CN102852066A - Precise installation method for expansion joint of concrete roadway type steel - Google Patents

Precise installation method for expansion joint of concrete roadway type steel Download PDF

Info

Publication number
CN102852066A
CN102852066A CN201110183821XA CN201110183821A CN102852066A CN 102852066 A CN102852066 A CN 102852066A CN 201110183821X A CN201110183821X A CN 201110183821XA CN 201110183821 A CN201110183821 A CN 201110183821A CN 102852066 A CN102852066 A CN 102852066A
Authority
CN
China
Prior art keywords
steel
shaped steel
expansion joint
bolt
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110183821XA
Other languages
Chinese (zh)
Inventor
李先国
谭志斌
张志敏
郭磊
徐文兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201110183821XA priority Critical patent/CN102852066A/en
Publication of CN102852066A publication Critical patent/CN102852066A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to concrete roadway construction method, and specially a precise installation method for expansion joint of concrete roadway type steel. The method includes pre-burying expansion joint distribution steel in advance; clearing provided groove bottom, fully laying plastic cloth, filling yellow sand to bottom part of asphalt surface layer to elevation, spreading asphalt, and rolling; putting lines according to design requirement, cutting the provided expansion joint position, and clearing; welding shaped steel regulating device by adopting nuts and bolts; burying and fixing the shaped steel regulating device in reinforced concrete; installing shaped steel, preliminarily fixing steel expansion joint, and interval-fixing bolts after meeting requirement; assembling steel bars, and arranging molds; performing flatness precise detection, and adopting shaped steel regulating device to regulate flatness precise regulation; pouring steel fiber reinforced concrete; and demolding, and installing rubber water-stop belt. The invention reduces construction cost, and improves installation quality.

