CN105755915B - The plate-type unballasted track bed plate construction methods of CRTS III - Google Patents

The plate-type unballasted track bed plate construction methods of CRTS III Download PDF

Info

Publication number
CN105755915B
CN105755915B CN201610110442.0A CN201610110442A CN105755915B CN 105755915 B CN105755915 B CN 105755915B CN 201610110442 A CN201610110442 A CN 201610110442A CN 105755915 B CN105755915 B CN 105755915B
Authority
CN
China
Prior art keywords
bedplate
template
plate
track bed
construction methods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610110442.0A
Other languages
Chinese (zh)
Other versions
CN105755915A (en
Inventor
刘军
陈谦
苏陵云
曾韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Seventh Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
Seventh Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seventh Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical Seventh Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority to CN201610110442.0A priority Critical patent/CN105755915B/en
Publication of CN105755915A publication Critical patent/CN105755915A/en
Application granted granted Critical
Publication of CN105755915B publication Critical patent/CN105755915B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/005Making of concrete parts of the track in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/10Making longitudinal or transverse sleepers or slabs in situ or embedding them

Abstract

The invention discloses a kind of plate-type unballasted track bed plate construction methods of CRTS III and leveling frock.Method comprises the following steps, S1:Preparation of construction;S2:Reinforcement installation;S3:Model sheetinstallat;S4:Frock is flattened to install;S5:Concreting is simultaneously flattened;S6:Form removal.The plate-type unballasted track bed plate construction methods of CRTS III of the present invention have the advantages that strong applicability, utilization rate are high, easy to operate, can improve operating efficiency and quality, reduction manual work intensity.

