CN106894296A - A kind of bridge area CRTSIII template base board construction methods - Google Patents

A kind of bridge area CRTSIII template base board construction methods Download PDF

Info

Publication number
CN106894296A
CN106894296A CN201710249139.3A CN201710249139A CN106894296A CN 106894296 A CN106894296 A CN 106894296A CN 201710249139 A CN201710249139 A CN 201710249139A CN 106894296 A CN106894296 A CN 106894296A
Authority
CN
China
Prior art keywords
template
concrete
base board
construction
bridge area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710249139.3A
Other languages
Chinese (zh)
Inventor
安龙
曹同来
刘继鹏
汤贵海
史升亮
刘小东
庞前凤
王肃良
孙敏钧
崔国强
徐小燕
何宇峰
韩三幸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
China Railway 22nd Bureau Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
China Railway 22nd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd, China Railway 22nd Bureau Group Co Ltd filed Critical First Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
Priority to CN201710249139.3A priority Critical patent/CN106894296A/en
Publication of CN106894296A publication Critical patent/CN106894296A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of bridge area CRTSIII template base board construction methods, comprise the following steps:1) beam face dabbing;2) embedded sleeve barrel treatment;3) measurement is put in a suitable place to breed:4) reinforcement installation;5) template support;6) concrete construction.The present invention is to summarize to form a set of perfect construction technology by locale simulation experiment and practice of construction, the construction technology has directive significance for the type rail bed plates of CRTS III and self-compaction perfusion, also there is obvious economic benefit and social benefit simultaneously, the method effectively raises efficiency of construction, solve the problems, such as that some bedplate grooves ftracture, there is certain reference to the construction of later similar engineering.

