme, sleeve pipe Can freely be slided up and down in Steel-bar Pile, altitude data data can be measured according to each mileage pile No. making during construction, in steel The upper adjusting sleeve pipe of muscle stake has height, and then adjusts the steel wire of control elevation(Twist)Wire;Crossbeam hangs steel wire using cantilever beam(Twist) Line, the sensor of paver can be along the steel wire of control elevation(Twist)Line wire, accessible freely passes through, it is ensured that Pave the continuity of making.The setting of the draw-in groove of crossbeam one end, increased steel wire(Twist)Stability of the line on crossbeam, prevents steel Silk thread is slided or fallen.The diagonal brace of below the crossbeam forms a triangle with crossbeam, sleeve pipe, and its stability preferably, counteracts steel Silk(Twist)Line is to crossbeam lateral pressure.Be fixed in Steel-bar Pile for whole sleeve pipe, crossbeam by fixed screw, makes it be difficult to slide up and down, Ensure that the flatness of pavement construction, and elevation reasonable control.
Brief description of the drawings
Fig. 1 is the structural representation of pavement spread wire hanging wire stake;
Fig. 2 is construction hanging wire schematic diagram.
Identified in figure:
1st, Steel-bar Pile;2nd, sleeve pipe;3rd, draw-in groove;4th, crossbeam;5th, diagonal brace;6th, screw hole;7th, fixed Luo bars.
Specific embodiment
Below in conjunction with accompanying drawing and preferred embodiment, to according to pavement spread wire hanging wire proposed by the present invention stake and its making Method specific embodiment, structure, feature and its effect, describe in detail as after.
Embodiment 1
Referring to Fig. 1, pavement spread wire hanging wire stake of the invention, including Steel-bar Pile 1 and sleeve pipe 2, wherein:The one end of Steel-bar Pile 1 is Tip, is provided with screw hole 6 on sleeve pipe 2, be fixed on sleeve pipe 2 in Steel-bar Pile 1 by screw hole 6 by standing screw 7;The one end of crossbeam 4 It is fixed on and cantilever beam is formed on sleeve pipe 2, the other end is provided with steel wire(Twist)Line card groove 3;The one end of diagonal brace 5 is fixed on sleeve pipe, another End is fixed on crossbeam 4.
Embodiment 2
Referring to Fig. 1, a kind of preparation method of pavement spread wire hanging wire stake of the invention is comprised the following steps:
(1)With the round steel of diameter ∮ 18, length is the tip of 60-65cm, one end hammering or polishing 3-5cm, is made Steel-bar Pile 1;
(2)Use a length of 10cm, the round steel of a diameter of ∮ 40 longitudinally bores the through holes of ∮ 20, does packaged tube 2, the tube wall of sleeve pipe 2 on bore the holes of ∮ 12 And tapping is into screw hole 6;
(3)Make crossbeam with the round steel of a diameter of ∮ 10, a length of 20cm, one end is welded on the opposite side of the screw hole 6 of sleeve pipe 2, the other end One 3-5mm steel wire of polishing away from termination about 2cm(Twist)Line card groove 3;
(4)It is about 10cm with long, round steel one end of a diameter of ∮ 10 is welded on sleeve pipe 2, and the other end is welded on conduct on crossbeam 4 Diagonal brace, as the support of crossbeam 4;
(5)With the Luo bars of a diameter of ∮ 12*30mm as fixed Luo bars, consolidated sleeve pipe 2 is covered by the screw hole 6 on the tube wall of sleeve pipe 2 Due in Steel-bar Pile 1.
It is fixed one per 10m in route both sides according to longitudinal stake site that surveying and locating is identified referring to Fig. 2 when using, bend On can be encrypted to every 5m mono- by Steel-bar Pile squeeze into will 10-20 cm below paving operation face, sleeve pipe is inserted in Steel-bar Pile; Sleeve pipe first can be inserted in Steel-bar Pile, then Steel-bar Pile is squeezed into will be below paving operation face, the measurement further according to each paves Altitude data data, coordinates horizon rule to carry out crossbeam adjustment with steel ruler, is then fixed with fixation screw, with turnbuckle by 2- 3mm steel wires(Twist)Line is tensed, then by steel wire(Twist)Line is put into the draw-in groove of crossbeam, is bundled with tied silk, by steel wire(Twist)Line is fixed In draw-in groove, the sensor of paver is gently placed on wire, adjusts sensor, proceeded by and pave.
The above, is only presently preferred embodiments of the present invention, and any formal limitation, Ren Hewei are not made to the present invention Disengaging technical solution of the present invention content, any simple modification made to above example according to technical spirit of the invention, etc. With change and modification, still fall within the range of technical solution of the present invention.