Description

The plate-type unballasted track bed plate construction methods of CRTS III
Technical field
Constructed the present invention relates to plate-type ballastless track construction technology, more particularly to the plate-type unballasted track bed plates of CRTS III Method.
Background technology
The template non-fragment orbits of CRTS III have shoulder block fastener, precast track plate, self-compacting concrete to fill by rail, elasticity Layer, limited impression, intermediate isolating layer(Geotextiles)With reinforced concrete footing plate composition, with performance stabilization, good endurance, make The features such as using long lifespan.The plate-type unballasted track bed plates of CRTS III are used as the supporting course between track plates and beam face and slip Layer, top surface absolute altitude, flatness control require high, and precision is difficult to ensure that.
The content of the invention
The technical problem to be solved in the present invention be overcome the deficiencies in the prior art there is provided a kind of strong applicability, utilization rate it is high, The plate-type unballasted track bed plates of CRTS III that are easy to operate, can improving operating efficiency and quality, reduce manual work intensity are applied Work method.
In order to solve the above technical problems, the present invention uses following technical scheme:
A kind of plate-type unballasted track bed plate construction methods of CRTS III, comprise the following steps:
S1:Preparation of construction:Complete beam face dabbing to check and check and accept, organization material, equipment are marched into the arena, four of measurement bedplate Angle point and setting-out, record setting-out point height, and the angle point line between four angle points is ejected with the line of ink marker;
S2:Reinforcement installation:Two layers of laying of reinforced mesh point, first lays bottom layer of the reinforcing steel mesh sheet according to angle point line, then in beam L-shaped connection reinforcing bar is installed in the pre-buried branch sleeve in face, after the completion of lay top layer reinforced mesh, and reinforcement bar support is connected by L-shaped Support is fixed, with U-shaped bar connecting levels reinforced mesh formation framework of steel reinforcement, U-shaped shape muscle bottom and reinforced mesh cage bar termination Alignment colligation;
S3:Model sheetinstallat:The installation position line of bedplate side template has first been set in beam face bullet, from the span centre position in beam face to Two ends assembly side template, in place and reinforces side template according to installation position line, after side template is installed, installs fixed expansion joint Template;Limited impression template is installed with locating rack again, first locating rack is arranged at the top of bedplate side template, then by limited impression Limited impression template is welded and fixed by model sheetinstallat on the crossbeam of locating rack with bedplate reinforced mesh, then removes locating rack, And bedplate top surface elevation line is indicated on the inside of template;
S4:Frock is flattened to install:The walking track of leveling frock is installed at the top of along side template, the vehicle with walking machine of frock will be flattened Set up into walking track, and be connected to the floating rule below walking mechanism and be placed between two side templates of bedplate, adjust floating rule Elevation of bottom, makes it meet base plate top surface absolute altitude requirement;
S5:Concreting is simultaneously flattened:First beam face is sprinkled water and soaked, then start to pour, vibrated concrete, concrete vibrating After closely knit, two people simultaneously advance leveling frock in bedplate both sides and carry out base plate top surface leveling warehouse, and leveling is until scrape repeatedly Untill chi lower concrete enriches;
S6:Form removal:Before concrete initial set, limited impression template and templates for expansion joints are removed, before concrete final set, bottom is carried out The press polish of seat board concrete surface is handled, and eliminates cup shake, sand holes, bubble, and concrete strength is reached after more than 2.5Mpa, removes bottom Two side templates of seat board.
It is used as the further improvement of above-mentioned technical proposal:
When performing step S2, when the pre-buried branch sleeve in beam face is if any damaged, missing or larger position deviation, bored Hole bar planting processing, bar planting depth is no less than 200mm.
During the U-shaped steel bar meter of 3 in Curve Segment, U-shaped reinforcing bar height change oblique line is first drawn, it is determined that high per hole beam U-shaped reinforcing bar Degree, according to the corresponding U-shaped muscle height per hole beam during colligation, by U-shaped reinforcing bar colligation to correspondence position after measurement is accurate.
When performing step S3, side template uses composite assembly punching block, and straightway construction uses monolithic punching block, and curved section is applied In man-hour, it will be superimposed and be connected by screw bolts above and below two pieces of punching blocks, adjusting screw rod is set between punching block and beam face, adjusted by adjusting Screw rod, makes side form plate top surface absolute altitude meet bedplate concreting requirement.
When monolithic punching block is constructed, in punching block outer beams face, steel bar end is squeezed into drilling, wedges timber wedge fixed form;Two pieces of punching blocks When being superimposed assembling construction up and down, template adjustment is carried out with reinforcing by flange adjusting screw rod in punching block mechanical junction, it is ensured that side Mold plate verticality and stability.