Description

The accurate mounting method of concrete road type steel expansion joint
Technical field
The present invention relates to the concrete road construction, relate in particular to the construction method of installation of concrete road type steel expansion joint.
Background technology
In municipal administration, highway and Bridge Construction, the type steel expansion joint construction is more and more general, and job practices also is varied, and construction quality is uneven.Some method inefficiency not only wherein, and the installation quality precision is not guaranteed yet.Therefore, in the execution control process, fail to embody efficient, convenient, characteristics accurately.Such as common are following two kinds of methods:
Method one is to adopt the method for the control planeness of shaped steel+guiding ruler that the shrinkage joint is installed:
1, shifts to an earlier date pre-buried shrinkage joint distribution reinforcement for the globality that guarantees concrete structure and shrinkage joint.
2, completely spread Polypropylence Sheet and yellow ground is filled to the asphalt surface course elevation of bottom at the bottom of preformed groove, the pitch that paves rolls.
3, according to the designing requirement unwrapping wire, cut out reserving good position, shrinkage joint flexible pavement, and clean out;
4, begin to install shaped steel.In road design horizontal wall inscription side slope point, type steel expansion joint overlapped points etc. shaped steel is set, and assurance shaped steel bottom contacts closely with flexible pavement, firm, utilize guiding ruler and clearance gauge to check whether the steel shrinkage joint flushes with road structure, and after meeting the requirements, adopt reinforcing bar that type steel expansion joint and shaped steel are welded, fixedly the shrinkage joint absolute altitude.
6, build steel fibrous concrete;
7, rubber fastening band is installed in form removal.
There is following point in this method:
1, after type steel expansion joint is fixed, can't again adjust its planeness.
2, can't again adjust after the local absolute altitude variation of type steel expansion joint that in work progress, causes having fixed.
The shaped steel magnitude setting is more when 3, constructing at long shrinkage joint, needs a large amount of manpower when shaped steel is set, and causes the waste of manpower.And the method carry out large batch of shrinkage joint when constructing simultaneously input manpower and materials larger.
4, type steel expansion joint difficulty when absolute altitude carries out trickle adjustment is large, and loaded down with trivial details.
Method two, the method that adopts the supporting fixing steel plate of type steel expansion joint to carry out planeness control is installed the shrinkage joint,
The main distinction of the method and method one is in the adjustment mode of absolute altitude:
Adopt the 3m guiding ruler to adjust deformed steel end face absolute altitude, utilize mortar, rubble etc. deformed steel to be fixed temporarily.
Fixing steel plate is fixedly welded on the pre-buried spacer bars of concrete structure.
The deficiency that wherein exists is: after deformed steel is temporary fixed, the absolute altitude of unavoidable deformed steel changes to some extent in this process, after finishing, the fixing steel plate welding can't again carry out the planeness adjustment to deformed steel, therefore cause the type steel expansion joint planeness to meet design requirement, cause during driving and jump the car sense, simultaneously, difficulty was large when type steel expansion joint carried out trickle adjustment at absolute altitude, and loaded down with trivial details.Further cause sexy shrinkage joint localized hyperthermia during a large amount of fixing steel plate welding, cause the shaped steel distortion, affect its application life.
Summary of the invention
The present invention is intended to address the aforementioned drawbacks, and provides a kind of concrete road type steel expansion joint accurate mounting method.The present invention reduces construction machinery and constructor, greatly reduces construction cost, and has improved installation quality, has shortened the construction period.
For addressing the above problem, the accurate mounting method of a kind of concrete road type steel expansion joint, it comprises the following steps:
Step 1 shifts to an earlier date pre-buried shrinkage joint distribution reinforcement;
Step 2 at the bottom of the cleaning preformed groove, and is filled to the asphalt surface course elevation of bottom with yellow ground after completely spreading Polypropylence Sheet, and the pitch that paves rolls;
Step 3 according to the designing requirement unwrapping wire, cuts out reserving good position, shrinkage joint, and cleans out;
Step 4 adopts common nut and bolt, is welded into a shaped steel adjusting device, and described shaped steel adjusting device comprises bolt;
Step 5 is buried expansion bolt underground in steel concrete, fixedly the shaped steel adjusting device;
Step 6 is installed shaped steel, and tentatively fixedly the steel shrinkage joint checks with guiding ruler and clearance gauge whether the steel shrinkage joint flushes with road structure, after meeting the requirements, and the interval set bolt;
Step 7, assembling reinforcement installs template;
Step 8 is carried out planeness with guiding ruler and clearance gauge and is accurately checked, utilizes the shaped steel adjusting device to carry out the accurate leveling of planeness;
Step 9 is built steel fibrous concrete;
Step 10, rubber fastening band is installed in form removal.
The accurate mounting method of described concrete road type steel expansion joint, described shaped steel adjusting device comprises a framework, be screwed with a bolt from the top of this framework, also be screwed with a bolt from this framework below, this bolt is provided with two and lays respectively at the inside and outside nut of described framework.
The accurate mounting method of described concrete road type steel expansion joint, the bottom and upper segment of the framework of described shaped steel key regulating device are the nut that two two ends and framework dual-side weld together.
The present invention utilizes plain bolt and the simple and easy apparatus for regulating that shapes of nut, and by the height of bolt adjusting shaped steel, manufacture craft is simple, and is easy to make, and economic benefit is high, and construction quality easily guarantees.It is particularly convenient, easy to operate to use this method installation type steel expansion joint, and installation accuracy is controlled easily, in the similar engineering construction very high using value is arranged, and has larger popularization and application space.
Description of drawings
Below, the present invention is further illustrated by reference to the accompanying drawings:
Fig. 1 is shrinkage joint of the present invention scheme of installation;
Among the figure, 1 is concrete mechanism, and 2 is shrinkage joint shaped steel, and 3 is described adjusting device, and 4 is expansion bolt.
The specific embodiment
As shown in Figure 1: the accurate mounting method of a kind of concrete road type steel expansion joint, it comprises the following steps:
Step 1 shifts to an earlier date pre-buried shrinkage joint distribution reinforcement;
Step 2 at the bottom of the cleaning preformed groove, and is filled to the asphalt surface course elevation of bottom with yellow ground after completely spreading Polypropylence Sheet, and the pitch that paves rolls;
Step 3 according to the designing requirement unwrapping wire, cuts out reserving good position, shrinkage joint, and cleans out;
Step 4 adopts common nut and bolt, is welded into a shaped steel adjusting device 3,
Step 5 is buried expansion bolt 4 underground in steel concrete 1, fixedly the shaped steel adjusting device 3;
Step 6 is installed shaped steel 2, and tentatively fixedly the steel shrinkage joint checks with guiding ruler and clearance gauge whether the steel shrinkage joint flushes with road structure, after meeting the requirements, and the interval set bolt, pitch of bolts is that 1m(according to circumstances can suitably encrypt or strengthen distance);
Step 7, assembling reinforcement installs template;
Step 8 is carried out planeness with guiding ruler and clearance gauge and is accurately checked, utilizes the shaped steel adjusting device to carry out the accurate leveling of planeness;
Step 9 is built steel fibrous concrete;
Step 10, rubber fastening band is installed in form removal.
The accurate mounting method of described concrete road type steel expansion joint, described shaped steel adjusting device 3 comprises a framework, be screwed with a bolt from the top of this framework, also be screwed with a bolt from this framework below, this bolt is provided with two and lays respectively at the inside and outside nut of described framework.
The accurate mounting method of described concrete road type steel expansion joint, the bottom and upper segment of the framework of described shaped steel key regulating device are the nut that two two ends and framework dual-side weld together.

