CN108316109A CN201810321802.0A CN201810321802A CN108316109A CN 108316109 A CN108316109 A CN 108316109A CN 201810321802 A CN201810321802 A CN 201810321802A CN 108316109 A CN108316109 A CN 108316109A
Authority
CN
China
Prior art keywords
elevating mechanism
casing
paver
stake
conducting wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810321802.0A
Other languages
Chinese (zh)
Inventor
渠洪卫
梁永玲
郭虎
高杰
高正
杜庆宏
李志玲
宋崇进
梁彦龙
罗建平
张永君
崔建永
史录军
周俊
安晋生
严燕龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liang Yongling
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810321802.0A priority Critical patent/CN108316109A/en
Publication of CN108316109A publication Critical patent/CN108316109A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/01Devices or auxiliary means for setting-out or checking the configuration of new surfacing, e.g. templates, screed or reference line supports; Applications of apparatus for measuring, indicating, or recording the surface configuration of existing surfacing, e.g. profilographs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The present invention relates to Highway Municipal road surface structare layer technical field of construction, specially a kind of paver conducting wire hanging wire stake.Paver conducting wire hanging wire stake of the present invention, including spud pile, it is equipped with connector in spud pile middle and upper part, the other end of connector is equipped with elevating mechanism installation part, elevating mechanism is equipped on elevating mechanism installation part, elevating mechanism includes fixing piece and the moving member that is moved up and down along fixing piece, and moving member is equipped with the installation crossbeam for fixing steel wire rope.The present invention is in application, first by the fixed respective position of Steel-bar Pile hammering, then it is inserted into elevating mechanism on elevating mechanism installation part, the level height that rotating arm coarse adjustment crossbeam is passed through according to the instruction of construction survey personnel later, when the object height that beam height approach construction survey crew calculates, it uses rotation hand wheel to realize accurate adjusting beam height under the instruction of survey crew, when crossbeam position just coincide the computed altitude requirement of survey crew, starts limiting and fixing device.