When performing step S5, promote and pour from one end to the other side along beam body longitudinal direction, one-shot forming;Or from limited impression Place is poured in the middle of groove to surrounding, extrudes laitance;Or poured from the downside of curved section to high side;When vibrating, vibrating head with it is each Template keeps 5cm-10cm distances.
During leveling, special messenger's follow-up leveling frock simultaneously observes floating rule lower concrete situation, and any excess concrete is rooted out in time simultaneously It is artificial behind floating rule receipts face to receive face to cavity place's feed supplement, after the completion of check flatness with 5m guiding rulers, unqualified place's progress is secondary to repair Mend.
When performing step S6, remove after limited impression template and templates for expansion joints, troweling is carried out to limited impression and is examined Physical dimension is looked into, it is underproof to be repaired;Faulting of slab ends situation, expansion joint width and smooth-going situation between bedplate are checked, if any scarce Limit repair process.
Compared with prior art, the advantage of the invention is that:
The plate-type unballasted track bed plate construction methods of CRTS III of the present invention, using assembled punching block, strong applicability, utilization Rate is high, assembly and disassembly are flexible;Bedplate upper surface is flattened using special leveling frock, manual operation amount is effectively reduced, protected Base plate top surface absolute altitude, flatness quality have been demonstrate,proved, construction efficiency has been improved, accelerates construction speed.
Brief description of the drawings
Fig. 1 is the flow chart of the plate-type unballasted track bed plate construction methods of CRTS III of the present invention.
Fig. 2 is the leveling tool structure schematic diagram for the present invention.
Each label is represented in figure:
1st, walking mechanism;11st, entablature;12nd, lifting screw;13rd, directive wheel;2nd, floating rule;3rd, walking track;4th, shake flat Machine;5th, side template.
Embodiment
Fig. 1 shows a kind of flow of the plate-type unballasted track bed plate construction method embodiments of CRTS III of the present invention, The construction method comprises the following steps:
S1:Preparation of construction:Complete beam face dabbing to check and check and accept, organization material, equipment are marched into the arena, four of measurement bedplate Angle point and setting-out, record setting-out point height, and the angle point line between four angle points is ejected with the line of ink marker;
S2:Reinforcement installation:Two layers of laying of reinforced mesh point, first lays bottom layer of the reinforcing steel mesh sheet according to angle point line, then in beam L-shaped connection reinforcing bar is installed in the pre-buried branch sleeve in face, after the completion of lay top layer reinforced mesh, and reinforcement bar support is connected by L-shaped Support is fixed, with U-shaped bar connecting levels reinforced mesh formation framework of steel reinforcement, U-shaped shape muscle bottom and reinforced mesh cage bar termination Alignment colligation;
S3:Model sheetinstallat:The installation position line of bedplate side template 5, the span centre position from beam face have first been set in beam face bullet To the assembled side template 5 of two ends, side template 5 in place and is reinforced according to installation position line, after side template 5 is installed, installs and fixes Templates for expansion joints;Installed again with locating rack in limited impression template, the present embodiment, locating rack uses channel-section steel welding production, by fixed Position frame, positioning crossbeam, adjusting screw rod and connecting bolt composition, are first arranged on the top of bedplate side template 5 by locating rack, then will limit Position groove template is arranged on the crossbeam of locating rack, and regulation adjusting bolt makes limited impression template top surface absolute altitude meet after requirement, Limited impression template is welded and fixed with bedplate reinforced mesh with 10mm round steel, then removes locating rack;Using CPIII track controls The system net measurement elevation of side template 5 and plan-position, secondary fine setting is carried out after calibration, after the completion of fine setting, and side template 5 is measured again and is pushed up Face elevation, and the top surface of side template 5 is calculated to bedplate designed elevation distance, then in the inner side of side template 5 sign bedplate top surface Elevation line;
S4:Frock is flattened to install:The walking track 3 of leveling frock is installed along the top of side template 5, the walking of frock will be flattened Walking track 3 is inserted by mechanism 1, and the floating rule 2 being connected to below walking mechanism 1 is placed between two side templates 5 of bedplate, is adjusted The whole elevation of bottom of floating rule 2, makes it meet base plate top surface absolute altitude requirement;
S5:Concreting is simultaneously flattened:First beam face is sprinkled water and soaked, then start to pour, vibrated concrete, concrete vibrating After closely knit, two people simultaneously advance leveling frock in bedplate both sides and carry out base plate top surface leveling warehouse, and leveling is until scrape repeatedly Untill the lower concrete of chi 2 enriches, and ensure that base plate top surface and the base plate top surface elevation line of the inner side of side template 5 sign are put down Together;