Claims (3)

1. the accurate mounting method of concrete road type steel expansion joint is characterized in that it comprises the following steps:
Step 1 shifts to an earlier date pre-buried shrinkage joint distribution reinforcement;
Step 2 at the bottom of the cleaning preformed groove, and is filled to the asphalt surface course elevation of bottom with yellow ground after completely spreading Polypropylence Sheet, carries out asphalt concrete pavement construction;
Step 3 according to the designing requirement unwrapping wire, cuts out reserving good position, shrinkage joint, and cleans out;
Step 4 adopts common nut and bolt, is welded into a shaped steel adjusting device, and described shaped steel adjusting device comprises bolt;
Step 5 is buried expansion bolt underground in steel concrete, fixedly the shaped steel adjusting device;
Step 6 is installed shaped steel, and tentatively fixedly the steel shrinkage joint checks with guiding ruler and clearance gauge whether the steel shrinkage joint flushes with road structure, after meeting the requirements, and the interval set bolt;
Step 7, assembling reinforcement installs template;
Step 8 is carried out planeness with guiding ruler and clearance gauge and is accurately checked, utilizes the adjustment of shaped steel adjusting device to carry out the accurate leveling of planeness;
Step 9 is built steel fibrous concrete;
Step 10, rubber fastening band is installed in form removal.
2. the accurate mounting method of concrete road type steel expansion joint according to claim 1, it is characterized in that, described shaped steel adjusting device comprises a framework, be screwed with a bolt from the top of this framework, also be screwed with a bolt from this framework below, this bolt is provided with two and lays respectively at the inside and outside nut of described framework.
3. the accurate mounting method of concrete road type steel expansion joint according to claim 1 and 2 is characterized in that, the bottom and upper segment of the framework of described shaped steel key regulating device is the nut that two two ends and framework dual-side weld together.
CN201110183821XA 2011-07-01 2011-07-01 Precise installation method for expansion joint of concrete roadway type steel Pending CN102852066A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110183821XA CN102852066A (en) 2011-07-01 2011-07-01 Precise installation method for expansion joint of concrete roadway type steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110183821XA CN102852066A (en) 2011-07-01 2011-07-01 Precise installation method for expansion joint of concrete roadway type steel

Publications (1)

Publication Number Publication Date
CN102852066A true CN102852066A (en) 2013-01-02

Family

ID=47399010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110183821XA Pending CN102852066A (en) 2011-07-01 2011-07-01 Precise installation method for expansion joint of concrete roadway type steel

Country Status (1)