Description

A kind of paver conducting wire hanging wire stake
Technical field
The present invention relates to highway engineering, municipal works road surface structare layer technical field of construction, specially a kind of paver is led Line hanging wire stake.
Background technology
At present in road surface structure layer work progress, generally use paver walks collimation method construction operation scheme.It is spreading During building, both sides of the road, which need to fix several reinforcing bars, is used as elevation location stake, and steel wire rope is fixed between multiple reinforcing bars and is made For high process control benchmark conducting wire.The sensor of paver remains with steel wire rope and well contacts, and sensor exists when paving operation Walking is slided on steel wire rope, to realize effective control of the whole process to technical parameters such as elevation, horizontal slope, flatness in paving process. Due to needing to be pre-adjusted fixed steel wire rope level height on guide pile before paving, it is therefore desirable to being capable of more fast and flexible The level height for completing to adjust steel wire rope measures the flat work of behaviour, and existing Steel-bar Pile cannot achieve the behaviour of quick level height It makes adjustments.To solve this problem, Chinese patent application " pavement spread conducting wire hanging wire stake and preparation method thereof " publication number:CN 106894317 A, disclose a kind of pavement spread guiding hanging wire stake, which includes the Steel-bar Pile that one end is in tip, the steel The lower pointed end of muscle stake is used to hammer the road surface structare layer for sinking to molding roadbed or compaction moulding, is arranged with and passes through in Steel-bar Pile The casing of fixed jackscrew positioning;The crossbeam of fixed steel wire rope is installed on casing.The hanging wire stake is directly tied up compared in Steel-bar Pile The absolute altitude of steel wire rope is adjusted more convenient for steel wire rope, but in practical applications, however it remains following problem:
1, the hanging wire stake needs to hammer fixed steel bars stake when mounted, when the road for encountering hard roadbed or compaction moulding When the structure sheaf of face, the hammer force that Steel-bar Pile shaking amplitude is big, bounce is serious, downward when hammering is fixed is not easy effectively to be passed to It is careless slightly when ground, dangerous operator are absent minded or cooperation is not tacit the hand of operator to be caused seriously Hammering injury and Steel-bar Pile can usually occur serious flexural deformation, and after Steel-bar Pile flexural deformation to a certain extent thereon Sleeve will be stuck with Steel-bar Pile, can no longer move up and down to adjust crossbeam absolute altitude, and function is used to lose.
2, when in use, limit jackscrew needs to realize that it is moved up and down or solid using spanner is repeatedly elastic for the hanging wire stake The function of fixing limit, that is, T-type nut, the variant arm strength of different operator's physique is different, therefore whether is tightened in sense organ to jackscrew It is completely different in judgement, somebody may twist 3N.m, and 3.5N.m may be twisted by changing personal operation, and such T-type nut holds very much Easily there is fatigue damage, the de- mouth of screw thread or nut fractures phenomenon, and spacing top screw thread is easy to oxidation and rusting, reuses Shi Songdong operations are extremely difficult.
3, operator adjusts sleeve and moves up and down, blindness is stronger, often passes through according to the instruction of construction survey personnel The about adjusting being repeatedly iteratively repeated is crossed, just beam height and object height can be made to coincide substantially.Such as:According to construction survey people Member sends out instruction " decline 12.8 centimeters ", different 12.8 centimeters of this length of operator couple, is not completely not on sense organ judges With, therefore the size adjusted downwards is necessarily different.
4, the frictional force that jackscrew i.e. its end of T-type nut and the generation of Steel-bar Pile contact point are tightened by spanner, carrys out supporting steel Cord and sleeve sliding force, many times there is frictional force deficiency causes former standing balance to be destroyed, and sleeve can drive at this time The problem of crossbeam slides downwardly together, work quality cannot get effective guarantee.
5, whole device component is inconvenient for operation, it is not high to recycle number, is easily damaged, performance accuracy is not high, the service life It is not long, use cost is very high.
Above-mentioned technical problem limits the application of the device, and influences the construction precision of pavement spread operation i.e. to mark Effective control of height, horizontal slope, flatness.In view of above-mentioned technical problem, it is necessary to develop one kind can safe operation, control it is steady It is fixed to reduce that thread-laying device use cost, lift adjustment be quick and convenient and lift adjustment thread-laying device with high accuracy to the maximum extent, To meet the actual demand of current road surface structure layer paving operation.
Invention content
The present invention is to solve current pavement spread thread-laying device there are dangerous, fragile, use cost are high and rise The technical problem that falling tone section is inconvenient for operation, performance accuracy is not high provides a kind of paver conducting wire hanging wire stake.
The present invention adopts the following technical scheme that realize:
A kind of paver conducting wire hanging wire stake, including spud pile are equipped with connector, the connector in the middle and upper part of spud pile The other end be equipped with elevating mechanism installation part, elevating mechanism is equipped on elevating mechanism installation part, the elevating mechanism includes perpendicular The straight fixing piece being arranged on elevating mechanism installation part and the moving member moved up and down along fixing piece, moving member are equipped with for solid Determine the installation crossbeam of steel wire rope.
Preferably, the lower end of spud pile of the present invention is taper.
Preferably, one end of connector of the present invention and spud pile vertical connection, the other end and elevator of connector Structure installation part vertical connection.
Preferably, elevating mechanism installation part of the present invention is the casing of bottom seal open topped.
Preferably, the middle and upper part of a side of fixing piece of the present invention is equipped with rack from top to bottom, under fixing piece Portion, which is inserted in elevating mechanism installation part, plays the role of limit.
Preferably, moving member of the present invention includes casing, and end cap is arranged at left and right sides of casing, on a left side for casing Right both sides symmetrically offer side opening, and two side openings penetrate through two end caps respectively, are opened up there are one vertical core in the centre of casing, vertical core The both sides up and down for penetrating through casing are equipped with ring gear, in casing from right to left along two side openings in the left side side opening of casing Be inserted into a two-stage gear axis, wherein positioned at right side module be more than left side module, and the gear in left side with it is interior Gear ring matching using playing the role of limit, casing be sleeved on fixing piece by vertical core and on two-stage gear axis the gear on right side with Rack matching uses, and the right end of two-stage gear axis is extended to outside the end cap on right side and set there are one handwheel, and crossbeam is arranged in casing On.
Preferably, handwheel sleeve of the present invention outer end on the right side of two-stage gear axis is equipped on the lateral surface of handwheel and shakes Arm.
Preferably, scale label is equipped on a side adjacent with rack on fixing piece of the present invention from top to bottom.
Preferably, one end of installation crossbeam of the present invention is fixed on casing and does not set on one of side opening side, pacifies Steel wire rope card slot is offered on dress crossbeam at the position of its other end, the steel wire rope card slot is opened along the circumference of installation crossbeam If.
Preferably, fixing piece of the present invention is in rectangular parallelepiped structure, and rack is set on a cuboid wherein side, lifting Mechanism installation part is square bushing.
The present invention is detached spud pile with elevating mechanism by the connector of a separate type using above-mentioned technical proposal It comes, when use first has to fix spud pile and then superstructure is just inserted into connector.In this way in the fixed spud pile of hammering When, connector can as help handle to be effectively ensured the hand of operating personnel exempt from hammering injury and will not be to top Elevating mechanism causes any harmful effect, and the fixation pile length for adhering to connector only has the pact of traditional hanging wire stake pile body length 50%, therefore spud pile shaking amplitude is obviously reduced, bounce disappears substantially, is easier to sink in hard when hammering fixed The road surface structare layer of roadbed or compaction moulding;The unique design of separate structure so that even if spud pile occurs bending and deformation Any harmful effect will not be caused to the lifting of elevating mechanism and hanging wire work;If spud pile flexural deformation is to certain journey Degree, directly replacement substructure, the elevating mechanism spare substructure that can arrange in pairs or groups are continuing with, and spud pile connector is suitable In the easy-consumed goods of low value, use cost is significantly reduced;360 degree of cyclic annular card slots of beam-end more have compared to traditional local card slot Conducive to banding fixed steel wire rope.Top elevating mechanism attachment positioning limiting fixator of the present invention can be complete with the insertion connector of fast and flexible At fixation working efficiency is considerably improved using extraction is finished.
Therefore, compared with prior art, the invention has the advantages that:
1, present invention peace dismounts and mounts complete quick and convenient, hammers the spud pile being connect with connector and consolidating for substructure can be completed Fixed, rectangular elevating mechanism installation part has the function of handle concurrently, since there is certain level distance, hammering to fix for handle and hammer point It effectively prevents causing hammering injury bad phenomenon, elevating mechanism installation part not to deform, rise the hand of operator when operation Drop adjustment mechanism will not scatter and disappear because of the adverse effect that spud pile deforms uses function.
2, rack side of the present invention is equipped with scale label, and operator is referred to read and do in adjustment beam height up and down To knowing what's what, efficiently avoid blindly adjusting operation.It certainly still will be to accept construction when operation adjusts beam height Based on the instruction of survey crew, supplemented by the scale label with reference to reading rack side, may be implemented in this way to operational sequence Double control can also carry out further self-test confirmation with reference to scale label, and then realize fast operating, work after fixed limit It is significantly improved as efficiency.Such as:Instruction " decline 12.8 centimeters " is sent out according to construction survey personnel, and operator can be by referring to Scale label is read, rapid accurately execute declines regulating command.
3, the present invention is adjusted by the coarse adjustment of rocking arm progress height soon first, when beam height is close to object height, The accurate adjusting of beam height is realized by rotation hand wheel, then by pushing handwheel to start accurate limiting device inwards, operation is fast Fast simplicity is not easy the failure that glides;Traditional spanner tightens jackscrew and squeezes the cumbersome easy landing of sleeve limiting device, Er Qieding Phenomena such as fatigue damage screw thread takes off mouth nut fractures is easy tod produce after the silk elastic certain number of Reusability, service life is generally not It is long.
4, entire component non-artificial factor during normal use of the present invention is hardly damaged.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the installation diagram of the present invention;
Fig. 3 is the structural schematic diagram of moving member of the present invention;
Fig. 4 is the structural schematic diagram of fixing piece of the present invention;
Fig. 5 is the mode of operation schematic diagram of moving member of the present invention;
Fig. 6 is the limit status diagram of moving member of the present invention;
Fig. 7 is the hanging wire status diagram of the present invention.
Specific implementation mode
Embodiment 1
As shown in Fig. 1-Fig. 7, a kind of paver conducting wire hanging wire stake, including lower end are the spud pile 1 of taper, in spud pile 1 Middle and upper part be equipped with connector 2, one end of connector 2 and 1 vertical connection of spud pile, the other end and elevating mechanism of connector 2 3 vertical connection of installation part, the elevating mechanism installation part 3 are the square bushing of bottom seal open topped, are pacified in elevating mechanism Piece installing 3 is equipped with elevating mechanism, and the elevating mechanism includes the fixing piece 4 being vertically arranged on elevating mechanism installation part 3 and edge The moving member 5 that fixing piece 4 moves up and down, moving member 5 are equipped with the installation crossbeam 7 for fixing steel wire rope, the fixing piece 4 The middle and upper part of one side is equipped with rack 41 from top to bottom, and the lower part of fixing piece 4, which is inserted in elevating mechanism installation part 3, plays limit Effect;
The moving member 5 includes casing 51, and the left and right sides of casing 51 is arranged with end cap 52, in the left and right of casing 51 two Side symmetrically offers side opening 53, and two side openings 53 penetrate through two end caps 52 respectively, set in each side opening 53 there are one and side opening 53 coaxial oiliness bearings are opened up in the centre of casing 51 there are one vertical core 54, and vertical core 54 penetrates through the both sides up and down of casing 51, It is equipped with ring gear 55 in the left side side opening 53 of casing 51, a twin-stage is inserted into from right to left along two side openings 53 in casing 51 Gear shaft 56 is more than the module in left side, and the gear in left side positioned at the module on right side wherein on two-stage gear axis 56 It matches to use with ring gear 55 and plays the role of limit, the outer diameter of two gears is all higher than the interior of side opening 53 on two-stage gear axis 56 Diameter so that two gears be located in casing 51, casing 51 by 54 sets of vertical core on the retainers 4 and two-stage gear axis 56 is upper right Wheel and rack 41 and oiliness bearing the engagement matching of side use, and the right end of two-stage gear axis 56 extends to outside the end cap 52 on right side Portion is set there are one handwheel 57, and crossbeam 7 is arranged on casing 51.
Handwheel 57 described in the present embodiment is sleeved on 56 right side outer end of two-stage gear axis, is equipped with and shakes on the lateral surface of handwheel 57 Arm 58, when rotating clockwise, casing drives crossbeam to move up;Casing drives crossbeam to move down when rotation counterclockwise, more convenient more to save trouble It is more accurate, and rocking arm can be used in rough adjustment, accurate adjustment is needed when moving beam is close calculates absolute altitude and finely tuned It is realized by rotation hand wheel.
It is carved with scale 42, Ke Yifang from top to bottom on a side adjacent with rack on fixing piece 4 described in the present embodiment Convenient to operate personnel read in adjusting elevation to accomplish to know what's what, and greatly enhances service speed, to significantly carry High working efficiency.
One end of installation crossbeam 7 described in the present embodiment is fixed on casing 51 and does not set on one of side opening side, installs Steel wire rope card slot 71, circle of the steel wire rope card slot 71 along installation crossbeam 7 are offered on crossbeam 7 at the position of its other end Zhou Kaishe, 360 degree of annular steel wire rope card slots can make steel wire rope installation more secured, efficiently avoid the steel wire in paving operation It shakes and slides when rope comes up against external force.
Fixing piece 4 described in the present embodiment is in rectangular parallelepiped structure, and rack 41 is set on a cuboid wherein side, elevator Structure installation part 3 is square bushing.
The end cap of casing both sides is installed, two-stage gear axis is positioned at casing after two-stage gear axis 56 is inserted into the present embodiment Internal part is equipped with two different gears of modulus, and the larger gear of modulus is complete when rotation hand wheel lifts casing Ratcheting state is kept with rack, when casing, which completes descending operation, to be adjusted, handwheel is pushed to make twin-stage wheel shaft to casing the inside Half of the mobile larger gear of modulus at this time there was only continue and rack it is ratcheting the other half in vacant state and modulus is smaller at this time Then complete and ring gear is ratcheting for gear, to realize the function that shell fixes limit;Side up and down is also provided on casing For being inserted into rack, casing is set in by vertical core on fixing piece shape vertical core;The fixing piece is positioned at lifting assembly installation position The part of top is provided with rack from top to bottom;The larger wheel and rack of the modulus and the smaller gear and ring gear of modulus It can be achieved while engaging;The twin-stage wheel shaft can be moved axially along side opening to realize the larger gear of modulus individually and rack Engagement, and the intermeshing of the smaller gear and ring gear of modulus is to realize casing precisely fixed limit, cannot again on Lower movement;Twin-stage wheel shaft is fixed with handwheel in one end outside casing;The installation crossbeam is horizontally fixed on the outer wall of casing On.
Elevating mechanism is inserted on elevating mechanism installation part and completes to fix, when adjusting lifting, passes through push-and-pull The gear and rack that the position of twin-stage wheel shaft makes modulus larger are completely ratcheting, in this way in crossbeam Pass line adjustment, pass through rotation Gear is moved up and down along rack drives casing when handwheel, and then the crossbeam that shell accords with can also move up and down arrival construction survey Personnel calculate desired height.After highly adjusting, by pushing handwheel to move twin-stage wheel shaft to casing internal, at this time The smaller gear of modulus on twin-stage wheel shaft is completely ratcheting with ring gear, and the larger gear of modulus is still mutually engaged with rack, this The position of the entire casing of sample is just fixed limit, and after Pass line adjustment end of operation, the steel wire rope being tensioned is mounted on crossbeam It can start paving operation construction in the card slot of end.
The present invention in specific application, first by the fixed respective position of Steel-bar Pile hammering, then pacifies in elevating mechanism Elevating mechanism is inserted into piece installing, later according to the instruction of construction survey personnel using the level height of rocking arm coarse adjustment crossbeam, at once It when being close to object height, is accurately adjusted using handwheel under the instruction of survey crew, until crossbeam position sign adds up to calculated altitude It is required that starting limiting and fixing device.The steel wire rope of tensioning is mounted in the card slot of beam-end, starts pavement spread operation and apply Work.

Claims (10)

1. a kind of paver conducting wire hanging wire stake, including spud pile (1), which is characterized in that be equipped with and connect in the middle and upper part of spud pile (1) The other end of fitting (2), the connector (2) is equipped with elevating mechanism installation part (3), is equipped on elevating mechanism installation part (3) Elevating mechanism, the elevating mechanism include being vertically arranged in fixing piece (4) on elevating mechanism installation part (3) and along fixing piece (4) moving member (5) moved up and down, moving member (5) are equipped with the installation crossbeam (7) for fixing steel wire rope.
2. paver conducting wire hanging wire stake as described in claim 1, which is characterized in that the lower end of the spud pile (1) is taper.
3. paver conducting wire hanging wire stake as described in claim 1, which is characterized in that one end of the connector (2) and fixation Stake (1) vertical connection, the other end and elevating mechanism installation part (3) vertical connection of connector (2).
4. paver conducting wire hanging wire stake as described in claim 1, which is characterized in that the elevating mechanism installation part (3) is bottom Seal the casing of open topped in portion.
5. paver conducting wire hanging wire stake as described in claim 1, which is characterized in that a side of the fixing piece (4) Middle and upper part is equipped with rack (41) from top to bottom, and the lower part of fixing piece (4) is inserted in the work that limit is played in elevating mechanism installation part (3) With.
6. paver conducting wire hanging wire stake as described in claim 1, which is characterized in that the moving member (5) includes casing (51), It is arranged with end cap (52) at left and right sides of casing (51), side opening (53) is symmetrically offered in the left and right sides of casing (51), two A side opening (53) penetrates through two end caps (52) respectively, is opened up there are one vertical core (54) in the centre of casing (51), vertical core (54) passes through The both sides up and down of logical casing (51), are equipped with ring gear (55), on casing (51) interior edge in the left side side opening (53) of casing (51) It two side openings (53) and is inserted into a two-stage gear axis (56) from right to left, wherein the module positioned at right side is more than left side Module, and the gear in left side is matched with ring gear (55) using limit is played the role of, casing (51) passes through vertical core (54) It is sleeved on fixing piece (4) and wheel and rack (41) matching on right side uses on two-stage gear axis (56), two-stage gear axis (56) Right end extend to outside the end cap (52) on right side and set there are one handwheel (57), crossbeam (7) is arranged on casing (51).
7. paver conducting wire hanging wire stake as described in claim 1, which is characterized in that the handwheel (57) is sleeved on two-stage gear axis (56) right side outer end is equipped with rocking arm (58) on the lateral surface of handwheel (57).
8. paver conducting wire hanging wire stake as described in claim 1, which is characterized in that adjacent with rack on the fixing piece (4) A side on from top to bottom be equipped with scale (42).
9. paver conducting wire hanging wire stake as described in claim 1, which is characterized in that one end of the installation crossbeam (7) is fixed It is not set on one of side opening side in casing (51), steel is offered at the position of its other end on installation crossbeam (7) Cord card slot (71), the steel wire rope card slot (71) open up along the circumference of installation crossbeam (7).
10. paver conducting wire hanging wire stake as described in claim 1, which is characterized in that the fixing piece (4) is in cuboid knot Structure, rack (41) are set on a cuboid wherein side, and elevating mechanism installation part (3) is square bushing.
CN201810321802.0A 2018-04-11 2018-04-11 A kind of paver conducting wire hanging wire stake Withdrawn CN108316109A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810321802.0A CN108316109A (en) 2018-04-11 2018-04-11 A kind of paver conducting wire hanging wire stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810321802.0A CN108316109A (en) 2018-04-11 2018-04-11 A kind of paver conducting wire hanging wire stake

Publications (1)

Publication Number Publication Date
CN108316109A true CN108316109A (en) 2018-07-24

Family

ID=62897324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810321802.0A Withdrawn CN108316109A (en) 2018-04-11 2018-04-11 A kind of paver conducting wire hanging wire stake

Country Status (1)

Country Link
CN (1) CN108316109A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894087A (en) * 2018-08-18 2018-11-27 重庆交通大学 Self-adjustable thread-laying device suitable for pan soil construction
CN108978409A (en) * 2018-08-18 2018-12-11 重庆交通大学 Thread-laying device
CN109056480A (en) * 2018-08-18 2018-12-21 重庆交通大学 Foot-operated thread-laying device
CN109112931A (en) * 2018-08-18 2019-01-01 重庆交通大学 Foot-operated hanging wire stake device suitable for pan soil construction
CN109183576A (en) * 2018-08-18 2019-01-11 重庆交通大学 Self-adjustable thread-laying device
CN109338859A (en) * 2018-08-18 2019-02-15 重庆交通大学 The stake of screw-in hanging wire and its mounting device suitable for pan soil construction
CN113250447A (en) * 2021-06-01 2021-08-13 云南穿山机甲能源装备科技有限公司 Sliding form construction linear and elevation detection control system and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2683151Y (en) * 2004-02-26 2005-03-09 孟娥 Hand-operated multipurpose transfusion stand
CN202440744U (en) * 2012-02-21 2012-09-19 中建五局第三建设有限公司 Steel wire rope adjusting device for elevation control of spreading machine
CN206228693U (en) * 2016-08-29 2017-06-09 南方医科大学第三附属医院 A kind of Infusion support of manual control lifting
CN106894317A (en) * 2017-04-05 2017-06-27 贵州路桥集团有限公司 Pavement spread wire hanging wire stake and preparation method thereof
CN206534922U (en) * 2016-11-07 2017-10-03 周娟 A kind of multi-functional pediatric nursing Infusion support
CN208362867U (en) * 2018-04-11 2019-01-11 渠洪卫 A kind of paver conducting wire hanging wire stake

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2683151Y (en) * 2004-02-26 2005-03-09 孟娥 Hand-operated multipurpose transfusion stand
CN202440744U (en) * 2012-02-21 2012-09-19 中建五局第三建设有限公司 Steel wire rope adjusting device for elevation control of spreading machine
CN206228693U (en) * 2016-08-29 2017-06-09 南方医科大学第三附属医院 A kind of Infusion support of manual control lifting
CN206534922U (en) * 2016-11-07 2017-10-03 周娟 A kind of multi-functional pediatric nursing Infusion support
CN106894317A (en) * 2017-04-05 2017-06-27 贵州路桥集团有限公司 Pavement spread wire hanging wire stake and preparation method thereof
CN208362867U (en) * 2018-04-11 2019-01-11 渠洪卫 A kind of paver conducting wire hanging wire stake

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894087A (en) * 2018-08-18 2018-11-27 重庆交通大学 Self-adjustable thread-laying device suitable for pan soil construction
CN108978409A (en) * 2018-08-18 2018-12-11 重庆交通大学 Thread-laying device
CN109056480A (en) * 2018-08-18 2018-12-21 重庆交通大学 Foot-operated thread-laying device
CN109112931A (en) * 2018-08-18 2019-01-01 重庆交通大学 Foot-operated hanging wire stake device suitable for pan soil construction
CN109183576A (en) * 2018-08-18 2019-01-11 重庆交通大学 Self-adjustable thread-laying device
CN109338859A (en) * 2018-08-18 2019-02-15 重庆交通大学 The stake of screw-in hanging wire and its mounting device suitable for pan soil construction
CN108894087B (en) * 2018-08-18 2020-12-04 上海城建职业学院 Self-adjusting wire hanging device suitable for hard soil construction
CN109112931B (en) * 2018-08-18 2021-05-04 上海城建职业学院 Foot-operated string line stake device suitable for hard soil construction
CN109056480B (en) * 2018-08-18 2021-05-25 重庆交通大学 Pedal type thread hanging device
CN108978409B (en) * 2018-08-18 2021-05-25 重庆交通大学 Wire hanging device
CN109183576B (en) * 2018-08-18 2021-06-29 重庆交通大学 But automatically regulated's hanging wire device
CN109338859B (en) * 2018-08-18 2021-07-23 重庆交通大学 Screw-in type wire hanging pile suitable for hard soil construction and mounting device thereof
CN113250447A (en) * 2021-06-01 2021-08-13 云南穿山机甲能源装备科技有限公司 Sliding form construction linear and elevation detection control system and method

Similar Documents

Publication Publication Date Title
CN108316109A (en) A kind of paver conducting wire hanging wire stake
CN104819818B (en) Self-action tunnel inverted arch impulsive model system
CN208362867U (en) A kind of paver conducting wire hanging wire stake
CN207158741U (en) A kind of lowering or hoisting gear for being used for electromechanical installation
CN209741839U (en) A vibration pile driver for bridge construction
CN213267883U (en) Anchor rod construction device for constructional engineering
CN102346118B (en) Impact testing machine
CN106825682A (en) High-altitude drilling automatic pilot
JP2014040747A (en) Double hammer type pile driving device
CN208223466U (en) A kind of engineering survey level support device
CN110514537A (en) Falling weight impact test device
CN111005383A (en) Subway steel pipe pile position correcting assembly
CN110617013A (en) Fixing support capable of adjusting direction of rock drill and rock drill assembly
KR102420116B1 (en) Cap-integrated Drop Hammer Device with Safety and its Operation Methods
CN109900703A (en) A kind of detection device and detection method for bridge crack
CN211349673U (en) Knocking mechanism for high-altitude falling object experience device
CN105234662A (en) Gravity striking device used for installing crusher liner plate
CN107119966A (en) A kind of pole upside-down mounting group founds lifting device
CN211004060U (en) High-speed ladder trailing cable stability and reliability test device
CN204430347U (en) One is used for high-altitude jewel hole can ranging localization lift electric hammer Electric drill support instrument
KR20170092514A (en) Pile hammer
CN208605128U (en) Rotary digging tooth installation system
CN206578331U (en) High-altitude drilling automatic pilot
CN219200292U (en) Underwater concrete pouring height measurer
CN110055884A (en) A kind of rigid support of spherical shape easy to install

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190412

Address after: 030605 Jinyuan, No. 11 Jianxin Lane, Yuci District, Jinzhong City, Shanxi Province

Applicant after: Liang Yongling

Address before: 030600 Unit 2, Building 4, Taitie 1 (New) Building, Yuci District, Jinzhong City, Shanxi Province

Applicant before: Qu Hong Wei

WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180724