S6:Form removal:Before concrete initial set, limited impression template and templates for expansion joints are removed, before concrete final set, bottom is carried out The press polish of seat board concrete surface is handled, and eliminates cup shake, sand holes, bubble, and concrete strength is reached after more than 2.5Mpa, removes bottom Two side templates 5 of seat board.
The plate-type unballasted track bed plate construction methods of CRTS III of the present invention, using assembled punching block, strong applicability, utilization Rate is high, assembly and disassembly are flexible;Bedplate upper surface is flattened using special leveling frock, manual operation amount is effectively reduced, protected Base plate top surface absolute altitude, flatness quality have been demonstrate,proved, construction efficiency has been improved, accelerates construction speed.Using Zheng Xu's Line for Passenger Transportation as Example, completes 11.59 kilometers of bedplate constructions, the time has been saved more in the original plan 18 days, saved 520,000 yuan of engineering cost.
In the present embodiment, when performing step S2, the pre-buried branch sleeve in beam face if any damaged, missing or position deviation compared with When big, steel planting processing is carried out, bar planting depth is no less than 200mm.
In the present embodiment, during the U-shaped steel bar meter of 3 in Curve Segment, U-shaped reinforcing bar height change oblique line is first drawn, it is determined that per hole Beam U-shaped reinforcing bar height, according to the corresponding U-shaped muscle height per hole beam during colligation, by U-shaped reinforcing bar colligation to correspondence position after measurement is accurate Put.
In the present embodiment, when performing step S3, side template 5 uses composite assembly punching block, high according to straightway bedplate Degree and Design of length monolithic punching block size, the monolithic punching block high 20cm of the present embodiment, the 1/2 of a length of bedplate length.Straightway Construction uses monolithic punching block, when curved section is constructed, will be superimposed and is connected by screw bolts above and below two pieces of punching blocks, between punching block and beam face Adjusting screw rod is set, by adjusting adjusting screw rod, the top surface absolute altitude of side template 5 is met bedplate concreting requirement.
In the present embodiment, when monolithic punching block is constructed, in punching block outer beams face, steel bar end is squeezed into drilling, wedges timber wedge stent Plate;When being superimposed assembling construction above and below two pieces of punching blocks, in the mechanical junction of punching block by flange adjusting screw rod carry out template adjustment with Reinforce, it is ensured that the perpendicularity of side template 5 and stability.
In the present embodiment, when performing step S5, promote and pour from one end to the other side along beam body longitudinal direction, one-shot forming; Or poured at limited impression in the middle of groove to surrounding, extrude laitance;Or poured from the downside of curved section to high side;Vibrate When, vibrating head keeps 5cm-10cm distances with each template.
In the present embodiment, during leveling, special messenger's follow-up leveling frock simultaneously observes the lower concrete situation of floating rule 2, roots out in time Any excess concrete and to cavity place's feed supplement, it is artificial behind the receipts face of floating rule 2 to receive face, after the completion of with 5m guiding rulers inspection flatness, it is unqualified Place carries out secondary repairing.
In the present embodiment, when performing step S6, remove after limited impression template and templates for expansion joints, limited impression is entered Row troweling simultaneously checks physical dimension, underproof to be repaired;Check faulting of slab ends situation, expansion joint width and smooth-going feelings between bedplate Condition, if any scarce limit repair process.
Fig. 2 shows the leveling frock for the above-mentioned plate-type unballasted track bed plate construction methods of CRTS III, the leveling Frock includes walking mechanism 1, floating rule 2 and the walking track 3 being installed on the side template 5 of bedplate, and walking mechanism 1 includes upper Crossbeam 11, lifting screw 12 and a pair of directive wheels 13, a pair of directive wheels 13 are divided into the two ends of entablature 11, and directive wheel 13 is placed in Walk in track 3, what the liftable of lifting screw 12 was adjusted is installed in the middle part of entablature 11, floating rule 2 is connected under lifting screw 12 End, the middle part of floating rule 2 is equiped with the flat machine 4 that shakes.The present invention's is used for the whole of the plate-type unballasted track bed plate construction methods of CRTS III Flat frock, its is simple in construction, easy to operate, is greatly improved screed operation efficiency and quality, and effectively reduce people's work Industry amount, reduces labor intensity.
Although the present invention is disclosed above with preferred embodiment, but is not limited to the present invention.It is any to be familiar with ability The technical staff in domain, in the case where not departing from technical solution of the present invention scope, all using the technology contents pair of the disclosure above Technical solution of the present invention makes many possible variations and modification, or is revised as the equivalent embodiment of equivalent variations.Therefore, it is every Without departing from the content of technical solution of the present invention, according to the technology of the present invention essence to any simple modification made for any of the above embodiments, Equivalent variations and modification, all should fall in the range of technical solution of the present invention protection.