Country Link
CN (1) CN102852066A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104775359A (en) * 2015-01-29 2015-07-15 同济大学 Bridge expansion joint device
CN104895340A (en) * 2015-06-18 2015-09-09 中建八局第四建设有限公司 Floor elevation pay-off rechecking device
CN107178031A (en) * 2017-04-07 2017-09-19 刘祖江 A kind of unit assembled prestressing force Multidirectional displacement bridge expansion device and installation method
CN109338877A (en) * 2018-12-10 2019-02-15 重庆交通大学 A kind of fast changeable precast bridge expansion gap device and its mounting structure
CN110593091A (en) * 2019-10-16 2019-12-20 中国十七冶集团有限公司 Precast block for bridge expansion joint and use method thereof
CN111809513A (en) * 2020-07-24 2020-10-23 中国十七冶集团有限公司 Expansion joint levelness adjusting device and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05148811A (en) * 1991-11-25 1993-06-15 Nitta Ind Corp Expansion joint for bridge
KR100734807B1 (en) * 2006-05-30 2007-07-06 홍석희 The structure that separated and integrated mutual between expansion joint, prestressed non-shrinkage concrete and bridge deck slab, the construction method of this
CN101270566A (en) * 2007-03-19 2008-09-24 黄垤树 Expanded joint structure capable of automatically adjusting gap
CN201158799Y (en) * 2008-02-23 2008-12-03 衡水中铁建工程橡胶有限责任公司 Bridge telescoping device
CN201406632Y (en) * 2009-04-28 2010-02-17 山西晋宇路桥材料有限责任公司 Bolt-anchored-type bridge-expansion-joint device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05148811A (en) * 1991-11-25 1993-06-15 Nitta Ind Corp Expansion joint for bridge
KR100734807B1 (en) * 2006-05-30 2007-07-06 홍석희 The structure that separated and integrated mutual between expansion joint, prestressed non-shrinkage concrete and bridge deck slab, the construction method of this
CN101270566A (en) * 2007-03-19 2008-09-24 黄垤树 Expanded joint structure capable of automatically adjusting gap
CN201158799Y (en) * 2008-02-23 2008-12-03 衡水中铁建工程橡胶有限责任公司 Bridge telescoping device
CN201406632Y (en) * 2009-04-28 2010-02-17 山西晋宇路桥材料有限责任公司 Bolt-anchored-type bridge-expansion-joint device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱海涛等: "桥梁伸缩缝的施工工艺", 《今日科苑》, no. 18, 23 September 2010 (2010-09-23), pages 110 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104775359A (en) * 2015-01-29 2015-07-15 同济大学 Bridge expansion joint device
CN104895340A (en) * 2015-06-18 2015-09-09 中建八局第四建设有限公司 Floor elevation pay-off rechecking device
CN107178031A (en) * 2017-04-07 2017-09-19 刘祖江 A kind of unit assembled prestressing force Multidirectional displacement bridge expansion device and installation method
CN109338877A (en) * 2018-12-10 2019-02-15 重庆交通大学 A kind of fast changeable precast bridge expansion gap device and its mounting structure
CN110593091A (en) * 2019-10-16 2019-12-20 中国十七冶集团有限公司 Precast block for bridge expansion joint and use method thereof
CN111809513A (en) * 2020-07-24 2020-10-23 中国十七冶集团有限公司 Expansion joint levelness adjusting device and method

Similar Documents

Publication Publication Date Title
CN102852066A (en) Precise installation method for expansion joint of concrete roadway type steel
CN105755915B (en) The plate-type unballasted track bed plate construction methods of CRTS III
CN101063289B (en) City-rail steel spring floating slab rail bed railroad switch construction method
CN107059667A (en) Door shape assembled armored concrete box culvert and its construction method
CN109610263B (en) Construction method of assembled construction access road
CN104005313B (en) Asphalt concrete pavement dividing strip road kerb construction method
CN103321111B (en) Streetcar track connects the construction method of paving
CN111074943A (en) Construction method for integrally casting inspection well shaping steel mould in situ
CN102704948A (en) Formworking jumbo construction process for long and large box culvert
JP4934779B2 (en) Boarding / exit structure and boarding / exiting method
JP5958907B2 (en) Partial restoration method for existing concrete slabs
KR20090070852A (en) Method and apparatus for constructing boader stones between footway and roadway
KR101593998B1 (en) Expansion joint maintenance facility and using the repair method
CN102071612B (en) Method for constructing arched uneven pavement slab
KR101705141B1 (en) Improved technique of railway track ballast operation
CN108625262B (en) Stud and construction method for fine adjustment of lifting height of pavement formwork of stud
KR100967180B1 (en) Precast concrete panel for pavement, paving method and paving repairing method using lifting bag
JP2019077986A (en) Installation state adjustment mechanism for road bed module of paved road structure
CN114562129A (en) Trinity reinforcing method for basement roof on crawler crane
KR101524272B1 (en) A repairing assembled structure precast-manhole and constructing method it
CN111917092A (en) Reinforced resin material assembled cable trench structure and manufacturing method thereof
CN112252176A (en) Expansion joint device and construction method thereof
KR101756965B1 (en) Height adjusting type maintanable rail track construction method and maintanance method using the same
CN111549652B (en) Construction method for preventing expansion joint vehicle jumping of prefabricated section beam
CN212153025U (en) Track supporting structure of bridge deck full-width paver

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130102