Claims (4)

1. a kind of pavement spread wire hanging wire stake, including Steel-bar Pile(1)And sleeve pipe(2), it is characterised in that:Steel-bar Pile(1)One end It is tip, sleeve pipe(2)It is fixed on Steel-bar Pile(1)On;Crossbeam(4)One end is fixed on sleeve pipe(2)Upper formation cantilever beam, the other end is opened There is steel wire(Twist)Line card groove(3).
2. pavement spread wire hanging wire stake as claimed in claim 1, it is characterised in that:Sleeve pipe(2)On be provided with screw hole(6)Gu, Determine screw rod(7)By screw hole(6)By sleeve pipe(2)It is fixed on Steel-bar Pile(1)On.
3. pavement spread wire hanging wire stake as claimed in claim 1, it is characterised in that:Diagonal brace(5)One end is fixed on sleeve pipe, separately One end is fixed on crossbeam(4)On.
4. a kind of preparation method of pavement spread wire hanging wire stake, comprises the following steps:
(1)With the round steel of diameter ∮ 18, length is the tip of 60-65cm, one end hammering or polishing 3-5cm, is made Steel-bar Pile (1);
(2)Use the round steel of a length of 10cm, a diameter of ∮ 40 longitudinally to bore the through holes of ∮ 20, do packaged tube(2), sleeve pipe(2)∮ is bored on tube wall 12 holes and tapping are into screw hole(6);
(3)Make crossbeam with the round steel of a diameter of ∮ 10, a length of 20cm, one end is welded on sleeve pipe(2)The opposite side of screw hole, it is another Hold one 3-5mm steel wire of polishing away from termination about 2cm(Twist)Line card groove(3);
(4)It is about 10cm with long, round steel one end of a diameter of ∮ 10 is welded on sleeve pipe(2)On, the other end is welded on crossbeam(4)On As diagonal brace, as crossbeam(4)Support;
(5)With the Luo bars of a diameter of ∮ 12*30mm as fixed Luo bars, by sleeve pipe(2)Screw hole on tube wall(6)Set is covered Pipe(2)It is fixed on Steel-bar Pile(1)On.
CN201710218243.6A 2017-04-05 2017-04-05 Pavement spread wire hanging wire stake and preparation method thereof Pending CN106894317A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710218243.6A CN106894317A (en) 2017-04-05 2017-04-05 Pavement spread wire hanging wire stake and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710218243.6A CN106894317A (en) 2017-04-05 2017-04-05 Pavement spread wire hanging wire stake and preparation method thereof

Publications (1)

Publication Number Publication Date
CN106894317A true CN106894317A (en) 2017-06-27

Family

ID=59194364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710218243.6A Pending CN106894317A (en) 2017-04-05 2017-04-05 Pavement spread wire hanging wire stake and preparation method thereof

Country Status (1)

Country Link
CN (1) CN106894317A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107217578A (en) * 2017-08-10 2017-09-29 贵州路桥集团有限公司 Control the benchmark line apparatus of road surface elevation and coordinate
CN108316109A (en) * 2018-04-11 2018-07-24 渠洪卫 A kind of paver conducting wire hanging wire stake
CN108894087A (en) * 2018-08-18 2018-11-27 重庆交通大学 Self-adjustable thread-laying device suitable for pan soil construction
CN108978409A (en) * 2018-08-18 2018-12-11 重庆交通大学 Thread-laying device
CN109056480A (en) * 2018-08-18 2018-12-21 重庆交通大学 Foot-operated thread-laying device
CN109112931A (en) * 2018-08-18 2019-01-01 重庆交通大学 Foot-operated hanging wire stake device suitable for pan soil construction
CN109183576A (en) * 2018-08-18 2019-01-11 重庆交通大学 Self-adjustable thread-laying device
CN109338859A (en) * 2018-08-18 2019-02-15 重庆交通大学 The stake of screw-in hanging wire and its mounting device suitable for pan soil construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2467031A1 (en) * 2004-05-12 2005-11-12 Glenn Robert Moblo Screed form stake
CN202482742U (en) * 2012-03-19 2012-10-10 四川路桥建设股份有限公司 Lifting-type barrier-free elevation guiding control beam bracket
CN204023362U (en) * 2014-08-22 2014-12-17 中国十七冶集团有限公司 A kind of paver paves leveling unit
CN204251997U (en) * 2014-11-27 2015-04-08 中交一公局第六工程有限公司 Suspension type sub-base grader reference line thread-laying device
US20170037585A1 (en) * 2015-08-04 2017-02-09 Joseph Voegele Ag Determination of the screed configuration in road pavers