Claims (8)

1. a kind of plate-type unballasted track bed plate construction methods of CRTS III, it is characterised in that comprise the following steps:
S1:Preparation of construction:Complete beam face dabbing to check and check and accept, organization material, equipment are marched into the arena, and measure four angle points of bedplate And setting-out, setting-out point height is recorded, the angle point line between four angle points is ejected with the line of ink marker;
S2:Reinforcement installation:Two layers of laying of reinforced mesh point, first lays bottom layer of the reinforcing steel mesh sheet according to angle point line, then pre- in beam face In the branch sleeve buried install L-shaped connection reinforcing bar, after the completion of lay top layer reinforced mesh, and by L-shaped connect reinforced bar support consolidate Fixed, with U-shaped bar connecting levels reinforced mesh formation framework of steel reinforcement, U-shaped shape muscle bottom is alignd with reinforced mesh cage bar termination Colligation;
S3:Model sheetinstallat:First bedplate side template has been set in beam face bullet(5)Installation position line, from the span centre position in beam face to Two ends assembly side template(5), according to installing position line by side template(5)It is in place and reinforce, side template(5)After installation, install Fixed templates for expansion joints;Limited impression template is installed with locating rack again, locating rack is first arranged on bedplate side template(5)Top Portion, then by limited impression model sheetinstallat on the crossbeam of locating rack, limited impression template and bedplate reinforced mesh are welded solid It is fixed, then remove locating rack, and the sign bedplate top surface elevation line on the inside of template;
S4:Frock is flattened to install:Along side template(5)Top is installed by the walking track of leveling frock(3), the walking of frock will be flattened Mechanism(1)Insert walking track(3), and it is connected to walking mechanism(1)The floating rule of lower section(2)It is placed in two side templates of bedplate (5)Between, adjust floating rule(2)Elevation of bottom, makes it meet base plate top surface absolute altitude requirement;
S5:Concreting is simultaneously flattened:First beam face is sprinkled water and soaked, then start to pour, vibrated concrete, concrete vibrating is closely knit Afterwards, two people simultaneously advance leveling frock in bedplate both sides and carry out base plate top surface leveling warehouse, and leveling is until floating rule repeatedly(2) Untill lower concrete enriches;
S6:Form removal:Before concrete initial set, limited impression template and templates for expansion joints are removed, before concrete final set, bedplate is carried out Concrete surface press polish is handled, and eliminates cup shake, sand holes, bubble, and concrete strength is reached after more than 2.5Mpa, removes bedplate Two side templates(5).
2. the plate-type unballasted track bed plate construction methods of CRTS III according to claim 1, it is characterised in that:Performing During step S2, when the pre-buried branch sleeve in beam face is if any damaged, missing or larger position deviation, steel planting processing is carried out, is planted Muscle depth is no less than 200mm.
3. the plate-type unballasted track bed plate construction methods of CRTS III according to claim 2, it is characterised in that:Curve During the U-shaped steel bar meter of section, first draw U-shaped reinforcing bar height change oblique line, it is determined that the height per hole beam U-shaped reinforcing bar, during colligation according to The corresponding U-shaped muscle height per hole beam, by U-shaped reinforcing bar colligation to correspondence position after measurement is accurate.
4. the plate-type unballasted track bed plate construction methods of CRTS III according to any one of claim 1 to 3, its feature It is:When performing step S3, side template(5)Using composite assembly punching block, straightway construction uses monolithic punching block, and curved section is applied In man-hour, it will be superimposed and be connected by screw bolts above and below two pieces of punching blocks, adjusting screw rod is set between punching block and beam face, adjusted by adjusting Screw rod, makes side template(5)Top surface absolute altitude meets bedplate concreting requirement.
5. the plate-type unballasted track bed plate construction methods of CRTS III according to claim 4, it is characterised in that:Monolithic steel When mould is constructed, in punching block outer beams face, steel bar end is squeezed into drilling, wedges timber wedge fixed form;Assembly is superimposed above and below two pieces of punching blocks to apply In man-hour, template adjustment is carried out with reinforcing by flange adjusting screw rod in punching block mechanical junction, it is ensured that side template(5)Perpendicularity and Stability.
6. the plate-type unballasted track bed plate construction methods of CRTS III according to any one of claim 1 to 3, its feature It is:When performing step S5, promote and pour from one end to the other side along beam body longitudinal direction, one-shot forming;Or at limited impression Poured in the middle of groove to surrounding, extrude laitance;Or poured from the downside of curved section to high side;When vibrating, vibrating head and each mould Plate keeps 5cm-10cm distances.
7. the plate-type unballasted track bed plate construction methods of CRTS III according to claim 6, it is characterised in that:Leveling When, special messenger's follow-up leveling frock simultaneously observes floating rule(2)Lower concrete situation, roots out any excess concrete and to being mended at cavity in time Material, floating rule(2)It is artificial behind receipts face to receive face, after the completion of check flatness with 5m guiding rulers, unqualified place carries out secondary repairing.
8. the plate-type unballasted track bed plate construction methods of CRTS III according to any one of claim 1 to 3, its feature It is:When performing step S6, remove after limited impression template and templates for expansion joints, troweling is carried out to limited impression and checks several What size, it is underproof to be repaired;Faulting of slab ends situation, expansion joint width and smooth-going situation between bedplate are checked, is repaiied if any scarce limit Multiple processing.
CN201610110442.0A 2016-02-29 2016-02-29 The plate-type unballasted track bed plate construction methods of CRTS III Active CN105755915B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610110442.0A CN105755915B (en) 2016-02-29 2016-02-29 The plate-type unballasted track bed plate construction methods of CRTS III