Description

A kind of bridge area CRTSIII template base board construction methods
Technical field
The present invention relates to construction of railways field, more particularly to a kind of bridge area CRTSIII template base board construction methods.
Background technology
With the development of high-speed railway, the template non-fragment orbits of CRTS III are used as a kind of new knot constructed on Line for Passenger Transportation Structure, the advantage such as Construction of Ballastless Track technology is because its stability is high, rigidity uniformity is good, structure durability is strong is in increasing visitor It is widely adopted on fortune special line.
The plate-type non-fragment orbits of CRTS III are China railways engineering technology foreign mature experiences, by introducing, digesting, Research and development are absorbed and innovate, China has the New-type plate non-fragment orbit of entirely autonomous intellectual property.
The plate-type ballastless track structures of CRTS III composition is rail, spring secures rail to sleeper, track plates, self-compacting concrete, spacing Groove, concrete bed etc..Wherein, bedplate construction technology is more comprehensive, and the precision of track slab pavement and self-compaction perfusion Quality be quality control key link.
Specifically, the type track structures of CRTS III have the characteristics that:
(1) the type tracks of CRTS III use unit block structure, have completely abolished the boss of the templates of CRTS I, the templates of CRTS II Terminal spine limit method, have also been made adjustment for structure sheaf.
(2) the type track structures of CRTS III are made up of reinforced concrete footing, intermediate isolating layer, self-compacting concrete, Wherein, the packing of self-compacting concrete perfusion determines the construction quality of track structure layer.
(3) the type track plates of CRTS III by intermediate isolating layer realize self-compacting concrete layer and bedplate between it is good every From being easy to later period maintenance;
Meanwhile, bedplate sets two limited impressions, and the vertically and horizontally displacement to track plates plays position-limiting action.
(4) requirement of the type track structure construction qualities of CRTS III is strict, is avoided that some problems using this engineering method and improves The construction quality and precision of track plates.
(5) the type track structure working procedures of CRTS III are complicated, and control point is more, and technological requirement is strict, and this engineering method can be reduced Cost, raising efficiency, accelerating construction progress.
The present invention is to summarize to form a set of perfect construction technology by locale simulation experiment and practice of construction, the construction skill Art has directive significance for the type rail bed plates of CRTS III and self-compaction perfusion, while also having obvious economic benefit and society Can benefit.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of bridge area CRTSIII template base board construction methods, The construction technology has directive significance for the type rail bed plates of CRTS III and self-compaction perfusion, while also having obvious economical Benefit and social benefit..
The technical problems to be solved by the invention are achieved through the following technical solutions:
A kind of bridge area CRTSIII template base board construction methods, comprise the following steps:
1) beam face dabbing:
To beam face longitudinal direction dabbing, further along embedded sleeve barrel centre position transverse direction dabbing, dabbing depth 1.5-2mm exposes 75% fresh concrete;
2) embedded sleeve barrel treatment:
When sleeve is effective, it is screwed into sleeve using power nail, is tightened;
If sleeve takes beam face bar planting mode when failing, perpendicular to line direction, the distance around pre-buried branch sleeve The position drill diameter 20mm of branch sleeve Zhong Xin≤35mm, depth are the hole of 220mm, and anchoring adhesive is injected after borehole cleaning dedusting, will Reinforcing bar is spirally inserted;
3) measurement is put in a suitable place to breed:
By no less than 3 pairs of control points of CP III, the position of bedplate being released according to fabric swatch software, used according to setting-out position The sideline of line of ink marker ejection bedplate and the position of cross form;
4) reinforcement installation:
Bottom layer of the reinforcing steel mesh sheet installation is first carried out, next enters cross girders face dowel and installs, then carries out top layer mesh sheet installation, finally Carry out bearing rod and limited impression cracking strip is installed;
5) template support:
Before model sheetinstallat, brushing releasing agent after template surface is cleared up;During model sheetinstallat, according to the control net measurement moulds of CP III Plate plan-position and elevation, and mark is made in template, mark is using industrial double faced adhesive tape, spacing 50cm;
6) concrete construction:
Cast before base surface carry out atomized water spray moistening, concrete vibrating, concrete leveling, concrete-face closure, form removal and The maintenance method of " a liquid geomembrane " is conserved.
Preferably, in above-mentioned technical proposal, the step 1) also include before:
Basic unit face is carried out an acceptance inspection before to bedplate construction, base by be connected with base surface so that track structure layer and Base surface forms an entirety.
Preferably, in above-mentioned technical proposal, the step 3) also include:
Alignd with beam-ends settings per hole beam both sides bedplate end, cause actual beam length not to be inconsistent with theory beam length when constructing When, the cantilevered out beam-ends of bedplate can not be more than 80mm.
Preferably, in above-mentioned technical proposal, the step 4) in,
Reinforced mesh in base is processed and formed at one time, and other reinforcing bars are by steel bar meter concentrated processing, then transport to applying Work onsite application.
Preferably, in above-mentioned technical proposal, described other reinforcing bars include bearing rod, U-shaped muscle and dowel.
Preferably, in above-mentioned technical proposal, the step 4) in,
Groove cracking strip is installed again after after groove model sheetinstallat, and anticracking tendon protective layer thickness is not more than 3cm.
Preferably, in above-mentioned technical proposal, the step 5) in,
It is bolted between base template;Expansion joint position pastes 3mm Interal fixations using 2cm polyethylenes backboard, 40*60mm square steel is fixed using G types card in top.
Preferably, in above-mentioned technical proposal, the step 5) in,
Two limited impressions, limited impression size 720mm* are set in the range of the corresponding bedplate of every piece of track plates 1020mm;
The limited impression template that will be processed is placed into base unit fixed position, and is connected solid with side form with G types card It is fixed.
Preferably, in above-mentioned technical proposal, the step 5) in,
According to formwork support arrangement line branching standing template, template is blocked with the gap of base surface using mortar,
Limited impression template is fixed according to setting-out position, and freeboard section template uses upper and lower two-layer combination type template.
Preferably, in above-mentioned technical proposal, the step 6) in,
Base board concrete is vibrated using internal vibration rod, and vibrating time one is 20~30s, follows fast in process of vibrating The slow mode pulled out is inserted, after the completion of concrete tamping, is manually struck off with aluminium alloy chi, it is ensured that the flatness of top surface;At the beginning for the treatment of concrete Second receipts face is carried out after solidifying before final set, the secondary receipts face time is no more than 4h;Side form reaches 5MPa with enterprising in concrete strength Row form removal;
The maintenance method of " a liquid geomembrane " sprays curing fluid for timely after the completion of base groove receipts face in groove surrounding, Geotextiles are covered again, and outer layer covers one layer of plastic cloth moisture-keeping maintaining, covering at least 14 days moisture-keeping maintaining time of watering.
Above-mentioned technical proposal of the present invention, has the advantages that:
Bridge area CRTSIII template base board construction methods of the invention, it is recessed from the treatment of beam face, bar planting, bedplate The constructions such as groove, concreting, maintenance aspect, the construction method and control for describing the template unballasted track bed plates of CRTS III will Point, the construction technology effectively raises efficiency of construction, solves the problems, such as that some bedplate grooves ftracture, to later similar work The construction of journey has certain reference.
Bridge area CRTSIII template base board construction methods of the invention, the method effectively raises construction Efficiency, solves the problems, such as that some bedplate grooves ftracture, and has certain reference to the construction of later similar engineering.
Specific embodiment
Specific embodiment of the invention is described in detail below, in order to further understand the present invention.
All experimental techniques for using unless otherwise specified, are conventional method in following examples.
A kind of bridge area CRTSIII template base board construction methods, comprise the following steps:Preparation of construction, CP III are controlled Net repetition measurement, the examination of beam face, basal plane treatment, mesh sheet installation, template support, concreting, maintenance.
Specifically:
(1) beam face dabbing
Basic unit face is carried out an acceptance inspection before bedplate construction, base is connected so that track structure layer and base by with base surface Plinth face forms an entirety, therefore beam face dabbing is particularly important.
In order to preferably reach dabbing effect using dabbing and dabbing, dabbing longitudinal first, then along in embedded sleeve barrel Between position transverse direction dabbing.The preferred depth of dabbing is 1.5-2mm, exposes 75% fresh concrete.
(2) embedded sleeve barrel treatment