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2467031A1 (en) * 2004-05-12 2005-11-12 Glenn Robert Moblo Screed form stake
CN202482742U (en) * 2012-03-19 2012-10-10 四川路桥建设股份有限公司 Lifting-type barrier-free elevation guiding control beam bracket
CN204023362U (en) * 2014-08-22 2014-12-17 中国十七冶集团有限公司 A kind of paver paves leveling unit
CN204251997U (en) * 2014-11-27 2015-04-08 中交一公局第六工程有限公司 Suspension type sub-base grader reference line thread-laying device
US20170037585A1 (en) * 2015-08-04 2017-02-09 Joseph Voegele Ag Determination of the screed configuration in road pavers

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107217578A (en) * 2017-08-10 2017-09-29 贵州路桥集团有限公司 Control the benchmark line apparatus of road surface elevation and coordinate
CN108316109A (en) * 2018-04-11 2018-07-24 渠洪卫 A kind of paver conducting wire hanging wire stake
CN108894087A (en) * 2018-08-18 2018-11-27 重庆交通大学 Self-adjustable thread-laying device suitable for pan soil construction
CN108978409A (en) * 2018-08-18 2018-12-11 重庆交通大学 Thread-laying device
CN109056480A (en) * 2018-08-18 2018-12-21 重庆交通大学 Foot-operated thread-laying device
CN109112931A (en) * 2018-08-18 2019-01-01 重庆交通大学 Foot-operated hanging wire stake device suitable for pan soil construction
CN109183576A (en) * 2018-08-18 2019-01-11 重庆交通大学 Self-adjustable thread-laying device
CN109338859A (en) * 2018-08-18 2019-02-15 重庆交通大学 The stake of screw-in hanging wire and its mounting device suitable for pan soil construction
CN108894087B (en) * 2018-08-18 2020-12-04 上海城建职业学院 Self-adjusting wire hanging device suitable for hard soil construction
CN109112931B (en) * 2018-08-18 2021-05-04 上海城建职业学院 Foot-operated string line stake device suitable for hard soil construction
CN109056480B (en) * 2018-08-18 2021-05-25 重庆交通大学 Pedal type thread hanging device
CN108978409B (en) * 2018-08-18 2021-05-25 重庆交通大学 Wire hanging device
CN109183576B (en) * 2018-08-18 2021-06-29 重庆交通大学 But automatically regulated's hanging wire device
CN109338859B (en) * 2018-08-18 2021-07-23 重庆交通大学 Screw-in type wire hanging pile suitable for hard soil construction and mounting device thereof

Similar Documents

Publication Publication Date Title
CN106894317A (en) Pavement spread wire hanging wire stake and preparation method thereof
CN104358188B (en) Filling construction method for collapsible loess subgrade
CN204479060U (en) A kind of subgrade stability recording geometry
CN101962928B (en) Construction method for processing aeolian sand roadbed base through impacting and grinding
CN101430199A (en) Method and apparatus for monitoring soft soil base sedimentation
KR101563015B1 (en) Method for measuring a track position
CN106546218B (en) A kind of high mountain permafrost differentiation cloth subgrade settlement monitoring system and method
CN102105637A (en) Paving machine control and method
CN105040557B (en) Paving thickness measuring system, paver and paving thickness measuring method
CN104631264A (en) Continuous paving construction technology of cement concrete bridge floor and steel bridge floor
CN102733273B (en) Method for adjusting control benchmark point of rail by means of approximate adjustment
CN103591929A (en) Leveling rod for measuring subsidence of ground with large surface relief and use method thereof
CN203550930U (en) Slope deep displacement measuring device
CN206591407U (en) A kind of skirt piles positioner constructed for roadbed, pavement engineering
CN103821072B (en) A kind of asphalt paver virtual resurfacing thickness measuring apparatus and method
CN204728182U (en) Grade elevation control device
CN205175392U (en) Tunnel earth's surface settlement monitoring device based on distributed optical fiber sensing
CN204023362U (en) A kind of paver paves leveling unit
CN110184940A (en) A kind of tunnel immediately adjacent to bridge str ucture laying method adjusting span of bridge adaptation to the ground
CN207109527U (en) Control the benchmark line apparatus of road surface elevation and coordinate
CN205664836U (en) Civil engineering construction laying -out guide pile
CN107366207A (en) One kind has acclive blacktop and its construction method
CN108316364A (en) The monitoring method of pattern foundation pit supporting structure pile driving construction effect under a kind of overhead high iron wire
CN206090372U (en) A device for $monitoring road surface structural layer temperature
CN114263085A (en) Intelligent paving control system of paver

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170627