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610110442.0A CN105755915B (en) 2016-02-29 2016-02-29 The plate-type unballasted track bed plate construction methods of CRTS III

Publications (2)

Publication Number Publication Date
CN105755915A CN105755915A (en) 2016-07-13
CN105755915B true CN105755915B (en) 2017-07-25

Family

ID=56329889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610110442.0A Active CN105755915B (en) 2016-02-29 2016-02-29 The plate-type unballasted track bed plate construction methods of CRTS III

Country Status (1)

Country Link
CN (1) CN105755915B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106012717B (en) * 2016-08-04 2017-11-03 中铁十七局集团第三工程有限公司 One kind is vibrated apparatus for leveling
CN106049206B (en) * 2016-08-04 2018-02-06 中铁十七局集团第三工程有限公司 The non-fragment orbit base cast running gear that vibrates
CN106272952B (en) * 2016-08-12 2018-10-12 中铁三局集团有限公司 Construction method is adjusted to the dual-direction pre-tensioning system prestressed track plate formwork camber of III types of CRTS
CN106320114A (en) * 2016-09-07 2017-01-11 中国铁路总公司 Method for repairing damage to high-speed-railway base plate concrete
CN106758586B (en) * 2016-12-16 2018-08-31 沈阳铁道勘察设计院有限公司 The method that railway is reinforced on sharp radius curve and easement curve
CN106894296A (en) * 2017-04-17 2017-06-27 中铁二十二局集团第工程有限公司 A kind of bridge area CRTSIII template base board construction methods
CN106988164A (en) * 2017-05-09 2017-07-28 中铁二十二局集团第工程有限公司 Platy ballastless track structure and its construction method
CN107119514A (en) * 2017-05-15 2017-09-01 中铁四局集团机电设备安装有限公司 A kind of complete frock of the plate-type unballasted track bed plates of CRTS III construction
CN110219246A (en) * 2019-06-18 2019-09-10 中铁十六局集团有限公司 A kind of large span flexible bridge Construction of Ballastless Track method
CN112376327A (en) * 2020-11-13 2021-02-19 中国铁路设计集团有限公司 Construction method of high-speed rail ballastless track bed plate
CN112681034B (en) * 2020-12-23 2022-11-04 中交路桥华南工程有限公司 Concrete leveling control method
CN113584957A (en) * 2021-07-07 2021-11-02 高速铁路建造技术国家工程实验室 Two-stage bolt-anchor assembling integral type track unit and bolt-anchor assembling integral type track
CN116516746A (en) * 2023-05-10 2023-08-01 中国水利水电第四工程局有限公司 Construction method for base plate of ballastless track of high-speed rail