Connection reinforcing bar at service sleeve will be connected firmly, and forbid to loosen.WELDING STUDS is screwed into sleeve at least 1.5 times straight Electrical path length, screw-down torque is not less than 100n.m.Certainly, the invention is not limited in this, those skilled in the art can be according to need Carry out corresponding rescaling.
If sleeve takes beam face bar planting mode when failing, should be carried out before bar planting detection determine bar planting scope without bridge reinforcement and Prestress wire, then perpendicular to line direction, apart from the position of branch sleeve Zhong Xin≤35mm around pre-buried branch sleeve The hole that drill diameter 20mm, depth are 220mm is put, anchoring adhesive is injected after borehole cleaning dedusting, reinforcing bar is spirally inserted.Certainly, originally Invention is not limited thereto, and those skilled in the art can as needed carry out corresponding rescaling.
(3) measurement is put in a suitable place to breed
By no less than 3 pairs of control points of CP III, the position of bedplate being released according to fabric swatch software, used according to setting-out position The sideline of line of ink marker ejection bedplate and the position of cross form.Alignd with beam-ends setting per hole beam both sides bedplate end, constructed When because when the other reasonses such as beam processed cause actual beam length not to be inconsistent with theoretical beam length, the cantilevered out beam-ends of bedplate can not be more than 80mm. Certainly, the invention is not limited in this, those skilled in the art can as needed carry out corresponding rescaling.
(4) reinforcement installation
Bottom layer of the reinforcing steel mesh sheet installation is first carried out, next enters cross girders face dowel and installs, then carries out top layer mesh sheet installation, finally Carry out bearing rod and limited impression cracking strip is installed.
Reinforced mesh in base is processed and formed at one time, and other reinforcing bars (such as bearing rod, U-shaped muscle, dowel) are by reinforcing bar Processing space concentrated processing, then transport to job site and use.The invention is not limited in the reinforcing bar of above-mentioned several types, this area Technical staff can be replaced as needed.
Bedplate groove cracking strip is installed again after after groove model sheetinstallat.Cracking strip must control protective layer thickness, 3cm can not be more than.Certainly, the invention is not limited in this, those skilled in the art can as needed carry out corresponding yardstick Adjustment.
(5) template support
Before model sheetinstallat, brushing releasing agent after template surface is cleared up, during model sheetinstallat, according to the control net measurement moulds of CP III Plate plan-position and elevation, and mark is made in template, mark is using industrial double faced adhesive tape, spacing 50cm.Certainly, the present invention simultaneously This is not limited to, those skilled in the art can as needed carry out corresponding rescaling.
It is connected between base template, Template Location is accurate, smooth-going, firm, seam is installed tightly, prevents swollen mould, leakage Slurry.Expansion joint position pastes 3mm Interal fixations using 2cm polyethylenes backboard, and 40*60mm square steel is consolidated using G types card in top It is fixed.Certainly, the invention is not limited in this, those skilled in the art can as needed carry out corresponding rescaling.
Two limited impressions, limited impression size 720mm* are set in the range of the corresponding bedplate of every piece of track plates 1020mm.The limited impression template that will be processed is placed into base unit fixed position, and is connected solid with side form with G types card It is fixed.Certainly, the invention is not limited in this, those skilled in the art can as needed carry out corresponding rescaling.
In strict accordance with formwork support arrangement line branching standing template, template is blocked with the gap of base surface using mortar, forbids spillage, is limited Position groove template is fixed in strict accordance with setting-out position, and freeboard section template is using upper and lower two-layer combination type template (straight line height+maximum Superelevation value is combined).
After the completion of curved section construction, by dismantling template by be transferred to straightway and use.
(6) concrete construction
1) spray:
Base surface will carry out atomized water spray moistening before cast, forbid seeping phenomenon occur.
2) concrete vibrating:
Base board concrete is vibrated using internal vibration rod.Vibrating time is suitable, and general control is in 20~30s Preferably.That is, be no longer sunk with concrete surface, bubble-free, surface bleeding are advisable, it is to avoid leakage is shaken, cross to shake.
The fast mode inserted and pull out slowly is followed in process of vibrating, and should prevent from hitting reinforcing bar and template (particularly groove template) Hit.
Groove surrounding answers vibration compacting, and base absolute altitude should be strictly controlled in construction.
3) in process of vibrating, the stability of shuttering supporting and the closely sealed situation of seam are checked, prevents from running mould, swollen mould and spillage Situations such as occur.
4) concrete leveling:
After the completion of concrete tamping, manually struck off with aluminium alloy chi, it is ensured that the flatness of top surface.Treat
Second receipts face, secondary receipts face time in the general presetting period according to concrete are carried out after concrete initial set before final set It is determined that, it is usually no more than 4 hours.Certainly, the invention is not limited in this, it is also possible to superelevation 4h.
5) concrete-face closure:
Because base plate surface need to lay geotextiles, so concrete surface is without plucking, only need to be floating, in both sides Must harvest smooth surface in the range of the flowing water slope of 250mm.Above-mentioned size is only preferred size of the invention, is not used to limit this hair It is bright.
6) side form:
More than 5MPa is reached in concrete strength, when its surface and corner angle are not damaged because of form removal, form removal is carried out.
7) concrete curing:
Bedplate concrete curing is timely in groove after the completion of base groove receipts face by the way of " a liquid geomembrane " Surrounding sprays curing fluid, is then covered by geotextiles, and outer layer covers one layer of plastic cloth moisture-keeping maintaining.The covering watering moisture-keeping maintaining time At least 14 days.Certainly, the invention is not limited in this, those skilled in the art can as needed select suitable maintenance method.
The above-mentioned bridge area CRTSIII template base board construction methods of the present invention, key control point is needed in its construction method And corrective measure:
(1) bedplate key control point
1) due to outside height difference in curved section, 7% flowing water slope is set in the range of bedplate requirement both sides 250mm, prevents Only self-compaction root ponding.
Frost heave is susceptible to after the ponding geotextiles water suction of severe cold area self-compaction root.The flowing water slope control of 3 in Curve Segment It is particularly main.
Scale trowel during construction using 250mm receives face, and the flowing water slope gradient is checked using grade rod.
2) bedplate groove crackle.
Bedplate groove surrounding is easy to crackle occur due to stress concentration, and groove must be controlled in work progress The anticracking tendon protective layer of surrounding, control to 2-3cm.
3) construction of bedplate expansion joint cystosepiment is important key control point.
Bothered because the bedplate expansion joint later stage is processed, track plates do not allow tooled joint, thus position at the top of cystosepiment and It is linear particularly critical.
Cystosepiment is close to using the thick steel plates of 3mm during construction, 40*60mm square steel is fixed and ensures bubble by top using G types card Foam printed line is attractive in appearance.
(2) corrective measure
1) after the completion of bedplate concrete vibrating, the small mesh sheet of steel wire of 10*10mm is increased in groove surrounding, corner location is every Individual angle inserts one piece, is 10mm or so apart from concrete surface.The method can efficiently solve the aperature of angle of bedplate groove four Problem.
2) after the completion of bedplate groove receipts face, curing fluid was sprayed in corner first before covering, for groove crackle Appearance plays a good role.
3) when bedplate expansion joint cystosepiment is constructed, being close to cystosepiment top using the thick steel plates of 3mm will using G types card 40*60mm square steel is fixed, and can effectively ensure the linear of expansion joint.
4) one piece of square tube of 20mm of bedplate end head formwork bottom welding, one block of steel plate of oblique welding.Beam-ends can be allowed weather-proof Combining closely when steel is poured with bedplate.
A kind of bridge area CRTSIII template base board construction methods of the invention, it is from the treatment of beam face, bar planting, base The constructions such as plate groove, concreting, maintenance aspect describes construction method and the control of the template unballasted track bed plates of CRTS III Main points processed and corrective measure, the construction technology effectively raise efficiency of construction, solve some bedplate grooves cracking Problem, has certain reference to the construction of later similar engineering.
For synthesis, a kind of construction method of bridge area CRTSIII template bedplates of the invention, the construction party Method can effectively improve existing efficiency of construction, solve at present construction present in some on bedplate groove cracking Problem, has certain guidance and reference to the construction of later similar engineering.
Although the present invention is disclosed as above with embodiment, so it is not intended to limit the present invention, any people in the art Member, without departing from the spirit and scope of the present invention, can make a variety of selections and modification, therefore protection model of the invention Enclose and limited by claims and its equivalents.

Claims (10)

1. a kind of bridge area CRTSIII template base board construction methods, it is characterised in that comprise the following steps:
1) beam face dabbing:To beam face longitudinal direction dabbing, further along embedded sleeve barrel centre position transverse direction dabbing, dabbing depth 1.5-2mm, Expose 75% fresh concrete;
2) embedded sleeve barrel treatment:When sleeve is effective, it is screwed into sleeve using power nail, is tightened;If sleeve takes beam face when failing Bar planting mode, perpendicular to line direction, apart from the position drill straight of branch sleeve Zhong Xin≤35mm around pre-buried branch sleeve Footpath 20mm, depth are the hole of 220mm, and anchoring adhesive is injected after borehole cleaning dedusting, and reinforcing bar is spirally inserted;
3) measurement is put in a suitable place to breed:By no less than 3 pairs of control points of CP III, the position of bedplate being released according to fabric swatch software, according to setting-out Position is using the sideline of line of ink marker ejection bedplate and the position of cross form;
4) reinforcement installation:Bottom layer of the reinforcing steel mesh sheet installation is first carried out, next enters cross girders face dowel and installs, then carries out top layer mesh sheet peace Dress, finally carries out bearing rod and limited impression cracking strip is installed;
5) template support:Before model sheetinstallat, brushing releasing agent after template surface is cleared up;During model sheetinstallat, controlled according to CP III Net measurement module plan-position and elevation, and mark is made in template, mark is using industrial double faced adhesive tape, spacing 50cm;
6) concrete construction:Cast before base surface carry out atomized water spray moistening, concrete vibrating, concrete leveling, concrete-face closure, The maintenance method of form removal and " a liquid geomembrane " is conserved.
2. bridge area CRTSIII template base board construction methods according to claim 1, it is characterised in that the step It is rapid 1) also to include before:Basic unit face is carried out an acceptance inspection before being constructed to bedplate, base is connected so that track by with base surface Structure sheaf forms an entirety with base surface.
3. bridge area CRTSIII template base board construction methods according to claim 1, it is characterised in that the step It is rapid 3) also to include setting of being alignd with beam-ends per hole beam both sides bedplate end, actual beam length is caused when construction with theoretical beam length not Fu Shi, the cantilevered out beam-ends of bedplate can not be more than 80mm.
4. bridge area CRTSIII template base board construction methods according to claim 1, it is characterised in that the step It is rapid 4) in reinforced mesh in base be processed and formed at one time, other reinforcing bars are by steel bar meter concentrated processing, then transport to construction Onsite application.
5. bridge area CRTSIII template base board construction methods according to claim 5, it is characterised in that it is described its He includes bearing rod, U-shaped muscle and dowel by reinforcing bar.
6. bridge area CRTSIII template base board construction methods according to claim 1, it is characterised in that the step Rapid 4) further groove cracking strip is installed again after after groove model sheetinstallat, and anticracking tendon protective layer thickness is not more than 3cm.
7. bridge area CRTSIII template base board construction methods according to claim 1, it is characterised in that the step It is rapid 5) in, be bolted between base template;Expansion joint position pastes 3mm Interal fixations using 2cm polyethylenes backboard, on 40*60mm square steel is fixed using G types card by portion.
8. bridge area CRTSIII template base board construction methods according to claim 7, it is characterised in that the step It is rapid 5) in, two limited impressions, limited impression size 720mm*1020mm are set in the range of the corresponding bedplate of every piece of track plates; The limited impression template that will be processed is placed into base unit fixed position, and is connected with G types card and side form.
9. bridge area CRTSIII template base board construction methods according to claim 8, it is characterised in that the step It is rapid 5) in, according to formwork support arrangement line branching standing template, template is blocked with the gap of base surface using mortar, limited impression template according to Setting-out position is fixed, and freeboard section template uses upper and lower two-layer combination type template.
10. bridge area CRTSIII template base board construction methods according to claim 1, it is characterised in that the step It is rapid 6) in, base board concrete is vibrated using internal vibration rod, and vibrating time one is 20~30s, follows fast in process of vibrating The slow mode pulled out is inserted, after the completion of concrete tamping, is manually struck off with aluminium alloy chi, it is ensured that the flatness of top surface;At the beginning for the treatment of concrete Second receipts face is carried out after solidifying before final set, the secondary receipts face time is no more than 4h;Side form reaches 5MPa with enterprising in concrete strength Row form removal;The maintenance method of " a liquid geomembrane " sprays curing fluid for timely after the completion of base groove receipts face in groove surrounding, Geotextiles are covered again, and outer layer covers one layer of plastic cloth moisture-keeping maintaining, covering at least 14 days moisture-keeping maintaining time of watering.
CN201710249139.3A 2017-04-17 2017-04-17 A kind of bridge area CRTSIII template base board construction methods Pending CN106894296A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710249139.3A CN106894296A (en) 2017-04-17 2017-04-17 A kind of bridge area CRTSIII template base board construction methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710249139.3A CN106894296A (en) 2017-04-17 2017-04-17 A kind of bridge area CRTSIII template base board construction methods

Publications (1)

Publication Number Publication Date
CN106894296A true CN106894296A (en) 2017-06-27

Family

ID=59196957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710249139.3A Pending CN106894296A (en) 2017-04-17 2017-04-17 A kind of bridge area CRTSIII template base board construction methods

Country Status (1)

Country Link
CN (1) CN106894296A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107988852A (en) * 2017-11-27 2018-05-04 中交隧道工程局有限公司 The construction method of III plate-type non-fragment orbit new structures of tunnel location CRTS

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101195983A (en) * 2007-12-29 2008-06-11 中铁二局股份有限公司 Unballasted track bed plate construction method
KR20140076937A (en) * 2012-12-13 2014-06-23 강남훈 3D precast slab track manufacturing device
CN104480802A (en) * 2014-11-20 2015-04-01 中铁八局集团有限公司 Construction method of CRTS III plate type ballastless track
CN105755915A (en) * 2016-02-29 2016-07-13 中铁十二局集团第七工程有限公司 Construction method for CRTS III plate type ballastless track bed plate

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101195983A (en) * 2007-12-29 2008-06-11 中铁二局股份有限公司 Unballasted track bed plate construction method
KR20140076937A (en) * 2012-12-13 2014-06-23 강남훈 3D precast slab track manufacturing device
CN104480802A (en) * 2014-11-20 2015-04-01 中铁八局集团有限公司 Construction method of CRTS III plate type ballastless track
CN105755915A (en) * 2016-02-29 2016-07-13 中铁十二局集团第七工程有限公司 Construction method for CRTS III plate type ballastless track bed plate

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
于硕: "合福客专桥上CRTSI 型双块式无砟轨道底座板施工技术", 《辽宁省交通高等专科学校学报》 *
史升亮: "CRTSⅢ型板式无砟轨道结构技术研究", 《铁道建筑技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107988852A (en) * 2017-11-27 2018-05-04 中交隧道工程局有限公司 The construction method of III plate-type non-fragment orbit new structures of tunnel location CRTS

Similar Documents

Publication Publication Date Title
CN106868959B (en) A kind of method that high ferro non-fragment orbit circuit is quickly repaired
CN101503870B (en) Construction method for two-block unballasted track bed board
CN101748662B (en) Construction process for double-block ballastless track bed on subgrade
CN105755915B (en) The plate-type unballasted track bed plate construction methods of CRTS III
CN110541329B (en) Construction method of ballastless track of heavy haul railway tunnel group
CN104480802A (en) Construction method of CRTS III plate type ballastless track
CN101063289B (en) City-rail steel spring floating slab rail bed railroad switch construction method
CN109706846B (en) High and narrow bridge capping beam through steel bar construction method for slope foundation
CN101418535A (en) Construction method of monolithic road-bed in rail tunnel
CN107574762A (en) A kind of construction method for strengthening Cast-in-situ Beam 0# block construction qualities
CN104264543B (en) The construction method of sharp radius curve non-fragment orbit
CN103643603A (en) Ballastless track construction method for laying sleepers and assembling track panel
CN107313314A (en) A kind of metro depot reserves column inspection hole track construction method
CN107090777A (en) A kind of T beam manufacture methods for reducing blibbing
CN106120835B (en) A kind of circle concrete structures toe board panel guide rail and its levelling construction
CN110396937A (en) The asynchronous construction of hollow thin-walled high pier binder pier beam
CN112411265A (en) Ballastless track structure suitable for large-span bridge and mounting method
CN109235891A (en) A kind of Large Span Prestressed Beam concrete pitched roof jump storehouse method construction method
CN101413236A (en) CRTS II type double-block type non-fragment rail bed board construction method
CN110468638A (en) A kind of road bed board concreting and plastering technique
CN110424194A (en) The prefabricated ballast bed structure of vibration isolator and its construction method on a kind of bridge
CN110080299A (en) A kind of shallow embedding mountain tunnel open-cut engineering method
CN106894296A (en) A kind of bridge area CRTSIII template base board construction methods
CN106567328A (en) Half-prefabricated reinforced concrete wall-type guardrail construction process
CN206245730U (en) A kind of cast-in-place pitched roof double template structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170627