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1318239A1 (en) * 2001-12-05 2003-06-11 Alstom Method for building a ballastless track
CN203593923U (en) * 2013-12-10 2014-05-14 中交一公局第六工程有限公司 CRTS III slab ballastless track construction tool
CN203668774U (en) * 2014-01-07 2014-06-25 中铁建工集团北京机械制造有限公司 High-speed rail CRTS III type ballastless track board floating preventing mechanism used during grouting
CN104480802A (en) * 2014-11-20 2015-04-01 中铁八局集团有限公司 Construction method of CRTS III plate type ballastless track

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1318239A1 (en) * 2001-12-05 2003-06-11 Alstom Method for building a ballastless track
CN203593923U (en) * 2013-12-10 2014-05-14 中交一公局第六工程有限公司 CRTS III slab ballastless track construction tool
CN203668774U (en) * 2014-01-07 2014-06-25 中铁建工集团北京机械制造有限公司 High-speed rail CRTS III type ballastless track board floating preventing mechanism used during grouting
CN104480802A (en) * 2014-11-20 2015-04-01 中铁八局集团有限公司 Construction method of CRTS III plate type ballastless track

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
"CRTSⅢ型板式无砟轨道底座板施工技术";任宏伟;《铁道建筑技术》;20150820(第8期);第86-87页第4节 *
"谈桥梁地段CRTSⅢ型板式无砟轨道施工工艺";惠宝;《山西建筑》;20150510;第41卷(第14期);第178页第5.2节、附图1 *
"高速铁路无砟轨道Ⅲ型板施工关键技术的研究与应用";刘文解;《建筑施工》;20150225;第37卷(第2期);第211页第3节 *

Also Published As

Publication number Publication date
CN105755915A (en) 2016-07-13

Similar Documents

Publication Publication Date Title
CN105755915B (en) The plate-type unballasted track bed plate construction methods of CRTS III
CN100587165C (en) Cast-in-situ beam-making construction method of assembled support
CN101481902A (en) V type pier inclined leg combined type support for continuous rigid frame bridge and layered cast-in-situ construction method
CN103321111B (en) Streetcar track connects the construction method of paving
CN106906758A (en) A kind of culvert fluid pressure type entire combination moving die plate
CN101985826A (en) Construction method for high-altitude section prefabricating, beam moving, beam storing and assembling of large concrete box beam
MX2010007687A (en) Apparatus and method for replacing a bridge using pre-cast construction techniques.
CN111576235A (en) BIM-based No. 0 block longitudinal prestressed pipeline positioning construction method
CN111074943A (en) Construction method for integrally casting inspection well shaping steel mould in situ
CN101413236A (en) CRTS II type double-block type non-fragment rail bed board construction method
CN102797223B (en) Construction method for cast-in-place of continuous beam at turnout junction for passenger transport line in seawall area by false work method
CN107725066B (en) Prefabricated box culvert and layout method thereof
CN111648169A (en) Elastic supporting block type integral ballast bed rapid construction method
CN110541332A (en) construction method of railway integral ballast bed in narrow tunnel
CN106988339A (en) Sandy gravel stratum piping lane construction technology
CN101768906B (en) Double-line construction method for double-block ballastless track bed board of railway passenger special line
CN102852066A (en) Precise installation method for expansion joint of concrete roadway type steel
CN106638183A (en) Urban rail transit assembly board type high precision rail base cast-in-place construction method
CN109112903A (en) Solid concrete roabed trackless construction technology is cheated in a kind of phase library inner column formula inspection
CN110468723B (en) Installation and construction method for wrapping steel plate outside main pier of swivel bridge
CN110374012A (en) A kind of prefabricated engineering method of T beam original position Support Method
CN111851155A (en) Steel spring floating plate construction method based on concentric tunnel of line tunnel
CN113818352B (en) Soft foundation high pier curve cast-in-situ box girder bridge and construction method thereof
JP2009121143A (en) Platform forming body and platform setting method
CN206859018U (en) The Combined formwork structure being exclusively used in airport pavement concrete construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant